SlideShare a Scribd company logo
1 of 14
Download to read offline
CV17832925 :‫اﻟﻤﺮﺟﻌﻲ‬ ‫اﻟﺮﻗﻢ‬ 2015-02-22 :‫ﻓﺎﻋﻠﻴﺔ‬ ‫آﺧﺮ‬
‫ﻋﻠﻰ‬ ‫ﻋﺒﺪاﻟﻤﺠﻴﺪ‬
company contracting Alayuni ‫ﻓﻲ‬ Engineer Planning
‫اﻟﺴﻌﻮدﻳﺔ‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻟﻤﻤﻠﻜﺔ‬ ,‫اﻟﺮﻳﺎض‬
‫اﻻﺗﺼﺎل‬ ‫ﻣﻌﻠﻮﻣﺎت‬
:‫اﻹﻟﻜﺘﺮوﻧﻲ‬ ‫اﻟﺒﺮﻳﺪ‬geedo0609@gmail.com
:‫اﻟﺠﻮال‬ ‫اﻟﻬﺎﺗﻒ‬ ‫رﻗﻢ‬+966.544076565
:‫اﻟﻨﻬﺎر‬ ‫أﺛﻨﺎء‬ ‫ﻟﻼﺗﺼﺎل‬ ‫ﻫﺎﺗﻒ‬+966.544076565
:‫اﻟﻤﺴﺎء‬ ‫أﺛﻨﺎء‬ ‫ﻟﻼﺗﺼﺎل‬ ‫ﻫﺎﺗﻒ‬+966.544076565
:‫اﻟﻌﻨﻮان‬‫اﻟﻘﺎﻫﺮة‬ - ‫ﻣﺼﺮ‬
‫اﻟﺮﻳﺎض‬ - ‫اﻟﺴﻌﻮدﻳﺔ‬
:‫اﻟﺒﺮﻳﺪ‬ ‫ﺻﻨﺪوق‬4727
‫اﻟﺒﺮﻳﺪي‬ ‫اﻟﺮﻣﺰ‬11412
:‫اﻟﻔﺎﻛﺲ‬ ‫رﻗﻢ‬+966.112160031
‫اﻟﻤﺮﻏﻮﺑﺔ‬ ‫اﻟﻮﻇﻴﻔﺔ‬
:‫اﻟﻤﺮﻏﻮﺑﺔ‬ ‫ﻟﻠﻮﻇﻴﻔﺔ‬ ‫اﻟﻮﻇﻴﻔﻲ‬ ‫اﻟﻠﻘﺐ‬Planning ENGINEER
:‫اﻟﻤﻬﻨﻲ‬ ‫اﻟﻤﺴﺘﻮى‬‫إدارة‬
:‫اﻟﻤﻬﻨﻲ‬ ‫اﻟﻬﺪف‬PROJECT MANAGEMENT OFFICE ( PMO)
1- Processing schedule as soon as you are finished selecting the main stages of the
project using Primavera:- ---Estimate the length of time for each task and the work of
the critical path -Estimate the resources required for each task, availability and
productivity rates.
-Estimate, monitor, predicts and reports project cost.
-Estimate the impact of change, enables and decouments the changes decision and
integrates the change into the project scope of work
-Plans project activities,monitors completion of those activities, predicts timing of
future activites and reports schedule status. 2- Add schedules to subcontractors to
the main schedule of the project and ensure their commitment to the time specified
stages them to the project.
3- Sort responsibilities of the project in coordination with the Project Manager and the
General Administration of finance and accounting to develop technical way to ensure
the safety of cash flow in all phases of the project. 4- Reliability clarify the
relationships between tasks and activities in order with the project manager.
5-Develops the overall project controls system.
6-Integrates Engineering, Construction and start-up controls system including: cost,
schedule andchange management.
7-Manages the change decision process foe engineering design.
7-Receves, analyzes and integrates cost and schedule reports from engineering
design, construction and start-up
8-Reports status and variation from plan to the project on periodic basis 9- Determine
the risk of the project with the calculation of risk-based budget with the project
manager, with the analysis of the relationships between the various elements of the
project (cost -
1/14
duration - Scope of Work - Quality - Resources - Safety and Security) and calculate
the risk factor.
10-Updated work schedule for the project with the completion of the project account
and follow-up reports in the project workflow.
:‫اﻟﻤﺮﻏﻮب‬ ‫اﻟﻘﻄﺎع‬‫اﻟﻤﺪﻧﻴﻪ‬ ‫اﻟﻬﻨﺪﺳﻪ‬ ‫و‬ ‫اﻟﺒﻨﺎء‬ ;‫وﺗﺸﻴﻴﺪ‬ ‫ﺑﻨﺎء‬
:‫اﻟﺘﻮﻇﻴﻒ‬ ‫ﻧﻮع‬‫ﻣﺘﻌﺎﻗﺪ‬
:‫اﻟﻮﻇﻴﻔﻴﺔ‬ ‫اﻟﺤﺎﻟﺔ‬‫ﻛﺎﻣﻞ‬ ‫دوام‬
:‫اﻟﻤﻄﻠﻮب‬ ‫اﻟﺸﻬﺮي‬ ‫اﻟﺮاﺗﺐ‬USD 5,000
:‫اﻹﺷﻌﺎر‬ ‫ﻓﺘﺮة‬‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ 1
: ‫ﺷﻬﺮي‬ ‫راﺗﺐ‬ ‫آﺧﺮ‬USD 5,000
‫اﻟﺸﺨﺼﻴﺔ‬ ‫اﻟﻤﻌﻠﻮﻣﺎت‬
:‫اﻟﻤﻴﻼد‬ ‫ﺗﺎرﻳﺦ‬28) :‫)اﻟﻌﻤﺮ‬ 1986 ‫ﺳﺒﺘﻤﺒﺮ‬ 6
:‫اﻟﺠﻨﺲ‬‫ذﻛﺮ‬
:‫اﻟﺠﻨﺴﻴﺔ‬‫ﻣﺼﺮ‬
:‫اﻹﻗﺎﻣﺔ‬ ‫ﺑﻠﺪ‬‫اﻟﺴﻌﻮدﻳﺔ‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻟﻤﻤﻠﻜﺔ‬ ,‫اﻟﺮﻳﺎض‬
:‫اﻟﺘﺄﺷﻴﺮة‬ ‫ﺣﺎﻟﺔ‬(‫ﻟﻠﺘﺤﻮﻳﻞ‬ ‫)ﻗﺎﺑﻠﺔ‬ ‫إﻗﺎﻣﺔ‬ ‫ﺗﺄﺷﻴﺮة‬
:‫اﻟﻤﻌﺎﻟﻴﻦ‬ ‫ﻋﺪد‬1
:‫ﻣﻦ‬ ‫ﺻﺎدرة‬ ‫اﻟﺴﻴﺎﻗﺔ‬ ‫رﺧﺼﺔ‬‫اﻟﺴﻌﻮدﻳﺔ‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻟﻤﻤﻠﻜﺔ‬ ;‫اﻟﻤﺘﺤﺪة‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻹﻣﺎرات‬ ;‫ﻣﺼﺮ‬
(‫أﺷﻬﺮ‬ 8 ,‫ﺳﻨﻮات‬ (6 ‫اﻟﺨﺒﺮة‬
Planning Engineer
company contracting Alayuni ‫ﻓﻲ‬
‫اﻟﺴﻌﻮدﻳﺔ‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻟﻤﻤﻠﻜﺔ‬ ,‫اﻟﺮﻳﺎض‬ :‫اﻟﻤﻮﻗﻊ‬
‫اﻟﻤﺪﻧﻴﻪ‬ ‫اﻟﻬﻨﺪﺳﻪ‬ ‫و‬ ‫اﻟﺒﻨﺎء‬ :‫اﻟﺸﺮﻛﺔ‬ ‫ﻗﻄﺎع‬
‫اﻹدارة‬ :‫اﻟﻮﻇﻴﻔﻲ‬ ‫اﻟﺪور‬
Present - 2015 ‫ﻓﺒﺮاﻳﺮ‬
1. Plan and schedule the project by developing a project master schedule in line with the proposal
requirements through the application of the primavera P6 software.
2. Indentify the project deliverables, milestones, and required tasks and targets to determine the staffing
requirements, and allotment of available resources to various phases of the project through the project
measurement system.
3. Implement the work schedule and monitor progress of the work for timely execution of the project
through daily/weekly/monthly/ reports with respect to review of the overall project.
4. Progress monitoring of specific projects on a regular basis. Anticipate and resolve any problems,
bottlenecks/scheduling conflicts. Prepare and maintain package work plans and monitor progress to
achieve on time or earlier deliveries to keep the project on schedule.
5. Co‐ordinate internal project team reviews followed by an approval and review by the client of the work
schedule, progress measurement and reporting systems. Review status reports, modify schedules and
plans as required and keep the management and Project director apprised of the progress on a regular
basis.
6. Ensure that project controls documents such as resources histogram, schedules, reporting systems,
material controls systems, etc. are fully developed by the designated personnel and reviewed by
Construction Management and that Engineering and Procurement interfaces are properly addressed.
7. Perform any other duties and responsibilities as and when directed by the Supervisor.
Planning Engineer
COMPANY CONSTRUCTION ALMOBTY ‫ﻓﻲ‬
‫اﻟﺴﻌﻮدﻳﺔ‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻟﻤﻤﻠﻜﺔ‬ ,‫اﻟﺮﻳﺎض‬ :‫اﻟﻤﻮﻗﻊ‬
‫اﻟﻤﺪﻧﻴﻪ‬ ‫اﻟﻬﻨﺪﺳﻪ‬ ‫و‬ ‫اﻟﺒﻨﺎء‬ :‫اﻟﺸﺮﻛﺔ‬ ‫ﻗﻄﺎع‬
‫اﻟﻬﻨﺪﺳﺔ‬ :‫اﻟﻮﻇﻴﻔﻲ‬ ‫اﻟﺪور‬
2/14
2015 ‫ﻳﻨﺎﻳﺮ‬ - 2013 ‫ﺳﺒﺘﻤﺒﺮ‬
At AL-MOBTY COMPANY FOR CONTRACTING IN SAUDI ARABIA IN RIYADH From 1 /10 / 2013 UP TILL NOW.
PROJECT MANAGEMENT OFFICE ( PMO)
1- Processing schedule as soon as you are finished selecting the main stages of the project using Primavera:- -Restructuring
of the phases of the project and detailed tasks -Determine the reliability Relations between all phases and tasks -Estimate
the length of time for each task and the work of the critical path -Estimate the resources required for each task, availability
and productivity rates.
-Estimate, monitor, predicts and reports project cost.
-Estimate the impact of change, enables and decouments the changes decision and integrates the change into the project
scope of work
-Plans project activities,monitors completion of those activities, predicts timing of future activites and reports schedule
status. 2- Add schedules to subcontractors to the main schedule of the project and ensure their commitment to the time
specified stages them to the project.
3- Sort responsibilities of the project in coordination with the Project Manager and the General Administration of finance and
accounting to develop technical way to ensure the safety of cash flow in all phases of the project. 4- Reliability clarify the
relationships between tasks and activities in order with the project manager.
5-Develops the overall project controls system.
6-Integrates Engineering, Construction and start-up controls system including: cost, schedule andchange management.
7-Manages the change decision process foe engineering design.
7-Receves, analyzes and integrates cost and schedule reports from engineering design, construction and start-up
8-Reports status and variation from plan to the project on periodic basis 9- Determine the risk of the project with the
calculation of risk-based budget with the project manager, with the analysis of the relationships between the various
elements of the project (cost -
duration - Scope of Work - Quality - Resources - Safety and Security) and calculate the risk factor.
10-Updated work schedule for the project with the completion of the project account and follow-up reports in the project
workflow..
‫ﺗﻮﺻﻴﺎت‬ 1 ‫ﺗﻠﻘﻰ‬ ‫ﻋﺒﺪاﻟﻤﺠﻴﺪ‬
‫ﻃﻤﻮﺣﺎﺗﻪ‬ ‫ﺗﺤﻘﻴﻖ‬ ‫اﻟﻰ‬ ‫ﻳﺆﻫﻠﻪ‬ ‫ﻣﺎﻫﻮ‬ ‫اﻟﻘﺪرات‬ ‫ﻣﻦ‬ ‫وﻟﺪﻳﻪ‬ ‫واﻟﻜﻔﺎءة‬ ‫ﺑﺎﻟﺼﺒﺮ‬ ‫وﻳﺘﺤﻠﻰ‬ ‫ﻋﻤﻠﻪ‬ ‫ﻓﻰ‬ ‫ﺟﺪا‬ ‫وذﻛﻰ‬ ‫وﻣﺠﺘﻬﺪ‬ ‫ودؤؤب‬ ‫ودﻗﻴﻖ‬ ‫وﻣﻨﻈﻢ‬ ‫ﻣﻤﺘﺎز‬ ‫وﻋﻤﻠﻴﺎ‬ ‫اﺧﻼﻗﻴﺎ‬ ‫ﺟﺪا‬ ‫ﺟﻴﺪ‬ ‫ﺷﺨﺺ‬
‫ﺗﺤﻘﻴﻖ‬ ‫اﻟﻰ‬ ‫ﻳﺆﻫﻠﻪ‬ ‫ﻣﺎﻫﻮ‬ ‫اﻟﻘﺪرات‬ ‫ﻣﻦ‬ ‫وﻟﺪﻳﻪ‬ ‫واﻟﻜﻔﺎءة‬ ‫ﺑﺎﻟﺼﺒﺮ‬ ‫وﻳﺘﺤﻠﻰ‬ ‫ﻋﻤﻠﻪ‬ ‫ﻓﻰ‬ ‫ﺟﺪا‬ ‫وذﻛﻰ‬ ‫وﻣﺠﺘﻬﺪ‬ ‫ودؤؤب‬ ‫ودﻗﻴﻖ‬ ‫وﻣﻨﻈﻢ‬ ‫ﻣﻤﺘﺎز‬ ‫وﻋﻤﻠﻴﺎ‬ ‫اﺧﻼﻗﻴﺎ‬ ‫ﺟﺪا‬ ‫ﺟﻴﺪ‬ ‫ﺷﺨﺺ‬ ‫اﻟﻤﺰﻳﺪ‬ ‫ﻋﺮض‬ ...‫ﻟﻞ‬ ‫ﺑﺎﻟﻨﺴﺒﺔ‬ ‫اﻣﺎ‬
‫ﻣﻘﺘﻀﺐ‬ ‫ﻋﺮض‬ ‫اﻟﻌﻤﻞ‬ ‫وﺧﺎرج‬ ‫اﻟﻌﻤﻞ‬ ‫ﻓﻰ‬ ‫زﻣﻼءه‬ ‫ﺑﻴﻦ‬ ‫ﻣﻦ‬ ‫وﻣﺤﺒﻮﺑﺔ‬ ‫ﻣﺘﻮاﺿﻌﺔ‬ ‫ﺷﺨﺼﻴﺔ‬ ‫ﻓﻬﻮ‬ ‫اﻻﻧﺴﺎﻧﻴﺔ‬ ‫ﻟﻠﻌﻼﻗﺎت‬ ‫ﺑﺎﻟﻨﺴﺒﺔ‬ ‫اﻣﺎ‬ ‫ﻃﻤﻮﺣﺎﺗﻪ‬
May-27-2014 ‫ﺑﺘﺎرﻳﺦ‬ (Subordinate) KHALIFA HASSAN FADY ‫ﻣﻦ‬
Structural Engineer
ARABIA SAUDI IN CONSULTENCYCOMPANY ENGINEERING& FOR SAKAN At ‫ﻓﻲ‬
ARABIA SAUDI IN CONSULTENCYCOMPANY ENGINEERING& FOR SAKAN At , ‫اﻟﺴﻌﻮدﻳﺔ‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻟﻤﻤﻠﻜﺔ‬ ,‫ﺗﺒﻮك‬ :‫اﻟﻤﻮﻗﻊ‬
‫اﻟﻤﺪﻧﻴﻪ‬ ‫اﻟﻬﻨﺪﺳﻪ‬ ‫و‬ ‫اﻟﺒﻨﺎء‬ :‫اﻟﺸﺮﻛﺔ‬ ‫ﻗﻄﺎع‬
‫اﻟﻬﻨﺪﺳﺔ‬ :‫اﻟﻮﻇﻴﻔﻲ‬ ‫اﻟﺪور‬
2012 ‫دﻳﺴﻤﺒﺮ‬ - 2011 ‫اﺑﺮﻳﻞ‬
1-Technical site engineer in TABUKCity
2-Planner Engineer for construction building-schduling&updating in this company
3-Design of the construction of the foundation of the building
4-Design of the construction of steel and concrete columns with glass facade in TABUK City
Planner Engineer
EMIRITES ARAB UNITED IN COMPANY DEVELOPMNT CONSTUCTION& FOR ABERY At ‫ﻓﻲ‬
EMIRITES ARAB UNITED IN COMPANY DEVELOPMNT CONSTUCTION& FOR ABERY At , ‫اﻟﻤﺘﺤﺪة‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻹﻣﺎرات‬ ,‫ﻇﺒﻲ‬ ‫أﺑﻮ‬ :‫اﻟﻤﻮﻗﻊ‬
‫اﻟﻤﺪﻧﻴﻪ‬ ‫اﻟﻬﻨﺪﺳﻪ‬ ‫و‬ ‫اﻟﺒﻨﺎء‬ :‫اﻟﺸﺮﻛﺔ‬ ‫ﻗﻄﺎع‬
‫اﻟﻬﻨﺪﺳﺔ‬ :‫اﻟﻮﻇﻴﻔﻲ‬ ‫اﻟﺪور‬
2011 ‫ﻣﺎرس‬ - 2010 ‫اﺑﺮﻳﻞ‬
1-Technical site engineer in Zayed Military City
2-Planner Engineer for construction building-schduling&updating in this company
3/14
3-Design of the construction of the foundation of the building
4-Design of the construction of steel and concrete columns with glass facade in Zayed Military City
‫ﺗﻮﺻﻴﺎت‬ 1 ‫ﺗﻠﻘﻰ‬ ‫ﻋﺒﺪاﻟﻤﺠﻴﺪ‬
Avery good planner engineer
August-21-2013 ‫ﺑﺘﺎرﻳﺦ‬ (Manager) Neveen shawky ali sheiha ‫ﻣﻦ‬
Civil Engineer
EGYPT. IN COMPANY BRIDGES & ROADS FOR WORKS NILE GENERAL ‫ﻓﻲ‬
EGYPT. IN COMPANY BRIDGES & ROADS FOR WORKS NILE GENERAL , ‫ﻣﺼﺮ‬ :‫اﻟﻤﻮﻗﻊ‬
‫اﻟﻤﺪﻧﻴﻪ‬ ‫اﻟﻬﻨﺪﺳﻪ‬ ‫و‬ ‫اﻟﺒﻨﺎء‬ :‫اﻟﺸﺮﻛﺔ‬ ‫ﻗﻄﺎع‬
‫اﻟﻬﻨﺪﺳﺔ‬ :‫اﻟﻮﻇﻴﻔﻲ‬ ‫اﻟﺪور‬
2010 ‫اﺑﺮﻳﻞ‬ - 2009 ‫اﻏﺴﻄﺲ‬
1. Site engineer At Bridge of Aswan Project.
The Egyptian Government is the owner.
1- Supervisor of the Construction Of the mechanical workshop (Steel Structure building).
2- Supervisor of the Construction Of the aggregate shed (Steel Structure).
3- Supervisor of the Construction Of two Patch Plants (two ELBA & one Stetter).
4- Participating in the Construction Of The foundation of The Bridge.
‫أﺷﻬﺮ‬ 0 ,‫ﺳﻨﻮات‬ 2 ‫ﻳﻮﺟﺪ‬ ‫ﻻ‬ :‫أﻋﻼه‬ ‫ﻣﺬﻛﻮرة‬ ‫ﻏﻴﺮ‬ ‫إﺿﺎﻓﻴﺔ‬ ‫ﺧﺒﺮة‬ ‫ﺳﻨﻮات‬
‫اﻟﺘﻌﻠﻴﻢ‬
MANAGEMENT PROJECT ENGINEERING , ‫ﻋﺎﻟﻲ‬ ‫دﺑﻠﻮم‬ /‫ﺑﻜﺎﻟﻮرﻳﻮس‬
BERLIN TU ( BERLIN IN UNIVERSITY (TECHNICAL ‫ﻓﻲ‬
‫أﻟﻤﺎﻧﻴﺎ‬ BERLIN :‫اﻟﻤﻮﻗﻊ‬
2013 ‫ﻳﻮﻧﻴﻮ‬
100 ‫ﻣﻦ‬ 76 :‫اﻟﻤﻌﺪل‬
1- PROJECTS & PROJECT MANAGEMENT
2-VALUE MANAGEMENT
3-PROJECT APPRAISAL & RISK MANAGEMENT
4-PROJECT MANAGEMENT & QUALITY
5- ENVIRONMENTAL MAAGEMENT
6- PROJECT FINANCE
7- COST ESTIMATING IN CONTRACTS AND PROJECTS
8- PROJECT STAKEHOLDERS
9- PLANNING
10- PROJECT CONTROL USING EARNED VALUE TECHNIQUES
11- CONTRACT STRATEGY ANDAND THE CONTRACTOR SELECTION PROCESS
12- CONTRACT POLICY AND DECOUMENTS
13- PROJECT ORGANISATION DESIGN / STRUCTURE
14- DESIGN MANAGEMENT
15- SUPPLY CHAIN MANAGEMENT
17- PRIVATE FINANCE INITIATIVE AND PUBLIC PRIVATE PARTENERSHIPS
Engineering Civil , ‫ﻋﺎﻟﻲ‬ ‫دﺑﻠﻮم‬ /‫ﺑﻜﺎﻟﻮرﻳﻮس‬
Cairo in University American ‫ﻓﻲ‬
4/14
‫ﻣﺼﺮ‬ ‫اﻟﻘﺎﻫﺮة‬ :‫اﻟﻤﻮﻗﻊ‬
2009 ‫ﻣﺎﻳﻮ‬
100 ‫ﻣﻦ‬ 77 :‫اﻟﻤﻌﺪل‬
The Professional Programme in Project Management
Primavera project management (p6 for windows
Project planning and control techniques ( CPM -PERT-LOB ):
Management of project resources ( Material-Money-Manpower-Machine ). :
Project budgeting and financial control ( Cashflow-Cashin-Cashout ) .
Project bids and contracts ( FIDIC-SBD-OECF-EPC -ADR-Law no 89 ).
Risk management (Risk Identification-Risk Allocations-Qualitative & Quantitative Risk analysis)
Computer-Aided Graphics (AutoCAD 2D&3D
Computer Aided Structural Analysis for Civil Engineers &Modeling and Analysis
Building (sap 2000-safe-etabs-allpiles-plaxis)
Microcomputer engineering applications: electronic spread sheets
Design of Reinforced and steel structers using excel
‫اﻟﺘﺨﺼﺼﺎت‬
0 :‫أﺟﻮﺑﺔ‬ 0 :‫أﺳﺌﻠﺔ‬ P6 ‫ﺑﺮﻳﻤﺎﻓﻴﺮا‬
0 :‫أﺟﻮﺑﺔ‬ 0 :‫أﺳﺌﻠﺔ‬ ‫ﻣﻬﻴﻜﻞ‬ ‫ﺗﺤﻠﻴﻞ‬
0 :‫أﺟﻮﺑﺔ‬ 0 :‫أﺳﺌﻠﺔ‬ ‫اﻟﻌﻄﺎءات‬ ‫إدارة‬
0 :‫أﺟﻮﺑﺔ‬ 0 :‫أﺳﺌﻠﺔ‬ ‫اﻟﺘﻜﺎﻟﻴﻒ‬ ‫ﻓﻲ‬ ‫اﻟﺘﺤﻜﻢ‬
0 :‫أﺟﻮﺑﺔ‬ 0 :‫أﺳﺌﻠﺔ‬ ‫اﻟﺒﻨﺎء‬ ‫إدارة‬
‫اﻟﻤﻬﺎرات‬
(Structural ENGINEER (DESIGN
‫أﻗﻞ‬ ‫أو‬ ‫أﺷﻬﺮ‬ ‫ﺳﺘﺔ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫ﺳﻨﻮات‬ ‫ﺧﻤﺲ‬ ‫ﻣﻦ‬ ‫أﻗﻞ‬ :‫اﻟﺨﺒﺮة‬ | ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬
PLANNING ENGINEER - (COST CONTROL - PMO - Primavera project management (p6
‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫ﺳﻨﻮات‬ ‫ﻋﺸﺮ‬ ‫ﻣﻦ‬ ‫أﻗﻞ‬ :‫اﻟﺨﺒﺮة‬ | ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬
The Professional Programme in Project Management
‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫ﺳﻨﻮات‬ ‫ﻋﺸﺮ‬ ‫ﻣﻦ‬ ‫أﻗﻞ‬ :‫اﻟﺨﺒﺮة‬ | ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬
Project budgeting and financial control ( Cashflow-Cashin-Cashout ) .
‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫ﺳﻨﻮات‬ ‫ﻋﺸﺮ‬ ‫ﻣﻦ‬ ‫أﻗﻞ‬ :‫اﻟﺨﺒﺮة‬ | ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬
Management of project resources ( Material-Money-Manpower-Machine ). :
‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫ﺳﻨﻮات‬ ‫ﻋﺸﺮ‬ ‫ﻣﻦ‬ ‫أﻗﻞ‬ :‫اﻟﺨﺒﺮة‬ | ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬
Risk management (Risk Identification-Risk Allocations-Qualitative & Quantitative Risk
analysis).
‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫ﺳﻨﻮات‬ ‫ﻋﺸﺮ‬ ‫ﻣﻦ‬ ‫أﻗﻞ‬ :‫اﻟﺨﺒﺮة‬ | ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬
‫اﻟﻠﻐﺎت‬
‫اﻻﻟﻤﺎﻧﻴﺔ‬
‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫أﻗﻞ‬ ‫أو‬ ‫أﺷﻬﺮ‬ ‫ﺳﺘﺔ‬ :‫اﻟﺨﺒﺮة‬ | ‫ﻣﺒﺘﺪئ‬ :‫اﻟﻤﺴﺘﻮى‬
‫اﻟﻌﺮﺑﻴﺔ‬
‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫ﺳﻨﻮات‬ ‫ﻋﺸﺮ‬ ‫ﻣﻦ‬ ‫أﻛﺜﺮ‬ :‫اﻟﺨﺒﺮة‬ | ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬
5/14
‫اﻻﻧﺠﻠﻴﺰﻳﺔ‬
‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬
‫اﻟﻤﻌﺮﻓﻮن‬
Abdelmeguid Ali
planning engineer :‫اﻟﻮﻇﻴﻔﻲ‬ ‫ّﻰ‬‫ﻤ‬‫اﻟﻤﺴ‬
almobty construction company :‫اﻟﺸﺮﻛﺔ‬ ‫اﺳﻢ‬
+966.545549765 :‫اﻟﻬﺎﺗﻒ‬ ‫رﻗﻢ‬
geedo0609@gmail.com :‫اﻹﻟﻜﺘﺮوﻧﻲ‬ ‫اﻟﺒﺮﻳﺪ‬
‫اﻟﻌﻀﻮﻳﺎت‬
‫ﺑﺎﻟﺮﻳﺎض‬ ‫اﻟﻤﺼﺮﻳﻴﻦ‬ ‫اﻟﻤﻬﻨﺪﺳﻴﻦ‬ ‫ﺟﻤﻌﻴﺔ‬
‫ﻣﺸﺘﺮك‬ ‫ﻋﻀﻮ‬ :‫اﻟﻌﻀﻮﻳﺔ/اﻟﺪور‬
2015 ‫ﻣﺎﻳﻮ‬ :‫ﻣﻨﺬ‬ ‫ﻋﻀﻮ‬
‫اﻟﺸﻬﺎدات‬ ‫و‬ ‫اﻟﺘﺪرﻳﺐ‬
(‫)ﺷﻬﺎدة‬Excellent
2033 ‫اﻏﺴﻄﺲ‬ :‫ﻟﻐﺎﻳﺔ‬ ‫ﺻﺎﻟﺤﺔ‬ 2008 ‫ﻳﻮﻟﻴﻮ‬ :‫ﻓﻲ‬ ‫ﺻﺪرت‬
‫اﻟﺨﺒﺮة‬ ‫ﻋﻠﻰ‬ ً ‫ﺑﻨﺎء‬ ‫ﺗﻮﺻﻴﺎت‬
As Planning Engineer - ALMOBTY CONSTRUCTION COMPANY
‫ﺗﺤﻘﻴﻖ‬ ‫اﻟﻰ‬ ‫ﻳﺆﻫﻠﻪ‬ ‫ﻣﺎﻫﻮ‬ ‫اﻟﻘﺪرات‬ ‫ﻣﻦ‬ ‫وﻟﺪﻳﻪ‬ ‫واﻟﻜﻔﺎءة‬ ‫ﺑﺎﻟﺼﺒﺮ‬ ‫وﻳﺘﺤﻠﻰ‬ ‫ﻋﻤﻠﻪ‬ ‫ﻓﻰ‬ ‫ﺟﺪا‬ ‫وذﻛﻰ‬ ‫وﻣﺠﺘﻬﺪ‬ ‫ودؤؤب‬ ‫ودﻗﻴﻖ‬ ‫وﻣﻨﻈﻢ‬ ‫ﻣﻤﺘﺎز‬ ‫وﻋﻤﻠﻴﺎ‬ ‫اﺧﻼﻗﻴﺎ‬ ‫ﺟﺪا‬ ‫ﺟﻴﺪ‬ ‫ﺷﺨﺺ‬
‫اﻟﻌﻤﻞ‬ ‫وﺧﺎرج‬ ‫اﻟﻌﻤﻞ‬ ‫ﻓﻰ‬ ‫زﻣﻼءه‬ ‫ﺑﻴﻦ‬ ‫ﻣﻦ‬ ‫وﻣﺤﺒﻮﺑﺔ‬ ‫ﻣﺘﻮاﺿﻌﺔ‬ ‫ﺷﺨﺼﻴﺔ‬ ‫ﻓﻬﻮ‬ ‫اﻻﻧﺴﺎﻧﻴﺔ‬ ‫ﻟﻠﻌﻼﻗﺎت‬ ‫ﺑﺎﻟﻨﺴﺒﺔ‬ ‫اﻣﺎ‬ ‫ﻃﻤﻮﺣﺎﺗﻪ‬
May-27-2014 ‫ﺑﺘﺎرﻳﺦ‬ (Subordinate) ‫ﺧﻠﻴﻔﺔ‬ HASSAN FADY ‫ﻣﻦ‬
As Planner Engineer - At ABERY FOR CONSTUCTION& DEVELOPMNT COMPANY IN UNITED ARAB
EMIRITES
Avery good planner engineer
August-21-2013 ‫ﺑﺘﺎرﻳﺦ‬ (Manager) Neveen shawky ali sheiha ‫ﻣﻦ‬
‫اﻟﺬاﺗﻴﺔ‬ ‫ﻟﻠﺴﻴﺮة‬ ‫اﻷﺻﻠﻲ‬ ‫اﻟﻤﻠﻒ‬ ‫إرﻓﺎق‬
.‫اﻟﻤﻌﻠﻮﻣﺎت‬ ‫اﺳﺘﺨﺮاج‬ ‫ﻋﻤﻠﻴﺔ‬ ‫ﺧﻼل‬ ‫ﻳﺘﻐﻴﺮ‬ ‫اﻟﺘﺼﻤﻴﻢ‬ ‫أن‬ ‫اﻹﻋﺘﺒﺎر‬ ‫ﺑﻌﻴﻦ‬ ‫اﻷﺧﺬ‬ ‫ﻳﺮﺟﻰ‬ .‫اﻟﺬاﺗﻴﺔ‬ ‫ﺳﻴﺮﺗﻚ‬ ‫ﻣﻦ‬ ‫اﻟﺘﺎﻟﻴﺔ‬ ‫اﻟﻤﻌﻠﻮﻣﺎت‬ ‫اﺳﺘﺨﺮﺟﻨﺎ‬ ‫ﻟﻘﺪ‬
Last update: Last Login Date: Ref.: CV
Abdelemeguid Last name hidden
Planning Engineer at At AL-MOBTY COMPANY FOR
CONTRACTING IN SAUDI ARABIA IN RIYADH
Riyadh, Saudi Arabia
6/14
Target Job
Target Job Title: Structural Engineer
Target Job Location: Jeddah, Saudi Arabia; Riyadh, Saudi Arabia
Career Objective: at GENERAL NILE WORKS FOR ROADS & BRIDGES COMPANY IN EGYPT. From 1
/ 8 /
2009 - till 1 / 4/ 2010.
1. Site engineer At Bridge of Aswan Project.
The Egyptian Government is the owner.
1- Supervisor of the Construction Of the mechanical workshop (Steel Structure
building).
2- Supervisor of the Construction Of the aggregate shed (Steel Structure).
3- Supervisor of the Construction Of two Patch Plants (two ELBA & one Stetter).
4- Participating in the Construction Of The foundation of The Bridge.
At ABERY FOR CONSTUCTION& DEVELOPMNT COMPANY IN UNITED ARAB EMIRITES
From 20 /4 / 2010 UP 1/3/2011.
1-Technical site engineer in Zayed Military City
2-Planner Engineer for construction building-schduling&updating in this company
3-Design of the construction of the foundation of the building
4-Design of the construction of steel and concrete columns with glass facade in
Zayed Military City
At SAKAN FOR ENGINEERING& CONSULTENCYCOMPANY IN SAUDI ARABIA From 1 /4 /
2011 UP 31/12/2012.
1- Structural design of a school in a way computer-aided structural analysis of
Civil
Engineers, modeling and analysis Building (SAP 2000 in TABUKCity
2- Supervising the projects of the Ministry of Interior and the receipt of all
business
entrusted to him
3- Technical work of the office where you work amounts inventory of projects and the
Ministry of the Interior and prepare drawings implementation and preparation of
extracts Contractors
4- Preparing schedules for these projects with follow-up schedules for contractors
5- The preparation of bids and tenders for projects and the Ministry of the Interior
with the work schedules of quantities and engineering specifications for
construction
and architectural work
At AL-MOBTY COMPANY FOR CONTRACTING IN SAUDI ARABIA IN RIYADH From 1 /10 /
2013 UP TILL NOW.
PROJECT MANAGEMENT OFFICE ( PMO)
1/7
7/14
1- Processing schedule as soon as you are finished selecting the main stages of the
project using Primavera:-
Employment Type: Employee
Employment Status: Full time
Target Monthly Salary: USD 5,000
Career Level: Mid Career
Notice Period: Immediately
Last Monthly Salary : USD 4,000
Personal Information
Birth Date: 6 September 1986 (Age: 27)
Gender: Male
Nationality: Egypt
Visa Status: Residency Visa (Transferable)
Marital Status: Single
Number of Dependents: 1
Driving License Issued From: Egypt; United Arab Emirates
Contact Information
Email Address:
Mobile Phone: +966.
Day-time Phone: +966.
Evening-time Phone: +966.
Address: Egypt
Saudi Arabia
Country: Riyadh, Saudi Arabia
P. O. Box: 7705
Zip/Postal Code 11472
Experience (4 Years, 1 Month)
Planning Engineer
at At AL-MOBTY COMPANY FOR CONTRACTING IN SAUDI ARABIA IN RIYADH
Location: Riyadh, Saudi Arabia, ALAMLAZ
Company Industry: Construction/Civil Engineering
Job Role: Engineering
September 2013 - Present
PROJECT MANAGEMENT OFFICE ( PMO)
1- Processing schedule as soon as you are finished selecting the main stages of the
project using Primavera:- -Restructuring
of the phases of the project and detailed tasks -Determine the reliability Relations
between all phases and tasks -Estimate
the length of time for each task and the work of the critical path -Estimate the
resources required for each task, availability
and productivity rates.
-Estimate, monitor, predicts and reports project cost.
-Estimate the impact of change, enables and decouments the changes decision and
integrates the change into the project
8/14
scope of work
-Plans project activities, monitors completion of those activities, predicts timing
of future activites and reports schedule
status. 2- Add schedules to subcontractors to the main schedule of the project and
ensure their commitment to the time
specified stages them to the project.
3- Sort responsibilities of the project in coordination with the Project Manager and
the General Administration of finance and
accounting to develop technical way to ensure the safety of cash flow in all phases
of the project. 4- Reliability clarify the
relationships between tasks and activities in order with the project manager.
5-Develops the overall project controls system.
2/7
6-Integrates Engineering, Construction and start-up controls system including: cost,
schedule andchange management.
7-Manages the change decision process foe engineering design.
7-Receves, analyzes and integrates cost and schedule reports from engineering design,
construction and start-up
8-Reports status and variation from plan to the project on periodic basis 9-
Determine the risk of the project with the
calculation of risk-based budget with the project manager, with the analysis of the
relationships between the various
elements of the project (cost -
duration - Scope of Work - Quality - Resources - Safety and Security) and calculate
the risk factor.
10-Updated work schedule for the project with the completion of the project account
and follow-up reports in the project
workflow
Structural Engineer
at SAKAN FOR ENGINEERING& CONSULTENCYCOMPANY IN SAUDI ARABIA From 1 /4 / 2011 UP
31/12/2012.
Location: Tabouk, Saudi Arabia, At SAKAN FOR ENGINEERING& CONSULTENCYCOMPANY IN
SAUDI ARABIA
Company Industry: Construction/Civil Engineering
Job Role: Engineering
March 2011 - December 2012
1- Structural design of a school in a way computer-aided structural analysis of
Civil Engineers, modeling and analysis
Building (SAP 2000 in TABUKCity
2- Supervising the projects of the Ministry of Interior and the receipt of all
business entrusted to him
3- Technical work of the office where you work amounts inventory of projects and the
Ministry of the Interior and prepare
drawings implementation and preparation of extracts Contractors
4- Preparing schedules for these projects with follow-up schedules for contractors
5- The preparation of bids and tenders for projects and the Ministry of the Interior
with the work schedules of quantities and
engineering specifications for construction and architectural work
Planner Engineer
9/14
at ABERY FOR CONSTUCTION& DEVELOPMNT COMPANY IN UNITED ARAB EMIRITES From 20 /4 /
2010 UP 1/3/2011.
Location: Abu Dhabi, United Arab Emirates, At ABERY FOR CONSTUCTION& DEVELOPMNT
COMPANY IN UNITED ARAB
EMIRITES
Company Industry: Construction/Civil Engineering
Job Role: Engineering
April 2010 - March 2011
1-Technical site engineer in Zayed Military City
2-Planner Engineer for construction building-schduling&updating in this company
3-Design of the construction of the foundation of the building
4-Design of the construction of steel and concrete columns with glass facade in
Zayed Military City
Structural Engineer
at GENERAL NILE WORKS FOR ROADS & BRIDGES COMPANY IN EGYPT. From 1 / 8 / 2009 - till
1 / 4/ 2010.
Location: Cairo, Egypt, GENERAL NILE WORKS FOR ROADS & BRIDGES COMPANY IN EGYPT.
Company Industry: Construction/Civil Engineering
Job Role: Engineering
August 2009 - April 2010
1. Site engineer At Bridge of Aswan Project.
The Egyptian Government is the owner.
1- Supervisor of the Construction Of the mechanical workshop (Steel Structure
building).
2- Supervisor of the Construction Of the aggregate shed (Steel Structure).
3- Supervisor of the Construction Of two Patch Plants (two ELBA & one Stetter).
4- Participating in the Construction Of The foundation of The Bridge.
3/7
Education
Bachelor's degree / higher diploma, Structural Engineering and Construction
Mnagement
at the American University in Cairo
Location: Egypt
Completion Date : June 2009
Grade: Good
: Structural Engineering
Getting on: Computer-Aided Graphics (AutoCAD 2D&3D) from the American University.
: Primavera project management (p6 for windows) from The American University
:Computer Aided Structural Analysis for Civil Engineers &Modeling and Analysis
Building (sap 2000-safe-etabs-allpiles-plaxis) from The American University
:Microcomputer engineering applications: electronic spread sheets from The American
10/14
University.
Design of Reinforced and steel structers using excel from The American University .:
:Fundamental Engineering from the American University(FE)
: Diploma in
The Professional Programme in Project Management from The American University which
content on
Project planning and control techniques ( CPM -PERT-LOB ):
Management of project resources ( Material-Money-Manpower-Machine ). :
Project budgeting and financial control ( Cashflow-Cashin-Cashout ) .
Project bids and contracts ( FIDIC-SBD-OECF-EPC -ADR-Law no 89 ).
Risk management (Risk Identification-Risk Allocations-Qualitative & Quantitative
Risk analysis).
Skills
PMP
Level: Expert Experience: 5 years or less Last Used: 3 months or less
Languages
German
Level: Beginner Experience: 6 months or less Last Used: 1 month or less
English
Level: Expert Experience: 3 months or less Last Used: 1 month or less
Arabic
Level: Expert Experience: 3 months or less Last Used: 1 month or less
References
First name hidden Last name hidden
Job Title: Planning Engineer
Company Name: ALMOBTY CO. FOR CONTRACTING
Phone Number: +966.
Email Address:
Original CV Attachment
4/7
We have taken the following information from your CV; please keep in mind that all
11/14
formatting gets lost in the extraction
process.
First name hidden Last name hidden Last name hidden
Civil Engineering email:
Benha -Cairo-Egypt / RIYADH - SAUDI ARABIA
Mobile:
RESUME IN TEXT
Abd El Maguid Shawky Last name hidden Last name hidden. EGYPT - CAIRO -
QALUBIA-BENHA¬..
Email: *Personal Information Date of birth : 6 / 9 / 1986 Place of birth : Kafr
Shoker, Benha, Qalubia, Egypt. Marital Status : Single. Nationality : Egyptian.
*Education University Graduation: Shoubra Faculty of Engineering. Specialization:
Structural Engineering. Graduation Date: May 2009. Graduation Grade: Good.
Skill Name Last Used Experience Computer Aided Structural Analysis for Civil
Engineer 2008 2 Year(s) 6 Month(s) Primavera project management(p6 for windows) from
2008 2 Year(s) 6 Month(s) Computer-Aided Graphics ( autocade 2D&3D) from The 2008 2
Year(s) 6 Month(s)
Personal Details Nationality : Egyptian Date of Birth: September 06, 1986 Religion:
Islam Gender:Male Marital Status: Single Driving Licence Received from
ABUDHABI-Saudi Arabia-Egypt
Visa Status for Current Location Residence Visa-Company Sponsorship Mailing
Address:,
*Project Graduation Project: Design of Irrigation and Drainage System Net Works.
Graduation Project Grade: Excellent. *Training Places & courses Training: At
Petrojet Company. and training in The Arab Contactors Company in project development
road desert Cairo to Alex and transporting to free road. *Qualifications Getting on:
Computer-Aided Graphics (AutoCAD 2D&3D) from the American University. : Primavera
project management (p6 for windows) from The American University :Computer Aided
Structural Analysis for Civil Engineers &Modeling and Analysis Building (sap
2000-safe-etabs-allpiles-plaxis) from The American University :Microcomputer
engineering applications: electronic spread sheets from The American University.
Design of Reinforced and steel structers using excel from The American University .:
:Fundamental Engineering from the American University(FE) : Diploma in The
Professional Programme in Project Management from The American University which
content on Project planning and control techniques ( CPM -PERT-LOB ): Management of
project resources ( Material-Money-Manpower-Machine ). : Project budgeting and
financial control ( Cashflow-Cashin-Cashout ) . Project bids and contracts (
FIDIC-SBD-OECF-EPC -ADR-Law no 89 ). Risk management (Risk Identification-Risk
Allocations-Qualitative & Quantitative Risk analysis).
PMP
planning-estimation-scheduling-design-executing Current Industry Construction /
Civil Engineering Current Functional Area Site Engineering / Projects Current
Monthly Salary$ DEVELOPMENT Years of Experience4 Year(s) 6 Month(s) Availability to
Join Immediately Work Level Top Management (CEO, CFO, Director) Languages Known
Arabic, English
Education Basic Education Diploma (Civil) Egypt, in 2008 Post Graduation Diploma in
professional programmed management (STRUCTRAL ENGINEER&CONSTUCTION MANAGEMENT) Egypt,
in 2008
IT Skills
*Languages Arabic: Mother Language.
German: Begining English: Native. Personal Skills - Self motivated. - Active Worker.
12/14
- Working under stress. - Dealing with people. - Public relation & cooperation. -
Ability to work within a team. Experience at GENERAL NILE WORKS FOR ROADS & BRIDGES
5/7
COMPANY IN EGYPT. From 1 / 8 / 2009 - till 1 / 4/ 2010. 1. Site engineer At Bridge
of Aswan Project. The Egyptian Government is the owner. 1- Supervisor of the
Construction Of the mechanical workshop (Steel Structure building). 2- Supervisor of
the Construction Of the aggregate shed (Steel Structure). 3- Supervisor of the
Construction Of two Patch Plants (two ELBA & one Stetter). 4- Participating in the
Construction Of The foundation of The Bridge. At ABERY FOR CONSTUCTION& DEVELOPMNT
COMPANY IN UNITED ARAB EMIRITES IN ABUDHABI From 20 /4 / 2010 UP 1/3/2011.
1-Technical site engineer in Zayed Military City 2-Planner Engineer for construction
building-schduling&updating in this company 3-Design of the construction of the
foundation of the building 4-Design of the construction of steel and concrete
columns with glass facade in Zayed Military City At SAKAN FOR ENGINEERING&
CONSULTENCYCOMPANY IN SAUDI ARABIA IN
TABOUK From 1 /4 / 2011 UP 31/12/2012. 1- Structural design of a school in a way
computer-aided structural analysis of Civil Engineers, modeling and analysis
Building (SAP 2000 in TABUKCity 2- Supervising the projects of the Ministry of
Interior and the receipt of all business entrusted to him 3- Technical work of the
office where you work amounts inventory of projects and the Ministry of the Interior
and prepare drawings implementation and preparation of extracts Contractors 4-
Preparing schedules for these projects with follow-up schedules for contractors 5-
The preparation of bids and tenders for projects and the Ministry of the Interior
with the work schedules of quantities and engineering specifications for
construction and architectural work
At AL-MOBTY COMPANY FOR CONTRACTING IN SAUDI ARABIA IN RIYADH From 1 /10 / 2013 UP
TILL NOW.
PROJECT MANAGEMENT OFFICE ( PMO)
1- Processing schedule as soon as you are finished selecting the main stages of the
project using Primavera:- -Restructuring of the phases of the project and detailed
tasks -Determine the reliability Relations between all phases and tasks -Estimate
the length of time for each task and the work of the critical path -Estimate the
resources required for each task, availability and productivity rates.
-Estimate, monitor, predicts and reports project cost.
-Estimate the impact of change, enables and decouments the changes decision and
integrates the change into the project scope of work
-Plans project activities, monitors completion of those activities, predicts timing
of future activites and reports schedule status. 2- Add schedules to subcontractors
to the main schedule of the project and ensure their commitment to the time
specified stages them to the project.
3- Sort responsibilities of the project in coordination with the Project Manager and
the General Administration of finance and accounting to develop technical way to
ensure the safety of cash flow in all phases of the project. 4- Reliability clarify
the relationships between tasks and activities in order with the project manager.
5-Develops the overall project controls system.
6-Integrates Engineering, Construction and start-up controls system including: cost,
schedule andchange management.
7-Manages the change decision process foe engineering design.
7-Receves, analyzes and integrates cost and schedule reports from engineering design,
construction and start-up
8-Reports status and variation from plan to the project on periodic basis 9-
Determine the risk of the project with the calculation of risk-based budget with the
project manager, with the analysis of the relationships between the various elements
of the project (cost -
13/14
duration - Scope of Work - Quality - Resources - Safety and Security) and calculate
the risk factor.
10-Updated work schedule for the project with the completion of the project account
and follow-up reports in the project workflow.
Hopping that my qualification will meet your requirements regard Eng. Abd El Maguid.
14/14

More Related Content

What's hot

Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Rakesh Arora
 
AHMED MOHAMED AHMED
AHMED MOHAMED AHMEDAHMED MOHAMED AHMED
AHMED MOHAMED AHMED
AHMED FAGEIR
 
Iad Zalaf C.V
Iad Zalaf C.VIad Zalaf C.V
Iad Zalaf C.V
iad zalaf
 
Njood Majid Resume
Njood Majid ResumeNjood Majid Resume
Njood Majid Resume
njood majid
 
Nixon T Jacob _CV
Nixon T Jacob _CVNixon T Jacob _CV
Nixon T Jacob _CV
Nixon Jacob
 
Planning Engineer (ERP, P6, SAP, EVM) Mehtab Zaidi CV
Planning Engineer (ERP, P6, SAP, EVM) Mehtab Zaidi CVPlanning Engineer (ERP, P6, SAP, EVM) Mehtab Zaidi CV
Planning Engineer (ERP, P6, SAP, EVM) Mehtab Zaidi CV
Mehtab Zaidi
 
CV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin ExecutiveCV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin Executive
Santhosh Prabhakaran
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016
belal alrwadieh
 

What's hot (20)

AHMED MOHAMED AHMED
AHMED MOHAMED AHMEDAHMED MOHAMED AHMED
AHMED MOHAMED AHMED
 
karthik resume 2016-UAE
karthik resume 2016-UAEkarthik resume 2016-UAE
karthik resume 2016-UAE
 
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
Curriculum Vitae-Senior Document Controller-Total 18.5 Years UAE Experience (...
 
AHMED MOHAMED AHMED
AHMED MOHAMED AHMEDAHMED MOHAMED AHMED
AHMED MOHAMED AHMED
 
Updated CV Azimuddin
Updated CV AzimuddinUpdated CV Azimuddin
Updated CV Azimuddin
 
Amitav Sahoo-CV
Amitav Sahoo-CVAmitav Sahoo-CV
Amitav Sahoo-CV
 
Iad Zalaf C.V
Iad Zalaf C.VIad Zalaf C.V
Iad Zalaf C.V
 
NEW CV
NEW CVNEW CV
NEW CV
 
Njood Majid Resume
Njood Majid ResumeNjood Majid Resume
Njood Majid Resume
 
Nixon T Jacob _CV
Nixon T Jacob _CVNixon T Jacob _CV
Nixon T Jacob _CV
 
Abdullah's Resume
Abdullah's ResumeAbdullah's Resume
Abdullah's Resume
 
Saad atman cv
Saad atman cvSaad atman cv
Saad atman cv
 
Planning Engineer (ERP, P6, SAP, EVM) Mehtab Zaidi CV
Planning Engineer (ERP, P6, SAP, EVM) Mehtab Zaidi CVPlanning Engineer (ERP, P6, SAP, EVM) Mehtab Zaidi CV
Planning Engineer (ERP, P6, SAP, EVM) Mehtab Zaidi CV
 
CV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin ExecutiveCV of QA-QC Senior Document Controller cum Admin Executive
CV of QA-QC Senior Document Controller cum Admin Executive
 
Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)Planning engineer cv with 9 yrs experience(1)
Planning engineer cv with 9 yrs experience(1)
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
CV
CVCV
CV
 
EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021EDUARDO H. PARE CV - CIRCA - 04.07.2021
EDUARDO H. PARE CV - CIRCA - 04.07.2021
 
MOIZCV (1)
MOIZCV (1)MOIZCV (1)
MOIZCV (1)
 

Viewers also liked

Steelconnections lecture Prof. F. Wald - April 2015
Steelconnections lecture Prof. F. Wald - April 2015Steelconnections lecture Prof. F. Wald - April 2015
Steelconnections lecture Prof. F. Wald - April 2015
Jo Gijbels
 
Ani janoyan
Ani janoyanAni janoyan
Ani janoyan
astghikp
 
bowlbys theory of attachment
bowlbys theory of attachmentbowlbys theory of attachment
bowlbys theory of attachment
Silke Force
 

Viewers also liked (15)

Nadciśnienie tętnicze - jak o siebie dbać?
Nadciśnienie tętnicze - jak o siebie dbać?Nadciśnienie tętnicze - jak o siebie dbać?
Nadciśnienie tętnicze - jak o siebie dbać?
 
Good idea Bad idea
Good idea Bad ideaGood idea Bad idea
Good idea Bad idea
 
To b1 or to not b1
To b1 or to not b1To b1 or to not b1
To b1 or to not b1
 
Word 97
Word 97Word 97
Word 97
 
Jak naturalnymi metodami leczyć łupież?
Jak naturalnymi metodami leczyć łupież?Jak naturalnymi metodami leczyć łupież?
Jak naturalnymi metodami leczyć łupież?
 
Stelian Dragomir-CV
Stelian Dragomir-CVStelian Dragomir-CV
Stelian Dragomir-CV
 
Steelconnections lecture Prof. F. Wald - April 2015
Steelconnections lecture Prof. F. Wald - April 2015Steelconnections lecture Prof. F. Wald - April 2015
Steelconnections lecture Prof. F. Wald - April 2015
 
Ani janoyan
Ani janoyanAni janoyan
Ani janoyan
 
E-ball PPT BY Mukesh
E-ball PPT BY MukeshE-ball PPT BY Mukesh
E-ball PPT BY Mukesh
 
Design
DesignDesign
Design
 
df
dfdf
df
 
Pp prezentacja o_polsce
Pp prezentacja o_polscePp prezentacja o_polsce
Pp prezentacja o_polsce
 
Mixed Method Research Methodology
Mixed Method Research MethodologyMixed Method Research Methodology
Mixed Method Research Methodology
 
bowlbys theory of attachment
bowlbys theory of attachmentbowlbys theory of attachment
bowlbys theory of attachment
 
Projects
ProjectsProjects
Projects
 

Similar to cv17832925_abdelmeguid-ali_planning-engineer (1)

Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)
Bishoy Wagdy Aziz
 
Maged George Kamel C.V
Maged George Kamel C.VMaged George Kamel C.V
Maged George Kamel C.V
Maged George
 
Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )
Ghafoor Butt
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad
 
Fadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWFadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEW
fadi kuwaik
 

Similar to cv17832925_abdelmeguid-ali_planning-engineer (1) (20)

Planner's Resume
Planner's ResumePlanner's Resume
Planner's Resume
 
Sylvia 's CV (11
Sylvia 's CV (11Sylvia 's CV (11
Sylvia 's CV (11
 
AMJATH-PLANNER CV
AMJATH-PLANNER CVAMJATH-PLANNER CV
AMJATH-PLANNER CV
 
My cv
My cvMy cv
My cv
 
12741
1274112741
12741
 
12741
1274112741
12741
 
Ahmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineerAhmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineer
 
Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)Resume - Bisho Wagdy Aziz (1)
Resume - Bisho Wagdy Aziz (1)
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Ahmed Elsamahy CV _
Ahmed Elsamahy CV _Ahmed Elsamahy CV _
Ahmed Elsamahy CV _
 
012741
012741012741
012741
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
Tarek CV 2015 planning
Tarek CV 2015 planningTarek CV 2015 planning
Tarek CV 2015 planning
 
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx- CV Planning Engr - Clinton Chidi -Jan 2023.docx
- CV Planning Engr - Clinton Chidi -Jan 2023.docx
 
Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.Mohamed abdelaziz c.v.
Mohamed abdelaziz c.v.
 
Maged George Kamel C.V
Maged George Kamel C.VMaged George Kamel C.V
Maged George Kamel C.V
 
Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )
 
Mohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CVMohamed Azaad - Estimation Engineer CV
Mohamed Azaad - Estimation Engineer CV
 
Fadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEWFadi abu kuwaik full cv,NEW
Fadi abu kuwaik full cv,NEW
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 

cv17832925_abdelmeguid-ali_planning-engineer (1)

  • 1. CV17832925 :‫اﻟﻤﺮﺟﻌﻲ‬ ‫اﻟﺮﻗﻢ‬ 2015-02-22 :‫ﻓﺎﻋﻠﻴﺔ‬ ‫آﺧﺮ‬ ‫ﻋﻠﻰ‬ ‫ﻋﺒﺪاﻟﻤﺠﻴﺪ‬ company contracting Alayuni ‫ﻓﻲ‬ Engineer Planning ‫اﻟﺴﻌﻮدﻳﺔ‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻟﻤﻤﻠﻜﺔ‬ ,‫اﻟﺮﻳﺎض‬ ‫اﻻﺗﺼﺎل‬ ‫ﻣﻌﻠﻮﻣﺎت‬ :‫اﻹﻟﻜﺘﺮوﻧﻲ‬ ‫اﻟﺒﺮﻳﺪ‬geedo0609@gmail.com :‫اﻟﺠﻮال‬ ‫اﻟﻬﺎﺗﻒ‬ ‫رﻗﻢ‬+966.544076565 :‫اﻟﻨﻬﺎر‬ ‫أﺛﻨﺎء‬ ‫ﻟﻼﺗﺼﺎل‬ ‫ﻫﺎﺗﻒ‬+966.544076565 :‫اﻟﻤﺴﺎء‬ ‫أﺛﻨﺎء‬ ‫ﻟﻼﺗﺼﺎل‬ ‫ﻫﺎﺗﻒ‬+966.544076565 :‫اﻟﻌﻨﻮان‬‫اﻟﻘﺎﻫﺮة‬ - ‫ﻣﺼﺮ‬ ‫اﻟﺮﻳﺎض‬ - ‫اﻟﺴﻌﻮدﻳﺔ‬ :‫اﻟﺒﺮﻳﺪ‬ ‫ﺻﻨﺪوق‬4727 ‫اﻟﺒﺮﻳﺪي‬ ‫اﻟﺮﻣﺰ‬11412 :‫اﻟﻔﺎﻛﺲ‬ ‫رﻗﻢ‬+966.112160031 ‫اﻟﻤﺮﻏﻮﺑﺔ‬ ‫اﻟﻮﻇﻴﻔﺔ‬ :‫اﻟﻤﺮﻏﻮﺑﺔ‬ ‫ﻟﻠﻮﻇﻴﻔﺔ‬ ‫اﻟﻮﻇﻴﻔﻲ‬ ‫اﻟﻠﻘﺐ‬Planning ENGINEER :‫اﻟﻤﻬﻨﻲ‬ ‫اﻟﻤﺴﺘﻮى‬‫إدارة‬ :‫اﻟﻤﻬﻨﻲ‬ ‫اﻟﻬﺪف‬PROJECT MANAGEMENT OFFICE ( PMO) 1- Processing schedule as soon as you are finished selecting the main stages of the project using Primavera:- ---Estimate the length of time for each task and the work of the critical path -Estimate the resources required for each task, availability and productivity rates. -Estimate, monitor, predicts and reports project cost. -Estimate the impact of change, enables and decouments the changes decision and integrates the change into the project scope of work -Plans project activities,monitors completion of those activities, predicts timing of future activites and reports schedule status. 2- Add schedules to subcontractors to the main schedule of the project and ensure their commitment to the time specified stages them to the project. 3- Sort responsibilities of the project in coordination with the Project Manager and the General Administration of finance and accounting to develop technical way to ensure the safety of cash flow in all phases of the project. 4- Reliability clarify the relationships between tasks and activities in order with the project manager. 5-Develops the overall project controls system. 6-Integrates Engineering, Construction and start-up controls system including: cost, schedule andchange management. 7-Manages the change decision process foe engineering design. 7-Receves, analyzes and integrates cost and schedule reports from engineering design, construction and start-up 8-Reports status and variation from plan to the project on periodic basis 9- Determine the risk of the project with the calculation of risk-based budget with the project manager, with the analysis of the relationships between the various elements of the project (cost - 1/14
  • 2. duration - Scope of Work - Quality - Resources - Safety and Security) and calculate the risk factor. 10-Updated work schedule for the project with the completion of the project account and follow-up reports in the project workflow. :‫اﻟﻤﺮﻏﻮب‬ ‫اﻟﻘﻄﺎع‬‫اﻟﻤﺪﻧﻴﻪ‬ ‫اﻟﻬﻨﺪﺳﻪ‬ ‫و‬ ‫اﻟﺒﻨﺎء‬ ;‫وﺗﺸﻴﻴﺪ‬ ‫ﺑﻨﺎء‬ :‫اﻟﺘﻮﻇﻴﻒ‬ ‫ﻧﻮع‬‫ﻣﺘﻌﺎﻗﺪ‬ :‫اﻟﻮﻇﻴﻔﻴﺔ‬ ‫اﻟﺤﺎﻟﺔ‬‫ﻛﺎﻣﻞ‬ ‫دوام‬ :‫اﻟﻤﻄﻠﻮب‬ ‫اﻟﺸﻬﺮي‬ ‫اﻟﺮاﺗﺐ‬USD 5,000 :‫اﻹﺷﻌﺎر‬ ‫ﻓﺘﺮة‬‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ 1 : ‫ﺷﻬﺮي‬ ‫راﺗﺐ‬ ‫آﺧﺮ‬USD 5,000 ‫اﻟﺸﺨﺼﻴﺔ‬ ‫اﻟﻤﻌﻠﻮﻣﺎت‬ :‫اﻟﻤﻴﻼد‬ ‫ﺗﺎرﻳﺦ‬28) :‫)اﻟﻌﻤﺮ‬ 1986 ‫ﺳﺒﺘﻤﺒﺮ‬ 6 :‫اﻟﺠﻨﺲ‬‫ذﻛﺮ‬ :‫اﻟﺠﻨﺴﻴﺔ‬‫ﻣﺼﺮ‬ :‫اﻹﻗﺎﻣﺔ‬ ‫ﺑﻠﺪ‬‫اﻟﺴﻌﻮدﻳﺔ‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻟﻤﻤﻠﻜﺔ‬ ,‫اﻟﺮﻳﺎض‬ :‫اﻟﺘﺄﺷﻴﺮة‬ ‫ﺣﺎﻟﺔ‬(‫ﻟﻠﺘﺤﻮﻳﻞ‬ ‫)ﻗﺎﺑﻠﺔ‬ ‫إﻗﺎﻣﺔ‬ ‫ﺗﺄﺷﻴﺮة‬ :‫اﻟﻤﻌﺎﻟﻴﻦ‬ ‫ﻋﺪد‬1 :‫ﻣﻦ‬ ‫ﺻﺎدرة‬ ‫اﻟﺴﻴﺎﻗﺔ‬ ‫رﺧﺼﺔ‬‫اﻟﺴﻌﻮدﻳﺔ‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻟﻤﻤﻠﻜﺔ‬ ;‫اﻟﻤﺘﺤﺪة‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻹﻣﺎرات‬ ;‫ﻣﺼﺮ‬ (‫أﺷﻬﺮ‬ 8 ,‫ﺳﻨﻮات‬ (6 ‫اﻟﺨﺒﺮة‬ Planning Engineer company contracting Alayuni ‫ﻓﻲ‬ ‫اﻟﺴﻌﻮدﻳﺔ‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻟﻤﻤﻠﻜﺔ‬ ,‫اﻟﺮﻳﺎض‬ :‫اﻟﻤﻮﻗﻊ‬ ‫اﻟﻤﺪﻧﻴﻪ‬ ‫اﻟﻬﻨﺪﺳﻪ‬ ‫و‬ ‫اﻟﺒﻨﺎء‬ :‫اﻟﺸﺮﻛﺔ‬ ‫ﻗﻄﺎع‬ ‫اﻹدارة‬ :‫اﻟﻮﻇﻴﻔﻲ‬ ‫اﻟﺪور‬ Present - 2015 ‫ﻓﺒﺮاﻳﺮ‬ 1. Plan and schedule the project by developing a project master schedule in line with the proposal requirements through the application of the primavera P6 software. 2. Indentify the project deliverables, milestones, and required tasks and targets to determine the staffing requirements, and allotment of available resources to various phases of the project through the project measurement system. 3. Implement the work schedule and monitor progress of the work for timely execution of the project through daily/weekly/monthly/ reports with respect to review of the overall project. 4. Progress monitoring of specific projects on a regular basis. Anticipate and resolve any problems, bottlenecks/scheduling conflicts. Prepare and maintain package work plans and monitor progress to achieve on time or earlier deliveries to keep the project on schedule. 5. Co‐ordinate internal project team reviews followed by an approval and review by the client of the work schedule, progress measurement and reporting systems. Review status reports, modify schedules and plans as required and keep the management and Project director apprised of the progress on a regular basis. 6. Ensure that project controls documents such as resources histogram, schedules, reporting systems, material controls systems, etc. are fully developed by the designated personnel and reviewed by Construction Management and that Engineering and Procurement interfaces are properly addressed. 7. Perform any other duties and responsibilities as and when directed by the Supervisor. Planning Engineer COMPANY CONSTRUCTION ALMOBTY ‫ﻓﻲ‬ ‫اﻟﺴﻌﻮدﻳﺔ‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻟﻤﻤﻠﻜﺔ‬ ,‫اﻟﺮﻳﺎض‬ :‫اﻟﻤﻮﻗﻊ‬ ‫اﻟﻤﺪﻧﻴﻪ‬ ‫اﻟﻬﻨﺪﺳﻪ‬ ‫و‬ ‫اﻟﺒﻨﺎء‬ :‫اﻟﺸﺮﻛﺔ‬ ‫ﻗﻄﺎع‬ ‫اﻟﻬﻨﺪﺳﺔ‬ :‫اﻟﻮﻇﻴﻔﻲ‬ ‫اﻟﺪور‬ 2/14
  • 3. 2015 ‫ﻳﻨﺎﻳﺮ‬ - 2013 ‫ﺳﺒﺘﻤﺒﺮ‬ At AL-MOBTY COMPANY FOR CONTRACTING IN SAUDI ARABIA IN RIYADH From 1 /10 / 2013 UP TILL NOW. PROJECT MANAGEMENT OFFICE ( PMO) 1- Processing schedule as soon as you are finished selecting the main stages of the project using Primavera:- -Restructuring of the phases of the project and detailed tasks -Determine the reliability Relations between all phases and tasks -Estimate the length of time for each task and the work of the critical path -Estimate the resources required for each task, availability and productivity rates. -Estimate, monitor, predicts and reports project cost. -Estimate the impact of change, enables and decouments the changes decision and integrates the change into the project scope of work -Plans project activities,monitors completion of those activities, predicts timing of future activites and reports schedule status. 2- Add schedules to subcontractors to the main schedule of the project and ensure their commitment to the time specified stages them to the project. 3- Sort responsibilities of the project in coordination with the Project Manager and the General Administration of finance and accounting to develop technical way to ensure the safety of cash flow in all phases of the project. 4- Reliability clarify the relationships between tasks and activities in order with the project manager. 5-Develops the overall project controls system. 6-Integrates Engineering, Construction and start-up controls system including: cost, schedule andchange management. 7-Manages the change decision process foe engineering design. 7-Receves, analyzes and integrates cost and schedule reports from engineering design, construction and start-up 8-Reports status and variation from plan to the project on periodic basis 9- Determine the risk of the project with the calculation of risk-based budget with the project manager, with the analysis of the relationships between the various elements of the project (cost - duration - Scope of Work - Quality - Resources - Safety and Security) and calculate the risk factor. 10-Updated work schedule for the project with the completion of the project account and follow-up reports in the project workflow.. ‫ﺗﻮﺻﻴﺎت‬ 1 ‫ﺗﻠﻘﻰ‬ ‫ﻋﺒﺪاﻟﻤﺠﻴﺪ‬ ‫ﻃﻤﻮﺣﺎﺗﻪ‬ ‫ﺗﺤﻘﻴﻖ‬ ‫اﻟﻰ‬ ‫ﻳﺆﻫﻠﻪ‬ ‫ﻣﺎﻫﻮ‬ ‫اﻟﻘﺪرات‬ ‫ﻣﻦ‬ ‫وﻟﺪﻳﻪ‬ ‫واﻟﻜﻔﺎءة‬ ‫ﺑﺎﻟﺼﺒﺮ‬ ‫وﻳﺘﺤﻠﻰ‬ ‫ﻋﻤﻠﻪ‬ ‫ﻓﻰ‬ ‫ﺟﺪا‬ ‫وذﻛﻰ‬ ‫وﻣﺠﺘﻬﺪ‬ ‫ودؤؤب‬ ‫ودﻗﻴﻖ‬ ‫وﻣﻨﻈﻢ‬ ‫ﻣﻤﺘﺎز‬ ‫وﻋﻤﻠﻴﺎ‬ ‫اﺧﻼﻗﻴﺎ‬ ‫ﺟﺪا‬ ‫ﺟﻴﺪ‬ ‫ﺷﺨﺺ‬ ‫ﺗﺤﻘﻴﻖ‬ ‫اﻟﻰ‬ ‫ﻳﺆﻫﻠﻪ‬ ‫ﻣﺎﻫﻮ‬ ‫اﻟﻘﺪرات‬ ‫ﻣﻦ‬ ‫وﻟﺪﻳﻪ‬ ‫واﻟﻜﻔﺎءة‬ ‫ﺑﺎﻟﺼﺒﺮ‬ ‫وﻳﺘﺤﻠﻰ‬ ‫ﻋﻤﻠﻪ‬ ‫ﻓﻰ‬ ‫ﺟﺪا‬ ‫وذﻛﻰ‬ ‫وﻣﺠﺘﻬﺪ‬ ‫ودؤؤب‬ ‫ودﻗﻴﻖ‬ ‫وﻣﻨﻈﻢ‬ ‫ﻣﻤﺘﺎز‬ ‫وﻋﻤﻠﻴﺎ‬ ‫اﺧﻼﻗﻴﺎ‬ ‫ﺟﺪا‬ ‫ﺟﻴﺪ‬ ‫ﺷﺨﺺ‬ ‫اﻟﻤﺰﻳﺪ‬ ‫ﻋﺮض‬ ...‫ﻟﻞ‬ ‫ﺑﺎﻟﻨﺴﺒﺔ‬ ‫اﻣﺎ‬ ‫ﻣﻘﺘﻀﺐ‬ ‫ﻋﺮض‬ ‫اﻟﻌﻤﻞ‬ ‫وﺧﺎرج‬ ‫اﻟﻌﻤﻞ‬ ‫ﻓﻰ‬ ‫زﻣﻼءه‬ ‫ﺑﻴﻦ‬ ‫ﻣﻦ‬ ‫وﻣﺤﺒﻮﺑﺔ‬ ‫ﻣﺘﻮاﺿﻌﺔ‬ ‫ﺷﺨﺼﻴﺔ‬ ‫ﻓﻬﻮ‬ ‫اﻻﻧﺴﺎﻧﻴﺔ‬ ‫ﻟﻠﻌﻼﻗﺎت‬ ‫ﺑﺎﻟﻨﺴﺒﺔ‬ ‫اﻣﺎ‬ ‫ﻃﻤﻮﺣﺎﺗﻪ‬ May-27-2014 ‫ﺑﺘﺎرﻳﺦ‬ (Subordinate) KHALIFA HASSAN FADY ‫ﻣﻦ‬ Structural Engineer ARABIA SAUDI IN CONSULTENCYCOMPANY ENGINEERING& FOR SAKAN At ‫ﻓﻲ‬ ARABIA SAUDI IN CONSULTENCYCOMPANY ENGINEERING& FOR SAKAN At , ‫اﻟﺴﻌﻮدﻳﺔ‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻟﻤﻤﻠﻜﺔ‬ ,‫ﺗﺒﻮك‬ :‫اﻟﻤﻮﻗﻊ‬ ‫اﻟﻤﺪﻧﻴﻪ‬ ‫اﻟﻬﻨﺪﺳﻪ‬ ‫و‬ ‫اﻟﺒﻨﺎء‬ :‫اﻟﺸﺮﻛﺔ‬ ‫ﻗﻄﺎع‬ ‫اﻟﻬﻨﺪﺳﺔ‬ :‫اﻟﻮﻇﻴﻔﻲ‬ ‫اﻟﺪور‬ 2012 ‫دﻳﺴﻤﺒﺮ‬ - 2011 ‫اﺑﺮﻳﻞ‬ 1-Technical site engineer in TABUKCity 2-Planner Engineer for construction building-schduling&updating in this company 3-Design of the construction of the foundation of the building 4-Design of the construction of steel and concrete columns with glass facade in TABUK City Planner Engineer EMIRITES ARAB UNITED IN COMPANY DEVELOPMNT CONSTUCTION& FOR ABERY At ‫ﻓﻲ‬ EMIRITES ARAB UNITED IN COMPANY DEVELOPMNT CONSTUCTION& FOR ABERY At , ‫اﻟﻤﺘﺤﺪة‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫اﻹﻣﺎرات‬ ,‫ﻇﺒﻲ‬ ‫أﺑﻮ‬ :‫اﻟﻤﻮﻗﻊ‬ ‫اﻟﻤﺪﻧﻴﻪ‬ ‫اﻟﻬﻨﺪﺳﻪ‬ ‫و‬ ‫اﻟﺒﻨﺎء‬ :‫اﻟﺸﺮﻛﺔ‬ ‫ﻗﻄﺎع‬ ‫اﻟﻬﻨﺪﺳﺔ‬ :‫اﻟﻮﻇﻴﻔﻲ‬ ‫اﻟﺪور‬ 2011 ‫ﻣﺎرس‬ - 2010 ‫اﺑﺮﻳﻞ‬ 1-Technical site engineer in Zayed Military City 2-Planner Engineer for construction building-schduling&updating in this company 3/14
  • 4. 3-Design of the construction of the foundation of the building 4-Design of the construction of steel and concrete columns with glass facade in Zayed Military City ‫ﺗﻮﺻﻴﺎت‬ 1 ‫ﺗﻠﻘﻰ‬ ‫ﻋﺒﺪاﻟﻤﺠﻴﺪ‬ Avery good planner engineer August-21-2013 ‫ﺑﺘﺎرﻳﺦ‬ (Manager) Neveen shawky ali sheiha ‫ﻣﻦ‬ Civil Engineer EGYPT. IN COMPANY BRIDGES & ROADS FOR WORKS NILE GENERAL ‫ﻓﻲ‬ EGYPT. IN COMPANY BRIDGES & ROADS FOR WORKS NILE GENERAL , ‫ﻣﺼﺮ‬ :‫اﻟﻤﻮﻗﻊ‬ ‫اﻟﻤﺪﻧﻴﻪ‬ ‫اﻟﻬﻨﺪﺳﻪ‬ ‫و‬ ‫اﻟﺒﻨﺎء‬ :‫اﻟﺸﺮﻛﺔ‬ ‫ﻗﻄﺎع‬ ‫اﻟﻬﻨﺪﺳﺔ‬ :‫اﻟﻮﻇﻴﻔﻲ‬ ‫اﻟﺪور‬ 2010 ‫اﺑﺮﻳﻞ‬ - 2009 ‫اﻏﺴﻄﺲ‬ 1. Site engineer At Bridge of Aswan Project. The Egyptian Government is the owner. 1- Supervisor of the Construction Of the mechanical workshop (Steel Structure building). 2- Supervisor of the Construction Of the aggregate shed (Steel Structure). 3- Supervisor of the Construction Of two Patch Plants (two ELBA & one Stetter). 4- Participating in the Construction Of The foundation of The Bridge. ‫أﺷﻬﺮ‬ 0 ,‫ﺳﻨﻮات‬ 2 ‫ﻳﻮﺟﺪ‬ ‫ﻻ‬ :‫أﻋﻼه‬ ‫ﻣﺬﻛﻮرة‬ ‫ﻏﻴﺮ‬ ‫إﺿﺎﻓﻴﺔ‬ ‫ﺧﺒﺮة‬ ‫ﺳﻨﻮات‬ ‫اﻟﺘﻌﻠﻴﻢ‬ MANAGEMENT PROJECT ENGINEERING , ‫ﻋﺎﻟﻲ‬ ‫دﺑﻠﻮم‬ /‫ﺑﻜﺎﻟﻮرﻳﻮس‬ BERLIN TU ( BERLIN IN UNIVERSITY (TECHNICAL ‫ﻓﻲ‬ ‫أﻟﻤﺎﻧﻴﺎ‬ BERLIN :‫اﻟﻤﻮﻗﻊ‬ 2013 ‫ﻳﻮﻧﻴﻮ‬ 100 ‫ﻣﻦ‬ 76 :‫اﻟﻤﻌﺪل‬ 1- PROJECTS & PROJECT MANAGEMENT 2-VALUE MANAGEMENT 3-PROJECT APPRAISAL & RISK MANAGEMENT 4-PROJECT MANAGEMENT & QUALITY 5- ENVIRONMENTAL MAAGEMENT 6- PROJECT FINANCE 7- COST ESTIMATING IN CONTRACTS AND PROJECTS 8- PROJECT STAKEHOLDERS 9- PLANNING 10- PROJECT CONTROL USING EARNED VALUE TECHNIQUES 11- CONTRACT STRATEGY ANDAND THE CONTRACTOR SELECTION PROCESS 12- CONTRACT POLICY AND DECOUMENTS 13- PROJECT ORGANISATION DESIGN / STRUCTURE 14- DESIGN MANAGEMENT 15- SUPPLY CHAIN MANAGEMENT 17- PRIVATE FINANCE INITIATIVE AND PUBLIC PRIVATE PARTENERSHIPS Engineering Civil , ‫ﻋﺎﻟﻲ‬ ‫دﺑﻠﻮم‬ /‫ﺑﻜﺎﻟﻮرﻳﻮس‬ Cairo in University American ‫ﻓﻲ‬ 4/14
  • 5. ‫ﻣﺼﺮ‬ ‫اﻟﻘﺎﻫﺮة‬ :‫اﻟﻤﻮﻗﻊ‬ 2009 ‫ﻣﺎﻳﻮ‬ 100 ‫ﻣﻦ‬ 77 :‫اﻟﻤﻌﺪل‬ The Professional Programme in Project Management Primavera project management (p6 for windows Project planning and control techniques ( CPM -PERT-LOB ): Management of project resources ( Material-Money-Manpower-Machine ). : Project budgeting and financial control ( Cashflow-Cashin-Cashout ) . Project bids and contracts ( FIDIC-SBD-OECF-EPC -ADR-Law no 89 ). Risk management (Risk Identification-Risk Allocations-Qualitative & Quantitative Risk analysis) Computer-Aided Graphics (AutoCAD 2D&3D Computer Aided Structural Analysis for Civil Engineers &Modeling and Analysis Building (sap 2000-safe-etabs-allpiles-plaxis) Microcomputer engineering applications: electronic spread sheets Design of Reinforced and steel structers using excel ‫اﻟﺘﺨﺼﺼﺎت‬ 0 :‫أﺟﻮﺑﺔ‬ 0 :‫أﺳﺌﻠﺔ‬ P6 ‫ﺑﺮﻳﻤﺎﻓﻴﺮا‬ 0 :‫أﺟﻮﺑﺔ‬ 0 :‫أﺳﺌﻠﺔ‬ ‫ﻣﻬﻴﻜﻞ‬ ‫ﺗﺤﻠﻴﻞ‬ 0 :‫أﺟﻮﺑﺔ‬ 0 :‫أﺳﺌﻠﺔ‬ ‫اﻟﻌﻄﺎءات‬ ‫إدارة‬ 0 :‫أﺟﻮﺑﺔ‬ 0 :‫أﺳﺌﻠﺔ‬ ‫اﻟﺘﻜﺎﻟﻴﻒ‬ ‫ﻓﻲ‬ ‫اﻟﺘﺤﻜﻢ‬ 0 :‫أﺟﻮﺑﺔ‬ 0 :‫أﺳﺌﻠﺔ‬ ‫اﻟﺒﻨﺎء‬ ‫إدارة‬ ‫اﻟﻤﻬﺎرات‬ (Structural ENGINEER (DESIGN ‫أﻗﻞ‬ ‫أو‬ ‫أﺷﻬﺮ‬ ‫ﺳﺘﺔ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫ﺳﻨﻮات‬ ‫ﺧﻤﺲ‬ ‫ﻣﻦ‬ ‫أﻗﻞ‬ :‫اﻟﺨﺒﺮة‬ | ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬ PLANNING ENGINEER - (COST CONTROL - PMO - Primavera project management (p6 ‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫ﺳﻨﻮات‬ ‫ﻋﺸﺮ‬ ‫ﻣﻦ‬ ‫أﻗﻞ‬ :‫اﻟﺨﺒﺮة‬ | ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬ The Professional Programme in Project Management ‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫ﺳﻨﻮات‬ ‫ﻋﺸﺮ‬ ‫ﻣﻦ‬ ‫أﻗﻞ‬ :‫اﻟﺨﺒﺮة‬ | ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬ Project budgeting and financial control ( Cashflow-Cashin-Cashout ) . ‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫ﺳﻨﻮات‬ ‫ﻋﺸﺮ‬ ‫ﻣﻦ‬ ‫أﻗﻞ‬ :‫اﻟﺨﺒﺮة‬ | ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬ Management of project resources ( Material-Money-Manpower-Machine ). : ‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫ﺳﻨﻮات‬ ‫ﻋﺸﺮ‬ ‫ﻣﻦ‬ ‫أﻗﻞ‬ :‫اﻟﺨﺒﺮة‬ | ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬ Risk management (Risk Identification-Risk Allocations-Qualitative & Quantitative Risk analysis). ‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫ﺳﻨﻮات‬ ‫ﻋﺸﺮ‬ ‫ﻣﻦ‬ ‫أﻗﻞ‬ :‫اﻟﺨﺒﺮة‬ | ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬ ‫اﻟﻠﻐﺎت‬ ‫اﻻﻟﻤﺎﻧﻴﺔ‬ ‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫أﻗﻞ‬ ‫أو‬ ‫أﺷﻬﺮ‬ ‫ﺳﺘﺔ‬ :‫اﻟﺨﺒﺮة‬ | ‫ﻣﺒﺘﺪئ‬ :‫اﻟﻤﺴﺘﻮى‬ ‫اﻟﻌﺮﺑﻴﺔ‬ ‫أﻗﻞ‬ ‫أو‬ ‫ﺷﻬﺮ‬ :‫ﻣﻤﺎرﺳﺔ‬ ‫آﺧﺮ‬ | ‫ﺳﻨﻮات‬ ‫ﻋﺸﺮ‬ ‫ﻣﻦ‬ ‫أﻛﺜﺮ‬ :‫اﻟﺨﺒﺮة‬ | ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬ 5/14
  • 6. ‫اﻻﻧﺠﻠﻴﺰﻳﺔ‬ ‫ّس‬‫ﺮ‬‫ﻣﺘﻤ‬ :‫اﻟﻤﺴﺘﻮى‬ ‫اﻟﻤﻌﺮﻓﻮن‬ Abdelmeguid Ali planning engineer :‫اﻟﻮﻇﻴﻔﻲ‬ ‫ّﻰ‬‫ﻤ‬‫اﻟﻤﺴ‬ almobty construction company :‫اﻟﺸﺮﻛﺔ‬ ‫اﺳﻢ‬ +966.545549765 :‫اﻟﻬﺎﺗﻒ‬ ‫رﻗﻢ‬ geedo0609@gmail.com :‫اﻹﻟﻜﺘﺮوﻧﻲ‬ ‫اﻟﺒﺮﻳﺪ‬ ‫اﻟﻌﻀﻮﻳﺎت‬ ‫ﺑﺎﻟﺮﻳﺎض‬ ‫اﻟﻤﺼﺮﻳﻴﻦ‬ ‫اﻟﻤﻬﻨﺪﺳﻴﻦ‬ ‫ﺟﻤﻌﻴﺔ‬ ‫ﻣﺸﺘﺮك‬ ‫ﻋﻀﻮ‬ :‫اﻟﻌﻀﻮﻳﺔ/اﻟﺪور‬ 2015 ‫ﻣﺎﻳﻮ‬ :‫ﻣﻨﺬ‬ ‫ﻋﻀﻮ‬ ‫اﻟﺸﻬﺎدات‬ ‫و‬ ‫اﻟﺘﺪرﻳﺐ‬ (‫)ﺷﻬﺎدة‬Excellent 2033 ‫اﻏﺴﻄﺲ‬ :‫ﻟﻐﺎﻳﺔ‬ ‫ﺻﺎﻟﺤﺔ‬ 2008 ‫ﻳﻮﻟﻴﻮ‬ :‫ﻓﻲ‬ ‫ﺻﺪرت‬ ‫اﻟﺨﺒﺮة‬ ‫ﻋﻠﻰ‬ ً ‫ﺑﻨﺎء‬ ‫ﺗﻮﺻﻴﺎت‬ As Planning Engineer - ALMOBTY CONSTRUCTION COMPANY ‫ﺗﺤﻘﻴﻖ‬ ‫اﻟﻰ‬ ‫ﻳﺆﻫﻠﻪ‬ ‫ﻣﺎﻫﻮ‬ ‫اﻟﻘﺪرات‬ ‫ﻣﻦ‬ ‫وﻟﺪﻳﻪ‬ ‫واﻟﻜﻔﺎءة‬ ‫ﺑﺎﻟﺼﺒﺮ‬ ‫وﻳﺘﺤﻠﻰ‬ ‫ﻋﻤﻠﻪ‬ ‫ﻓﻰ‬ ‫ﺟﺪا‬ ‫وذﻛﻰ‬ ‫وﻣﺠﺘﻬﺪ‬ ‫ودؤؤب‬ ‫ودﻗﻴﻖ‬ ‫وﻣﻨﻈﻢ‬ ‫ﻣﻤﺘﺎز‬ ‫وﻋﻤﻠﻴﺎ‬ ‫اﺧﻼﻗﻴﺎ‬ ‫ﺟﺪا‬ ‫ﺟﻴﺪ‬ ‫ﺷﺨﺺ‬ ‫اﻟﻌﻤﻞ‬ ‫وﺧﺎرج‬ ‫اﻟﻌﻤﻞ‬ ‫ﻓﻰ‬ ‫زﻣﻼءه‬ ‫ﺑﻴﻦ‬ ‫ﻣﻦ‬ ‫وﻣﺤﺒﻮﺑﺔ‬ ‫ﻣﺘﻮاﺿﻌﺔ‬ ‫ﺷﺨﺼﻴﺔ‬ ‫ﻓﻬﻮ‬ ‫اﻻﻧﺴﺎﻧﻴﺔ‬ ‫ﻟﻠﻌﻼﻗﺎت‬ ‫ﺑﺎﻟﻨﺴﺒﺔ‬ ‫اﻣﺎ‬ ‫ﻃﻤﻮﺣﺎﺗﻪ‬ May-27-2014 ‫ﺑﺘﺎرﻳﺦ‬ (Subordinate) ‫ﺧﻠﻴﻔﺔ‬ HASSAN FADY ‫ﻣﻦ‬ As Planner Engineer - At ABERY FOR CONSTUCTION& DEVELOPMNT COMPANY IN UNITED ARAB EMIRITES Avery good planner engineer August-21-2013 ‫ﺑﺘﺎرﻳﺦ‬ (Manager) Neveen shawky ali sheiha ‫ﻣﻦ‬ ‫اﻟﺬاﺗﻴﺔ‬ ‫ﻟﻠﺴﻴﺮة‬ ‫اﻷﺻﻠﻲ‬ ‫اﻟﻤﻠﻒ‬ ‫إرﻓﺎق‬ .‫اﻟﻤﻌﻠﻮﻣﺎت‬ ‫اﺳﺘﺨﺮاج‬ ‫ﻋﻤﻠﻴﺔ‬ ‫ﺧﻼل‬ ‫ﻳﺘﻐﻴﺮ‬ ‫اﻟﺘﺼﻤﻴﻢ‬ ‫أن‬ ‫اﻹﻋﺘﺒﺎر‬ ‫ﺑﻌﻴﻦ‬ ‫اﻷﺧﺬ‬ ‫ﻳﺮﺟﻰ‬ .‫اﻟﺬاﺗﻴﺔ‬ ‫ﺳﻴﺮﺗﻚ‬ ‫ﻣﻦ‬ ‫اﻟﺘﺎﻟﻴﺔ‬ ‫اﻟﻤﻌﻠﻮﻣﺎت‬ ‫اﺳﺘﺨﺮﺟﻨﺎ‬ ‫ﻟﻘﺪ‬ Last update: Last Login Date: Ref.: CV Abdelemeguid Last name hidden Planning Engineer at At AL-MOBTY COMPANY FOR CONTRACTING IN SAUDI ARABIA IN RIYADH Riyadh, Saudi Arabia 6/14
  • 7. Target Job Target Job Title: Structural Engineer Target Job Location: Jeddah, Saudi Arabia; Riyadh, Saudi Arabia Career Objective: at GENERAL NILE WORKS FOR ROADS & BRIDGES COMPANY IN EGYPT. From 1 / 8 / 2009 - till 1 / 4/ 2010. 1. Site engineer At Bridge of Aswan Project. The Egyptian Government is the owner. 1- Supervisor of the Construction Of the mechanical workshop (Steel Structure building). 2- Supervisor of the Construction Of the aggregate shed (Steel Structure). 3- Supervisor of the Construction Of two Patch Plants (two ELBA & one Stetter). 4- Participating in the Construction Of The foundation of The Bridge. At ABERY FOR CONSTUCTION& DEVELOPMNT COMPANY IN UNITED ARAB EMIRITES From 20 /4 / 2010 UP 1/3/2011. 1-Technical site engineer in Zayed Military City 2-Planner Engineer for construction building-schduling&updating in this company 3-Design of the construction of the foundation of the building 4-Design of the construction of steel and concrete columns with glass facade in Zayed Military City At SAKAN FOR ENGINEERING& CONSULTENCYCOMPANY IN SAUDI ARABIA From 1 /4 / 2011 UP 31/12/2012. 1- Structural design of a school in a way computer-aided structural analysis of Civil Engineers, modeling and analysis Building (SAP 2000 in TABUKCity 2- Supervising the projects of the Ministry of Interior and the receipt of all business entrusted to him 3- Technical work of the office where you work amounts inventory of projects and the Ministry of the Interior and prepare drawings implementation and preparation of extracts Contractors 4- Preparing schedules for these projects with follow-up schedules for contractors 5- The preparation of bids and tenders for projects and the Ministry of the Interior with the work schedules of quantities and engineering specifications for construction and architectural work At AL-MOBTY COMPANY FOR CONTRACTING IN SAUDI ARABIA IN RIYADH From 1 /10 / 2013 UP TILL NOW. PROJECT MANAGEMENT OFFICE ( PMO) 1/7 7/14
  • 8. 1- Processing schedule as soon as you are finished selecting the main stages of the project using Primavera:- Employment Type: Employee Employment Status: Full time Target Monthly Salary: USD 5,000 Career Level: Mid Career Notice Period: Immediately Last Monthly Salary : USD 4,000 Personal Information Birth Date: 6 September 1986 (Age: 27) Gender: Male Nationality: Egypt Visa Status: Residency Visa (Transferable) Marital Status: Single Number of Dependents: 1 Driving License Issued From: Egypt; United Arab Emirates Contact Information Email Address: Mobile Phone: +966. Day-time Phone: +966. Evening-time Phone: +966. Address: Egypt Saudi Arabia Country: Riyadh, Saudi Arabia P. O. Box: 7705 Zip/Postal Code 11472 Experience (4 Years, 1 Month) Planning Engineer at At AL-MOBTY COMPANY FOR CONTRACTING IN SAUDI ARABIA IN RIYADH Location: Riyadh, Saudi Arabia, ALAMLAZ Company Industry: Construction/Civil Engineering Job Role: Engineering September 2013 - Present PROJECT MANAGEMENT OFFICE ( PMO) 1- Processing schedule as soon as you are finished selecting the main stages of the project using Primavera:- -Restructuring of the phases of the project and detailed tasks -Determine the reliability Relations between all phases and tasks -Estimate the length of time for each task and the work of the critical path -Estimate the resources required for each task, availability and productivity rates. -Estimate, monitor, predicts and reports project cost. -Estimate the impact of change, enables and decouments the changes decision and integrates the change into the project 8/14
  • 9. scope of work -Plans project activities, monitors completion of those activities, predicts timing of future activites and reports schedule status. 2- Add schedules to subcontractors to the main schedule of the project and ensure their commitment to the time specified stages them to the project. 3- Sort responsibilities of the project in coordination with the Project Manager and the General Administration of finance and accounting to develop technical way to ensure the safety of cash flow in all phases of the project. 4- Reliability clarify the relationships between tasks and activities in order with the project manager. 5-Develops the overall project controls system. 2/7 6-Integrates Engineering, Construction and start-up controls system including: cost, schedule andchange management. 7-Manages the change decision process foe engineering design. 7-Receves, analyzes and integrates cost and schedule reports from engineering design, construction and start-up 8-Reports status and variation from plan to the project on periodic basis 9- Determine the risk of the project with the calculation of risk-based budget with the project manager, with the analysis of the relationships between the various elements of the project (cost - duration - Scope of Work - Quality - Resources - Safety and Security) and calculate the risk factor. 10-Updated work schedule for the project with the completion of the project account and follow-up reports in the project workflow Structural Engineer at SAKAN FOR ENGINEERING& CONSULTENCYCOMPANY IN SAUDI ARABIA From 1 /4 / 2011 UP 31/12/2012. Location: Tabouk, Saudi Arabia, At SAKAN FOR ENGINEERING& CONSULTENCYCOMPANY IN SAUDI ARABIA Company Industry: Construction/Civil Engineering Job Role: Engineering March 2011 - December 2012 1- Structural design of a school in a way computer-aided structural analysis of Civil Engineers, modeling and analysis Building (SAP 2000 in TABUKCity 2- Supervising the projects of the Ministry of Interior and the receipt of all business entrusted to him 3- Technical work of the office where you work amounts inventory of projects and the Ministry of the Interior and prepare drawings implementation and preparation of extracts Contractors 4- Preparing schedules for these projects with follow-up schedules for contractors 5- The preparation of bids and tenders for projects and the Ministry of the Interior with the work schedules of quantities and engineering specifications for construction and architectural work Planner Engineer 9/14
  • 10. at ABERY FOR CONSTUCTION& DEVELOPMNT COMPANY IN UNITED ARAB EMIRITES From 20 /4 / 2010 UP 1/3/2011. Location: Abu Dhabi, United Arab Emirates, At ABERY FOR CONSTUCTION& DEVELOPMNT COMPANY IN UNITED ARAB EMIRITES Company Industry: Construction/Civil Engineering Job Role: Engineering April 2010 - March 2011 1-Technical site engineer in Zayed Military City 2-Planner Engineer for construction building-schduling&updating in this company 3-Design of the construction of the foundation of the building 4-Design of the construction of steel and concrete columns with glass facade in Zayed Military City Structural Engineer at GENERAL NILE WORKS FOR ROADS & BRIDGES COMPANY IN EGYPT. From 1 / 8 / 2009 - till 1 / 4/ 2010. Location: Cairo, Egypt, GENERAL NILE WORKS FOR ROADS & BRIDGES COMPANY IN EGYPT. Company Industry: Construction/Civil Engineering Job Role: Engineering August 2009 - April 2010 1. Site engineer At Bridge of Aswan Project. The Egyptian Government is the owner. 1- Supervisor of the Construction Of the mechanical workshop (Steel Structure building). 2- Supervisor of the Construction Of the aggregate shed (Steel Structure). 3- Supervisor of the Construction Of two Patch Plants (two ELBA & one Stetter). 4- Participating in the Construction Of The foundation of The Bridge. 3/7 Education Bachelor's degree / higher diploma, Structural Engineering and Construction Mnagement at the American University in Cairo Location: Egypt Completion Date : June 2009 Grade: Good : Structural Engineering Getting on: Computer-Aided Graphics (AutoCAD 2D&3D) from the American University. : Primavera project management (p6 for windows) from The American University :Computer Aided Structural Analysis for Civil Engineers &Modeling and Analysis Building (sap 2000-safe-etabs-allpiles-plaxis) from The American University :Microcomputer engineering applications: electronic spread sheets from The American 10/14
  • 11. University. Design of Reinforced and steel structers using excel from The American University .: :Fundamental Engineering from the American University(FE) : Diploma in The Professional Programme in Project Management from The American University which content on Project planning and control techniques ( CPM -PERT-LOB ): Management of project resources ( Material-Money-Manpower-Machine ). : Project budgeting and financial control ( Cashflow-Cashin-Cashout ) . Project bids and contracts ( FIDIC-SBD-OECF-EPC -ADR-Law no 89 ). Risk management (Risk Identification-Risk Allocations-Qualitative & Quantitative Risk analysis). Skills PMP Level: Expert Experience: 5 years or less Last Used: 3 months or less Languages German Level: Beginner Experience: 6 months or less Last Used: 1 month or less English Level: Expert Experience: 3 months or less Last Used: 1 month or less Arabic Level: Expert Experience: 3 months or less Last Used: 1 month or less References First name hidden Last name hidden Job Title: Planning Engineer Company Name: ALMOBTY CO. FOR CONTRACTING Phone Number: +966. Email Address: Original CV Attachment 4/7 We have taken the following information from your CV; please keep in mind that all 11/14
  • 12. formatting gets lost in the extraction process. First name hidden Last name hidden Last name hidden Civil Engineering email: Benha -Cairo-Egypt / RIYADH - SAUDI ARABIA Mobile: RESUME IN TEXT Abd El Maguid Shawky Last name hidden Last name hidden. EGYPT - CAIRO - QALUBIA-BENHA¬.. Email: *Personal Information Date of birth : 6 / 9 / 1986 Place of birth : Kafr Shoker, Benha, Qalubia, Egypt. Marital Status : Single. Nationality : Egyptian. *Education University Graduation: Shoubra Faculty of Engineering. Specialization: Structural Engineering. Graduation Date: May 2009. Graduation Grade: Good. Skill Name Last Used Experience Computer Aided Structural Analysis for Civil Engineer 2008 2 Year(s) 6 Month(s) Primavera project management(p6 for windows) from 2008 2 Year(s) 6 Month(s) Computer-Aided Graphics ( autocade 2D&3D) from The 2008 2 Year(s) 6 Month(s) Personal Details Nationality : Egyptian Date of Birth: September 06, 1986 Religion: Islam Gender:Male Marital Status: Single Driving Licence Received from ABUDHABI-Saudi Arabia-Egypt Visa Status for Current Location Residence Visa-Company Sponsorship Mailing Address:, *Project Graduation Project: Design of Irrigation and Drainage System Net Works. Graduation Project Grade: Excellent. *Training Places & courses Training: At Petrojet Company. and training in The Arab Contactors Company in project development road desert Cairo to Alex and transporting to free road. *Qualifications Getting on: Computer-Aided Graphics (AutoCAD 2D&3D) from the American University. : Primavera project management (p6 for windows) from The American University :Computer Aided Structural Analysis for Civil Engineers &Modeling and Analysis Building (sap 2000-safe-etabs-allpiles-plaxis) from The American University :Microcomputer engineering applications: electronic spread sheets from The American University. Design of Reinforced and steel structers using excel from The American University .: :Fundamental Engineering from the American University(FE) : Diploma in The Professional Programme in Project Management from The American University which content on Project planning and control techniques ( CPM -PERT-LOB ): Management of project resources ( Material-Money-Manpower-Machine ). : Project budgeting and financial control ( Cashflow-Cashin-Cashout ) . Project bids and contracts ( FIDIC-SBD-OECF-EPC -ADR-Law no 89 ). Risk management (Risk Identification-Risk Allocations-Qualitative & Quantitative Risk analysis). PMP planning-estimation-scheduling-design-executing Current Industry Construction / Civil Engineering Current Functional Area Site Engineering / Projects Current Monthly Salary$ DEVELOPMENT Years of Experience4 Year(s) 6 Month(s) Availability to Join Immediately Work Level Top Management (CEO, CFO, Director) Languages Known Arabic, English Education Basic Education Diploma (Civil) Egypt, in 2008 Post Graduation Diploma in professional programmed management (STRUCTRAL ENGINEER&CONSTUCTION MANAGEMENT) Egypt, in 2008 IT Skills *Languages Arabic: Mother Language. German: Begining English: Native. Personal Skills - Self motivated. - Active Worker. 12/14
  • 13. - Working under stress. - Dealing with people. - Public relation & cooperation. - Ability to work within a team. Experience at GENERAL NILE WORKS FOR ROADS & BRIDGES 5/7 COMPANY IN EGYPT. From 1 / 8 / 2009 - till 1 / 4/ 2010. 1. Site engineer At Bridge of Aswan Project. The Egyptian Government is the owner. 1- Supervisor of the Construction Of the mechanical workshop (Steel Structure building). 2- Supervisor of the Construction Of the aggregate shed (Steel Structure). 3- Supervisor of the Construction Of two Patch Plants (two ELBA & one Stetter). 4- Participating in the Construction Of The foundation of The Bridge. At ABERY FOR CONSTUCTION& DEVELOPMNT COMPANY IN UNITED ARAB EMIRITES IN ABUDHABI From 20 /4 / 2010 UP 1/3/2011. 1-Technical site engineer in Zayed Military City 2-Planner Engineer for construction building-schduling&updating in this company 3-Design of the construction of the foundation of the building 4-Design of the construction of steel and concrete columns with glass facade in Zayed Military City At SAKAN FOR ENGINEERING& CONSULTENCYCOMPANY IN SAUDI ARABIA IN TABOUK From 1 /4 / 2011 UP 31/12/2012. 1- Structural design of a school in a way computer-aided structural analysis of Civil Engineers, modeling and analysis Building (SAP 2000 in TABUKCity 2- Supervising the projects of the Ministry of Interior and the receipt of all business entrusted to him 3- Technical work of the office where you work amounts inventory of projects and the Ministry of the Interior and prepare drawings implementation and preparation of extracts Contractors 4- Preparing schedules for these projects with follow-up schedules for contractors 5- The preparation of bids and tenders for projects and the Ministry of the Interior with the work schedules of quantities and engineering specifications for construction and architectural work At AL-MOBTY COMPANY FOR CONTRACTING IN SAUDI ARABIA IN RIYADH From 1 /10 / 2013 UP TILL NOW. PROJECT MANAGEMENT OFFICE ( PMO) 1- Processing schedule as soon as you are finished selecting the main stages of the project using Primavera:- -Restructuring of the phases of the project and detailed tasks -Determine the reliability Relations between all phases and tasks -Estimate the length of time for each task and the work of the critical path -Estimate the resources required for each task, availability and productivity rates. -Estimate, monitor, predicts and reports project cost. -Estimate the impact of change, enables and decouments the changes decision and integrates the change into the project scope of work -Plans project activities, monitors completion of those activities, predicts timing of future activites and reports schedule status. 2- Add schedules to subcontractors to the main schedule of the project and ensure their commitment to the time specified stages them to the project. 3- Sort responsibilities of the project in coordination with the Project Manager and the General Administration of finance and accounting to develop technical way to ensure the safety of cash flow in all phases of the project. 4- Reliability clarify the relationships between tasks and activities in order with the project manager. 5-Develops the overall project controls system. 6-Integrates Engineering, Construction and start-up controls system including: cost, schedule andchange management. 7-Manages the change decision process foe engineering design. 7-Receves, analyzes and integrates cost and schedule reports from engineering design, construction and start-up 8-Reports status and variation from plan to the project on periodic basis 9- Determine the risk of the project with the calculation of risk-based budget with the project manager, with the analysis of the relationships between the various elements of the project (cost - 13/14
  • 14. duration - Scope of Work - Quality - Resources - Safety and Security) and calculate the risk factor. 10-Updated work schedule for the project with the completion of the project account and follow-up reports in the project workflow. Hopping that my qualification will meet your requirements regard Eng. Abd El Maguid. 14/14