SlideShare a Scribd company logo
1 of 2
Download to read offline
Name : Abdulmeguid Ali Ali
Year of Birth : 06-Sep-1986
Nationality : Egyptian
Educational Attainment : B.Sc of Civil Engineering - 2009
Total Experience : 6 Years
PHONE : 966544076565 - 966544455214
Professional Experience : Al-ayuni Investment & Contracting - KSA ( Planning Engineer ) PMO
E-Mail : geedo0609@gmail.com
2015 - PRESENT
*
Provides planning, progress monitoring services and have significant impact and input on the planning and organizational issues and
relevant decision making of the project’s Senior Management Team.
* Review contract documentation to ensure a thorough understanding of the contract requirements.
*
Develops a fully detailed Project Schedule, proposing amendments and alternatives to it and to the project construction Method
Statement as considered advantageous to meet or improve on project targets. Ensures that the project organization chart and all
manning schedules are kept up-to-date.
* Designs report forms of all sorts as required for progress reports on all aspects of the project (excepting cost reports).
*
Updates the overall programs. Prepares in conjunction with the concerned staff the detailed short-term working programs as necessary,
accentuating any revision in the sequences of durations of activities arising from enforced changes being made to the overall program.
*
Checks progress on the above programs by frequent site inspection, and stresses to site supervisors the need to adhere to the required
sequences and durations of the scheduled activities.
*
Where necessary draws up daily programs showing hourly resource allocation for manpower, plant and factory production items.
Recommends priorities for allocation in the event of conflicting demands and co-ordinates the transfer of labor as necessary.
*
Prepares programs as required prior to the letting of sub-contracts to arrange continuity of work for the sub-contractor at the least cost
to the project. Issues necessary programs to Sub-contractors on site and checks to ensure that their activities are kept in line with
contract requirements.
*
Prepares and updates labor resource programs showing the work force required for each direct trade, and for major sub-contractors
when applicable.
*
Prepares programs for major site operations and production facilities (earthworks, concrete production, precasting, steel fabrication,
etc.) and monitors output to ensure that site requirements are met.
*
Monitors all change orders to the contract to make certain that all additions and deletions are incorporated in revisions of the
construction method statement and the overall program.
* Train and guide new planers. Identify, in conjunction with manager, the need and areas where training is required.
* Maintain and run the project cost control system.
* Establish and produce the project monthly cost reports
* Record and supervise cost Manpower, Equipment, Subcontracts and Materials Logs.
* Monitor and supervise changes to maintain awareness of project progress / cost and report them to the management.
* Prepare cost variation analysis, cost trends and record changes affecting budget and forecast cost.
ALAYUNI INVESTMENT & CONTRACTING
‫شركة‬‫العيونى‬‫لالستثمار‬‫والمقاوالت‬
CURRICULUM VITAE
PLANNING ENGINEER
ALMOBTY CO. for Contracting
‫شركة‬‫سعد‬‫المبطي‬‫وشركاه‬‫للمقاوالت‬
2013 - 2015 : Al Mobty Co. for Contracting - KSA - Planning Engineer (PMO)
* Processing schedule of the projects using Primavera.
* Add schedule of subcontractor to main schedule of the project and ensure commitment to the time specified stages.
* Sort responsibilites, coordination with the managers, finance and accounting to ensure safety cash flow in all phases of projects.
* Reliability clarify the relationships between task and activities.
* Develops overall project controls system.
* Integrates engineering, construction and startup controls system.
* Manage change decision process foe engineering design.
* Recieve, analyze, and integrate cost and schedule reports.
* Report status and variation from plan to the project on periodic basis.
* Determine risk of the projects with the calculation risk-based budget.
* Update work schedule of the project with the completion of proj. account and follow-up reports in the proj. workflow
* Prepare and regularly validates the project forecast cost and completion.
* Coordinate with the management in the preparation of claims and provide / retrieve data where needed.
* Participate and assist in the preparation of V.O pricing and scope changes cost impacts
* Initiate budget revisions drafts in coordination with estimation, budget department.
2011 - 2012 : Sakan for Engineering & Consultancy Co. - KSA
* Structural design of school in a way computer-aided structural analysis modeling and analysis building (sap 2000 Tabuk city)
* Supervising projects of the Ministry of Interior.
*
Technical work office (work amounts inventory of projects, ministry of interior,and prepare drawings implementation and preparation of
extract contractors)
* Preparing schedule with follow-up schedule for contractors.
*
Preparation of bids and tenders for projects, work schedules of quantities and engineering specifications for construction and
architectural works.
2010 - 2011 : Abery for Construction & Development Co. - UAE, Abu Dhabi
* Technical Site Engineer in Zayed Military City
* Planner Engineer for Construction Building-Scheduling & Updating
* Design of the Construction of the Foundation of the Building
* Design of the Construction of Steel and Concrete Column with Glass Façade in Zayed Military City
2009 - 2010 : General Nile Works for Roads & Bridges Co. - EGYPT
* Site Engineer at Bridge of Aswan Project
* Supervisor of the Construction of Mechanical Workshop, Aggregate Shed, and Two Patch Plants (Two Eleba & One Stetter)
* Participating in the Construction of Foundation of the Bridge.

More Related Content

What's hot (18)

Amr. 2015....
Amr. 2015....Amr. 2015....
Amr. 2015....
 
CV Muhammad Kashif Khan
CV Muhammad Kashif KhanCV Muhammad Kashif Khan
CV Muhammad Kashif Khan
 
Mohamed khamis
Mohamed khamisMohamed khamis
Mohamed khamis
 
Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]
 
Mohammad .Afzaal
Mohammad .AfzaalMohammad .Afzaal
Mohammad .Afzaal
 
Raman Rezaei Infographic
Raman Rezaei InfographicRaman Rezaei Infographic
Raman Rezaei Infographic
 
Vignesh Nagarajan CV
Vignesh Nagarajan CVVignesh Nagarajan CV
Vignesh Nagarajan CV
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar Behera
 
Cari LoTurco Resume
Cari LoTurco ResumeCari LoTurco Resume
Cari LoTurco Resume
 
Job Profile as a Planning Engineer
Job Profile as a Planning EngineerJob Profile as a Planning Engineer
Job Profile as a Planning Engineer
 
Kamal Farid CV
Kamal Farid CVKamal Farid CV
Kamal Farid CV
 
C. v. siboniso
C. v. sibonisoC. v. siboniso
C. v. siboniso
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
shafaqat cv 1
shafaqat cv 1shafaqat cv 1
shafaqat cv 1
 
Ecv
EcvEcv
Ecv
 
Factors affeccting cost estimates of a project
Factors affeccting cost estimates of a projectFactors affeccting cost estimates of a project
Factors affeccting cost estimates of a project
 

Similar to 012741

Similar to 012741 (20)

12741
1274112741
12741
 
C.V
C.VC.V
C.V
 
Abo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & DutiesAbo-Eldardaa_CV_2015 & Duties
Abo-Eldardaa_CV_2015 & Duties
 
Resume
ResumeResume
Resume
 
Peter Khalil CV
Peter Khalil CVPeter Khalil CV
Peter Khalil CV
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
 
Nestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning EngineerNestor Gabilan CV - Sr. Planning Engineer
Nestor Gabilan CV - Sr. Planning Engineer
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
hassan assamy - TO
hassan assamy  - TOhassan assamy  - TO
hassan assamy - TO
 
CV Amr Zaki - PMP®
CV Amr Zaki - PMP®CV Amr Zaki - PMP®
CV Amr Zaki - PMP®
 
CV_Ahmad_Eida final
CV_Ahmad_Eida finalCV_Ahmad_Eida final
CV_Ahmad_Eida final
 
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCECV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
 
Amgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CVAmgad_ Reda_Barakat.CV
Amgad_ Reda_Barakat.CV
 
Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016Eng. Sherif kadry C.V.updating April 2016
Eng. Sherif kadry C.V.updating April 2016
 
RESUME - Cas Scheepers 1 Rev
RESUME - Cas Scheepers 1 RevRESUME - Cas Scheepers 1 Rev
RESUME - Cas Scheepers 1 Rev
 
TONEY GASCO CV updated
TONEY GASCO CV updatedTONEY GASCO CV updated
TONEY GASCO CV updated
 
CV UPDATE17-11-2015
CV UPDATE17-11-2015CV UPDATE17-11-2015
CV UPDATE17-11-2015
 
Peter White CV
Peter White CV Peter White CV
Peter White CV
 
Ashraf final_english_cv
Ashraf final_english_cvAshraf final_english_cv
Ashraf final_english_cv
 

012741

  • 1. Name : Abdulmeguid Ali Ali Year of Birth : 06-Sep-1986 Nationality : Egyptian Educational Attainment : B.Sc of Civil Engineering - 2009 Total Experience : 6 Years PHONE : 966544076565 - 966544455214 Professional Experience : Al-ayuni Investment & Contracting - KSA ( Planning Engineer ) PMO E-Mail : geedo0609@gmail.com 2015 - PRESENT * Provides planning, progress monitoring services and have significant impact and input on the planning and organizational issues and relevant decision making of the project’s Senior Management Team. * Review contract documentation to ensure a thorough understanding of the contract requirements. * Develops a fully detailed Project Schedule, proposing amendments and alternatives to it and to the project construction Method Statement as considered advantageous to meet or improve on project targets. Ensures that the project organization chart and all manning schedules are kept up-to-date. * Designs report forms of all sorts as required for progress reports on all aspects of the project (excepting cost reports). * Updates the overall programs. Prepares in conjunction with the concerned staff the detailed short-term working programs as necessary, accentuating any revision in the sequences of durations of activities arising from enforced changes being made to the overall program. * Checks progress on the above programs by frequent site inspection, and stresses to site supervisors the need to adhere to the required sequences and durations of the scheduled activities. * Where necessary draws up daily programs showing hourly resource allocation for manpower, plant and factory production items. Recommends priorities for allocation in the event of conflicting demands and co-ordinates the transfer of labor as necessary. * Prepares programs as required prior to the letting of sub-contracts to arrange continuity of work for the sub-contractor at the least cost to the project. Issues necessary programs to Sub-contractors on site and checks to ensure that their activities are kept in line with contract requirements. * Prepares and updates labor resource programs showing the work force required for each direct trade, and for major sub-contractors when applicable. * Prepares programs for major site operations and production facilities (earthworks, concrete production, precasting, steel fabrication, etc.) and monitors output to ensure that site requirements are met. * Monitors all change orders to the contract to make certain that all additions and deletions are incorporated in revisions of the construction method statement and the overall program. * Train and guide new planers. Identify, in conjunction with manager, the need and areas where training is required. * Maintain and run the project cost control system. * Establish and produce the project monthly cost reports * Record and supervise cost Manpower, Equipment, Subcontracts and Materials Logs. * Monitor and supervise changes to maintain awareness of project progress / cost and report them to the management. * Prepare cost variation analysis, cost trends and record changes affecting budget and forecast cost. ALAYUNI INVESTMENT & CONTRACTING ‫شركة‬‫العيونى‬‫لالستثمار‬‫والمقاوالت‬ CURRICULUM VITAE PLANNING ENGINEER
  • 2. ALMOBTY CO. for Contracting ‫شركة‬‫سعد‬‫المبطي‬‫وشركاه‬‫للمقاوالت‬ 2013 - 2015 : Al Mobty Co. for Contracting - KSA - Planning Engineer (PMO) * Processing schedule of the projects using Primavera. * Add schedule of subcontractor to main schedule of the project and ensure commitment to the time specified stages. * Sort responsibilites, coordination with the managers, finance and accounting to ensure safety cash flow in all phases of projects. * Reliability clarify the relationships between task and activities. * Develops overall project controls system. * Integrates engineering, construction and startup controls system. * Manage change decision process foe engineering design. * Recieve, analyze, and integrate cost and schedule reports. * Report status and variation from plan to the project on periodic basis. * Determine risk of the projects with the calculation risk-based budget. * Update work schedule of the project with the completion of proj. account and follow-up reports in the proj. workflow * Prepare and regularly validates the project forecast cost and completion. * Coordinate with the management in the preparation of claims and provide / retrieve data where needed. * Participate and assist in the preparation of V.O pricing and scope changes cost impacts * Initiate budget revisions drafts in coordination with estimation, budget department. 2011 - 2012 : Sakan for Engineering & Consultancy Co. - KSA * Structural design of school in a way computer-aided structural analysis modeling and analysis building (sap 2000 Tabuk city) * Supervising projects of the Ministry of Interior. * Technical work office (work amounts inventory of projects, ministry of interior,and prepare drawings implementation and preparation of extract contractors) * Preparing schedule with follow-up schedule for contractors. * Preparation of bids and tenders for projects, work schedules of quantities and engineering specifications for construction and architectural works. 2010 - 2011 : Abery for Construction & Development Co. - UAE, Abu Dhabi * Technical Site Engineer in Zayed Military City * Planner Engineer for Construction Building-Scheduling & Updating * Design of the Construction of the Foundation of the Building * Design of the Construction of Steel and Concrete Column with Glass Façade in Zayed Military City 2009 - 2010 : General Nile Works for Roads & Bridges Co. - EGYPT * Site Engineer at Bridge of Aswan Project * Supervisor of the Construction of Mechanical Workshop, Aggregate Shed, and Two Patch Plants (Two Eleba & One Stetter) * Participating in the Construction of Foundation of the Bridge.