This document is the ISAGO Standards Manual effective May 2010. It contains information on the purpose, structure, standards, guidance material, operational audit process, and documentation system for the IATA Safety Audit for Ground Operations (ISAGO) program. The manual establishes requirements for ground service providers in areas such as organization and management, load control, passenger handling, and baggage handling. It is the second edition, with revisions tracked through a change/revision history.