Management
issues
21th February 2013, Lleida
Main management issues
• EC Report submitted on 7th January 2013 to
EC due to delay in the submission of some
financial reports  to be improved for the
next report
• Waiting for answer from the EC Reviewer
• A lot of Deliverables to be submitted in the
coming months
DELIVERABLES AND REPORTS
Deliverable review process
• Deliverables are contractual elements to be
provided at a specific delivery date to the EC.
• In case a delay is foreseen, please inform me
as soon as possible.
EC
Coordinator
Project Manager
Author
WP
Leader
Due date
Check & approve Check & validate
Ask for revisions if
needed
Write the
deliverable
Deliverables due during 2nd and 3rd
year of the project
WP Del. Description
In
iti
2nd Reporting Period
Year 2 Year 3
Ma. Ap.May Ju. Ju. Au. Se. Oc. No. De. Ja. Fe. Ma. Ap.May Ju. Ju. Au. Se. Oc. No. De. Ja. Fe.
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
D1.1 Description of ideotypes and breeding schemes M12 P X,0
D1.2 Evaluation of breeding strategies used in other crops (GWS included) M30 I
D1.3 Submitted manuscripts on fine mapping of selected major genes or
QTLs
M28 I
D2.1 Detailed description of available genetic material carrying the chosen traits and useful for breedingM23 I
D2.2 Selected progenies with pyramided resistances M35 I
D3.1 List of EU-founders and indications on their level of exploitation in breeding.M10 P
D3.2 New version of the FlexQTLTM with several new capacities and functionalities.M24 I
D3.3 Two scientific papers on 1) QTL for Nectria resistance in apple and 2) some QTLs in peach.M36 I
D3.7 Workshop as kick off for the training of WP3-participants in in-depth PBA-analysesM17 I L
D4.1 Description of phenotypic and genotypic variability using available data in (i) in 4 peach germplasm collections and (ii) in 5 apple germplasm collections.M12 P L
D4.2 Database uploaded with already-available phenotypic characterisation of the 600 peach cultivars of the selected core collections (4 CC of 150 cultivars each) and the 1500 appM24 I
D4.3 Submit manuscript with description and characterisation of allelic diversity, population structure and LD in: i) the 1250 studied peach cultivars analysed with 10.000 SNPs genoM30 I
D5.1 List of the tools and protocols developed for phenotyping new (sub)-traits. M12 0
D5.2 Identification of effective tools or protocols to characterise (sub)-traits. M24 I L
D5.3 Identification of the sub-traits linked to the novel traits. M36 I
D6.2 Medium density apple genotyping array (3-9K SNP array) is made availableM12 P L
D6.3 The peach GWA genotyping array (9K SNP) is made available M12 X 0
D6.4 Apple GWA genotyping array (ca. 50K SNP array, final density to be decided based on LD extension (see milestone year 1.5) is made available.M24 I
D6.5 Protocols for MAB are made available. M36 I
D7.1 Fruit Breedomics database frame M12 X,0
D7.2 Complete collections of trait phenotypic data from genetic material available and complete list of identified genomic variation.M24 I
D8.2 Detailed stakeholder requirements compiled from the seminars. M9 0 I I
D8.3 Publication of annual newsletters M12 X 0 I I
D8.4 Printing the Booklets M24 I I I
D8.5 Mapping of the connections established with other project and initiatives. M20 I L
D8.6 Training proceedings and materials of the training sessions available on the website.M28 I I
D9.4 Organisation of Annual Project Meetings (including meetings of the ExCom, the General Assembly, and the Stakeholder Advisory Board) and preparation of minutes.M12 X 0 I I
D9.5 1st
Reporting Period consolidated technical and financial reports M20 I,0
9
8
7
6
5
4
3
2
1
2012 2013
14 Out of 20 Deliverables due
before February 2013 are late
Milestones
• Milestones are significant points or events in
the project to follow-up the project
progresses.
• No official report is necessary.
• Each milestone must at least lead to a short
description of the result that must be
uploaded on the workspace for internal
purpose: even if they are only working
document and not beautiful reports.
14 Milestones due before
February 2013
Overall planning
M1
March 2011
M18
Aug. 2012
M54
Aug. 2015
M36
Feb. 2014
1st Pre-
financing
M3
May 2011
2nd Pre-financing
M13
March 2012
Final Payment
M60
Feb. 2016
First Reporting period Third Reporting periodSecond Reporting period
Evaluation
Procedure
M12
Periodic
Report
M20
Periodic
Report
M38
Final Report
M56
EC Review
M39
EC Review
M21
1st Interim Payment
M22
Dec. 2012
2nd Interim Payment
M42
Aug. 2014
= Kick-off, Annual Meetings and Final Conference
= Lead to
M1
March 2011
M18
Aug. 2012
M54
Aug. 2015
M36
Feb. 2014
1st Pre-
financing
M3
May 2011
2nd Pre-financing
M13
March 2012
Final Payment
M60
Feb. 2016
First Reporting period Third Reporting periodSecond Reporting period
Evaluation
Procedure
M12
Periodic
Report
M23
Periodic
Report
M38
Final Report
M56
EC Review
M39
EC Review
M25
1st Interim
Payment
M28
Dec. 2012
2nd Interim Payment
M42
Aug. 2014
= Kick-off, Annual Meetings and Final Conference
= Lead to
M30-Report
FruitBreedomics
M30-Reporting Process
M19 M20M18
Coord. + IT
Write the
final report
Partners
Fill in the report template
for the different WPs they
contributed to
10 April
IT
Checks and
Compiles
the report
28 March
ExCom
Checks and
validates
WP Leaders
Check the information
provided and request
changes to partners, and
compile their WP report
IT
Provides
report
templates
9 January 24 April
31 April
21 March
End of
reporting
period
28
February
14 March
Partners
Fill in the report templates:
1. Annex I “FormC” or FormC online
2. Annex II “Detailed FormC”
3. A Word file with partner
information
ECIT
Provides
report
templates
IT
Checks &
Compiles
17 April
Partners
Sign the FormC
validated by the
Project Manager
IT
Checks and
Compiles
ScientificReportFinancialReport
FINANCIAL ISSUES
Next Payments
• Following approval by the EC of the first
M18-periodic report, the Coordinator will
distribute:
– a payment which settles the amounts
justified and accepted by the EC during the
first reporting period. This payment will be
limited to 75% of the EC contribution to be
received during the whole project duration
and might be distributed around May-June
2013
Payments
European
Commission
• Pre-financing : contract signature + 45
days
• Interim or Final payments: 105 days after
receipt of the validated report
INRAINRA Transfert
Preparation of
payments
PARTNER 1 PARTNER 2 PARTNER n
No more than 15 days after receiving the
EC payments
Financial issues
• Refer to the Reference Sheet N°9 of the Researchers’ Guide
for general principles
• Temporary and permanent staff must declare their working
time on timesheets (no FruitBreedomics standards)
• Reimbursement of congress costs:
– Reimbursement of the participation to a scientific congress
under the frame of an EU project:
• must be an action of dissemination (poster minimum in Europe; oral
communication minimum outside of Europe),
• is limited to one person per institute (or per research units for large
institutes).
– To have more researchers attending a congress, you have to
provide justifications that will be forwarded to the Project
Officer for validation. If you don’t do so before attending a
congress, the EC might refuse to reimburse your costs.
EC Financial contribution per
activity
MAXIMUM EC CONTRIBUTION
ACTIVITIES
Non-profit public bodies,
secondary and higher
education establishments,
research organisations
and SMEs
Others
Research: WPs 1 to 7 75 % 50 %
Dissemination of results:
articles, presentation in
conferences, news for the
website, etc. WP8 100 % 100 %
Management: WP9 (only for
INRA and INRA Transfert) 100 % 100 %
USEFUL TOOLS FOR ALL
PARTICIPANTS OF THE PROJECT
Researcher’s Guide
• For all the persons involved in the project
• Sets up common rules
• Print it and have it available at all time
on your desk
Collaborative workspace
• To help you to achieve your tasks in the project.
• Not a web-site to consult data
• But a place where to exchange ideas, information
and documents with other FruitBreedomics
participants
• Core of the project
• All the minutes of the workshops organised by
your tasks should be available on the workspace so
that other members of the project can see what is
going on in your task.
• Internal Newsletter displays links to the workspace
External communication
• Every partner must be actor of external communication
by:
– adding a link on the website of your organization to the
FruitBreedomics website,
– providing input to the FruitBreedomics website if you have
some items to disseminate to the outside world,
– representing FruitBreedomics at national or International
events,
– spreading information about FruitBreedomics in your country
and to your usual contacts (national projects, press, etc.).
Communication tools
• Dedicated communication tools to present the project
have been developed by WP8. You can find them on the
workspace:
– A PowerPoint template
– A Poster template
– A general PowerPoint presentation of the project
– A general Poster presentation of the project
– The logo of the project
– The brochure of the project.
Stakeholder Platform
• The objectives of the Stakeholder Platform are:
– to provide preferential contact for the dissemination of the
project’s outcomes to society,
– to discuss the most promising results and how they should be
transferred.
• The Stakeholder Platform gathers representatives of all
players intervening in the supply chain from scientists,
breeders, germplasm collection curators, nurserymen,
to cooperatives, and growers.
• Do not hesitate to propose additional contacts in order
to enlarge the platform and ensure the efficient uptake
of FruitBreedomics results. Send your propositions of
contacts to Joan Bonany (Joan.Bonany@irta.cat).
Publication
• We remind you that:
– Any project of publication must be submitted through the workspace
30 days before publication (or 30 days before submission in the case
of a scientific paper) following the process described in the
FruitBreedomics Researcher’s Guide (Reference Sheet N°5). This
concerns all publications linked to FruitBreedomics even if only
partially funded by FruitBreedomics.
– It is mandatory acknowledge EC funding in every publication or
communication.
Next meetings organisation
• Next ExCom meeting by Phone beginning of
April 2013
• 2014 Annual Meeting
– Dates and location will be chosen in the coming
weeks/months
– We have a proposition of Switzerland in Zurich
to be studied
• 2015 Annual Meeting is still to be decided
but will take place around february
• Final conference in Bologna Italy jointly with
Eucarpia conference?
EC documentation
• Cordis: Reference Documents
http://cordis.europa.eu/fp7/find-doc_en.html
– Project Reporting Guidelines
– Financial Guidelines
• Financial helpdesk
www.finance-helpdesk.org
• IPR Helpdesk
www.iprhelpdesk.eu
Thank you for your attention
+ Evaluation of the meeting
+ Social Event

More Related Content

Similar to 10 management issues-20130221

{LIKE} kick off PPT
{LIKE} kick off PPT{LIKE} kick off PPT
{LIKE} kick off PPT
LIKE
 
{LIKE} 2nd PM PPT
{LIKE} 2nd PM PPT{LIKE} 2nd PM PPT
{LIKE} 2nd PM PPT
LIKE
 
Project management
Project managementProject management
Project management
FogGuru MSCA Project
 
FruitBreedomics KOM 30-03-2011 1 management issues
FruitBreedomics KOM 30-03-2011 1 management issuesFruitBreedomics KOM 30-03-2011 1 management issues
FruitBreedomics KOM 30-03-2011 1 management issues
fruitbreedomics
 
FP7-ICT Programme
FP7-ICT ProgrammeFP7-ICT Programme
FP7-ICT Programme
Leandro Ciuffo
 
E Sponder Project
E Sponder ProjectE Sponder Project
E Sponder Project
dvasilia1978
 
Project starting report iktimed 2 nov
Project starting report iktimed 2  novProject starting report iktimed 2  nov
Project starting report iktimed 2 nov
Iktimed Med project - Marche Regional Authority
 
EDI - European Data Incubator - Public Presentation
EDI - European Data Incubator - Public PresentationEDI - European Data Incubator - Public Presentation
EDI - European Data Incubator - Public Presentation
Diego López-de-Ipiña González-de-Artaza
 
F & A D R E A M I T Baasansuren Burmaa
F &  A  D R E A M  I T  Baasansuren  BurmaaF &  A  D R E A M  I T  Baasansuren  Burmaa
F & A D R E A M I T Baasansuren Burmaa
panall2009
 
World bank project a case study of africa region
World bank project a case study of africa region World bank project a case study of africa region
World bank project a case study of africa region
Ministry Of Information & communications
 
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation
Erasmus+ UK National Agency
 
Step4all guide 3 How to apply and how to manage successful European projects
Step4all guide 3 How to apply and how to manage successful European projectsStep4all guide 3 How to apply and how to manage successful European projects
Step4all guide 3 How to apply and how to manage successful European projects
GIANLUCA COPPOLA
 
H2020. Criterios de evaluación y consejos prácticos para la elaboración de pr...
H2020. Criterios de evaluación y consejos prácticos para la elaboración de pr...H2020. Criterios de evaluación y consejos prácticos para la elaboración de pr...
H2020. Criterios de evaluación y consejos prácticos para la elaboración de pr...
CTAEX
 
Fostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication PlanFostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication Plan
FOSTEr in MED
 
Dialogos+ Project Presentation
Dialogos+ Project PresentationDialogos+ Project Presentation
Dialogos+ Project Presentation
Aristoteles Lakkas
 
6_Link LFA to Full application
6_Link LFA to Full application6_Link LFA to Full application
6_Link LFA to Full application
csdialogue
 
33138 gf a ip v1-en
33138 gf a ip v1-en33138 gf a ip v1-en
33138 gf a ip v1-en
Rob Blaauboer
 
Sifem 3rd review_report-consolidated_final
Sifem 3rd review_report-consolidated_finalSifem 3rd review_report-consolidated_final
Sifem 3rd review_report-consolidated_final
Joao Bosco Jares
 
Formato Teoria de cambio para convocatoria UKPACT
Formato Teoria de cambio para convocatoria UKPACTFormato Teoria de cambio para convocatoria UKPACT
Formato Teoria de cambio para convocatoria UKPACT
deisyvero
 
Europeana v1.0 Overview and ambitions
Europeana v1.0 Overview and ambitionsEuropeana v1.0 Overview and ambitions
Europeana v1.0 Overview and ambitions
Europeana
 

Similar to 10 management issues-20130221 (20)

{LIKE} kick off PPT
{LIKE} kick off PPT{LIKE} kick off PPT
{LIKE} kick off PPT
 
{LIKE} 2nd PM PPT
{LIKE} 2nd PM PPT{LIKE} 2nd PM PPT
{LIKE} 2nd PM PPT
 
Project management
Project managementProject management
Project management
 
FruitBreedomics KOM 30-03-2011 1 management issues
FruitBreedomics KOM 30-03-2011 1 management issuesFruitBreedomics KOM 30-03-2011 1 management issues
FruitBreedomics KOM 30-03-2011 1 management issues
 
FP7-ICT Programme
FP7-ICT ProgrammeFP7-ICT Programme
FP7-ICT Programme
 
E Sponder Project
E Sponder ProjectE Sponder Project
E Sponder Project
 
Project starting report iktimed 2 nov
Project starting report iktimed 2  novProject starting report iktimed 2  nov
Project starting report iktimed 2 nov
 
EDI - European Data Incubator - Public Presentation
EDI - European Data Incubator - Public PresentationEDI - European Data Incubator - Public Presentation
EDI - European Data Incubator - Public Presentation
 
F & A D R E A M I T Baasansuren Burmaa
F &  A  D R E A M  I T  Baasansuren  BurmaaF &  A  D R E A M  I T  Baasansuren  Burmaa
F & A D R E A M I T Baasansuren Burmaa
 
World bank project a case study of africa region
World bank project a case study of africa region World bank project a case study of africa region
World bank project a case study of africa region
 
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation
2015 Call Key Action 2 VET, adult ed and youth Start Up Seminar presentation
 
Step4all guide 3 How to apply and how to manage successful European projects
Step4all guide 3 How to apply and how to manage successful European projectsStep4all guide 3 How to apply and how to manage successful European projects
Step4all guide 3 How to apply and how to manage successful European projects
 
H2020. Criterios de evaluación y consejos prácticos para la elaboración de pr...
H2020. Criterios de evaluación y consejos prácticos para la elaboración de pr...H2020. Criterios de evaluación y consejos prácticos para la elaboración de pr...
H2020. Criterios de evaluación y consejos prácticos para la elaboración de pr...
 
Fostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication PlanFostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication Plan
 
Dialogos+ Project Presentation
Dialogos+ Project PresentationDialogos+ Project Presentation
Dialogos+ Project Presentation
 
6_Link LFA to Full application
6_Link LFA to Full application6_Link LFA to Full application
6_Link LFA to Full application
 
33138 gf a ip v1-en
33138 gf a ip v1-en33138 gf a ip v1-en
33138 gf a ip v1-en
 
Sifem 3rd review_report-consolidated_final
Sifem 3rd review_report-consolidated_finalSifem 3rd review_report-consolidated_final
Sifem 3rd review_report-consolidated_final
 
Formato Teoria de cambio para convocatoria UKPACT
Formato Teoria de cambio para convocatoria UKPACTFormato Teoria de cambio para convocatoria UKPACT
Formato Teoria de cambio para convocatoria UKPACT
 
Europeana v1.0 Overview and ambitions
Europeana v1.0 Overview and ambitionsEuropeana v1.0 Overview and ambitions
Europeana v1.0 Overview and ambitions
 

More from fruitbreedomics

11 nazzicari
11 nazzicari11 nazzicari
11 nazzicari
fruitbreedomics
 
Fq haplotyper poster-eucarpia-2015-fruit-section_bologna-june_14-18
Fq haplotyper poster-eucarpia-2015-fruit-section_bologna-june_14-18Fq haplotyper poster-eucarpia-2015-fruit-section_bologna-june_14-18
Fq haplotyper poster-eucarpia-2015-fruit-section_bologna-june_14-18
fruitbreedomics
 
10 cantin
10 cantin10 cantin
10 cantin
fruitbreedomics
 
09 bonany
09 bonany09 bonany
09 bonany
fruitbreedomics
 
08 patocchi
08 patocchi08 patocchi
08 patocchi
fruitbreedomics
 
06 aranzana
06 aranzana06 aranzana
06 aranzana
fruitbreedomics
 
05 costa
05 costa05 costa
05 costa
fruitbreedomics
 
04 baumgartner
04 baumgartner04 baumgartner
04 baumgartner
fruitbreedomics
 
03 arus
03 arus03 arus
02 baumgartner
02 baumgartner02 baumgartner
02 baumgartner
fruitbreedomics
 
00 soatin
00 soatin00 soatin
00 soatin
fruitbreedomics
 
01 patocchi 1
01 patocchi 101 patocchi 1
01 patocchi 1
fruitbreedomics
 
20 nazzicari
20 nazzicari20 nazzicari
20 nazzicari
fruitbreedomics
 
19 van de weg
19 van de weg19 van de weg
19 van de weg
fruitbreedomics
 
18 baumgartner pascal
18 baumgartner pascal18 baumgartner pascal
18 baumgartner pascal
fruitbreedomics
 
17 biscarini
17 biscarini17 biscarini
17 biscarini
fruitbreedomics
 
16 bink
16 bink16 bink
15 pascal
15 pascal15 pascal
15 pascal
fruitbreedomics
 
14 kellerhals
14 kellerhals14 kellerhals
14 kellerhals
fruitbreedomics
 
13 aranzana
13 aranzana13 aranzana
13 aranzana
fruitbreedomics
 

More from fruitbreedomics (20)

11 nazzicari
11 nazzicari11 nazzicari
11 nazzicari
 
Fq haplotyper poster-eucarpia-2015-fruit-section_bologna-june_14-18
Fq haplotyper poster-eucarpia-2015-fruit-section_bologna-june_14-18Fq haplotyper poster-eucarpia-2015-fruit-section_bologna-june_14-18
Fq haplotyper poster-eucarpia-2015-fruit-section_bologna-june_14-18
 
10 cantin
10 cantin10 cantin
10 cantin
 
09 bonany
09 bonany09 bonany
09 bonany
 
08 patocchi
08 patocchi08 patocchi
08 patocchi
 
06 aranzana
06 aranzana06 aranzana
06 aranzana
 
05 costa
05 costa05 costa
05 costa
 
04 baumgartner
04 baumgartner04 baumgartner
04 baumgartner
 
03 arus
03 arus03 arus
03 arus
 
02 baumgartner
02 baumgartner02 baumgartner
02 baumgartner
 
00 soatin
00 soatin00 soatin
00 soatin
 
01 patocchi 1
01 patocchi 101 patocchi 1
01 patocchi 1
 
20 nazzicari
20 nazzicari20 nazzicari
20 nazzicari
 
19 van de weg
19 van de weg19 van de weg
19 van de weg
 
18 baumgartner pascal
18 baumgartner pascal18 baumgartner pascal
18 baumgartner pascal
 
17 biscarini
17 biscarini17 biscarini
17 biscarini
 
16 bink
16 bink16 bink
16 bink
 
15 pascal
15 pascal15 pascal
15 pascal
 
14 kellerhals
14 kellerhals14 kellerhals
14 kellerhals
 
13 aranzana
13 aranzana13 aranzana
13 aranzana
 

Recently uploaded

Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptxOcean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
SitimaJohn
 
Building Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and MilvusBuilding Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and Milvus
Zilliz
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
Matthew Sinclair
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
panagenda
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
kumardaparthi1024
 
UI5 Controls simplified - UI5con2024 presentation
UI5 Controls simplified - UI5con2024 presentationUI5 Controls simplified - UI5con2024 presentation
UI5 Controls simplified - UI5con2024 presentation
Wouter Lemaire
 
How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
Daiki Mogmet Ito
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
DianaGray10
 
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development ProvidersYour One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
akankshawande
 
Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
tolgahangng
 
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdfMonitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Tosin Akinosho
 
Infrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI modelsInfrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI models
Zilliz
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
Claudio Di Ciccio
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
panagenda
 
OpenID AuthZEN Interop Read Out - Authorization
OpenID AuthZEN Interop Read Out - AuthorizationOpenID AuthZEN Interop Read Out - Authorization
OpenID AuthZEN Interop Read Out - Authorization
David Brossard
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
Safe Software
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
Alpen-Adria-Universität
 

Recently uploaded (20)

Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptxOcean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
 
Building Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and MilvusBuilding Production Ready Search Pipelines with Spark and Milvus
Building Production Ready Search Pipelines with Spark and Milvus
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
GenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizationsGenAI Pilot Implementation in the organizations
GenAI Pilot Implementation in the organizations
 
UI5 Controls simplified - UI5con2024 presentation
UI5 Controls simplified - UI5con2024 presentationUI5 Controls simplified - UI5con2024 presentation
UI5 Controls simplified - UI5con2024 presentation
 
How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
 
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development ProvidersYour One-Stop Shop for Python Success: Top 10 US Python Development Providers
Your One-Stop Shop for Python Success: Top 10 US Python Development Providers
 
Serial Arm Control in Real Time Presentation
Serial Arm Control in Real Time PresentationSerial Arm Control in Real Time Presentation
Serial Arm Control in Real Time Presentation
 
Monitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdfMonitoring and Managing Anomaly Detection on OpenShift.pdf
Monitoring and Managing Anomaly Detection on OpenShift.pdf
 
Infrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI modelsInfrastructure Challenges in Scaling RAG with Custom AI models
Infrastructure Challenges in Scaling RAG with Custom AI models
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”“I’m still / I’m still / Chaining from the Block”
“I’m still / I’m still / Chaining from the Block”
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
 
OpenID AuthZEN Interop Read Out - Authorization
OpenID AuthZEN Interop Read Out - AuthorizationOpenID AuthZEN Interop Read Out - Authorization
OpenID AuthZEN Interop Read Out - Authorization
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
 

10 management issues-20130221

  • 2. Main management issues • EC Report submitted on 7th January 2013 to EC due to delay in the submission of some financial reports  to be improved for the next report • Waiting for answer from the EC Reviewer • A lot of Deliverables to be submitted in the coming months
  • 4. Deliverable review process • Deliverables are contractual elements to be provided at a specific delivery date to the EC. • In case a delay is foreseen, please inform me as soon as possible. EC Coordinator Project Manager Author WP Leader Due date Check & approve Check & validate Ask for revisions if needed Write the deliverable
  • 5. Deliverables due during 2nd and 3rd year of the project WP Del. Description In iti 2nd Reporting Period Year 2 Year 3 Ma. Ap.May Ju. Ju. Au. Se. Oc. No. De. Ja. Fe. Ma. Ap.May Ju. Ju. Au. Se. Oc. No. De. Ja. Fe. 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 D1.1 Description of ideotypes and breeding schemes M12 P X,0 D1.2 Evaluation of breeding strategies used in other crops (GWS included) M30 I D1.3 Submitted manuscripts on fine mapping of selected major genes or QTLs M28 I D2.1 Detailed description of available genetic material carrying the chosen traits and useful for breedingM23 I D2.2 Selected progenies with pyramided resistances M35 I D3.1 List of EU-founders and indications on their level of exploitation in breeding.M10 P D3.2 New version of the FlexQTLTM with several new capacities and functionalities.M24 I D3.3 Two scientific papers on 1) QTL for Nectria resistance in apple and 2) some QTLs in peach.M36 I D3.7 Workshop as kick off for the training of WP3-participants in in-depth PBA-analysesM17 I L D4.1 Description of phenotypic and genotypic variability using available data in (i) in 4 peach germplasm collections and (ii) in 5 apple germplasm collections.M12 P L D4.2 Database uploaded with already-available phenotypic characterisation of the 600 peach cultivars of the selected core collections (4 CC of 150 cultivars each) and the 1500 appM24 I D4.3 Submit manuscript with description and characterisation of allelic diversity, population structure and LD in: i) the 1250 studied peach cultivars analysed with 10.000 SNPs genoM30 I D5.1 List of the tools and protocols developed for phenotyping new (sub)-traits. M12 0 D5.2 Identification of effective tools or protocols to characterise (sub)-traits. M24 I L D5.3 Identification of the sub-traits linked to the novel traits. M36 I D6.2 Medium density apple genotyping array (3-9K SNP array) is made availableM12 P L D6.3 The peach GWA genotyping array (9K SNP) is made available M12 X 0 D6.4 Apple GWA genotyping array (ca. 50K SNP array, final density to be decided based on LD extension (see milestone year 1.5) is made available.M24 I D6.5 Protocols for MAB are made available. M36 I D7.1 Fruit Breedomics database frame M12 X,0 D7.2 Complete collections of trait phenotypic data from genetic material available and complete list of identified genomic variation.M24 I D8.2 Detailed stakeholder requirements compiled from the seminars. M9 0 I I D8.3 Publication of annual newsletters M12 X 0 I I D8.4 Printing the Booklets M24 I I I D8.5 Mapping of the connections established with other project and initiatives. M20 I L D8.6 Training proceedings and materials of the training sessions available on the website.M28 I I D9.4 Organisation of Annual Project Meetings (including meetings of the ExCom, the General Assembly, and the Stakeholder Advisory Board) and preparation of minutes.M12 X 0 I I D9.5 1st Reporting Period consolidated technical and financial reports M20 I,0 9 8 7 6 5 4 3 2 1 2012 2013 14 Out of 20 Deliverables due before February 2013 are late
  • 6. Milestones • Milestones are significant points or events in the project to follow-up the project progresses. • No official report is necessary. • Each milestone must at least lead to a short description of the result that must be uploaded on the workspace for internal purpose: even if they are only working document and not beautiful reports. 14 Milestones due before February 2013
  • 7. Overall planning M1 March 2011 M18 Aug. 2012 M54 Aug. 2015 M36 Feb. 2014 1st Pre- financing M3 May 2011 2nd Pre-financing M13 March 2012 Final Payment M60 Feb. 2016 First Reporting period Third Reporting periodSecond Reporting period Evaluation Procedure M12 Periodic Report M20 Periodic Report M38 Final Report M56 EC Review M39 EC Review M21 1st Interim Payment M22 Dec. 2012 2nd Interim Payment M42 Aug. 2014 = Kick-off, Annual Meetings and Final Conference = Lead to M1 March 2011 M18 Aug. 2012 M54 Aug. 2015 M36 Feb. 2014 1st Pre- financing M3 May 2011 2nd Pre-financing M13 March 2012 Final Payment M60 Feb. 2016 First Reporting period Third Reporting periodSecond Reporting period Evaluation Procedure M12 Periodic Report M23 Periodic Report M38 Final Report M56 EC Review M39 EC Review M25 1st Interim Payment M28 Dec. 2012 2nd Interim Payment M42 Aug. 2014 = Kick-off, Annual Meetings and Final Conference = Lead to
  • 8. M30-Report FruitBreedomics M30-Reporting Process M19 M20M18 Coord. + IT Write the final report Partners Fill in the report template for the different WPs they contributed to 10 April IT Checks and Compiles the report 28 March ExCom Checks and validates WP Leaders Check the information provided and request changes to partners, and compile their WP report IT Provides report templates 9 January 24 April 31 April 21 March End of reporting period 28 February 14 March Partners Fill in the report templates: 1. Annex I “FormC” or FormC online 2. Annex II “Detailed FormC” 3. A Word file with partner information ECIT Provides report templates IT Checks & Compiles 17 April Partners Sign the FormC validated by the Project Manager IT Checks and Compiles ScientificReportFinancialReport
  • 10. Next Payments • Following approval by the EC of the first M18-periodic report, the Coordinator will distribute: – a payment which settles the amounts justified and accepted by the EC during the first reporting period. This payment will be limited to 75% of the EC contribution to be received during the whole project duration and might be distributed around May-June 2013
  • 11. Payments European Commission • Pre-financing : contract signature + 45 days • Interim or Final payments: 105 days after receipt of the validated report INRAINRA Transfert Preparation of payments PARTNER 1 PARTNER 2 PARTNER n No more than 15 days after receiving the EC payments
  • 12. Financial issues • Refer to the Reference Sheet N°9 of the Researchers’ Guide for general principles • Temporary and permanent staff must declare their working time on timesheets (no FruitBreedomics standards) • Reimbursement of congress costs: – Reimbursement of the participation to a scientific congress under the frame of an EU project: • must be an action of dissemination (poster minimum in Europe; oral communication minimum outside of Europe), • is limited to one person per institute (or per research units for large institutes). – To have more researchers attending a congress, you have to provide justifications that will be forwarded to the Project Officer for validation. If you don’t do so before attending a congress, the EC might refuse to reimburse your costs.
  • 13. EC Financial contribution per activity MAXIMUM EC CONTRIBUTION ACTIVITIES Non-profit public bodies, secondary and higher education establishments, research organisations and SMEs Others Research: WPs 1 to 7 75 % 50 % Dissemination of results: articles, presentation in conferences, news for the website, etc. WP8 100 % 100 % Management: WP9 (only for INRA and INRA Transfert) 100 % 100 %
  • 14. USEFUL TOOLS FOR ALL PARTICIPANTS OF THE PROJECT
  • 15. Researcher’s Guide • For all the persons involved in the project • Sets up common rules • Print it and have it available at all time on your desk
  • 16. Collaborative workspace • To help you to achieve your tasks in the project. • Not a web-site to consult data • But a place where to exchange ideas, information and documents with other FruitBreedomics participants • Core of the project • All the minutes of the workshops organised by your tasks should be available on the workspace so that other members of the project can see what is going on in your task. • Internal Newsletter displays links to the workspace
  • 17. External communication • Every partner must be actor of external communication by: – adding a link on the website of your organization to the FruitBreedomics website, – providing input to the FruitBreedomics website if you have some items to disseminate to the outside world, – representing FruitBreedomics at national or International events, – spreading information about FruitBreedomics in your country and to your usual contacts (national projects, press, etc.).
  • 18. Communication tools • Dedicated communication tools to present the project have been developed by WP8. You can find them on the workspace: – A PowerPoint template – A Poster template – A general PowerPoint presentation of the project – A general Poster presentation of the project – The logo of the project – The brochure of the project.
  • 19. Stakeholder Platform • The objectives of the Stakeholder Platform are: – to provide preferential contact for the dissemination of the project’s outcomes to society, – to discuss the most promising results and how they should be transferred. • The Stakeholder Platform gathers representatives of all players intervening in the supply chain from scientists, breeders, germplasm collection curators, nurserymen, to cooperatives, and growers. • Do not hesitate to propose additional contacts in order to enlarge the platform and ensure the efficient uptake of FruitBreedomics results. Send your propositions of contacts to Joan Bonany (Joan.Bonany@irta.cat).
  • 20. Publication • We remind you that: – Any project of publication must be submitted through the workspace 30 days before publication (or 30 days before submission in the case of a scientific paper) following the process described in the FruitBreedomics Researcher’s Guide (Reference Sheet N°5). This concerns all publications linked to FruitBreedomics even if only partially funded by FruitBreedomics. – It is mandatory acknowledge EC funding in every publication or communication.
  • 21. Next meetings organisation • Next ExCom meeting by Phone beginning of April 2013 • 2014 Annual Meeting – Dates and location will be chosen in the coming weeks/months – We have a proposition of Switzerland in Zurich to be studied • 2015 Annual Meeting is still to be decided but will take place around february • Final conference in Bologna Italy jointly with Eucarpia conference?
  • 22. EC documentation • Cordis: Reference Documents http://cordis.europa.eu/fp7/find-doc_en.html – Project Reporting Guidelines – Financial Guidelines • Financial helpdesk www.finance-helpdesk.org • IPR Helpdesk www.iprhelpdesk.eu
  • 23. Thank you for your attention + Evaluation of the meeting + Social Event