Index
  • Defining project
  • Bypassing planning
  • Project objectives
  • Setting limitations
  • Project planning
  • Effective planning
  • Project resources
  • Launching a project
  • Effective Monitoring
  • Scope creep
  • Software
  • Closing a project

                                                         3
Contact – rrakhecha@myefg.org   Making earth little softer
Defining project
  • Define Goal & expected changes after project
     • What are the benefits for client
     • For organisation (helps to set the priorities)
  • Time boundaries
  • Resources needed
     • People
     • Money
     • Hardware & Software
     • Facilities
  • Element of the risks
  • Maximising result –plan & optimize efforts
                                                                 4
Contact – rrakhecha@myefg.org           Making earth little softer
Defining project
  • Steps
     • Define the project
     • Plan the project
     • Estimate duration, money and resources
     • Build a project team
     • Launch the project, Party with stake holders
     • Monitor the project, review the progress
     • Closure of the project



                                                               5
Contact – rrakhecha@myefg.org         Making earth little softer
Bypassing planning
  • Mentality of
     • Pushing the project
     • Planning means waste of money and time
     • Laziness, Shying away new methods
     • Overconfidence
     • Deceiving that adopted methods are the best
     • Hoping everything will be all-right
  • Lesser / Poor experience of manager
  • Sr. management involved in many crisis &
    activities
  • Too much dependency on consultants
                                                             6
Contact – rrakhecha@myefg.org       Making earth little softer
Project objectives
  • Sense of purpose? Would help on focus
  • Target? Would help motivating the team members
  • Prioritization & Time sensitive? Would help to
    organise & measure how much to go
  • Specific – Clear & Simple
  • Measurable – to measure the success of the project
  • Aggressive but Realistic – to achieve action & result
  Who has created the project?
  • Have you suggested? Or
  • Direct client? Or senior management of client? Or
  • Their client? Or
  • Consultant of client? Or
  • Consultants of client’s client?
                                                                    7
Contact – rrakhecha@myefg.org              Making earth little softer
Define Project
   Ask - What project should attempt to achieve?
    • Is there a need to change? How?
    • To create something new? Why?
    • Why is it important? Is any liability linked?
    • How soon it is needed? Is it time dependant?
   Define – Key players from client &
   organizational side
    • Vision statement & share during kickoff
      meeting – Seek agreement
    • Be flexible to revise the vision statement or
      objectives
                                                              8
Contact – rrakhecha@myefg.org        Making earth little softer
Setting limitations
   Time constraints
    • Who is setting the time constraints?
    • Is any scope shifting the time frame?
    • Is it realistic? Is it shorter than team envisaging?
    • Does it have right distribution across phases? e.g.
      RA 2 months & entire development – 2 months??
   Budget constraints –
    • To control the scope of the project, Client would
      always want to have as much
    • To check, monitor & control the budgets
    • Can you absorb over-run of efforts & budget?
   Structural constraints - To get buying from all the
   hierarchy
                                                                   9
Contact – rrakhecha@myefg.org             Making earth little softer
Risk & mitigation
  • Estimate probability of occurrence and impact
    thus likely exposure
  • External - Out of control of manager; good to
    identify the owner & transfer
  • Internal - Understand, measure the impact,
    mitigate or transfer
  • Track till closure or transfer
  • Think always contingency plan



                                                            10
Contact – rrakhecha@myefg.org       Making earth little softer
Project planning
  • Look at the bigger picture - Think priority,
    available    resources,    budget,  schedule,
    resources to be recruited, etc
  • Set a reference point - Baseline the schedule
    for tracking
  • Communicate a vision - Share a well written
    plan to all
  • Delegate the tasks - Cover all the activities,
    define role of everyone, make delegation
  • Break into modules - Clearer & smaller tasks
    helps
                                                            11
Contact – rrakhecha@myefg.org       Making earth little softer
Project planning
  • Allow to control - Define ownership once
    modules are defined
  • Set clear roles - Helps avoiding confusion, no
    excuses for missing deadline
  • Adapt to change – Plan creates direction,
    revisit original assumptions & change if & as
    required, needs agreement
  • Check history – Similar project might have
    been executed, visit previous templates, talk
    with team members who were involved,
    capture the tips & act accordingly
                                                            12
Contact – rrakhecha@myefg.org       Making earth little softer
Project planning
  Plan brainstorming meeting chaired by third party -
  Gather team members to brainstorm
   • Requirements understanding & knowledge transfer
   • Detailed Plan
   • Risk mitigation
   • Resourcing and Budgets
  Pre-project activities are listed & scheduled;
  To check if re-scheduling is required
  To group the activities logically, chronologically and cost
  based to make assignment eazier
  To plan further meetings for checking completion,
  acceptance, availability of the resources

                                                                    13
Contact – rrakhecha@myefg.org               Making earth little softer
Project planning
  Creating milestones
  • To measure the progress
  • To focus on results
  • To divide work schedule
  • To raise alerts for risks & difficulties
  Attributes of mile stones
  • Defined milestones in agreement with client
  • Direct & clear statements for deliverables
  • Verifiable results
  • Adaptability – By client and team members

                                                             14
Contact – rrakhecha@myefg.org        Making earth little softer
Effective planning
  • Time estimate – Estimate the size of the
    project , convert it to schedule & check is it
    inline with client’s expectations?
  • Resource need- Build the team using the best
    possible members, also include infrastructure,
    hardware, software, etc
  • Cost – determine how much would the project
    cost? Have a firm grip on direct (salary, travel,
    equipment) & indirect cost(overheads like
    management cost, stationary, administration,
    etc. Track the cost as project progresses
                                                              15
Contact – rrakhecha@myefg.org         Making earth little softer
Effective planning
  Completeness –
  • Do not miss any activity/ feature/ function. Include all
    review & rework activities.
  • Estimate efforts & time needed to complete the
    activity – Allow contingency time for holdups ,
    overruns, quality rejections, delivery failures, leave,
    holidays, meeting, emergency, accidents, etc.
  • Identify dependent & non dependent activities,
    Connect activities based on priorities & dependency.
    Non-dependent activities can be completed in
    parallel. Create network diagram for dependent
    activities & determine critical path
  • Track all activities
                                                                    16
Contact – rrakhecha@myefg.org               Making earth little softer
Effective planning
  • Assign the resources
  • Changing objectives- review to check the changes
    due to inadequacy at starting phase, Address
    appropriately re-estimating & re-scheduling.
  • Experience-Use organisational experience
  • Recorded data & PCB (project capability baseline) -
    Use historical data- PCB, ready components, etc
  • Consultant – Hire expert for estimation & reviews
  • Do not agree under pressure- Client or management
    might push estimation or schedule. Unless it is
    realistic & doable, do not agree.
  • Communication – Synchronize the communication
    with all stake holders & seek agreement
                                                                17
Contact – rrakhecha@myefg.org           Making earth little softer
Leadership style
  • Authorative – Making most of the decision on own,
    discouraging different ways of looking at thing;
     • Disadv – team members can get disgruntled since
       unable to vent their opinions
  • Hands-on – Less dependent on fellow members, can
    work with less confident members
  • Consensus seeking -          spend time listening to
    members,      helps    building   team      confidence,
    encourage members to use their initiatives, long time
    for decision making
  • Analytical – more time spend analyzing the situation
    & planning, fine tuning decision making, attention to
    details, need to be good at delegation
                                                                   18
Contact – rrakhecha@myefg.org              Making earth little softer
Project resources
  Check the leadership of manager
  • Ownership of failures
  • Ability to motivate team
  • Ability developing team members
  • Ability to cope up with the changes
  • Ability to delegate
  • Leading from front
     #                          Role    #                  Role
     1 Establishing objectives          6   Encouraging & Motivating team
     2 Preparing master plan            7   Keeping priorities of stake holders
     3 Fixing budget                    8   Reciprocating demands
     4 Defining & communicating roles   9   Monitoring & controlling progress
     5 Selecting team                   10 Ensuring targets
                                                                                 19
Contact – rrakhecha@myefg.org                            Making earth little softer
Project resources
  Project performance depends on the skills of the best possible
  team without burdening the budgets to ensure quality & speed
  • List the key role, designation, brief description of each tasks,
    necessary & preferred skills
  • Check team logic by grouping different roles
  • Get the best available resources, identify the training needs
  • Assure to have back up for the key resources
  • Revisit schedule to adopt available resource
  • Chase second choice if first choice is not available
  • Workout new recruitment, invest as & if necessary
  • Get agreement on the team, hierarchy and their roles
  • Forecast direct (Salary & subcontract) & indirect cost
  • Arrange a team meeting, convey goal & objectives,
    communicate the role and schedule
  • Request for explaining understanding of role & responsibility
                                                                          20
Contact – rrakhecha@myefg.org                     Making earth little softer
Teamwork & spirit
  • Forming – Seek commitment from individual, explain their roles
    & seek their understanding, discuss their expectation,
    understand their background, areas of expertise, etc
  • Storming – Address the grievances & conflict, avoid getting too
    personal, brainstrom to carry assigned tasks effectively, what
    support do they need, etc
  • Norming – Allow members to settle, set the guideline for daily
    reporting, conduct start up meeting for daily updates, etc
  • Performing – Motivate working together & to perform towards
    shared objectives, recognize good work, grant higher role,
    more responsibility, encourage to develop new skills, etc
  • Boring – If project is long, members feel they have outlasted
    their role, remind their deadlines & targets
  • Mourning – Finishing tasks early could de-stabilise, assign
    more tasks to bind those members
                                                                         21
Contact – rrakhecha@myefg.org                    Making earth little softer
Project resources
    #              Role                                Description
    1 Champion                  Supports project, guides to manager , powerful leverage
                                during tough time, can be relied
    2 Director/                 Having final say, manages the project - plan, track, control
      Manager                   & measure
    3 Sponsor/                  Seek agreement , advice & secondary support; invaluable
      client                    contributor, provides opinions on result, involving at every
                                possible phase, listen & act on their feedback, Test &
                                accept
    4 Project                   To execute day-today operation, measurement, arranging
      manager                   meeting,
    5 Team                      Have hierarchy, can raise question decisions offer
      members                   alternate way of thinking, execute responsibilities offered,
                                updates on progress
    6 Support team Includes HR, legal, contract, finance, sys-admin, admin,

                                                                                              22
Contact – rrakhecha@myefg.org                                         Making earth little softer
Project resources
     #    Role                                   Description
     7 Analyst                  Seek inputs, from external sources,
                                Appointment based on repeat experience
     8 Critic /                 Critic who has unrealistic standards, final say
       Reviewer                 is of manager, compare results of advice
     9 Team                     Brings members together, inject team spirit,
       builder                  energetic & self motivated
    10 Creative                 Improvised way of working helps to project &
                                team
    11 Activator                Keen to push things forward, usually goal
                                oriented,
    12 Carer                    A sympathetic person listening to the
                                grievances, safety valve for volatile member
                                                                                     23
Contact – rrakhecha@myefg.org                                Making earth little softer
Delegate effectively
    Right team                  Seek the member based on track record & then
                                potential
    Communicate Communicate expectations clearly, exact nature of
    clearly     the tasks, Avoid ignorance
    Set realistic Understand potential, capability, experience & energy
    targets       while setting the tasks
    Monitor                     Indicate clear milestone, define % completion in
    progress                    agreement, Have a check list to declare the
                                completion of the tasks, seek inputs on daily basis
    Get & give Seek updates on performance, check the results, ask
    feedback   the supervisor & give feedback setting / reminding the
               expectations
    Encourage      Encourage commitment & time from team members
    accountability to complete tasks as planned;challenge ownership
                                                                                         24
Contact – rrakhecha@myefg.org                                    Making earth little softer
To motivate team
   Question Understand reasons liking of challenges, status of
   motivation the assignment, recognition, salary, security &
               stability. Understand liking & disliking & act;
               demand high standards of them & encourage hard
               work, think something new always.
   Recognize Credit members for the tasks well done, be specific
   good work on compliment,
   Steer them Understand the resistance to change, get the
               agreement sharing the cons of the old system,
               support while establishing the change
   Encourage Select employee who dares & like change, Support
   change      & guide to take more, share examples of success,
   Set      up Appraise regularly, focus on hard facts & quantify.,
   appraisals set up measurement
                                                                         25
Contact – rrakhecha@myefg.org                    Making earth little softer
Launching a project
  Halfway point…revisit again while launching a project
  • What are the main constraints of the project?
  • What are the reasons for the project? What are the
    problems of the client which lead to this project?
  • Who suggested the project? Vision of the project…
  • Who will be main beneficiaries of the project?
  • What would happen if project is failed or shelved?
    (Loss of revenue or profitability?)
  • What are the desired outcome of the project?
  • Who have you involved in the project? Have you
    identified all the resources needed for this project?
  • Activities needed to complete the project?
  • Set monitoring process and reporting mechanism?
                                                                 26
Contact – rrakhecha@myefg.org            Making earth little softer
Launching a project
  Re-launching project
  • Understand the problem
  • Seek main beneficiaries – inspiration to push
  • Reestate project objectives
  • Focus on activities
  • Reenergise team
  • Revisit time table
  • Revisit members- right members & numbers
  • Consider the risks & their handling
  • Focus on monitoring – keep close eye on
    performance & progress
                                                            27
Contact – rrakhecha@myefg.org       Making earth little softer
Launching a project
     #          Analysis                       Detail description
     1 Handling      • Ask what if questions & alternate paths
       uncertainties • Workout odds…seek expert advice
                     • Assess success; to lower the element of errors
                     • Identify key uncertainty – choose 3 to 5 points
                     • Prioritize – Try top most important uncertainty
                     • Specify impact & outcome
                     • Simulate the future
                     • Hire consultant- Experienced resources when
                       needed
                     • Prepare contingency plan
     2 Managing                 • To set up physical information center like LCD
       information              • Separate the data - group the information
                                • Appoint a knowledge coordinator if budget
                                  permits
                                                                                      28
Contact – rrakhecha@myefg.org                                 Making earth little softer
Launching a project
     #     Analysis                            Detail description
     3 Effective                •   Ask questions, encourage open
       Communicating                communication
                         •          Make announcements
                         •          Listen , pay attention, don’t interrupt
                         •          Prepare weekly reports
     4 Preparing project •          List the stakeholders
       report            •          Kickoff / launch the project
                         •          Project a vision
                         •          Establish a targets
                         •          Recognize uncertainties



                                                                                    29
Contact – rrakhecha@myefg.org                               Making earth little softer
Effective Monitoring
     #    Item          Description             Description
     1 Effective  Measure progress         Assure client
       monitoring Boost team morale        Safeguard decisions
                  Encourage flexibility    Prevent collapse
     2 Progress Provide eazy feedback      Include basic details
       reports    forms                    Make comparisons
                  Make reports regular     Underline problems
                  Make reports brief       Start with highlights
     3 Review     Book a regular meeting   Allow question time
       meeting    slot                     Be available
                  Be specific              Write meeting
                  Structure the meeting    summary
                                           Appoint a meeting
                                           leader
                                                                       30
Contact – rrakhecha@myefg.org                  Making earth little softer
Effective Monitoring
    #                Item             Description                  Description
   4 Email         Is email the best?                      Don’t shout
     communication Keep email short                        Keep copies & ready
                   Read through                            reference
    5 Monitoring                Monitor schedule           Fail to achieve targets
      schedule-                 capture reasons for        Personality clashes
                                delay                      Incomplete prerequisites
                                Overestimation of          Less efforts than envisaged
                                experience & skills        In-efficiencies
                                Low motivation
    6 Measures to               Encourage use of time      Encourage ideas to improve
      avoid delay               sheet                      Cost effective alternatives
                                Face to face meeting       Judge the work for its quality
                                Conclude on non-
                                performers, change if
                                needed, it is never late

                                                                                            31
Contact – rrakhecha@myefg.org                                      Making earth little softer
Effective Monitoring
     #            Item                 Description                  Description
     7 Monitor the              Under researched            Underestimated work
       cost                     purchases                   schedule for the consultants
                                Time delay & overrun
     8 Measures    Invite more bids, negotiate              Adopt close down process -
       to minimise hard                                     release equipment or
       the cost    Avoid overtime                           members if not required
     9 Change                   Assess impact on efforts,   Explain change once
       request                  schedule, quality & cost,   accepted
                                convey to stakeholders &
                                get approval




                                                                                             32
Contact – rrakhecha@myefg.org                                        Making earth little softer
Scope creep
  Process of introducing new parameters & approaches
  to a completed project plan
  • Factors for scope creep
  • Fear of turning down a client
  • Not realizing or underestimation of impact of
     changing project plan
  • Over-optimism of new suggestion to improve a
     difficult situation
  • Lack of faith in original plan, desire of over
     engineering
  Effect of scope creep
  • Risking / derailing the project
  • Encourages client to make further suggestions
                                                              33
Contact – rrakhecha@myefg.org         Making earth little softer
Scope creep
  Controlling the scope creep
  • Reasons for change to be convincing
  • Check impact of not making changes & doing nothing
  • Do not be afraid, convey the proposed changes, it
    could hinder the project
  Managing the risk
  • Identify the risk, probability of occurrence, impact,
    exposure, mitigation plan & owner
  • Be objective while avoiding occurrence of the risks
  • Develop risk management strategy, close or transfer
    the risk, develop contingency plan
  • Communicate the risks to all stake holders, seek
    feedback, device alternative strategy
                                                                  34
Contact – rrakhecha@myefg.org             Making earth little softer
Softwares
      #              Item                             Description
     1       Project    Eazier storage & retrieval of information
             management Analysis of information
             software   Preparing report & presentation, check accuracy of data
                        Over-reliance on data
                        Loss of team spirit / communication
     2       Speciality         Project management, email, Spread-sheet, word ,
             software           calendar, database (access), presentation
                                Eazily available, and Efficient
                                Difficulty in integration, we miss bigger picture
     3       Integrated         Calculate project budget
             Software           Manage/ Monitor schedule; task duration, assignee, etc
                                Optimize schedule & resources
                                Auto / predefined project report
                                Integration with data
                                Needs training to the users

                                                                                            35
Contact – rrakhecha@myefg.org                                       Making earth little softer
Closing a project
  Following are advantages closing the project
  • Measure success if objectives have been achieved?
  • Satisfies the team- sense of achievement of
    completing project
  • Paves the way for future teamwork recognizing
    efforts & hard work
  • Avoid repeating mistakes – create records of lesson
    learnt, derive benefits from mistakes
  • Control expense–release the resources
  • Improves communication with end users, earns
    respect
  • Offer personal satisfaction, write challenges you have
    faces & how did you overcome
                                                                  36
Contact – rrakhecha@myefg.org             Making earth little softer
Closing a project
  • Plan project closure - To arrange a meeting with all stake
    holders communicating formally the closure, presenting data
    of efforts, schedule, quality (defect data) and cost (actual &
    variances), degree of achievement, change requests,
    feedback, progress reports, positive & negative points,
    challenges, risks & how those were managed, lessons learnt
    & corrective actions, performers, emerging leaders,
    productivity, do & don’t for future projects, areas of
    improvements, etc
  • Release hard & soft resources (Hardware, source code,
    software, team members, their access rights, project email id)
  • Complete appraisal
  • Celebration & thanking – Foster a spirit of collaboration,
    improves morale, underline core values
  • Seek official approval of closure
                                                                        37
Contact – rrakhecha@myefg.org                   Making earth little softer
Thank You




                                                            38
Contact – rrakhecha@myefg.org       Making earth little softer

More Related Content

What's hot

Project management - a practical overview Sue Greener
Project management - a practical overview Sue GreenerProject management - a practical overview Sue Greener
Project management - a practical overview Sue Greener
Sue Greener
 
Managing the Unknown v2
Managing the Unknown v2Managing the Unknown v2
Managing the Unknown v2
MikeGriffiths403
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
Chris Hattingh
 
Event project management
Event project managementEvent project management
Event project management
Raghu Raj Gopal
 
Project Management
Project ManagementProject Management
Project Management
David Edgerton, Jr.
 
Proj Mgmt Capability
Proj Mgmt CapabilityProj Mgmt Capability
Proj Mgmt Capabilitysmcasas
 
Art of Project Management - Make Things Done On Time
Art of Project Management - Make Things Done On TimeArt of Project Management - Make Things Done On Time
Art of Project Management - Make Things Done On Time
calvinbiz0514
 
John.rigoli
John.rigoliJohn.rigoli
John.rigoliNASAPMC
 
Project Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management ProcessesProject Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management ProcessesThink For A Change
 
Project Management Pocket Skills Guide
Project Management Pocket Skills GuideProject Management Pocket Skills Guide
Project Management Pocket Skills Guide
Emily Robinson
 
Event Organisation, Coorporation & Project Management
Event Organisation, Coorporation & Project ManagementEvent Organisation, Coorporation & Project Management
Event Organisation, Coorporation & Project Management
rlabsza
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
Anand Subramaniam
 
Project Management Webinar
Project Management WebinarProject Management Webinar
Project Management Webinar
james_waterhouse
 
Effective project management skills
Effective project management skillsEffective project management skills
Effective project management skills
Charles Cotter, PhD
 
Drupal GovCon 2021 - Using Agile to Plan & Execute Better Together
Drupal GovCon 2021 - Using Agile to Plan & Execute Better TogetherDrupal GovCon 2021 - Using Agile to Plan & Execute Better Together
Drupal GovCon 2021 - Using Agile to Plan & Execute Better Together
Bill Annibell
 
Kerika: A Case Study of a Project Management Office at Treinen Associates
Kerika: A Case Study of a Project Management Office at Treinen AssociatesKerika: A Case Study of a Project Management Office at Treinen Associates
Kerika: A Case Study of a Project Management Office at Treinen Associates
Arun Kumar
 
Project Management In Our Changing World
Project Management In Our Changing WorldProject Management In Our Changing World
Project Management In Our Changing World
Randy Dunson
 

What's hot (20)

Project management - a practical overview Sue Greener
Project management - a practical overview Sue GreenerProject management - a practical overview Sue Greener
Project management - a practical overview Sue Greener
 
Managing the Unknown v2
Managing the Unknown v2Managing the Unknown v2
Managing the Unknown v2
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
Event project management
Event project managementEvent project management
Event project management
 
PM Related Info
PM Related InfoPM Related Info
PM Related Info
 
Project Management
Project ManagementProject Management
Project Management
 
Program Management Office (PMO)
Program Management Office (PMO)Program Management Office (PMO)
Program Management Office (PMO)
 
Proj Mgmt Capability
Proj Mgmt CapabilityProj Mgmt Capability
Proj Mgmt Capability
 
Pm
PmPm
Pm
 
Art of Project Management - Make Things Done On Time
Art of Project Management - Make Things Done On TimeArt of Project Management - Make Things Done On Time
Art of Project Management - Make Things Done On Time
 
John.rigoli
John.rigoliJohn.rigoli
John.rigoli
 
Project Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management ProcessesProject Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management Processes
 
Project Management Pocket Skills Guide
Project Management Pocket Skills GuideProject Management Pocket Skills Guide
Project Management Pocket Skills Guide
 
Event Organisation, Coorporation & Project Management
Event Organisation, Coorporation & Project ManagementEvent Organisation, Coorporation & Project Management
Event Organisation, Coorporation & Project Management
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
Project Management Webinar
Project Management WebinarProject Management Webinar
Project Management Webinar
 
Effective project management skills
Effective project management skillsEffective project management skills
Effective project management skills
 
Drupal GovCon 2021 - Using Agile to Plan & Execute Better Together
Drupal GovCon 2021 - Using Agile to Plan & Execute Better TogetherDrupal GovCon 2021 - Using Agile to Plan & Execute Better Together
Drupal GovCon 2021 - Using Agile to Plan & Execute Better Together
 
Kerika: A Case Study of a Project Management Office at Treinen Associates
Kerika: A Case Study of a Project Management Office at Treinen AssociatesKerika: A Case Study of a Project Management Office at Treinen Associates
Kerika: A Case Study of a Project Management Office at Treinen Associates
 
Project Management In Our Changing World
Project Management In Our Changing WorldProject Management In Our Changing World
Project Management In Our Changing World
 

Viewers also liked

6 earthsoft-building indiav1 1
6 earthsoft-building indiav1 16 earthsoft-building indiav1 1
6 earthsoft-building indiav1 1
EarthSoft Foundation of Guidance - EFG
 
Follow Your Internal Guidance System to Apply the Law of Attraction
Follow Your Internal Guidance System to Apply the Law of AttractionFollow Your Internal Guidance System to Apply the Law of Attraction
Follow Your Internal Guidance System to Apply the Law of Attraction
Sharon Ballantine, Parenting Coach and Life Coach
 
-HIV-Prevention-Early-Childhood-Development-Interventions
-HIV-Prevention-Early-Childhood-Development-Interventions-HIV-Prevention-Early-Childhood-Development-Interventions
-HIV-Prevention-Early-Childhood-Development-InterventionsFarai Charasika
 
Tips para usar slideshare
Tips para usar slideshareTips para usar slideshare
Tips para usar slideshare
velacarla
 
Corrientes de pensamiento economico
Corrientes de pensamiento economicoCorrientes de pensamiento economico
Corrientes de pensamiento economico
Yadira Guzmán Aguirre
 
平面グラフ
平面グラフ平面グラフ
平面グラフyutaka1999
 
Let´s travel to scotland
Let´s travel to scotlandLet´s travel to scotland
Let´s travel to scotland
Rosafersa
 
第5回 情動
第5回 情動第5回 情動
第5回 情動
Katsuyoshi Sato
 
Presentacion Cádiz Libro "Epilepsia en situaciones de urgencia"
Presentacion Cádiz Libro "Epilepsia en situaciones de urgencia"Presentacion Cádiz Libro "Epilepsia en situaciones de urgencia"
Presentacion Cádiz Libro "Epilepsia en situaciones de urgencia"
Pedro Serrano Castro
 
Nonprofit Day - Ethics Presentation. Gary Bukowski 10.25.16
Nonprofit Day - Ethics Presentation. Gary Bukowski 10.25.16Nonprofit Day - Ethics Presentation. Gary Bukowski 10.25.16
Nonprofit Day - Ethics Presentation. Gary Bukowski 10.25.16
Gary L. Bukowski MA,CFRE VP for Advancement
 

Viewers also liked (10)

6 earthsoft-building indiav1 1
6 earthsoft-building indiav1 16 earthsoft-building indiav1 1
6 earthsoft-building indiav1 1
 
Follow Your Internal Guidance System to Apply the Law of Attraction
Follow Your Internal Guidance System to Apply the Law of AttractionFollow Your Internal Guidance System to Apply the Law of Attraction
Follow Your Internal Guidance System to Apply the Law of Attraction
 
-HIV-Prevention-Early-Childhood-Development-Interventions
-HIV-Prevention-Early-Childhood-Development-Interventions-HIV-Prevention-Early-Childhood-Development-Interventions
-HIV-Prevention-Early-Childhood-Development-Interventions
 
Tips para usar slideshare
Tips para usar slideshareTips para usar slideshare
Tips para usar slideshare
 
Corrientes de pensamiento economico
Corrientes de pensamiento economicoCorrientes de pensamiento economico
Corrientes de pensamiento economico
 
平面グラフ
平面グラフ平面グラフ
平面グラフ
 
Let´s travel to scotland
Let´s travel to scotlandLet´s travel to scotland
Let´s travel to scotland
 
第5回 情動
第5回 情動第5回 情動
第5回 情動
 
Presentacion Cádiz Libro "Epilepsia en situaciones de urgencia"
Presentacion Cádiz Libro "Epilepsia en situaciones de urgencia"Presentacion Cádiz Libro "Epilepsia en situaciones de urgencia"
Presentacion Cádiz Libro "Epilepsia en situaciones de urgencia"
 
Nonprofit Day - Ethics Presentation. Gary Bukowski 10.25.16
Nonprofit Day - Ethics Presentation. Gary Bukowski 10.25.16Nonprofit Day - Ethics Presentation. Gary Bukowski 10.25.16
Nonprofit Day - Ethics Presentation. Gary Bukowski 10.25.16
 

Similar to 10 earthsoft-97-project management-v1 1

2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptx2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptx
ProfDrAnbalaganChinn
 
PART- 1 Engineering Project Management
PART- 1 Engineering Project Management PART- 1 Engineering Project Management
Software Project Management Basics
Software Project Management BasicsSoftware Project Management Basics
Software Project Management Basics
Amarjeet Singh
 
Elements of Project Management
Elements of Project ManagementElements of Project Management
Elements of Project Management
eph-hr
 
Elements of Project Management
Elements of Project ManagementElements of Project Management
Elements of Project Management
Kevin Thomas
 
Project Management
Project ManagementProject Management
Project Management
Project ManagementProject Management
Project ManagementAtif Rehmat
 
The art of execution
The art of executionThe art of execution
The art of execution
Crystal Taggart
 
Mpug 111208 generic
Mpug 111208 genericMpug 111208 generic
Mpug 111208 generic
Moritz Farbstein
 
project-management.pdf
project-management.pdfproject-management.pdf
project-management.pdf
SAMPREET3
 
Project management by Dr. Huda Hassan
Project management by Dr. Huda HassanProject management by Dr. Huda Hassan
Project management by Dr. Huda Hassan
Dr Ghaiath Hussein
 
Project management
Project managementProject management
Project management
Brian Pichman
 
Project management and Success Criteria
Project management and Success Criteria Project management and Success Criteria
Project management and Success Criteria
ujjwal Mania
 
Project management
Project managementProject management
Project managementobsession56
 
MODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptxMODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptx
SharanabasappaDegoan
 
Managing Big IT Projects
Managing Big IT ProjectsManaging Big IT Projects
Managing Big IT ProjectsInfoPier
 
Project management System
Project management SystemProject management System
Project management System
Hitesh Jangid
 
Project initiation topic 2.7_the project manager
Project initiation topic 2.7_the project managerProject initiation topic 2.7_the project manager
Project initiation topic 2.7_the project manager
RudreshSamant
 
Project management_0.ppt
Project management_0.pptProject management_0.ppt
Project management_0.ppt
AmulShrestha3
 
Project Management Base Camp
Project Management Base CampProject Management Base Camp
Project Management Base Camp
eph-hr
 

Similar to 10 earthsoft-97-project management-v1 1 (20)

2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptx2. PAE AcFn621 Ch-2 Principle ppt.pptx
2. PAE AcFn621 Ch-2 Principle ppt.pptx
 
PART- 1 Engineering Project Management
PART- 1 Engineering Project Management PART- 1 Engineering Project Management
PART- 1 Engineering Project Management
 
Software Project Management Basics
Software Project Management BasicsSoftware Project Management Basics
Software Project Management Basics
 
Elements of Project Management
Elements of Project ManagementElements of Project Management
Elements of Project Management
 
Elements of Project Management
Elements of Project ManagementElements of Project Management
Elements of Project Management
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management
Project ManagementProject Management
Project Management
 
The art of execution
The art of executionThe art of execution
The art of execution
 
Mpug 111208 generic
Mpug 111208 genericMpug 111208 generic
Mpug 111208 generic
 
project-management.pdf
project-management.pdfproject-management.pdf
project-management.pdf
 
Project management by Dr. Huda Hassan
Project management by Dr. Huda HassanProject management by Dr. Huda Hassan
Project management by Dr. Huda Hassan
 
Project management
Project managementProject management
Project management
 
Project management and Success Criteria
Project management and Success Criteria Project management and Success Criteria
Project management and Success Criteria
 
Project management
Project managementProject management
Project management
 
MODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptxMODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptx
 
Managing Big IT Projects
Managing Big IT ProjectsManaging Big IT Projects
Managing Big IT Projects
 
Project management System
Project management SystemProject management System
Project management System
 
Project initiation topic 2.7_the project manager
Project initiation topic 2.7_the project managerProject initiation topic 2.7_the project manager
Project initiation topic 2.7_the project manager
 
Project management_0.ppt
Project management_0.pptProject management_0.ppt
Project management_0.ppt
 
Project Management Base Camp
Project Management Base CampProject Management Base Camp
Project Management Base Camp
 

More from EarthSoft Foundation of Guidance - EFG

CompilationOfAllSongs-DevAnand-movies.pdf
CompilationOfAllSongs-DevAnand-movies.pdfCompilationOfAllSongs-DevAnand-movies.pdf
CompilationOfAllSongs-DevAnand-movies.pdf
EarthSoft Foundation of Guidance - EFG
 
Devsaab Essay-2 - Slideshare-English.docx
Devsaab Essay-2 - Slideshare-English.docxDevsaab Essay-2 - Slideshare-English.docx
Devsaab Essay-2 - Slideshare-English.docx
EarthSoft Foundation of Guidance - EFG
 
Devsaab Essay-2 - Slideshare-Hindi.docx
Devsaab Essay-2 - Slideshare-Hindi.docxDevsaab Essay-2 - Slideshare-Hindi.docx
Devsaab Essay-2 - Slideshare-Hindi.docx
EarthSoft Foundation of Guidance - EFG
 
Essay-Brief-English-Devsaab-1.docx
Essay-Brief-English-Devsaab-1.docxEssay-Brief-English-Devsaab-1.docx
Essay-Brief-English-Devsaab-1.docx
EarthSoft Foundation of Guidance - EFG
 
Devsaab-Essay-English.docx
Devsaab-Essay-English.docxDevsaab-Essay-English.docx
Devsaab-Essay-English.docx
EarthSoft Foundation of Guidance - EFG
 
Visiting-Chittodgad-Guide-Shooting-Locations
Visiting-Chittodgad-Guide-Shooting-LocationsVisiting-Chittodgad-Guide-Shooting-Locations
Visiting-Chittodgad-Guide-Shooting-Locations
EarthSoft Foundation of Guidance - EFG
 
17-3-Dev-Style-hat-scarf-Full-V1_1.pdf
17-3-Dev-Style-hat-scarf-Full-V1_1.pdf17-3-Dev-Style-hat-scarf-Full-V1_1.pdf
17-3-Dev-Style-hat-scarf-Full-V1_1.pdf
EarthSoft Foundation of Guidance - EFG
 
Prem Pujari Review-analysis
Prem Pujari Review-analysisPrem Pujari Review-analysis
Prem Pujari Review-analysis
EarthSoft Foundation of Guidance - EFG
 
Nostalgia-Bollywood-Songs
Nostalgia-Bollywood-SongsNostalgia-Bollywood-Songs
Nostalgia-Bollywood-Songs
EarthSoft Foundation of Guidance - EFG
 
Mahal(969)-analysis
Mahal(969)-analysisMahal(969)-analysis
Ambition and being contended
Ambition and being contendedAmbition and being contended
Ambition and being contended
EarthSoft Foundation of Guidance - EFG
 
Dev Anand Movies-list of Artists
Dev Anand Movies-list of ArtistsDev Anand Movies-list of Artists
Dev Anand Movies-list of Artists
EarthSoft Foundation of Guidance - EFG
 
Hotspots-Of-The-Boss
Hotspots-Of-The-BossHotspots-Of-The-Boss
Suggestions financial-budget
Suggestions financial-budgetSuggestions financial-budget
Suggestions financial-budget
EarthSoft Foundation of Guidance - EFG
 
Dev anand birthday-26 Sep Celebration
Dev anand birthday-26 Sep CelebrationDev anand birthday-26 Sep Celebration
Dev anand birthday-26 Sep Celebration
EarthSoft Foundation of Guidance - EFG
 
Great-Golden-Goldie
Great-Golden-GoldieGreat-Golden-Goldie
The guide immortal movie-great goldie
The guide  immortal movie-great goldieThe guide  immortal movie-great goldie
The guide immortal movie-great goldie
EarthSoft Foundation of Guidance - EFG
 
Success - The Turning Point-Higher Education Guide
Success - The Turning Point-Higher Education GuideSuccess - The Turning Point-Higher Education Guide
Success - The Turning Point-Higher Education Guide
EarthSoft Foundation of Guidance - EFG
 
Success-TheTurningPoint-1
Success-TheTurningPoint-1Success-TheTurningPoint-1
Success-TheTurningPoint-1
EarthSoft Foundation of Guidance - EFG
 
Ideas Technical blogs
Ideas Technical blogsIdeas Technical blogs

More from EarthSoft Foundation of Guidance - EFG (20)

CompilationOfAllSongs-DevAnand-movies.pdf
CompilationOfAllSongs-DevAnand-movies.pdfCompilationOfAllSongs-DevAnand-movies.pdf
CompilationOfAllSongs-DevAnand-movies.pdf
 
Devsaab Essay-2 - Slideshare-English.docx
Devsaab Essay-2 - Slideshare-English.docxDevsaab Essay-2 - Slideshare-English.docx
Devsaab Essay-2 - Slideshare-English.docx
 
Devsaab Essay-2 - Slideshare-Hindi.docx
Devsaab Essay-2 - Slideshare-Hindi.docxDevsaab Essay-2 - Slideshare-Hindi.docx
Devsaab Essay-2 - Slideshare-Hindi.docx
 
Essay-Brief-English-Devsaab-1.docx
Essay-Brief-English-Devsaab-1.docxEssay-Brief-English-Devsaab-1.docx
Essay-Brief-English-Devsaab-1.docx
 
Devsaab-Essay-English.docx
Devsaab-Essay-English.docxDevsaab-Essay-English.docx
Devsaab-Essay-English.docx
 
Visiting-Chittodgad-Guide-Shooting-Locations
Visiting-Chittodgad-Guide-Shooting-LocationsVisiting-Chittodgad-Guide-Shooting-Locations
Visiting-Chittodgad-Guide-Shooting-Locations
 
17-3-Dev-Style-hat-scarf-Full-V1_1.pdf
17-3-Dev-Style-hat-scarf-Full-V1_1.pdf17-3-Dev-Style-hat-scarf-Full-V1_1.pdf
17-3-Dev-Style-hat-scarf-Full-V1_1.pdf
 
Prem Pujari Review-analysis
Prem Pujari Review-analysisPrem Pujari Review-analysis
Prem Pujari Review-analysis
 
Nostalgia-Bollywood-Songs
Nostalgia-Bollywood-SongsNostalgia-Bollywood-Songs
Nostalgia-Bollywood-Songs
 
Mahal(969)-analysis
Mahal(969)-analysisMahal(969)-analysis
Mahal(969)-analysis
 
Ambition and being contended
Ambition and being contendedAmbition and being contended
Ambition and being contended
 
Dev Anand Movies-list of Artists
Dev Anand Movies-list of ArtistsDev Anand Movies-list of Artists
Dev Anand Movies-list of Artists
 
Hotspots-Of-The-Boss
Hotspots-Of-The-BossHotspots-Of-The-Boss
Hotspots-Of-The-Boss
 
Suggestions financial-budget
Suggestions financial-budgetSuggestions financial-budget
Suggestions financial-budget
 
Dev anand birthday-26 Sep Celebration
Dev anand birthday-26 Sep CelebrationDev anand birthday-26 Sep Celebration
Dev anand birthday-26 Sep Celebration
 
Great-Golden-Goldie
Great-Golden-GoldieGreat-Golden-Goldie
Great-Golden-Goldie
 
The guide immortal movie-great goldie
The guide  immortal movie-great goldieThe guide  immortal movie-great goldie
The guide immortal movie-great goldie
 
Success - The Turning Point-Higher Education Guide
Success - The Turning Point-Higher Education GuideSuccess - The Turning Point-Higher Education Guide
Success - The Turning Point-Higher Education Guide
 
Success-TheTurningPoint-1
Success-TheTurningPoint-1Success-TheTurningPoint-1
Success-TheTurningPoint-1
 
Ideas Technical blogs
Ideas Technical blogsIdeas Technical blogs
Ideas Technical blogs
 

Recently uploaded

What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
 

Recently uploaded (20)

What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
 

10 earthsoft-97-project management-v1 1

  • 2. Appeal 2 Contact – rrakhecha@myefg.org Making earth little softer
  • 3. Index • Defining project • Bypassing planning • Project objectives • Setting limitations • Project planning • Effective planning • Project resources • Launching a project • Effective Monitoring • Scope creep • Software • Closing a project 3 Contact – rrakhecha@myefg.org Making earth little softer
  • 4. Defining project • Define Goal & expected changes after project • What are the benefits for client • For organisation (helps to set the priorities) • Time boundaries • Resources needed • People • Money • Hardware & Software • Facilities • Element of the risks • Maximising result –plan & optimize efforts 4 Contact – rrakhecha@myefg.org Making earth little softer
  • 5. Defining project • Steps • Define the project • Plan the project • Estimate duration, money and resources • Build a project team • Launch the project, Party with stake holders • Monitor the project, review the progress • Closure of the project 5 Contact – rrakhecha@myefg.org Making earth little softer
  • 6. Bypassing planning • Mentality of • Pushing the project • Planning means waste of money and time • Laziness, Shying away new methods • Overconfidence • Deceiving that adopted methods are the best • Hoping everything will be all-right • Lesser / Poor experience of manager • Sr. management involved in many crisis & activities • Too much dependency on consultants 6 Contact – rrakhecha@myefg.org Making earth little softer
  • 7. Project objectives • Sense of purpose? Would help on focus • Target? Would help motivating the team members • Prioritization & Time sensitive? Would help to organise & measure how much to go • Specific – Clear & Simple • Measurable – to measure the success of the project • Aggressive but Realistic – to achieve action & result Who has created the project? • Have you suggested? Or • Direct client? Or senior management of client? Or • Their client? Or • Consultant of client? Or • Consultants of client’s client? 7 Contact – rrakhecha@myefg.org Making earth little softer
  • 8. Define Project Ask - What project should attempt to achieve? • Is there a need to change? How? • To create something new? Why? • Why is it important? Is any liability linked? • How soon it is needed? Is it time dependant? Define – Key players from client & organizational side • Vision statement & share during kickoff meeting – Seek agreement • Be flexible to revise the vision statement or objectives 8 Contact – rrakhecha@myefg.org Making earth little softer
  • 9. Setting limitations Time constraints • Who is setting the time constraints? • Is any scope shifting the time frame? • Is it realistic? Is it shorter than team envisaging? • Does it have right distribution across phases? e.g. RA 2 months & entire development – 2 months?? Budget constraints – • To control the scope of the project, Client would always want to have as much • To check, monitor & control the budgets • Can you absorb over-run of efforts & budget? Structural constraints - To get buying from all the hierarchy 9 Contact – rrakhecha@myefg.org Making earth little softer
  • 10. Risk & mitigation • Estimate probability of occurrence and impact thus likely exposure • External - Out of control of manager; good to identify the owner & transfer • Internal - Understand, measure the impact, mitigate or transfer • Track till closure or transfer • Think always contingency plan 10 Contact – rrakhecha@myefg.org Making earth little softer
  • 11. Project planning • Look at the bigger picture - Think priority, available resources, budget, schedule, resources to be recruited, etc • Set a reference point - Baseline the schedule for tracking • Communicate a vision - Share a well written plan to all • Delegate the tasks - Cover all the activities, define role of everyone, make delegation • Break into modules - Clearer & smaller tasks helps 11 Contact – rrakhecha@myefg.org Making earth little softer
  • 12. Project planning • Allow to control - Define ownership once modules are defined • Set clear roles - Helps avoiding confusion, no excuses for missing deadline • Adapt to change – Plan creates direction, revisit original assumptions & change if & as required, needs agreement • Check history – Similar project might have been executed, visit previous templates, talk with team members who were involved, capture the tips & act accordingly 12 Contact – rrakhecha@myefg.org Making earth little softer
  • 13. Project planning Plan brainstorming meeting chaired by third party - Gather team members to brainstorm • Requirements understanding & knowledge transfer • Detailed Plan • Risk mitigation • Resourcing and Budgets Pre-project activities are listed & scheduled; To check if re-scheduling is required To group the activities logically, chronologically and cost based to make assignment eazier To plan further meetings for checking completion, acceptance, availability of the resources 13 Contact – rrakhecha@myefg.org Making earth little softer
  • 14. Project planning Creating milestones • To measure the progress • To focus on results • To divide work schedule • To raise alerts for risks & difficulties Attributes of mile stones • Defined milestones in agreement with client • Direct & clear statements for deliverables • Verifiable results • Adaptability – By client and team members 14 Contact – rrakhecha@myefg.org Making earth little softer
  • 15. Effective planning • Time estimate – Estimate the size of the project , convert it to schedule & check is it inline with client’s expectations? • Resource need- Build the team using the best possible members, also include infrastructure, hardware, software, etc • Cost – determine how much would the project cost? Have a firm grip on direct (salary, travel, equipment) & indirect cost(overheads like management cost, stationary, administration, etc. Track the cost as project progresses 15 Contact – rrakhecha@myefg.org Making earth little softer
  • 16. Effective planning Completeness – • Do not miss any activity/ feature/ function. Include all review & rework activities. • Estimate efforts & time needed to complete the activity – Allow contingency time for holdups , overruns, quality rejections, delivery failures, leave, holidays, meeting, emergency, accidents, etc. • Identify dependent & non dependent activities, Connect activities based on priorities & dependency. Non-dependent activities can be completed in parallel. Create network diagram for dependent activities & determine critical path • Track all activities 16 Contact – rrakhecha@myefg.org Making earth little softer
  • 17. Effective planning • Assign the resources • Changing objectives- review to check the changes due to inadequacy at starting phase, Address appropriately re-estimating & re-scheduling. • Experience-Use organisational experience • Recorded data & PCB (project capability baseline) - Use historical data- PCB, ready components, etc • Consultant – Hire expert for estimation & reviews • Do not agree under pressure- Client or management might push estimation or schedule. Unless it is realistic & doable, do not agree. • Communication – Synchronize the communication with all stake holders & seek agreement 17 Contact – rrakhecha@myefg.org Making earth little softer
  • 18. Leadership style • Authorative – Making most of the decision on own, discouraging different ways of looking at thing; • Disadv – team members can get disgruntled since unable to vent their opinions • Hands-on – Less dependent on fellow members, can work with less confident members • Consensus seeking - spend time listening to members, helps building team confidence, encourage members to use their initiatives, long time for decision making • Analytical – more time spend analyzing the situation & planning, fine tuning decision making, attention to details, need to be good at delegation 18 Contact – rrakhecha@myefg.org Making earth little softer
  • 19. Project resources Check the leadership of manager • Ownership of failures • Ability to motivate team • Ability developing team members • Ability to cope up with the changes • Ability to delegate • Leading from front # Role # Role 1 Establishing objectives 6 Encouraging & Motivating team 2 Preparing master plan 7 Keeping priorities of stake holders 3 Fixing budget 8 Reciprocating demands 4 Defining & communicating roles 9 Monitoring & controlling progress 5 Selecting team 10 Ensuring targets 19 Contact – rrakhecha@myefg.org Making earth little softer
  • 20. Project resources Project performance depends on the skills of the best possible team without burdening the budgets to ensure quality & speed • List the key role, designation, brief description of each tasks, necessary & preferred skills • Check team logic by grouping different roles • Get the best available resources, identify the training needs • Assure to have back up for the key resources • Revisit schedule to adopt available resource • Chase second choice if first choice is not available • Workout new recruitment, invest as & if necessary • Get agreement on the team, hierarchy and their roles • Forecast direct (Salary & subcontract) & indirect cost • Arrange a team meeting, convey goal & objectives, communicate the role and schedule • Request for explaining understanding of role & responsibility 20 Contact – rrakhecha@myefg.org Making earth little softer
  • 21. Teamwork & spirit • Forming – Seek commitment from individual, explain their roles & seek their understanding, discuss their expectation, understand their background, areas of expertise, etc • Storming – Address the grievances & conflict, avoid getting too personal, brainstrom to carry assigned tasks effectively, what support do they need, etc • Norming – Allow members to settle, set the guideline for daily reporting, conduct start up meeting for daily updates, etc • Performing – Motivate working together & to perform towards shared objectives, recognize good work, grant higher role, more responsibility, encourage to develop new skills, etc • Boring – If project is long, members feel they have outlasted their role, remind their deadlines & targets • Mourning – Finishing tasks early could de-stabilise, assign more tasks to bind those members 21 Contact – rrakhecha@myefg.org Making earth little softer
  • 22. Project resources # Role Description 1 Champion Supports project, guides to manager , powerful leverage during tough time, can be relied 2 Director/ Having final say, manages the project - plan, track, control Manager & measure 3 Sponsor/ Seek agreement , advice & secondary support; invaluable client contributor, provides opinions on result, involving at every possible phase, listen & act on their feedback, Test & accept 4 Project To execute day-today operation, measurement, arranging manager meeting, 5 Team Have hierarchy, can raise question decisions offer members alternate way of thinking, execute responsibilities offered, updates on progress 6 Support team Includes HR, legal, contract, finance, sys-admin, admin, 22 Contact – rrakhecha@myefg.org Making earth little softer
  • 23. Project resources # Role Description 7 Analyst Seek inputs, from external sources, Appointment based on repeat experience 8 Critic / Critic who has unrealistic standards, final say Reviewer is of manager, compare results of advice 9 Team Brings members together, inject team spirit, builder energetic & self motivated 10 Creative Improvised way of working helps to project & team 11 Activator Keen to push things forward, usually goal oriented, 12 Carer A sympathetic person listening to the grievances, safety valve for volatile member 23 Contact – rrakhecha@myefg.org Making earth little softer
  • 24. Delegate effectively Right team Seek the member based on track record & then potential Communicate Communicate expectations clearly, exact nature of clearly the tasks, Avoid ignorance Set realistic Understand potential, capability, experience & energy targets while setting the tasks Monitor Indicate clear milestone, define % completion in progress agreement, Have a check list to declare the completion of the tasks, seek inputs on daily basis Get & give Seek updates on performance, check the results, ask feedback the supervisor & give feedback setting / reminding the expectations Encourage Encourage commitment & time from team members accountability to complete tasks as planned;challenge ownership 24 Contact – rrakhecha@myefg.org Making earth little softer
  • 25. To motivate team Question Understand reasons liking of challenges, status of motivation the assignment, recognition, salary, security & stability. Understand liking & disliking & act; demand high standards of them & encourage hard work, think something new always. Recognize Credit members for the tasks well done, be specific good work on compliment, Steer them Understand the resistance to change, get the agreement sharing the cons of the old system, support while establishing the change Encourage Select employee who dares & like change, Support change & guide to take more, share examples of success, Set up Appraise regularly, focus on hard facts & quantify., appraisals set up measurement 25 Contact – rrakhecha@myefg.org Making earth little softer
  • 26. Launching a project Halfway point…revisit again while launching a project • What are the main constraints of the project? • What are the reasons for the project? What are the problems of the client which lead to this project? • Who suggested the project? Vision of the project… • Who will be main beneficiaries of the project? • What would happen if project is failed or shelved? (Loss of revenue or profitability?) • What are the desired outcome of the project? • Who have you involved in the project? Have you identified all the resources needed for this project? • Activities needed to complete the project? • Set monitoring process and reporting mechanism? 26 Contact – rrakhecha@myefg.org Making earth little softer
  • 27. Launching a project Re-launching project • Understand the problem • Seek main beneficiaries – inspiration to push • Reestate project objectives • Focus on activities • Reenergise team • Revisit time table • Revisit members- right members & numbers • Consider the risks & their handling • Focus on monitoring – keep close eye on performance & progress 27 Contact – rrakhecha@myefg.org Making earth little softer
  • 28. Launching a project # Analysis Detail description 1 Handling • Ask what if questions & alternate paths uncertainties • Workout odds…seek expert advice • Assess success; to lower the element of errors • Identify key uncertainty – choose 3 to 5 points • Prioritize – Try top most important uncertainty • Specify impact & outcome • Simulate the future • Hire consultant- Experienced resources when needed • Prepare contingency plan 2 Managing • To set up physical information center like LCD information • Separate the data - group the information • Appoint a knowledge coordinator if budget permits 28 Contact – rrakhecha@myefg.org Making earth little softer
  • 29. Launching a project # Analysis Detail description 3 Effective • Ask questions, encourage open Communicating communication • Make announcements • Listen , pay attention, don’t interrupt • Prepare weekly reports 4 Preparing project • List the stakeholders report • Kickoff / launch the project • Project a vision • Establish a targets • Recognize uncertainties 29 Contact – rrakhecha@myefg.org Making earth little softer
  • 30. Effective Monitoring # Item Description Description 1 Effective Measure progress Assure client monitoring Boost team morale Safeguard decisions Encourage flexibility Prevent collapse 2 Progress Provide eazy feedback Include basic details reports forms Make comparisons Make reports regular Underline problems Make reports brief Start with highlights 3 Review Book a regular meeting Allow question time meeting slot Be available Be specific Write meeting Structure the meeting summary Appoint a meeting leader 30 Contact – rrakhecha@myefg.org Making earth little softer
  • 31. Effective Monitoring # Item Description Description 4 Email Is email the best? Don’t shout communication Keep email short Keep copies & ready Read through reference 5 Monitoring Monitor schedule Fail to achieve targets schedule- capture reasons for Personality clashes delay Incomplete prerequisites Overestimation of Less efforts than envisaged experience & skills In-efficiencies Low motivation 6 Measures to Encourage use of time Encourage ideas to improve avoid delay sheet Cost effective alternatives Face to face meeting Judge the work for its quality Conclude on non- performers, change if needed, it is never late 31 Contact – rrakhecha@myefg.org Making earth little softer
  • 32. Effective Monitoring # Item Description Description 7 Monitor the Under researched Underestimated work cost purchases schedule for the consultants Time delay & overrun 8 Measures Invite more bids, negotiate Adopt close down process - to minimise hard release equipment or the cost Avoid overtime members if not required 9 Change Assess impact on efforts, Explain change once request schedule, quality & cost, accepted convey to stakeholders & get approval 32 Contact – rrakhecha@myefg.org Making earth little softer
  • 33. Scope creep Process of introducing new parameters & approaches to a completed project plan • Factors for scope creep • Fear of turning down a client • Not realizing or underestimation of impact of changing project plan • Over-optimism of new suggestion to improve a difficult situation • Lack of faith in original plan, desire of over engineering Effect of scope creep • Risking / derailing the project • Encourages client to make further suggestions 33 Contact – rrakhecha@myefg.org Making earth little softer
  • 34. Scope creep Controlling the scope creep • Reasons for change to be convincing • Check impact of not making changes & doing nothing • Do not be afraid, convey the proposed changes, it could hinder the project Managing the risk • Identify the risk, probability of occurrence, impact, exposure, mitigation plan & owner • Be objective while avoiding occurrence of the risks • Develop risk management strategy, close or transfer the risk, develop contingency plan • Communicate the risks to all stake holders, seek feedback, device alternative strategy 34 Contact – rrakhecha@myefg.org Making earth little softer
  • 35. Softwares # Item Description 1 Project Eazier storage & retrieval of information management Analysis of information software Preparing report & presentation, check accuracy of data Over-reliance on data Loss of team spirit / communication 2 Speciality Project management, email, Spread-sheet, word , software calendar, database (access), presentation Eazily available, and Efficient Difficulty in integration, we miss bigger picture 3 Integrated Calculate project budget Software Manage/ Monitor schedule; task duration, assignee, etc Optimize schedule & resources Auto / predefined project report Integration with data Needs training to the users 35 Contact – rrakhecha@myefg.org Making earth little softer
  • 36. Closing a project Following are advantages closing the project • Measure success if objectives have been achieved? • Satisfies the team- sense of achievement of completing project • Paves the way for future teamwork recognizing efforts & hard work • Avoid repeating mistakes – create records of lesson learnt, derive benefits from mistakes • Control expense–release the resources • Improves communication with end users, earns respect • Offer personal satisfaction, write challenges you have faces & how did you overcome 36 Contact – rrakhecha@myefg.org Making earth little softer
  • 37. Closing a project • Plan project closure - To arrange a meeting with all stake holders communicating formally the closure, presenting data of efforts, schedule, quality (defect data) and cost (actual & variances), degree of achievement, change requests, feedback, progress reports, positive & negative points, challenges, risks & how those were managed, lessons learnt & corrective actions, performers, emerging leaders, productivity, do & don’t for future projects, areas of improvements, etc • Release hard & soft resources (Hardware, source code, software, team members, their access rights, project email id) • Complete appraisal • Celebration & thanking – Foster a spirit of collaboration, improves morale, underline core values • Seek official approval of closure 37 Contact – rrakhecha@myefg.org Making earth little softer
  • 38. Thank You 38 Contact – rrakhecha@myefg.org Making earth little softer