Virtual design and construction (VD&C) incorporates building information modeling (BIM) into the construction process. It creates intelligent 3D models that identify constructability issues and are shared across design disciplines through integrated project delivery. VD&C integrates design, engineering, and construction operations. The company has over 75 modeled projects worth over $4.5 billion, including the Ritz Carlton in North Lake Tahoe, which used VD&C to identify structural conflicts before construction. VD&C is changing the industry by enabling better communication and coordination to reduce risks and issues in the field.
Thorough presentation on all components of Virtual Design and Construction using Building Explorer as the primary BIM analysis tool for model cost estimating, scheduling, project management, and clash detection
Siliconec NZ specialized in BIM Services for Architectural, Structural, MEP, Point Cloud, Prefabrication, Construction Planning, Clash Detection for Residential, Commercial & Industrial Sectors Site Works & Document Management.
The presentation covers following areas:
- Typical Problems in Construction Industry
- What is BIM?
-BIM Process
- Influence of BIM on Industry Problems
- BIM Application
- BIM Advantages
- BIM Workflow
- BIM & Project Management
- BIM & Design Team Members
- BIM around the Globe
- Construction Industry with BIM
All work presented in the presentation is carried out by graduates of NUST, Islambad including Abdul Mughees Khan, Syed Kashif Ali Shah, Sharjeel Ahmad Tariq, Malik Awais Ahmad and Hamza Khan Shinwari.
Special credit of the work goes to Engr Tahir Shamshad, Vice President NESPAK and Engr Zia Ud Din, Asst Professor NUST under guidance and mentor ship the whole work was performed.
For more details feel free to contact: amugheeskhan@gmail.com
Thorough presentation on all components of Virtual Design and Construction using Building Explorer as the primary BIM analysis tool for model cost estimating, scheduling, project management, and clash detection
Siliconec NZ specialized in BIM Services for Architectural, Structural, MEP, Point Cloud, Prefabrication, Construction Planning, Clash Detection for Residential, Commercial & Industrial Sectors Site Works & Document Management.
The presentation covers following areas:
- Typical Problems in Construction Industry
- What is BIM?
-BIM Process
- Influence of BIM on Industry Problems
- BIM Application
- BIM Advantages
- BIM Workflow
- BIM & Project Management
- BIM & Design Team Members
- BIM around the Globe
- Construction Industry with BIM
All work presented in the presentation is carried out by graduates of NUST, Islambad including Abdul Mughees Khan, Syed Kashif Ali Shah, Sharjeel Ahmad Tariq, Malik Awais Ahmad and Hamza Khan Shinwari.
Special credit of the work goes to Engr Tahir Shamshad, Vice President NESPAK and Engr Zia Ud Din, Asst Professor NUST under guidance and mentor ship the whole work was performed.
For more details feel free to contact: amugheeskhan@gmail.com
4D BIM model is created by adding one more dimension that is time to the 3D BIM model. Once the time is added, the 4D model will show the amount of time needed to finish each construction phase. Hence, the 4D and 3D BIM model helps to gain control over the two most difficult parts of construction- time and cost. All in all, it becomes obvious that 4D and 5D BIM is game-changer in the construction industry.
Free Quote : info@buildinginformationmodelling.net
T.J. Meehan, AIA, LEED AP / Vice President of Professional Services, shares how to implement BIM for owners from the Government Solutions Breakfast hosted by DLT Solutions and CADD Microsystems.
How we can implement Safety Barrier in Revit, what are the advantages of having an Add-In and what are the procedures to have a successful BIM project, hope you enjoy it
The Information ChallengeManaging Construction with BIMCCT International
Presentation of Zuhair Haddad CIO, Corporate Asset and Risk Management for Consolidated Contractors Company (CCC) at the 3rd Annual BIM conference Dubai (25-26 February, 2
BIM: The Promise of an Integrated Approach to Project DeliveryAWC|WEST
A presentation about (1) The technological and business practice influences that are impacting today’s architectural practice;
(2) The difference between Little-BIM and Big-BIM; (3) The relationship of Integrated Project Delivery in Big-BIM; (4) A practical discussion of resources to implement BIM; and (5) The practical uses for the BIM model
Introduction to BIM and business case of BIMreem-yousef
This presentation was prepared by me as part of BIM Management Course with RICS online academy and was based on the Middle East Region and Working in a CM/PM company
What does BIM mean for Civil Engineers?Chun Keung Ng
BIM is a norm for the building industry. How about for infrastructures? Some countries are over confident on the implementation of BIM in both building and civil engineering industries. Is the BIM technology for infrastructures mature and easily available? Are the professionals ready for BIM?
Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp SurvivorsArthur L. Finkle
Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp Survivors
Fascinating story of a Methodist Minister's vital role as a seaman on Exodus 1947 and his appearance before the UN Special Committee on Palestine.
4D BIM model is created by adding one more dimension that is time to the 3D BIM model. Once the time is added, the 4D model will show the amount of time needed to finish each construction phase. Hence, the 4D and 3D BIM model helps to gain control over the two most difficult parts of construction- time and cost. All in all, it becomes obvious that 4D and 5D BIM is game-changer in the construction industry.
Free Quote : info@buildinginformationmodelling.net
T.J. Meehan, AIA, LEED AP / Vice President of Professional Services, shares how to implement BIM for owners from the Government Solutions Breakfast hosted by DLT Solutions and CADD Microsystems.
How we can implement Safety Barrier in Revit, what are the advantages of having an Add-In and what are the procedures to have a successful BIM project, hope you enjoy it
The Information ChallengeManaging Construction with BIMCCT International
Presentation of Zuhair Haddad CIO, Corporate Asset and Risk Management for Consolidated Contractors Company (CCC) at the 3rd Annual BIM conference Dubai (25-26 February, 2
BIM: The Promise of an Integrated Approach to Project DeliveryAWC|WEST
A presentation about (1) The technological and business practice influences that are impacting today’s architectural practice;
(2) The difference between Little-BIM and Big-BIM; (3) The relationship of Integrated Project Delivery in Big-BIM; (4) A practical discussion of resources to implement BIM; and (5) The practical uses for the BIM model
Introduction to BIM and business case of BIMreem-yousef
This presentation was prepared by me as part of BIM Management Course with RICS online academy and was based on the Middle East Region and Working in a CM/PM company
What does BIM mean for Civil Engineers?Chun Keung Ng
BIM is a norm for the building industry. How about for infrastructures? Some countries are over confident on the implementation of BIM in both building and civil engineering industries. Is the BIM technology for infrastructures mature and easily available? Are the professionals ready for BIM?
Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp SurvivorsArthur L. Finkle
Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp Survivors
Fascinating story of a Methodist Minister's vital role as a seaman on Exodus 1947 and his appearance before the UN Special Committee on Palestine.
Building Information Modeling (BIM) is more than a new technology;
it is an innovative approach to the entire design, construction, and
maintenance process. Many of the agencies and organizations
involved in the building industry have their own definitions of BIM,
but they all have a similar feel to that of the National BIM Standard
definition
Smart Cities, Smart Citizens and the case for the CitySDKFrank Kresin
Presentation at Information Access in Smart Cities workshop in Amsterdam, 13/04/2014 - on how smart citizens should be the focus in smart cities, and what CitySDK does to make it possible. The presentation starts with some design rules for smarter cities, then introduces Waag Society, and quickly moves on to the Amsterdam Case for Open Data. Then the shortcomings of this approach are described, after which it introduces the City Service Development Kit - a set of bottom up, harmonized API's for software development that scales across cities and countries. Some examples are presented, and it gets back to the central thesis: design smart cities with the people, not for or against them.
3D and bim technology for construction safety morning section final version...Stephen Au
Today 3D & cloud computing technology can be used for the safety awareness, design, operation, training and improvement in construction industry. The presentation in 2nd International Conference on Workplace Safety & Health for the Construction Industry, 13 & 14 August 2013 • BCA Academy illustrate how it works. www.mtech.com.hk
www.bimbots.org
A new (business) model for automating BIM tasks. Use a bot to perform you BIM tasks and simulations! Get off your BIM island and let BIM Bots work for you!
CIB W78 - Collaborative engineering with IFC in the NetherlandsLéon Berlo
Paper presentation about the use of openBIM (IFC, BCF, etc) in the Netherlands. The presentations shows the process phases of a BIM project and the collaboration iteration cycles.
Paper is online at http://www.stumico.nl/wp-content/uploads/2015_CIB-W078_Collaborative_Engineering.pdf
Introductory Keynote by Jarmo Eskelinen, President of the European Network of Living Labs. Jarmo asked the question on what drives a City and what we need to do to make Cities Smart: involving citizens, users as innovators of their own environment.
Flevy.com - Collaborative Process MappingDavid Tracy
This is a partial preview of the document found here:
https://flevy.com/browse/business-document/collaborative-process-mapping-97
Description:
The presentation teaches the Collaborative Process Mapping technique. The Collaborative Process Map is a logical representation of an entire business process flow, detailing the actual steps taken, applicable interfaces, decision points, and information flows
HVAC Design Services is very essential for every Resedential, Commercial and industrial Construction. However, It will give you proper ventilation like Indoor Air Qulaity, Energy Conservation, Moisture Consistency, Smart Controls, Environmenral Impact. Silicon Valley the top rated CAD Outsourcing and Web development Company welcoming you with proper team and reasonable rates. Our Professional team gives the real format of HVAC Shop Drawing and Testimonial.
TechnoStruct I MEP Design Engineering I BIM Consulting I LBE San FranciscoTechnostruct LLC
**Certified CMD-LBE of San Francisco (CMD021910059)01**
TechnoStruct's services result in better-engineered buildings delivered on-time and on-budget by means of engineering design optimization, design-conflict minimization, shrinking the margin for errors & omissions; and at the same time, producing precise and synchronized engineering documents. The company’s VDC offerings ensure efficient processes, improved collaboration, better-informed decisions and accelerated understanding of the design and input data.For More Info Visit:-http://technostruct.com/
AVEVA World Conference NA - Patrick Reilly, Vista ProjectsAVEVA-Americas
We receive all types of day to day information from news to banking in real time. But many projects are still executing based on stale data that is days or weeks old.
This presentation covers why this is a great opportunity to improve projects and how enabling project teams to work with real time data drives collaboration, transparency and overall improved project results.
Background and lessons learned from adoption of agile design and development methodologies in a web project at Washington Post Media. Delivered at George Washington University, Oct. 2008
AEC Digital Solutions LLC (www.aecdsl.co) is a pioneering Building Information Modelling (BIM) services firm, providing Virtual Design & Construction (VDC) technology services, and global sourcing solutions to leading international architects, engineering and construction firms. AEC's objective is to leverage international best practices and latest advancements in BIM technology, to add value to clients businesses, and help client's save time and money.
Piping Design course, revit course, plumbing courses revit mep training for plumbing engineers and professionals given precise and perfect at NIBT elearning
Chemionix is Engineering Design Outsourcing Company providing wide range on Engineering Design Solutions & CAD Drafting Services for wide range of Project for our International client. Kindly visit our website www.chemionix.com for more information about our company services offered.
Certified CMD-LBE of San Francisco (CMD021910059)01
TechnoStruct is an emerging name in the Design & Construction technology space, providing localized Engineering and BIM/VDC services to players across the Construction spectrum.For More Info Read:-http://technostruct.com/
We are interested to do project with your esteemed organisation. Please find our company presentation for your persual.
We provide with Architecture ,Structure & MEP BIM (mechanical,electrical &
plumbing)Building information Modeling and HVAC designing,revit
software & Auto cad software.we have specialized knowledge in this
field.
Hence we are looking to serve in your esteemed organisation.
Benefits of our application.
A) cost savings.
B) Time saving.
C) Best quality.
D) Details of drawing will be delivered fast and all parts standardized.
E) Easy to identify on BOQ ( BILL OF QUANTITY)
F) Sufficient input for design.
G)Manpower saving.
H) Space savings.
I) Design standards part as per client requirements of all reputed markes.
J) we are providing GFC drawings ( good for construction)
k) As build drawing.
Thank you
With regards
Neena Deb
Ravi kumar
S-260 second floor
Greater Kailash
Part 2
New Delhi-110048(INDIA)
Mobile no :- +91-9811470036
+91- 9958179748
Email Id:- nrbimconsultant@gmail.com
neena.deb@gmail.com
Website:- www.nrbimconsultant.co.in
2. Virtual Design and Construction incorporates BIM or
Building Information Modeling into the construction
process.
A paradigm shift for the AEC industry.
It is the creation of intelligent product models that
identify constructible elements or problems of a
building which are shared among the different
disciplines: Integrated Project Delivery.
VD&C integrates design, engineering and
construction operations.
3.
4. Team VD&C
• 40people in 7 divisions trained in
the Vico Constructor suite.
• 45
people in 5 divisions trained in
NavisWorks Jetstream.
• SketchUp Training is available to
anyone in Operations.
5. Projects
75 VD&C modeled
•
projects.
33 used by
•
operations teams.
20.25 million
•
Virtual SQ FT
Construction value
•
over $4.5 Billion.
6. • Lodge Resort and Spa in
Ritz Carlton
North Lake Tahoe,
California.
• The complex includes two
main structures connected
by an underground
pedestrian tunnel, with the
main structure housing
more than 170 hotel
rooms, meeting spaces,
an attached four-level
parking structure and a
19,000-square-foot spa.
• Several conflicts between
steel framing and roofing
were identified and solved
before construction.
20. VD&C Process
Identify Project
Goals
Model Scope/Setup
Obtain Digital Files
VD&C Schedule
Structural &
Architectural Model
Integrate Integrate RFIs
& Submittals
MEP Systems
Clash MEP Systems
Proceed with
Architect’s
Model Updates
Approval Construction
21. VD&C helps us …
… manage the quality of design documents
…better communicate constructability issues to the
client, design team, and subcontractors
…provide better service for our clients
…provide new business services
…detect constructability issues before reaching the
site
…provide full Integrated Project Delivery
25. Neiman Marcus
• Two VD&C Projects
– First project in Los Angeles
• High Success Rate
– Positive outcome on coordination of
lights
– Lessen Amount of Material Waste:
HVAC
– Able to visualize conflicts
beforehand
• Owner insisted on having VD&C as
part of Neiman Marcus Bellevue
26. Neiman Marcus Topanga
Woodland Hills, CA
• ELS Architects & Cortland Morgan Architects
• Two Stories High End Retail
• 120,000 SF
• Design-Bid-Build
• $22 Million
• July 2008
27. Neiman Marcus Seattle
Seattle, WA
• SJW Architects & Designers
• Three Stories High End Retail + Basement
• 123,550 SF
• Design-Bid-Build
• $12.5 Million
• June 26, 2009
28. Project Goals
• Find and resolve conflicts before
construction
• Coordinate more than 5,500 light fixtures
– Lights took precedent over other trades
• Manage Risk: Use the model to
communicate conflicts and to generate
better solutions through a collaborative
effort.
• Reduce number of RFIs and Response
Latency
29. VD&C Scope
• Structure per plans and as built dwgs.
• Reflected ceilings
• Light fixtures layout and coordination
• Interior & fire rated walls
• MEPFP coordination
• Model updates per Bulletins, RFIs, and
Weekly Coordination Meetings
• Pipe rack – Topanga
• Cable tray
• Plumbing
30. Communication
NM Topanga
• Close to Main Office
– Weekly coordination
meetings on site
NM Seattle
• Go to Meeting
– Weekly,
online coordination meetings
31. Topanga VD&C Model
• Preparation of cut sheets through 3D model
– Used in coordination meetings on site
32. Bellevue VD&C Model
• Representational modeling based on
dimensions
• 3D Coordination Meetings via online
conferences
33. Communication: LA to Seattle
• Model Setup
• Append Drawings
– NavisWorks
• Clash Detection
• Create Reports and Logs
• Distribute Reports
– HTML Files
• Distribute Navis File
– Saved Viewpoints included
• Online Coordination Meetings
34. Communication: LA to Seattle
• Model Setup
• Append Drawings
– NavisWorks
• Clash Detection
• Create Reports and Logs
• Distribute Reports
– HTML Files
• Distribute Navis File
– Saved Viewpoints included
• Online Coordination Meetings
35. Communication: LA to Seattle
• Model Setup
• Append Drawings
– NavisWorks
• Clash Detection
• Create Reports and Logs
• Distribute Reports
– HTML Files
• Distribute Navis File
– Saved Viewpoints included
• Online Coordination Meetings
36. Communication: LA to Seattle
• Model Setup
• Append Drawings
– NavisWorks
• Clash Detection
• Create Reports and Logs
• Distribute Reports
– HTML Files
• Distribute Navis File
– Saved Viewpoints included
• Online Coordination Meetings
37. Communication: LA to Seattle
• Model Setup
• Append Drawings
– NavisWorks
• Clash Detection
• Create Reports and Logs
• Distribute Reports
– HTML Files
• Distribute Navis File
– Saved Viewpoints included
• Online Coordination Meetings
38. Communication: LA to Seattle
• Model Setup
• Append Drawings
– NavisWorks
• Clash Detection
• Create Reports and Logs
• Distribute Reports
– HTML Files
• Distribute Navis File
– Saved Viewpoints included
• Coordination Meetings
– Online vs. In Person
48. Virtual Building->Virtual
Management
• Model-Based benefits
today:
– 3D/4D -> DIGITAL
ASSET
• Other benefits:
– Operations
– Energy Analysis
– Safety/Maximized
Efficiency
– Facility Management
• Communication
49. Integrated Project Delivery
A paradigm shift for the AEC industry that
requires:
• No Silos
• A mental Shift to New Ways of Relating
• Collaborative, Integrated, Partnered, Fluid
Are you ready?