Pre-Retrofit Activity
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
2
Pre-Retrofit Activity
Site Survey of Exchange
Total number of Co-located Line BMs
Total number of Trunk BMs
Total number of RSUs working
Connectivity available at RSUs
Total number of V5.2 AI links working
Total number of PRI Links working
Total number of BRI lines working
Connectivity available for MPLS
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
3
Pre-Deployment Activity
 Filling the exchange Survey Sheet for Site-wise BOM preparation.
 Total number of Co-located Line BMs and compaction of BMs as
per corporate guidelines. BM Compression.ppt
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
4
BM Compression
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
5
 As per the PAN-India data most of the exchanges / BMs are working
with only 30% to 40% loading.
 In present Scenario the working ports of LCC Cards are distributed in
a random fashion.
Present Scenario
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
6
Faulty Ports Working ports Spare Ports
Present Working of Ports
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
7
 We need to shift Terminal equipments in such a manner, so that
the working subscriber should be moved to Base Module rack and
then Line Module-01 and Line Module-02 rack.
 In this manner subscribers are organized properly among the
various racks.
Action Item
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
8
After Relocation - I
Faulty Ports Working ports Spare Ports
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
9
After Relocation - II
Faulty Ports Working ports Spare Ports
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
10
Final Result
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
11
The Final Working Rack
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
12
Main Advantage
 This is applicable to Co-located BMs and Remote BMs.
 This will lead to power saving.
 It will generate inventory of Control cards of ATU (i.e.
TIC/ISP/TUI) and Power Supply Cards.
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
13
Activity for MBM Sites
10-08-2022
14
Copyright © 2016 C-DOT. All Rights Reserved
MBM Exchange
 The same strategy can be implemented in the MBM exchange.
 The equipment planning for MAX-NG has been done after
considering the BM compression activity.
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
15
]
BM8
BM7
BM6
BM5
BM1
2
BM1
1
BM1
0
BM9
BM4
BM3
BM
BM2
BM1
Schematic View of MBM Exchange 10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
16
BM8
BM7
BM6
BM5
BM8
BM1
2
BM7
BM1
1
BM6
BM1
0
BM5 BM9
BM4
BM3
BM
BM2
BM1
BM Compression Activity… 10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
17
BM8
BM7
BM6
BM5
BM4
BM3
BM2
BM1
Power Saving
Controller Card Repository
LCC Cards Repository
Less No. of NGTK Required For MAX-
NG Conversion
Schematic View after BM Compression 10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
18
 Power Saving
 Controller Card Inventory
 LCC Cards Inventory
 Less No. of NGTK Required For MAX-NG Conversion
Main Advantage
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
19
Pre-Deployment Activity (Contd.)
 Migration of existing BRI connection to alternate solution like
CDMA VPN
 Network Configuration between SDCA and Core switch by MPLS
NOC
 Last Mile connectivity between MAX-NG Aggregator and MPLS
Core through RPR
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
20
Pre-Deployment Activity
 Configuration of Required IP addresses at MPLS for MAX-NG VLAN
 Verification of various equipment as per the site configuration and
final BOM.
 Retrofit data preparation for MAX to MAX-NG migration for C5
subscribers creation, Routing and Trunking Data, various Access
Gateway related Data.
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
21
Requirement
 The uplink connectivity is through 1GigE Optical patch cord.
 The length of patch cord for the above connectivity.
 The type of connectorization at ADM end of RPR i.e. FC or LC or SC
so that the patch cord can be supplied accordingly.
Kindly mail this information urgently to cdotmaxng@gmail.com
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
22
Deployment Related Activity
 Infrastructure Installation at Main exchange site i.e. 2-Slot and 6-
Slot Chassis.
 Installation of network elements and configuration at Remote site
for the IP connectivity.
 Installation of MAX-NG Access Equipment, EBM, LAN Switch and
Client Terminal at site
 Configuration of LAGs as per Co-located BMs and Remote BMs
 Configuration of MLS as per Network Connection
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
23
Deployment Related Activity
 Configuration of MG/SG (if required for POI), V5AG and PRIAG as
per working ISUP Signalling & Media links, AIs and PRI Links
 Network Data Creation in Class-4 SS for connectivity of SDCA to L2
TAX and POIs
 Configuration w.r.t Billing and Provisioning through BSNL CDR
system and Clarity system
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
24
Planning for MAX-NG Installation
 One BM Cabinet at MBM location will be use as MAX-NG BM
 MAX-NG BM will house CACU (Central Access Control Unit) system to
install common elements for that MBM i.e.
Main Aggregation Switch (1+1)
Network Access Gateway Card (1+1)
Ethernet-to-E1 Bridge Main (1+1)
Shelf Manager Card (1+1)
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
25
Planning for MAX-NG BM
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
26
MAX-NG BM for CACU System
10-08-2022
27
 All the E1s for the Network i.e. POI PCMs, V5.2 AN-RAXs and PRI-
PBX are required to re-route to MAX-NG BM.
 One Card Frame of MAX-NG BM has a provision of DDF to
terminate all the above mentioned E1s.
Copyright © 2016 C-DOT. All Rights Reserved
DDF Unit for MAX-NG BM
10-08-2022
28
Assy. With MDF Tag Block to DDF Plate Assy.
Complete Assy. With MDF Tag Block to DDF Plate Assy.
Fully Assembled Card Frame with MDF Tag Blocks
Copyright © 2016 C-DOT. All Rights Reserved
Planning at Line BM / RSU Site
 At Co-located Line BM / RBM site, new LAGU (Line Access Gateway
Unit) system will be installed in place of bottom two Card frame of
Base Module.
 LAGU system house only 02 nos of NGTJ-LAG Card and 02 nos of TSI
card.
 CAT-5e LAN cable for Co-located Line BM or existing E1 Cables in
case of RSU are directly terminated on the backplane of LAGU system.
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
29
Suggestion
Few Suggestion / Maintenance after MAX-NG:
 IPM should be connected at MDF for Lightning Protection
 High Voltage Protection (HVP) module developed by C-DOT to be installed
in the exchange at Heavy Lightning Prone Area
 Proper checking of Earthing of exchange.
 Proper training of MAX-NG maintenance staff.
 Proper maintenance of Power plant, Generator and battery back-up
arrangement.
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
30
10-08-2022
Copyright © 2016 C-DOT. All Rights Reserved
31
Feedback :- cdotmaxng@gmail.com
THANK YOU

More Related Content

Similar to 07_PRE_MIGRATION_ACT.ppt

Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011
Jian Shen
 
Internet of things case studies of edge computing
Internet of things case studies of edge computingInternet of things case studies of edge computing
Internet of things case studies of edge computing
KhoonSeang (Richard) Kang
 
Internet of things case studies of edge computing
Internet of things case studies of edge computingInternet of things case studies of edge computing
Internet of things case studies of edge computing
KhoonSeang (Richard) Kang
 
Internet of things case studies of edge computing
Internet of things   case studies of edge computingInternet of things   case studies of edge computing
Internet of things case studies of edge computing
KhoonSeang (Richard) Kang
 
MPI Communication
MPI CommunicationMPI Communication
MPI Communication
Mahmoud Hussein
 
2 s120 commissioning
2 s120 commissioning2 s120 commissioning
2 s120 commissioning
confidencial
 
Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...
Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...
Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...
Ike Alisson
 
06 EPI: the European approach for Exascale ages
06 EPI: the European approach for Exascale ages06 EPI: the European approach for Exascale ages
06 EPI: the European approach for Exascale ages
RCCSRENKEI
 
AIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network ArchitectureAIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network Architecture
AIRCOM International
 
MIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication Networks
MIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication NetworksMIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication Networks
MIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication Networks
MIPI Alliance
 
Broad Sky Networks Use Cases in the field
Broad Sky Networks Use Cases in the fieldBroad Sky Networks Use Cases in the field
Broad Sky Networks Use Cases in the field
Tom Benson
 
Industrial communication
Industrial communicationIndustrial communication
Industrial communication
Mahmoud Hussein
 
Sspi day out_2014_comtech-leonardo_gil
Sspi day out_2014_comtech-leonardo_gilSspi day out_2014_comtech-leonardo_gil
Sspi day out_2014_comtech-leonardo_gil
SSPI Brasil
 
15_C5_DATA_CREATION.pptx
15_C5_DATA_CREATION.pptx15_C5_DATA_CREATION.pptx
15_C5_DATA_CREATION.pptx
nitin_009
 
Flexible Manufacturing System-Hardware and Software Components with Commercia...
Flexible Manufacturing System-Hardware and Software Components with Commercia...Flexible Manufacturing System-Hardware and Software Components with Commercia...
Flexible Manufacturing System-Hardware and Software Components with Commercia...
KathiravanRS
 
BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」
BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」
BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」
BitVisor
 
Optical and mobile networks: friends or foes?
Optical and mobile networks: friends or foes?Optical and mobile networks: friends or foes?
Optical and mobile networks: friends or foes?
ADVA
 
【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...
【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...
【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...
Ryuichi Yasunaga
 
SA call flow
SA call flowSA call flow
SA call flow
rajeev799958
 
Meetup_adessoCamunda_2023-09-13_Part1&2_en.pdf
Meetup_adessoCamunda_2023-09-13_Part1&2_en.pdfMeetup_adessoCamunda_2023-09-13_Part1&2_en.pdf
Meetup_adessoCamunda_2023-09-13_Part1&2_en.pdf
MariaAlcantara50
 

Similar to 07_PRE_MIGRATION_ACT.ppt (20)

Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011Shen_Presentation_CBTC_Conf_2011
Shen_Presentation_CBTC_Conf_2011
 
Internet of things case studies of edge computing
Internet of things case studies of edge computingInternet of things case studies of edge computing
Internet of things case studies of edge computing
 
Internet of things case studies of edge computing
Internet of things case studies of edge computingInternet of things case studies of edge computing
Internet of things case studies of edge computing
 
Internet of things case studies of edge computing
Internet of things   case studies of edge computingInternet of things   case studies of edge computing
Internet of things case studies of edge computing
 
MPI Communication
MPI CommunicationMPI Communication
MPI Communication
 
2 s120 commissioning
2 s120 commissioning2 s120 commissioning
2 s120 commissioning
 
Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...
Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...
Ike A to LF Edge Akraino Comp Stor Netw & Commun & ETSI MEC AppD Mngmnt Prese...
 
06 EPI: the European approach for Exascale ages
06 EPI: the European approach for Exascale ages06 EPI: the European approach for Exascale ages
06 EPI: the European approach for Exascale ages
 
AIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network ArchitectureAIRCOM LTE Webinar 1 - Network Architecture
AIRCOM LTE Webinar 1 - Network Architecture
 
MIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication Networks
MIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication NetworksMIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication Networks
MIPI DevCon 2020 | Keynote: Trends in Future In-Vehicle Communication Networks
 
Broad Sky Networks Use Cases in the field
Broad Sky Networks Use Cases in the fieldBroad Sky Networks Use Cases in the field
Broad Sky Networks Use Cases in the field
 
Industrial communication
Industrial communicationIndustrial communication
Industrial communication
 
Sspi day out_2014_comtech-leonardo_gil
Sspi day out_2014_comtech-leonardo_gilSspi day out_2014_comtech-leonardo_gil
Sspi day out_2014_comtech-leonardo_gil
 
15_C5_DATA_CREATION.pptx
15_C5_DATA_CREATION.pptx15_C5_DATA_CREATION.pptx
15_C5_DATA_CREATION.pptx
 
Flexible Manufacturing System-Hardware and Software Components with Commercia...
Flexible Manufacturing System-Hardware and Software Components with Commercia...Flexible Manufacturing System-Hardware and Software Components with Commercia...
Flexible Manufacturing System-Hardware and Software Components with Commercia...
 
BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」
BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」
BitVisor Summit 8「3. AQC107 Driver and Changes coming to network API」
 
Optical and mobile networks: friends or foes?
Optical and mobile networks: friends or foes?Optical and mobile networks: friends or foes?
Optical and mobile networks: friends or foes?
 
【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...
【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...
【English version】3GPP 5G Standalone Access Registration Call flow_Rev3.00_202...
 
SA call flow
SA call flowSA call flow
SA call flow
 
Meetup_adessoCamunda_2023-09-13_Part1&2_en.pdf
Meetup_adessoCamunda_2023-09-13_Part1&2_en.pdfMeetup_adessoCamunda_2023-09-13_Part1&2_en.pdf
Meetup_adessoCamunda_2023-09-13_Part1&2_en.pdf
 

More from nitin_009

BSNL_Context Setting.pptx
BSNL_Context Setting.pptxBSNL_Context Setting.pptx
BSNL_Context Setting.pptx
nitin_009
 
BSNL_Executives_Day3_vF.pptx
BSNL_Executives_Day3_vF.pptxBSNL_Executives_Day3_vF.pptx
BSNL_Executives_Day3_vF.pptx
nitin_009
 
IO_09.ppt
IO_09.pptIO_09.ppt
IO_09.ppt
nitin_009
 
self_motivation.ppt
self_motivation.pptself_motivation.ppt
self_motivation.ppt
nitin_009
 
Emergency Communications and Disaster Mangment.pptx
Emergency Communications and Disaster Mangment.pptxEmergency Communications and Disaster Mangment.pptx
Emergency Communications and Disaster Mangment.pptx
nitin_009
 
cps_nitin_final.ppt
cps_nitin_final.pptcps_nitin_final.ppt
cps_nitin_final.ppt
nitin_009
 
HumanEvolutionLecture.ppt
HumanEvolutionLecture.pptHumanEvolutionLecture.ppt
HumanEvolutionLecture.ppt
nitin_009
 
Team5.ppt
Team5.pptTeam5.ppt
Team5.ppt
nitin_009
 
wirelessbbppt.ppt
wirelessbbppt.pptwirelessbbppt.ppt
wirelessbbppt.ppt
nitin_009
 
p&b presentation.ppt
p&b presentation.pptp&b presentation.ppt
p&b presentation.ppt
nitin_009
 
ims-alerts_9001_14001_overview.ppt
ims-alerts_9001_14001_overview.pptims-alerts_9001_14001_overview.ppt
ims-alerts_9001_14001_overview.ppt
nitin_009
 
quality-management-systems-fundamentals-vocabulary-awareness.pptx
quality-management-systems-fundamentals-vocabulary-awareness.pptxquality-management-systems-fundamentals-vocabulary-awareness.pptx
quality-management-systems-fundamentals-vocabulary-awareness.pptx
nitin_009
 
Talk-ISO.ppt
Talk-ISO.pptTalk-ISO.ppt
Talk-ISO.ppt
nitin_009
 
Chap11
Chap11Chap11
Chap11
nitin_009
 

More from nitin_009 (14)

BSNL_Context Setting.pptx
BSNL_Context Setting.pptxBSNL_Context Setting.pptx
BSNL_Context Setting.pptx
 
BSNL_Executives_Day3_vF.pptx
BSNL_Executives_Day3_vF.pptxBSNL_Executives_Day3_vF.pptx
BSNL_Executives_Day3_vF.pptx
 
IO_09.ppt
IO_09.pptIO_09.ppt
IO_09.ppt
 
self_motivation.ppt
self_motivation.pptself_motivation.ppt
self_motivation.ppt
 
Emergency Communications and Disaster Mangment.pptx
Emergency Communications and Disaster Mangment.pptxEmergency Communications and Disaster Mangment.pptx
Emergency Communications and Disaster Mangment.pptx
 
cps_nitin_final.ppt
cps_nitin_final.pptcps_nitin_final.ppt
cps_nitin_final.ppt
 
HumanEvolutionLecture.ppt
HumanEvolutionLecture.pptHumanEvolutionLecture.ppt
HumanEvolutionLecture.ppt
 
Team5.ppt
Team5.pptTeam5.ppt
Team5.ppt
 
wirelessbbppt.ppt
wirelessbbppt.pptwirelessbbppt.ppt
wirelessbbppt.ppt
 
p&b presentation.ppt
p&b presentation.pptp&b presentation.ppt
p&b presentation.ppt
 
ims-alerts_9001_14001_overview.ppt
ims-alerts_9001_14001_overview.pptims-alerts_9001_14001_overview.ppt
ims-alerts_9001_14001_overview.ppt
 
quality-management-systems-fundamentals-vocabulary-awareness.pptx
quality-management-systems-fundamentals-vocabulary-awareness.pptxquality-management-systems-fundamentals-vocabulary-awareness.pptx
quality-management-systems-fundamentals-vocabulary-awareness.pptx
 
Talk-ISO.ppt
Talk-ISO.pptTalk-ISO.ppt
Talk-ISO.ppt
 
Chap11
Chap11Chap11
Chap11
 

Recently uploaded

spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
insn4465
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
gerogepatton
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
nooriasukmaningtyas
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 

Recently uploaded (20)

spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
哪里办理(csu毕业证书)查尔斯特大学毕业证硕士学历原版一模一样
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...International Conference on NLP, Artificial Intelligence, Machine Learning an...
International Conference on NLP, Artificial Intelligence, Machine Learning an...
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
Low power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniquesLow power architecture of logic gates using adiabatic techniques
Low power architecture of logic gates using adiabatic techniques
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 

07_PRE_MIGRATION_ACT.ppt

  • 1. PRE-MIGRATION ACTIVITY Copyright © 2016 C-DOT. All Rights Reserved 10-08-2022 1
  • 2. Pre-Retrofit Activity 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 2
  • 3. Pre-Retrofit Activity Site Survey of Exchange Total number of Co-located Line BMs Total number of Trunk BMs Total number of RSUs working Connectivity available at RSUs Total number of V5.2 AI links working Total number of PRI Links working Total number of BRI lines working Connectivity available for MPLS 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 3
  • 4. Pre-Deployment Activity  Filling the exchange Survey Sheet for Site-wise BOM preparation.  Total number of Co-located Line BMs and compaction of BMs as per corporate guidelines. BM Compression.ppt 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 4
  • 5. BM Compression 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 5
  • 6.  As per the PAN-India data most of the exchanges / BMs are working with only 30% to 40% loading.  In present Scenario the working ports of LCC Cards are distributed in a random fashion. Present Scenario 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 6
  • 7. Faulty Ports Working ports Spare Ports Present Working of Ports 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 7
  • 8.  We need to shift Terminal equipments in such a manner, so that the working subscriber should be moved to Base Module rack and then Line Module-01 and Line Module-02 rack.  In this manner subscribers are organized properly among the various racks. Action Item 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 8
  • 9. After Relocation - I Faulty Ports Working ports Spare Ports 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 9
  • 10. After Relocation - II Faulty Ports Working ports Spare Ports 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 10
  • 11. Final Result 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 11
  • 12. The Final Working Rack 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 12
  • 13. Main Advantage  This is applicable to Co-located BMs and Remote BMs.  This will lead to power saving.  It will generate inventory of Control cards of ATU (i.e. TIC/ISP/TUI) and Power Supply Cards. 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 13
  • 14. Activity for MBM Sites 10-08-2022 14 Copyright © 2016 C-DOT. All Rights Reserved
  • 15. MBM Exchange  The same strategy can be implemented in the MBM exchange.  The equipment planning for MAX-NG has been done after considering the BM compression activity. 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 15
  • 16. ] BM8 BM7 BM6 BM5 BM1 2 BM1 1 BM1 0 BM9 BM4 BM3 BM BM2 BM1 Schematic View of MBM Exchange 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 16
  • 17. BM8 BM7 BM6 BM5 BM8 BM1 2 BM7 BM1 1 BM6 BM1 0 BM5 BM9 BM4 BM3 BM BM2 BM1 BM Compression Activity… 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 17
  • 18. BM8 BM7 BM6 BM5 BM4 BM3 BM2 BM1 Power Saving Controller Card Repository LCC Cards Repository Less No. of NGTK Required For MAX- NG Conversion Schematic View after BM Compression 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 18
  • 19.  Power Saving  Controller Card Inventory  LCC Cards Inventory  Less No. of NGTK Required For MAX-NG Conversion Main Advantage 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 19
  • 20. Pre-Deployment Activity (Contd.)  Migration of existing BRI connection to alternate solution like CDMA VPN  Network Configuration between SDCA and Core switch by MPLS NOC  Last Mile connectivity between MAX-NG Aggregator and MPLS Core through RPR 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 20
  • 21. Pre-Deployment Activity  Configuration of Required IP addresses at MPLS for MAX-NG VLAN  Verification of various equipment as per the site configuration and final BOM.  Retrofit data preparation for MAX to MAX-NG migration for C5 subscribers creation, Routing and Trunking Data, various Access Gateway related Data. 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 21
  • 22. Requirement  The uplink connectivity is through 1GigE Optical patch cord.  The length of patch cord for the above connectivity.  The type of connectorization at ADM end of RPR i.e. FC or LC or SC so that the patch cord can be supplied accordingly. Kindly mail this information urgently to cdotmaxng@gmail.com 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 22
  • 23. Deployment Related Activity  Infrastructure Installation at Main exchange site i.e. 2-Slot and 6- Slot Chassis.  Installation of network elements and configuration at Remote site for the IP connectivity.  Installation of MAX-NG Access Equipment, EBM, LAN Switch and Client Terminal at site  Configuration of LAGs as per Co-located BMs and Remote BMs  Configuration of MLS as per Network Connection 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 23
  • 24. Deployment Related Activity  Configuration of MG/SG (if required for POI), V5AG and PRIAG as per working ISUP Signalling & Media links, AIs and PRI Links  Network Data Creation in Class-4 SS for connectivity of SDCA to L2 TAX and POIs  Configuration w.r.t Billing and Provisioning through BSNL CDR system and Clarity system 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 24
  • 25. Planning for MAX-NG Installation  One BM Cabinet at MBM location will be use as MAX-NG BM  MAX-NG BM will house CACU (Central Access Control Unit) system to install common elements for that MBM i.e. Main Aggregation Switch (1+1) Network Access Gateway Card (1+1) Ethernet-to-E1 Bridge Main (1+1) Shelf Manager Card (1+1) 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 25
  • 26. Planning for MAX-NG BM 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 26
  • 27. MAX-NG BM for CACU System 10-08-2022 27  All the E1s for the Network i.e. POI PCMs, V5.2 AN-RAXs and PRI- PBX are required to re-route to MAX-NG BM.  One Card Frame of MAX-NG BM has a provision of DDF to terminate all the above mentioned E1s. Copyright © 2016 C-DOT. All Rights Reserved
  • 28. DDF Unit for MAX-NG BM 10-08-2022 28 Assy. With MDF Tag Block to DDF Plate Assy. Complete Assy. With MDF Tag Block to DDF Plate Assy. Fully Assembled Card Frame with MDF Tag Blocks Copyright © 2016 C-DOT. All Rights Reserved
  • 29. Planning at Line BM / RSU Site  At Co-located Line BM / RBM site, new LAGU (Line Access Gateway Unit) system will be installed in place of bottom two Card frame of Base Module.  LAGU system house only 02 nos of NGTJ-LAG Card and 02 nos of TSI card.  CAT-5e LAN cable for Co-located Line BM or existing E1 Cables in case of RSU are directly terminated on the backplane of LAGU system. 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 29
  • 30. Suggestion Few Suggestion / Maintenance after MAX-NG:  IPM should be connected at MDF for Lightning Protection  High Voltage Protection (HVP) module developed by C-DOT to be installed in the exchange at Heavy Lightning Prone Area  Proper checking of Earthing of exchange.  Proper training of MAX-NG maintenance staff.  Proper maintenance of Power plant, Generator and battery back-up arrangement. 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 30
  • 31. 10-08-2022 Copyright © 2016 C-DOT. All Rights Reserved 31 Feedback :- cdotmaxng@gmail.com THANK YOU