Amendments that I will make in the
existing land acquisition act of Nepal
to improve project Environment in
Nepal
2. If you have all the rights (absolute majority in
parliament), what amendments will you make in
the existing Land Acquisition Act of Nepal to
improve project environment in Nepal?
3. INTRODUCTION
LAND
LAND ACQUISITION ACT
PROJECT ENVIRONMENT
CURRENT ISSUES
AMENDMENTS AND THEIR REASONS
CONTENTS:
4. LAND
"Land" means any land belonging to any person, and walls,
buildings, trees, etc., permanently installed thereon.
Solid part on the surface of earth.
Immovable property
Ownership can be transferred
5. LAND ACQUISITION ACT
Enacted in Nepal under ‘Land Acquisition Act, 1977’.
Process by which state or government acquires the
private land.
For industrialization, development of infrastructure and
urbanization.
Provides compensation to the affected owners.
Source: www.lawcommission.gov.np
6. PROJECT ENVIRONMENT
All the surrounding which affects the project to achieve its
goal
Decisive entity for the success or the failure of the project
Can be sub divided into three parts:
Internal Environment
Task Environment
External Environment
8. CURRENT ISSUES ON PROJECT ENVIRONMENT WITH
RESPECT TO LAND
Compensation
Haphazard land pooling and urbanization
Ecological disturbance
Lack of land information system
Local interference
Weak local governance system
Unregistered land
Misuse of cultivable land
9. Fig :Protesters march against the Khimti-Dhalkebar
hydropower project
Fig :Protest at Modi Khola
hydropower project
10. SPECIFIC SUGGESTIONS REASONS FOR CHANGE
1. Formation of database of land type
and its value throughout the country
Detail status of the land can be studied.
Value of land for compensation can be
determined
Project selection as per land type and its
value.
Development projects can be planned
easily.
2. Provision of town, city or regional land
acquisition.
• Proper planning of the sector.
3.Section for the protection of
agricultural land and forests.
Good impact in the agriculture based
projects
Increase in Food per capita.
Optimum use of productive land.
Controls cutting of timber and fuel woods
11. SPECIFIC SUGGESTIONS REASONS FOR CHANGE
4.Detailed section for the
compensation.
•Elimination of ambiguity
•Rehabilitation and relocation
•Payment value and methods for timely
payment
•Quick settlement
5. Acquiring the land for the private
companies through government if
their works is targeted for the public
benefit.
•Resolves local interference.
•Land can be acquired quickly.
•Provides energy to the private
companies
•Increases investments
6. Provision of property valuation
method
•Currently, only cost approach method is
followed.
•Method including sales comparison
approach, income approach and market
approach should be followed.
12. SPECIFIC SUGGESTIONS REASONS FOR CHANGE
7. Provision for Environmental
Impact Assessment(EIA).
•Environmental impact due to project can be
analyzed.
•Exact location for the project can be
determined
•Ecological disturbance an its mitigation can
be analyzed
8. Acquired land can only be
used for the pre-defined purpose.
•Right use of land
•Minimizes the corruption
9. Provision of Monitoring
department.
•Monitoring the land use
•Verification of land parcel
•Project approval
•Regular research
•Updating the status of land
•After effects of land acquisition