SlideShare a Scribd company logo
1 of 26
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
HOUSING , RESETTLEMENT &
REHABILITATION
MPL-105
(Topic –Land Acquisition Models And Practices In India
And Elsewhere For Projects . Compulsory Acquisition
Land Sharing And Adjustment Models, Land Pooling ,
Negotiated Land Acquisition)
SUBMITTED TO:
PROF. MAHIMA THUSSU
SUBMITTED BY:
ANJU YADAV
POOJA YADAV
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
Land acquisition is the process by
which government acquires private
property for public purposes.
LAND ACQUISITION
Land pooling is an activity where a
group of landowners handover their
land parcels to the government
collectively for infrastructure
development. Once the development is
complete, the land is handed over to the
original owners, after deducting some
portion as the cost for the same.
LAND POOLING
COMPULSORYACQUISITION OF LAND
If in the opinion of the Central Government, any
land is required for the purpose of development, or
for any other purpose, under this Act, the Central
Government may acquire such land under the
provisions of the Land Acquisition Act, 1894.
• Compulsory land acquisition based on the
principle of eminent domain.
• Eminent domain is the legal theory of
government taking power; the power of the
sovereign to take or destroy private property
for public purpose
without the consent of the owner.
• Land is a dominant source Of livelihood.
• It is a crucial resource required for development activities.
• Land Acquisition in India refers to the process of land acquisition by the central or state
government of India for various infrastructure and economic growth initiatives.
LAND ACQUISITION IN INDIA
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
LOWS IN LAND ACQUISITION ACTS
TIMELINE
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
 Landowners
• Increase in Value of land
The increasement in land value resulting from the development accrues to the original owner
whenever the land is sold and developed for urban use .
• Non-Displacing Strategy of Land Assembly
• The original owner is not displaced in the process of land development and continues to
enjoy access to the land resources. Thus the negative impact of the process of urbanization
on farmers is minimized.
• The world population living in the urban areas is expected to increase to 70 percent from the
present 50 percent by the middle of this century.
• Land assembly strategy for development projects is known in different parts of the world by
different names viz.,
• Land readjustment (LR) in South Korea And Japan. No transfer of title to the development
entity. The title is simply modified at the end to show the new Property designation.
• Land consolidation in Europe and
• Land pooling in Australia & India. the original landowners actually transfer title to the
• development entity at the beginning of the process and receive a new title after
reconstitution.
LAND POOLING/RECONSTITUTION MECHANISMS
BENEFITS OF LAND POOLING/READJUSTMENT
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
• Better Infrastructure:
• Not just the landlords in the area but it could also
be a good means of providing entry to land for
the lower income housing scheme.
 GOVERNMENT
• No Upfront Costs: In the new land acquisition law, the compensation and R & R costs
would have to be borne by the land requiring body.
• Under land pooling, The landowners and development entity share in the risk and return of
the project.
• Relatively less Conflict Ridden Process
• Higher tax base with increase in property prices: As explained above, the revenue
base of the local bodies increase owing to increased land values and enlarged tax base.
• The increased tax revenues provides an extra source of funding for the government.
• Conversion of irregular land parcels into plots of
regular sizes and shapes
Showing infrastructure changes after land pooling
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
Others
• Not just the landlords in the area but it could also be a good means of providing entry to land
for the lower income housing scheme.
• Social Capital Creation-refers to the institutions, relationships, and norms that shape the
quality and quantity of a society's social interactions.
• is created by the private and public actors working collectively foreseeing mutual benefits.
• Increase of public-private cooperation and trust-a wider community participation in land
development and public-private partnership is fostered
The strategy ensures a three way win;
• for the private players to put their skills to use;
• the government to facilitate the development and ultimately
• the land owners who benefit from the development.
DISADVANTAGES
• Method is time consuming
• Betterment charges are assessed at the beginning of the land pooling or readjustment
scheme preparation.
• Due to the inordinate delays in finalizing schemes , the betterment charges levied on
finalization of the scheme do not meet the cost of the infrastructure provided.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
• Germany has the oldest example of land readjustment (LR).
• The legal Framework for land pooling was established in 1902 by Franz Adickes , Mayor Of Frankfurt Am-
main, Germany.
• Called UMLEGUNG in the local parlance
• The German LR process is led by the local authority.
• Has two standards of distribution For readjusted land returned to landowners-
GERMAN MODEL OF LAND POOLING (READJUSTMENT)
1. STANDARD OF DISTRIBUTION BASED ON
RELATIVE SIZE:
• Used when the land values in the redistribution area are
homogeneous.
• followed if the land values are hard to determine and
where plots have very similar characteristics.
• Under this method, the government retains up to 30
percent of the landowners land.
2. STANDARD OF DISTRIBUTION BASED ON
RELATIVE VALUE:
• Since land values are rarely Homogeneous, the
distribution based on relative value is practiced more
widely in Germany.
• The principle in this method is to share the benefit
created by the Development project between the
government and the landowners.
RELATIVE SIZE. RELATIVE VALUE.
1. PROCESS OF LAND
RECONSTITUTION IN GERMANY
Commencement
of
Readjustment
Preparation for
Land
Readjustment
Value Capture and
Reallocation
Readjustment
Plans
Implementation
of Readjustment
Plan
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
LAND POOLING AND READJUSTMENT EXPERIENCE IN INDIA
In India the urban planning in
each state is governed by the
state Town planning acts and
several development acts.
1960 Model Town and
Country Planning Law
1985 Model Regional and
Town Planning and
Development Law
TCPO FORMULATED
The concept of TPS implies
• Pooling together all the land
under different ownership
• Redistributing it in a properly
Reconstituted form after deducting
the land required for open-spaces,
social infrastructures, services,
housing for the economically
weaker section and road network.
• The process enables the
government/local authority to develop the land without fully Acquiring it.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
THE INDIAN LAND POOLING MODELS
• In India, the Town Panning Scheme (TPS) was first introduced under the Bombay Town
Planning Act (TPA) of 1915.
• The first TPS was prepared for seven acres in Bandra (Deuskar, 2011).
• There are important differences in the different land pooling policies with regard to the
standards governing returnable plots to landowners.
Source- Administrative Staff College of India (ASCI), Hyderabad.
Delhi
• 40-60%
Gujrat
• 40-50%
Raipur
• 35%
Andhra Pradesh
• 25/30% For dry/wet
Punjab
• 23%
MP
• 24%
• The minimum land size that can be pooled also varies with a minimum in Raipur to a
maximum in Delhi (two hectares and 10 hectares respectively).
• All the models have a homogeneous contribution ratio in terms of land to be returned to the
landowners with the exception of AP and MSRDC LPS (differential entitlements for wet/dry
lands and different categories of assigned land owners) and the Kutch Reconstruction
Project/KVTDS (progressive contribution ratio).
• The AP LPS is also unique in being the only pooling model that provides benefits to the
landless and other social development benefits to the affected families.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
THE INDIAN LAND POOLING MODELS
The Legislation:
In Gujarat, the first TPA was implemented in 1915 & modified in 1954
• The recent version of the Act is the Gujarat Town Planning and Urban Development Act
(GTPUDA), 1976.
• The legislation provides for the development of decadal macro level “Development Plan”
for the entire city and
• followed by a large number of micro level TPSs of 100 ha area each.
• The Act was amended in 1999 to enable the local Government to take the possession of
land for construction of roads after approval of the draft TPS.
• The allotment of land in the TPS is
1. THE GUJARAT PLAN–TOWN PLANNING SCHEME, 1976
Source- Administrative Staff College of India (ASCI), Hyderabad.
15%
• Roads
5%
• Parks
• Play grounds
• Garden & open
spaces
5%
• Social
infrastructure
plots
15%
• Sale for
residential/com
mercial or
industrial
10%
• Housing for
EWS
• The remaining land is to be reconstituted and returned to the land owners.
• The scheme is conceptualized as a joint venture between the local authority and the owners
of land, who voluntarily agree to pool their land, redistribute the reconstituted plots of land
among themselves and share the development cost.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
THE INDIAN LAND POOLING MODELS
1. The Gujarat Plan–Town Planning Scheme, 1976
Source- Administrative Staff College of India (ASCI), Hyderabad.
Benefits Entitlements to Land Owners/Others: The land owner gets back 50 to 60 percent of the size of the original
plot. The Government is entitled to pay compensation for the land surrendered to the Government. The land owners
are entitled to pay betterment levies at the rate of half the increase in land values of the final plots.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
1. The Gujarat Plan–Town Planning Scheme, 1976
THE INDIAN LAND POOLING MODELS
Source- Administrative Staff College of India (ASCI), Hyderabad.
The stepwise process in Gujarat is explained below:
1. Survey of the area
2. Establishing the ownership details of land parcels.
3. Preparation of a base map.
4. Defining the boundary of the TPS.
5. Laying out the roads in the Area.
6. Carving out plots for amenities in the area.
7. Tabulating deduction and final plot size.
8. Delineation of final plots, computing compensation and final plots.
9. Estimating the cost of the TPS, value of FPs and betterment charges.
10. Owner’s meeting, modification of the Draft TPS and its Approval.
11. Appointment of the Town Planning Officer (TPO).
12. Individual hearings to each landowner on the preliminary TPS.
13. Finalisation of the preliminary TPS and Its approval.
Conclusion: The TPS is being implemented by all urban development authorities in the State of
Gujarat. The scale of TPS implementation has however increased since the 1999 amendment
across different development authorities. TPS is an established mechanism and working very
successfully in Gujarat.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
2. The Punjab Land Pooling Model
The Department of Housing and Urban Development, Government of Punjab notified the Land
Pooling Policy in June 2013, though practice of sharing a proportion of developed land existed
earlier. The stated aim of the land pooling policy is to avoid complications of compulsory
acquisition and share benefits of urban development with landowners so as to make them a
stakeholder in development.
• The landowners can opt for compensation, as arrived under the provisions of LAA or the
package under land pooling policy. The land pooling policy is available to the land owners
even if the land is acquired for other than residential purpose.
• The Policy:
The Process Flow:
Entitlements to Land Owners/Others:
• For every acre of land pooled, the land owners are entitled to 1000 square yards of residential
land. The commercial returnable plot is Shop cum Office of 121 sq yards or two shops of 60
sq. yards. A landowner possessing half an acre of land is entitled to 500 square yards of
residential land and one shop of 60 sq yards.
• The minimum land size that can be pooled is one canal, for which the residential returnable
land is 150 square yards. Similarly, returnable land for two and three canals is 300 and 450
square yards respectively. Commercial returnable plot entitlements are only for those
possessing half acre or more.
Source- Administrative Staff College of India (ASCI), Hyderabad.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
2. The Punjab Land Pooling Model
• The Department of Housing and Urban Development, Government of Punjab notified the
Land Pooling Policy in June 2013.
• The stated aim of the land pooling policy is to avoid complications of compulsory acquisition
and share benefits of urban development with landowners so as to make them a stakeholder
in development.
The two policies are:
 Land Pooling Policy for the State of Punjab
 Land Owners become Partners in Development
• The Policy:
The Process Flow:
Source- Administrative Staff College of India (ASCI), Hyderabad.
• The land owners can opt for
maximum three standard plots per
acre of land offered for
the scheme.
• The land owners shall be allowed
to have two standard size
residential plots for an area of
0.5 acre (4 kanals) acquired.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
• In case, the area acquired under land pooling scheme is less than 0.5 acre (4 kanals, the land
owner shall be allowed to have one residential plot as per the table above.
• Where the land owner is to be allotted two or more plots of the same size, he shall have the
option to club these plots.
• The land pooling policy shall be available to the land owners even if the land is acquired for
other than residential purpose.
• In case the possession of the structure (house) of the land owner is taken by the Authority,
• the possession shall not be made effective for a period of one year from the date of giving
possession of the developed plot to the land owner so as to enable him/her to construct a new
house in the plot in that period.
• The land owners shall be given subsistence allowance @ Rs. 25,000/ per acre upto a
maximum three years or till the possession of developed share of land is not handed over to
him/her, whichever is earlier.
Conclusion:
• The Punjab LPS provides a real option to the land owners to choose between compensation
or share the developed land in return.
• Given the high compensation cost of land in the State, the land pooling has helped the
Government in reducing its financial burden as well as reducing litigation at different
courts. It is also seen that the Government can easily recover its high compensation outgo
by the sale of high value plots.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
2. The Punjab Land Pooling Model
Source- Administrative Staff College of India (ASCI), Hyderabad.
• The delay in the period
for returning the land to
the landowners is the
most common concern
with land pooling
models. This transition
period is critical if the
landowners were
dependent on the pooled
land for their livelihood.
• The Policy provides a transitional allowance for the landowners for a maximum period of three
years. This should be extended till the period the developed land is returned to the landowner.
• The Punjab policy has not been modified after the coming into force of the 2013 Act. According
to the 2013 Act, a mandatory SIA is to be carried out prior to land acquisition. Since the Punjab
policy is integrated with the land acquisition framework. It remains to be seen if a diligently
conducted SIA study prior to notification would cover the gaps in the existing pooling policy
viz. holistic assessment of the impacted and providing entitlements to non-title-holders and
others adversely impacted.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
3. The Andhra Pradesh Capital City Land Pooling Model
The Legislation:
The Andhra Pradesh Capital Region Development Authority (APCRDA) Act, 2014 notified an
area of 8352.69 Sq. Kms for Capital Region and 217.23 Sq.Kms as AP Capital City area. The
Capital City area falls in Guntur district, covering 24 revenue villages and part of Tadepalli
Municipality covering mandals of Thullur, Mangalagiri and Tadepalli.
• The Capital Region Development Authority (CRDA) notified the Andhra Pradesh Capital
City Land Pooling Scheme (LPS) Rules in January 2015. Through the LPS, land parcels
owned by individuals or group of owners were legally consolidated by transfer of ownership
rights to the CRDA, which later transferred the ownership of a part of the land back to the
land owners.
• Half of the total land in the capital city is reserved for roads, utility services, parks,
playgrounds, gardens, open spaces, social amenities and affordable housing. The balance
after meeting the above requirements and the return of plot to the landowners were vested
with CRDA.
Source- Administrative Staff College of India (ASCI), Hyderabad.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
3. The Andhra Pradesh Capital City Land Pooling Model
• Upon issuance of the Notification by the Commissioner the landowners had to submit their
consent/suggestions/objections within 30 days.
• The Authority made a draft LPS of the area in accordance with the sanctioned plans and in
consultation with the landowners. A 30-day period timeline was provided for suggestions/
objections and the final LPS was notified by the Commissioner.
• After the landowners executed a Development Agreement cum Irrevocable General Power of
Attorney with AP CRDA, the rights over the land were transferred to CRDA by executing a
registered deed.
• The finalized plan is notified and land owners were allotted their ‘returnable plots’ by means
of a digital lottery.
• The landowners could opt for different sizes of standard plots as per their eligibility.
Source- Administrative Staff College of India (ASCI), Hyderabad.
The Process Flow:
Entitlements to Land Owners/Others:
• For every acre of irrigated and semi urban land surrendered for the LPS, the land owners
received 1000/450 square yards of developed residential/commercial plots. Those possessing
dry land have a lower entitlement of 1000/250 sq yards of residential/commercial plots per
acre.
• The landowners are also entitled to annuity for crop loss at the rate of Rs. 30,000 for dry and
Rs. 50,000 for irrigated lands (with annual enhancement of ten percent); one time additional
payment up to Rs 1 lakh for gardens. Agricultural loans amounting to Rs. 1.50 lakh in
agriculture loans for each family were also waived off.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
3. The Andhra Pradesh Capital City Land Pooling Model
• The AP LPS is also unique in providing benefits to the landless families viz. Rs. 2,500 /- per
month for a period of 10 years besides a plethora of other benefits that includes provision of
National Rural Employment Guarantee Scheme (NREGS) upto 365 days a year per family,
Interest free loan up to 25 lakhs to all the poor families for self employment, free education
and medical benefits and skill development trainings with sty-fund to enhance the skills of
cultivating tenants, agricultural labourers and other needy persons to have alternative
livelihoods.
Source- Administrative Staff College of India (ASCI), Hyderabad.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
3. The Andhra Pradesh Capital City Land Pooling Model
Source- Administrative Staff College of India (ASCI), Hyderabad.
Other Benefits:
• Rs. 2,500 /- per month for a period of 10 years to all the landless families
• One time agricultural loan waiver up to Rs. 1, 50, 000 per family to farmers who are
surrendering their lands under LPS.
• Providing NREGA upto 365 days a year per family.
• Return of land to the landowners near pooled land / within 5 KM radius subject to other
planning requirements.
• Provision of reconstituted plots in one area to different landowners having original plots in
different areas jointly.
• Demarcation of Abadi lands and extended habitations so as to ensure no displacement of
residential families.
• Provision of housing to houseless as well as those losing houses in the course of
development.
• Provision of skill development trainings with sty-fund to enhance the skills of cultivating
tenants, agricultural labourers and other needy persons to have alternative livelihoods.
• Provision of interest free loan up to 25 Lakhs to all the poor families for self employment.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
• an initiative primarily initiated by the land owners themselves.
• City covered 430 acres of land that was owned by about 120 farmer families.
• farmers joined together to form the Township called Magarpatta Township Development
Construction Company Limited (MTDCCL) and developed the city.
The objective of the Magarpatta joint venture model was-
• to create long term wealth for the farmers from their landholdings
• create opportunity for the farmers to turn into entrepreneurs
• to provide the farmers with a long term annuity and
• to create a strong real estate franchise to enable the development of other large scale
projects
• In the Model, the farmers contributed their individual landholdings under a Joint
Development Agreement (JDA) to the project for a refundable security deposit and a
revenue share.
• The property values in Magarpatta City increased from about Rs. 1000 per square feet to
about Rs. 5000 per square feet during the period 2003 to 2011.
The Magarpatta Land Pooling Model
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
• In the year 2000, the land rate around the area was between Rs. 30-35 lakhs per acre.
• In 2011, the land became worth Rs. 3.5 crore per acre
• The model also offered significant advantages to the developers.
• The developers were able to acquire larger tracts of land with minimal capital
• Litigations from land owners which are a proverbial problem were non-existent since the
model locks in the land-owners.
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
Comparison Of Various Land Pooling Models In India
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
Comparison Of Various Land Pooling Models In India
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
Comparison Of Various Land Pooling Models In India
FACULTY OF ARCHITECTURE AND PLANNING, AKTU
HOUSING, RESETTLEMENT & REHABILITATION
Comparison Of Various Land Pooling Models In India

More Related Content

What's hot

Town planning schemes
Town planning schemesTown planning schemes
Town planning schemesSakshiGadakh
 
Master Plan & Delhi Master Plan
Master Plan & Delhi Master PlanMaster Plan & Delhi Master Plan
Master Plan & Delhi Master PlanSahil Kaundal
 
URDPFI - 2016
URDPFI - 2016URDPFI - 2016
URDPFI - 2016ARYAN GUPTA
 
National housing & habitat policy priyank
National housing & habitat policy priyankNational housing & habitat policy priyank
National housing & habitat policy priyankPriyank Jain
 
KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016Tulika Kumar
 
Planning Legislation in India (Town Planning)
Planning Legislation in India (Town Planning)Planning Legislation in India (Town Planning)
Planning Legislation in India (Town Planning)S.P. Sharma
 
Elements of national housing policy
Elements of national housing policyElements of national housing policy
Elements of national housing policykvn virinchi
 
Kolkata Metropolitan Development Plan
Kolkata Metropolitan Development PlanKolkata Metropolitan Development Plan
Kolkata Metropolitan Development PlanDivya Kothari
 
3.1.2 development control rules tdr
3.1.2 development control rules tdr3.1.2 development control rules tdr
3.1.2 development control rules tdrSachin PatiL
 
Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...
Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...
Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...Shrikant Kate
 
Bhubaneswar- Urban Planning
Bhubaneswar- Urban PlanningBhubaneswar- Urban Planning
Bhubaneswar- Urban PlanningKharunya Chitravelu
 
Planning concepts
Planning conceptsPlanning concepts
Planning conceptsctlachu
 
Urban sprawl in india and smart growth model
Urban sprawl in india and smart growth modelUrban sprawl in india and smart growth model
Urban sprawl in india and smart growth modelJigar Pandya
 
Lesson 2 town planning concepts
Lesson  2 town planning conceptsLesson  2 town planning concepts
Lesson 2 town planning conceptsVINCENT WAN PERERA
 
Town Planning Act: Mahrashtra
Town Planning Act: MahrashtraTown Planning Act: Mahrashtra
Town Planning Act: MahrashtraMalvika Jaishal
 
Determinants or Urban Form urban morphology
Determinants or Urban Form urban morphologyDeterminants or Urban Form urban morphology
Determinants or Urban Form urban morphologySomesh Siddharth
 
Housing policies and finances
Housing policies and financesHousing policies and finances
Housing policies and financesSiddhi Vakharia
 

What's hot (20)

Town planning schemes
Town planning schemesTown planning schemes
Town planning schemes
 
TDR - TRANSFER OF DEVELOPMENT RIGHTS
TDR - TRANSFER OF DEVELOPMENT RIGHTSTDR - TRANSFER OF DEVELOPMENT RIGHTS
TDR - TRANSFER OF DEVELOPMENT RIGHTS
 
Master Plan & Delhi Master Plan
Master Plan & Delhi Master PlanMaster Plan & Delhi Master Plan
Master Plan & Delhi Master Plan
 
Webinar on Town planning scheme
Webinar on Town planning schemeWebinar on Town planning scheme
Webinar on Town planning scheme
 
URDPFI - 2016
URDPFI - 2016URDPFI - 2016
URDPFI - 2016
 
National housing & habitat policy priyank
National housing & habitat policy priyankNational housing & habitat policy priyank
National housing & habitat policy priyank
 
KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016
 
Planning Legislation in India (Town Planning)
Planning Legislation in India (Town Planning)Planning Legislation in India (Town Planning)
Planning Legislation in India (Town Planning)
 
Tcpo
TcpoTcpo
Tcpo
 
Elements of national housing policy
Elements of national housing policyElements of national housing policy
Elements of national housing policy
 
Kolkata Metropolitan Development Plan
Kolkata Metropolitan Development PlanKolkata Metropolitan Development Plan
Kolkata Metropolitan Development Plan
 
3.1.2 development control rules tdr
3.1.2 development control rules tdr3.1.2 development control rules tdr
3.1.2 development control rules tdr
 
Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...
Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...
Architecture and town planning _Unit 3_SPPU_Town planning and various levels ...
 
Bhubaneswar- Urban Planning
Bhubaneswar- Urban PlanningBhubaneswar- Urban Planning
Bhubaneswar- Urban Planning
 
Planning concepts
Planning conceptsPlanning concepts
Planning concepts
 
Urban sprawl in india and smart growth model
Urban sprawl in india and smart growth modelUrban sprawl in india and smart growth model
Urban sprawl in india and smart growth model
 
Lesson 2 town planning concepts
Lesson  2 town planning conceptsLesson  2 town planning concepts
Lesson 2 town planning concepts
 
Town Planning Act: Mahrashtra
Town Planning Act: MahrashtraTown Planning Act: Mahrashtra
Town Planning Act: Mahrashtra
 
Determinants or Urban Form urban morphology
Determinants or Urban Form urban morphologyDeterminants or Urban Form urban morphology
Determinants or Urban Form urban morphology
 
Housing policies and finances
Housing policies and financesHousing policies and finances
Housing policies and finances
 

Similar to Land Pooling Models in India.pptx

Participatory inclusive land readjustment in post war angola - conference on ...
Participatory inclusive land readjustment in post war angola - conference on ...Participatory inclusive land readjustment in post war angola - conference on ...
Participatory inclusive land readjustment in post war angola - conference on ...Development Workshop Angola
 
Participatory Inclusive Land Readjustment in Angola - Allan Cain, 2016/06/01
Participatory Inclusive Land Readjustment in Angola - Allan Cain, 2016/06/01 Participatory Inclusive Land Readjustment in Angola - Allan Cain, 2016/06/01
Participatory Inclusive Land Readjustment in Angola - Allan Cain, 2016/06/01 Development Workshop Angola
 
Urban land policies
Urban land policiesUrban land policies
Urban land policiesAbhishek Kanwar
 
Slum Area Improvement & Clearance Act
Slum Area Improvement & Clearance ActSlum Area Improvement & Clearance Act
Slum Area Improvement & Clearance ActMitiksha Jain
 
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...Shrikant Kate
 
OVERVIEW OF LAND ACQUISITION ACT, 2013.pptx
OVERVIEW OF LAND ACQUISITION ACT, 2013.pptxOVERVIEW OF LAND ACQUISITION ACT, 2013.pptx
OVERVIEW OF LAND ACQUISITION ACT, 2013.pptxHarshDhaka9
 
Community Land Sharing in Huambo, Angola - Allan Cain, 2013/10/23
Community Land Sharing in Huambo, Angola - Allan Cain, 2013/10/23Community Land Sharing in Huambo, Angola - Allan Cain, 2013/10/23
Community Land Sharing in Huambo, Angola - Allan Cain, 2013/10/23Development Workshop Angola
 
Community land sharing, the case of Huambo, Angola - Allan Cain, 23/10/2013
Community land sharing, the case of Huambo, Angola - Allan Cain, 23/10/2013Community land sharing, the case of Huambo, Angola - Allan Cain, 23/10/2013
Community land sharing, the case of Huambo, Angola - Allan Cain, 23/10/2013Development Workshop Angola
 
Amendments in land acquisition act of nepal
Amendments in land acquisition act of nepal Amendments in land acquisition act of nepal
Amendments in land acquisition act of nepal slidejoya
 
Sourcing and managing land in urban context
Sourcing and managing land in urban contextSourcing and managing land in urban context
Sourcing and managing land in urban contextJIT KUMAR GUPTA
 
Land Acquisition - Sem 9 .pptx
Land Acquisition - Sem 9 .pptxLand Acquisition - Sem 9 .pptx
Land Acquisition - Sem 9 .pptxSajidPatel28
 
9. Addis Ababa: a case study on land leasing
9. Addis Ababa: a case study on land leasing9. Addis Ababa: a case study on land leasing
9. Addis Ababa: a case study on land leasingACCUCT
 
Landuse theory _introduction to landuse planning
Landuse theory  _introduction to landuse planningLanduse theory  _introduction to landuse planning
Landuse theory _introduction to landuse planningTulsi Patel
 
ANDHRA PRADESH TOWN PLANNING ACT 1920.pptx
ANDHRA PRADESH TOWN PLANNING ACT 1920.pptxANDHRA PRADESH TOWN PLANNING ACT 1920.pptx
ANDHRA PRADESH TOWN PLANNING ACT 1920.pptxsantu75
 
UPDATED-LAND-USE-PLANNING-REPORT.pptx
UPDATED-LAND-USE-PLANNING-REPORT.pptxUPDATED-LAND-USE-PLANNING-REPORT.pptx
UPDATED-LAND-USE-PLANNING-REPORT.pptxIvanaJoyceVillalobos
 
2013 World Bank Conference on Land and Poverty: Participatory Inclusive Land ...
2013 World Bank Conference on Land and Poverty: Participatory Inclusive Land ...2013 World Bank Conference on Land and Poverty: Participatory Inclusive Land ...
2013 World Bank Conference on Land and Poverty: Participatory Inclusive Land ...Development Workshop Angola
 

Similar to Land Pooling Models in India.pptx (20)

URBAN LAND MANAGEMENT 1.pdf
URBAN LAND MANAGEMENT 1.pdfURBAN LAND MANAGEMENT 1.pdf
URBAN LAND MANAGEMENT 1.pdf
 
Participatory inclusive land readjustment in post war angola - conference on ...
Participatory inclusive land readjustment in post war angola - conference on ...Participatory inclusive land readjustment in post war angola - conference on ...
Participatory inclusive land readjustment in post war angola - conference on ...
 
Participatory Inclusive Land Readjustment in Angola - Allan Cain, 2016/06/01
Participatory Inclusive Land Readjustment in Angola - Allan Cain, 2016/06/01 Participatory Inclusive Land Readjustment in Angola - Allan Cain, 2016/06/01
Participatory Inclusive Land Readjustment in Angola - Allan Cain, 2016/06/01
 
Urban land policies
Urban land policiesUrban land policies
Urban land policies
 
Slum Area Improvement & Clearance Act
Slum Area Improvement & Clearance ActSlum Area Improvement & Clearance Act
Slum Area Improvement & Clearance Act
 
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...
 
MAPC land pooling symposium presentation 5 11 2011
MAPC land pooling symposium presentation 5 11 2011MAPC land pooling symposium presentation 5 11 2011
MAPC land pooling symposium presentation 5 11 2011
 
OVERVIEW OF LAND ACQUISITION ACT, 2013.pptx
OVERVIEW OF LAND ACQUISITION ACT, 2013.pptxOVERVIEW OF LAND ACQUISITION ACT, 2013.pptx
OVERVIEW OF LAND ACQUISITION ACT, 2013.pptx
 
Community Land Sharing in Huambo, Angola - Allan Cain, 2013/10/23
Community Land Sharing in Huambo, Angola - Allan Cain, 2013/10/23Community Land Sharing in Huambo, Angola - Allan Cain, 2013/10/23
Community Land Sharing in Huambo, Angola - Allan Cain, 2013/10/23
 
Community land sharing, the case of Huambo, Angola - Allan Cain, 23/10/2013
Community land sharing, the case of Huambo, Angola - Allan Cain, 23/10/2013Community land sharing, the case of Huambo, Angola - Allan Cain, 23/10/2013
Community land sharing, the case of Huambo, Angola - Allan Cain, 23/10/2013
 
Amendments in land acquisition act of nepal
Amendments in land acquisition act of nepal Amendments in land acquisition act of nepal
Amendments in land acquisition act of nepal
 
Sourcing and managing land in urban context
Sourcing and managing land in urban contextSourcing and managing land in urban context
Sourcing and managing land in urban context
 
Land Acquisition - Sem 9 .pptx
Land Acquisition - Sem 9 .pptxLand Acquisition - Sem 9 .pptx
Land Acquisition - Sem 9 .pptx
 
Exploring Alternatives to Land Acquisition
Exploring Alternatives to Land AcquisitionExploring Alternatives to Land Acquisition
Exploring Alternatives to Land Acquisition
 
9. Addis Ababa: a case study on land leasing
9. Addis Ababa: a case study on land leasing9. Addis Ababa: a case study on land leasing
9. Addis Ababa: a case study on land leasing
 
Landuse theory _introduction to landuse planning
Landuse theory  _introduction to landuse planningLanduse theory  _introduction to landuse planning
Landuse theory _introduction to landuse planning
 
ANDHRA PRADESH TOWN PLANNING ACT 1920.pptx
ANDHRA PRADESH TOWN PLANNING ACT 1920.pptxANDHRA PRADESH TOWN PLANNING ACT 1920.pptx
ANDHRA PRADESH TOWN PLANNING ACT 1920.pptx
 
UPDATED-LAND-USE-PLANNING-REPORT.pptx
UPDATED-LAND-USE-PLANNING-REPORT.pptxUPDATED-LAND-USE-PLANNING-REPORT.pptx
UPDATED-LAND-USE-PLANNING-REPORT.pptx
 
Land administration part ii
Land administration  part iiLand administration  part ii
Land administration part ii
 
2013 World Bank Conference on Land and Poverty: Participatory Inclusive Land ...
2013 World Bank Conference on Land and Poverty: Participatory Inclusive Land ...2013 World Bank Conference on Land and Poverty: Participatory Inclusive Land ...
2013 World Bank Conference on Land and Poverty: Participatory Inclusive Land ...
 

Recently uploaded

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxsqpmdrvczh
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........LeaCamillePacle
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 

Recently uploaded (20)

Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptx
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 

Land Pooling Models in India.pptx

  • 1. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION HOUSING , RESETTLEMENT & REHABILITATION MPL-105 (Topic –Land Acquisition Models And Practices In India And Elsewhere For Projects . Compulsory Acquisition Land Sharing And Adjustment Models, Land Pooling , Negotiated Land Acquisition) SUBMITTED TO: PROF. MAHIMA THUSSU SUBMITTED BY: ANJU YADAV POOJA YADAV
  • 2. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION Land acquisition is the process by which government acquires private property for public purposes. LAND ACQUISITION Land pooling is an activity where a group of landowners handover their land parcels to the government collectively for infrastructure development. Once the development is complete, the land is handed over to the original owners, after deducting some portion as the cost for the same. LAND POOLING COMPULSORYACQUISITION OF LAND If in the opinion of the Central Government, any land is required for the purpose of development, or for any other purpose, under this Act, the Central Government may acquire such land under the provisions of the Land Acquisition Act, 1894. • Compulsory land acquisition based on the principle of eminent domain. • Eminent domain is the legal theory of government taking power; the power of the sovereign to take or destroy private property for public purpose without the consent of the owner. • Land is a dominant source Of livelihood. • It is a crucial resource required for development activities. • Land Acquisition in India refers to the process of land acquisition by the central or state government of India for various infrastructure and economic growth initiatives. LAND ACQUISITION IN INDIA
  • 3. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION LOWS IN LAND ACQUISITION ACTS TIMELINE
  • 4. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION  Landowners • Increase in Value of land The increasement in land value resulting from the development accrues to the original owner whenever the land is sold and developed for urban use . • Non-Displacing Strategy of Land Assembly • The original owner is not displaced in the process of land development and continues to enjoy access to the land resources. Thus the negative impact of the process of urbanization on farmers is minimized. • The world population living in the urban areas is expected to increase to 70 percent from the present 50 percent by the middle of this century. • Land assembly strategy for development projects is known in different parts of the world by different names viz., • Land readjustment (LR) in South Korea And Japan. No transfer of title to the development entity. The title is simply modified at the end to show the new Property designation. • Land consolidation in Europe and • Land pooling in Australia & India. the original landowners actually transfer title to the • development entity at the beginning of the process and receive a new title after reconstitution. LAND POOLING/RECONSTITUTION MECHANISMS BENEFITS OF LAND POOLING/READJUSTMENT
  • 5. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION • Better Infrastructure: • Not just the landlords in the area but it could also be a good means of providing entry to land for the lower income housing scheme.  GOVERNMENT • No Upfront Costs: In the new land acquisition law, the compensation and R & R costs would have to be borne by the land requiring body. • Under land pooling, The landowners and development entity share in the risk and return of the project. • Relatively less Conflict Ridden Process • Higher tax base with increase in property prices: As explained above, the revenue base of the local bodies increase owing to increased land values and enlarged tax base. • The increased tax revenues provides an extra source of funding for the government. • Conversion of irregular land parcels into plots of regular sizes and shapes Showing infrastructure changes after land pooling
  • 6. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION Others • Not just the landlords in the area but it could also be a good means of providing entry to land for the lower income housing scheme. • Social Capital Creation-refers to the institutions, relationships, and norms that shape the quality and quantity of a society's social interactions. • is created by the private and public actors working collectively foreseeing mutual benefits. • Increase of public-private cooperation and trust-a wider community participation in land development and public-private partnership is fostered The strategy ensures a three way win; • for the private players to put their skills to use; • the government to facilitate the development and ultimately • the land owners who benefit from the development. DISADVANTAGES • Method is time consuming • Betterment charges are assessed at the beginning of the land pooling or readjustment scheme preparation. • Due to the inordinate delays in finalizing schemes , the betterment charges levied on finalization of the scheme do not meet the cost of the infrastructure provided.
  • 7. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION • Germany has the oldest example of land readjustment (LR). • The legal Framework for land pooling was established in 1902 by Franz Adickes , Mayor Of Frankfurt Am- main, Germany. • Called UMLEGUNG in the local parlance • The German LR process is led by the local authority. • Has two standards of distribution For readjusted land returned to landowners- GERMAN MODEL OF LAND POOLING (READJUSTMENT) 1. STANDARD OF DISTRIBUTION BASED ON RELATIVE SIZE: • Used when the land values in the redistribution area are homogeneous. • followed if the land values are hard to determine and where plots have very similar characteristics. • Under this method, the government retains up to 30 percent of the landowners land. 2. STANDARD OF DISTRIBUTION BASED ON RELATIVE VALUE: • Since land values are rarely Homogeneous, the distribution based on relative value is practiced more widely in Germany. • The principle in this method is to share the benefit created by the Development project between the government and the landowners. RELATIVE SIZE. RELATIVE VALUE. 1. PROCESS OF LAND RECONSTITUTION IN GERMANY Commencement of Readjustment Preparation for Land Readjustment Value Capture and Reallocation Readjustment Plans Implementation of Readjustment Plan
  • 8. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION LAND POOLING AND READJUSTMENT EXPERIENCE IN INDIA In India the urban planning in each state is governed by the state Town planning acts and several development acts. 1960 Model Town and Country Planning Law 1985 Model Regional and Town Planning and Development Law TCPO FORMULATED The concept of TPS implies • Pooling together all the land under different ownership • Redistributing it in a properly Reconstituted form after deducting the land required for open-spaces, social infrastructures, services, housing for the economically weaker section and road network. • The process enables the government/local authority to develop the land without fully Acquiring it.
  • 9. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION THE INDIAN LAND POOLING MODELS • In India, the Town Panning Scheme (TPS) was first introduced under the Bombay Town Planning Act (TPA) of 1915. • The first TPS was prepared for seven acres in Bandra (Deuskar, 2011). • There are important differences in the different land pooling policies with regard to the standards governing returnable plots to landowners. Source- Administrative Staff College of India (ASCI), Hyderabad. Delhi • 40-60% Gujrat • 40-50% Raipur • 35% Andhra Pradesh • 25/30% For dry/wet Punjab • 23% MP • 24% • The minimum land size that can be pooled also varies with a minimum in Raipur to a maximum in Delhi (two hectares and 10 hectares respectively). • All the models have a homogeneous contribution ratio in terms of land to be returned to the landowners with the exception of AP and MSRDC LPS (differential entitlements for wet/dry lands and different categories of assigned land owners) and the Kutch Reconstruction Project/KVTDS (progressive contribution ratio). • The AP LPS is also unique in being the only pooling model that provides benefits to the landless and other social development benefits to the affected families.
  • 10. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION THE INDIAN LAND POOLING MODELS The Legislation: In Gujarat, the first TPA was implemented in 1915 & modified in 1954 • The recent version of the Act is the Gujarat Town Planning and Urban Development Act (GTPUDA), 1976. • The legislation provides for the development of decadal macro level “Development Plan” for the entire city and • followed by a large number of micro level TPSs of 100 ha area each. • The Act was amended in 1999 to enable the local Government to take the possession of land for construction of roads after approval of the draft TPS. • The allotment of land in the TPS is 1. THE GUJARAT PLAN–TOWN PLANNING SCHEME, 1976 Source- Administrative Staff College of India (ASCI), Hyderabad. 15% • Roads 5% • Parks • Play grounds • Garden & open spaces 5% • Social infrastructure plots 15% • Sale for residential/com mercial or industrial 10% • Housing for EWS • The remaining land is to be reconstituted and returned to the land owners. • The scheme is conceptualized as a joint venture between the local authority and the owners of land, who voluntarily agree to pool their land, redistribute the reconstituted plots of land among themselves and share the development cost.
  • 11. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION THE INDIAN LAND POOLING MODELS 1. The Gujarat Plan–Town Planning Scheme, 1976 Source- Administrative Staff College of India (ASCI), Hyderabad. Benefits Entitlements to Land Owners/Others: The land owner gets back 50 to 60 percent of the size of the original plot. The Government is entitled to pay compensation for the land surrendered to the Government. The land owners are entitled to pay betterment levies at the rate of half the increase in land values of the final plots.
  • 12. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION 1. The Gujarat Plan–Town Planning Scheme, 1976 THE INDIAN LAND POOLING MODELS Source- Administrative Staff College of India (ASCI), Hyderabad. The stepwise process in Gujarat is explained below: 1. Survey of the area 2. Establishing the ownership details of land parcels. 3. Preparation of a base map. 4. Defining the boundary of the TPS. 5. Laying out the roads in the Area. 6. Carving out plots for amenities in the area. 7. Tabulating deduction and final plot size. 8. Delineation of final plots, computing compensation and final plots. 9. Estimating the cost of the TPS, value of FPs and betterment charges. 10. Owner’s meeting, modification of the Draft TPS and its Approval. 11. Appointment of the Town Planning Officer (TPO). 12. Individual hearings to each landowner on the preliminary TPS. 13. Finalisation of the preliminary TPS and Its approval. Conclusion: The TPS is being implemented by all urban development authorities in the State of Gujarat. The scale of TPS implementation has however increased since the 1999 amendment across different development authorities. TPS is an established mechanism and working very successfully in Gujarat.
  • 13. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION 2. The Punjab Land Pooling Model The Department of Housing and Urban Development, Government of Punjab notified the Land Pooling Policy in June 2013, though practice of sharing a proportion of developed land existed earlier. The stated aim of the land pooling policy is to avoid complications of compulsory acquisition and share benefits of urban development with landowners so as to make them a stakeholder in development. • The landowners can opt for compensation, as arrived under the provisions of LAA or the package under land pooling policy. The land pooling policy is available to the land owners even if the land is acquired for other than residential purpose. • The Policy: The Process Flow: Entitlements to Land Owners/Others: • For every acre of land pooled, the land owners are entitled to 1000 square yards of residential land. The commercial returnable plot is Shop cum Office of 121 sq yards or two shops of 60 sq. yards. A landowner possessing half an acre of land is entitled to 500 square yards of residential land and one shop of 60 sq yards. • The minimum land size that can be pooled is one canal, for which the residential returnable land is 150 square yards. Similarly, returnable land for two and three canals is 300 and 450 square yards respectively. Commercial returnable plot entitlements are only for those possessing half acre or more. Source- Administrative Staff College of India (ASCI), Hyderabad.
  • 14. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION 2. The Punjab Land Pooling Model • The Department of Housing and Urban Development, Government of Punjab notified the Land Pooling Policy in June 2013. • The stated aim of the land pooling policy is to avoid complications of compulsory acquisition and share benefits of urban development with landowners so as to make them a stakeholder in development. The two policies are:  Land Pooling Policy for the State of Punjab  Land Owners become Partners in Development • The Policy: The Process Flow: Source- Administrative Staff College of India (ASCI), Hyderabad. • The land owners can opt for maximum three standard plots per acre of land offered for the scheme. • The land owners shall be allowed to have two standard size residential plots for an area of 0.5 acre (4 kanals) acquired.
  • 15. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION • In case, the area acquired under land pooling scheme is less than 0.5 acre (4 kanals, the land owner shall be allowed to have one residential plot as per the table above. • Where the land owner is to be allotted two or more plots of the same size, he shall have the option to club these plots. • The land pooling policy shall be available to the land owners even if the land is acquired for other than residential purpose. • In case the possession of the structure (house) of the land owner is taken by the Authority, • the possession shall not be made effective for a period of one year from the date of giving possession of the developed plot to the land owner so as to enable him/her to construct a new house in the plot in that period. • The land owners shall be given subsistence allowance @ Rs. 25,000/ per acre upto a maximum three years or till the possession of developed share of land is not handed over to him/her, whichever is earlier. Conclusion: • The Punjab LPS provides a real option to the land owners to choose between compensation or share the developed land in return. • Given the high compensation cost of land in the State, the land pooling has helped the Government in reducing its financial burden as well as reducing litigation at different courts. It is also seen that the Government can easily recover its high compensation outgo by the sale of high value plots.
  • 16. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION 2. The Punjab Land Pooling Model Source- Administrative Staff College of India (ASCI), Hyderabad. • The delay in the period for returning the land to the landowners is the most common concern with land pooling models. This transition period is critical if the landowners were dependent on the pooled land for their livelihood. • The Policy provides a transitional allowance for the landowners for a maximum period of three years. This should be extended till the period the developed land is returned to the landowner. • The Punjab policy has not been modified after the coming into force of the 2013 Act. According to the 2013 Act, a mandatory SIA is to be carried out prior to land acquisition. Since the Punjab policy is integrated with the land acquisition framework. It remains to be seen if a diligently conducted SIA study prior to notification would cover the gaps in the existing pooling policy viz. holistic assessment of the impacted and providing entitlements to non-title-holders and others adversely impacted.
  • 17. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION 3. The Andhra Pradesh Capital City Land Pooling Model The Legislation: The Andhra Pradesh Capital Region Development Authority (APCRDA) Act, 2014 notified an area of 8352.69 Sq. Kms for Capital Region and 217.23 Sq.Kms as AP Capital City area. The Capital City area falls in Guntur district, covering 24 revenue villages and part of Tadepalli Municipality covering mandals of Thullur, Mangalagiri and Tadepalli. • The Capital Region Development Authority (CRDA) notified the Andhra Pradesh Capital City Land Pooling Scheme (LPS) Rules in January 2015. Through the LPS, land parcels owned by individuals or group of owners were legally consolidated by transfer of ownership rights to the CRDA, which later transferred the ownership of a part of the land back to the land owners. • Half of the total land in the capital city is reserved for roads, utility services, parks, playgrounds, gardens, open spaces, social amenities and affordable housing. The balance after meeting the above requirements and the return of plot to the landowners were vested with CRDA. Source- Administrative Staff College of India (ASCI), Hyderabad.
  • 18. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION 3. The Andhra Pradesh Capital City Land Pooling Model • Upon issuance of the Notification by the Commissioner the landowners had to submit their consent/suggestions/objections within 30 days. • The Authority made a draft LPS of the area in accordance with the sanctioned plans and in consultation with the landowners. A 30-day period timeline was provided for suggestions/ objections and the final LPS was notified by the Commissioner. • After the landowners executed a Development Agreement cum Irrevocable General Power of Attorney with AP CRDA, the rights over the land were transferred to CRDA by executing a registered deed. • The finalized plan is notified and land owners were allotted their ‘returnable plots’ by means of a digital lottery. • The landowners could opt for different sizes of standard plots as per their eligibility. Source- Administrative Staff College of India (ASCI), Hyderabad. The Process Flow: Entitlements to Land Owners/Others: • For every acre of irrigated and semi urban land surrendered for the LPS, the land owners received 1000/450 square yards of developed residential/commercial plots. Those possessing dry land have a lower entitlement of 1000/250 sq yards of residential/commercial plots per acre. • The landowners are also entitled to annuity for crop loss at the rate of Rs. 30,000 for dry and Rs. 50,000 for irrigated lands (with annual enhancement of ten percent); one time additional payment up to Rs 1 lakh for gardens. Agricultural loans amounting to Rs. 1.50 lakh in agriculture loans for each family were also waived off.
  • 19. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION 3. The Andhra Pradesh Capital City Land Pooling Model • The AP LPS is also unique in providing benefits to the landless families viz. Rs. 2,500 /- per month for a period of 10 years besides a plethora of other benefits that includes provision of National Rural Employment Guarantee Scheme (NREGS) upto 365 days a year per family, Interest free loan up to 25 lakhs to all the poor families for self employment, free education and medical benefits and skill development trainings with sty-fund to enhance the skills of cultivating tenants, agricultural labourers and other needy persons to have alternative livelihoods. Source- Administrative Staff College of India (ASCI), Hyderabad.
  • 20. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION 3. The Andhra Pradesh Capital City Land Pooling Model Source- Administrative Staff College of India (ASCI), Hyderabad. Other Benefits: • Rs. 2,500 /- per month for a period of 10 years to all the landless families • One time agricultural loan waiver up to Rs. 1, 50, 000 per family to farmers who are surrendering their lands under LPS. • Providing NREGA upto 365 days a year per family. • Return of land to the landowners near pooled land / within 5 KM radius subject to other planning requirements. • Provision of reconstituted plots in one area to different landowners having original plots in different areas jointly. • Demarcation of Abadi lands and extended habitations so as to ensure no displacement of residential families. • Provision of housing to houseless as well as those losing houses in the course of development. • Provision of skill development trainings with sty-fund to enhance the skills of cultivating tenants, agricultural labourers and other needy persons to have alternative livelihoods. • Provision of interest free loan up to 25 Lakhs to all the poor families for self employment.
  • 21. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION • an initiative primarily initiated by the land owners themselves. • City covered 430 acres of land that was owned by about 120 farmer families. • farmers joined together to form the Township called Magarpatta Township Development Construction Company Limited (MTDCCL) and developed the city. The objective of the Magarpatta joint venture model was- • to create long term wealth for the farmers from their landholdings • create opportunity for the farmers to turn into entrepreneurs • to provide the farmers with a long term annuity and • to create a strong real estate franchise to enable the development of other large scale projects • In the Model, the farmers contributed their individual landholdings under a Joint Development Agreement (JDA) to the project for a refundable security deposit and a revenue share. • The property values in Magarpatta City increased from about Rs. 1000 per square feet to about Rs. 5000 per square feet during the period 2003 to 2011. The Magarpatta Land Pooling Model
  • 22. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION • In the year 2000, the land rate around the area was between Rs. 30-35 lakhs per acre. • In 2011, the land became worth Rs. 3.5 crore per acre • The model also offered significant advantages to the developers. • The developers were able to acquire larger tracts of land with minimal capital • Litigations from land owners which are a proverbial problem were non-existent since the model locks in the land-owners.
  • 23. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION Comparison Of Various Land Pooling Models In India
  • 24. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION Comparison Of Various Land Pooling Models In India
  • 25. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION Comparison Of Various Land Pooling Models In India
  • 26. FACULTY OF ARCHITECTURE AND PLANNING, AKTU HOUSING, RESETTLEMENT & REHABILITATION Comparison Of Various Land Pooling Models In India