1. 1 | P a g e
CURRICULUM VITAE
2016
CERTIFICATION
IMCA AIR DIVING SUPERVISOR Cert. No. 6002 Sept 2004
IMCA SURFACE SUPPLIED DIVER Cert.No.SS/DASSESS/072 5/12/2001
ASSISTANT AIR DIVING SUPERVISOR Cert. No.(2002/53) 21 Dec. 2002
CSWIP 3.1U - NDT INSPECTION DIVER Cert. No.(754075/622650) 10 Aug. 2011
IMO 1 OIL SPILL RESPONSE TRAINING. 28
th
Apr. to the 2
nd
May 2014
IUCN Marine Biodiversity Management
Training Workshop 19 to 20 October 2014
Safety Certificate:
BOSIET (OPITO) Certificate No.: 058550103021561091
Included “HUET with EBS” ( OPITO Approved ) Valid until 02 / 02 / 2019
H2S & BREATHING APARATUS ( OPITO Approved ) Valid until 02 / 02 / 2017
SAFE LIFTING OPERATION. Valid until 03 / 02 / 2018
PIRMT TO WORK (PTW) 04 / 02 / 2015
RISK ASSESSMENT 04 / 02 / 2015
MANAGEMENT OF CHANGE 04 / 02 / 2015
HAZARD IDENTIFICATION 04 / 02 / 2015
ACCIDENT / INCIDENT INVESTIGATION 04 / 02 / 2015
ADMA/OPCO & ZADCO SAFETY INDUCTION COURSE.
All the jobs has been done on vessels:
DP2 V, DSV and D.L.B BARGES most of the sizes.
Nationality : Egyptian
Place of birth Egypt
SIAM RAMADAN AHMED SAYED
Date of Birth : 01-02-1964
Tel : 002-03-5622240
Mobile :
002-01227378580 &
00971-506495306
Email: siam.ramadan2000@gmail.com
Passport Number: A09925045 Valid until 16/06/2020
Sea man book Number: 198113 Valid until 30/01/2021
Marital status: married
2. 2 | P a g e
CURRICULUM VITAE
2016
EXPERIENCE – WORK HISTORY
DATE CONTRACTOR TASK POSITION VESSEL CLIENT
04 May - 06 Sep.
2016
MUTAWA
Marine
ANCHOR HANDLING & MOORING
MAINTENANCE
Mooring Maintenance &
Positioning (Including laying
& recovery of Gravity
anchors)
Monitoring during Jacking
Down barges / Rigs.
Minor repairs of ship’s hull,
cleaning intakes etc.
Video record & photograph
work on sea bed structures
Anomaly reporting
Scour and debris survey
Seabed survey and pipeline
marking for rig approach
Recovery of dropped items
Provide support for
conductor guide
Inspection of seabed
mooring, base plate and
anchor pile
Collection of soil samples
Sand bagging
Provide support in running
anchor wire
Diving
Supervisor
MUT-305
DSV
ADMA / OPCO
Fields:
ZAKUM
UMM
ALSHAIF
DAS ISLAND
HAIR DELMA
NASR FIELD
SATAH
TOTAL ABK
UMM AL
DALAKH
UMM LULU
ZIRKU
Abu Dhabi
Aug. - 31Des. 2015
MUTAWA
Marine
8'' J-TUBE & ANODES Installation
Old Anodes Removal (Hot
Cutting).
Clamps and 8'' J-tube
installation
8'',12'',16'' Riser Clamp
Installation
Impact, Torque wrench
tightens.
Butterfly, Sled and Single
anodes installation
CP Measure pre and post
electrical continuity bolts
connecting.
GVI and Still photo
As Built video survey
Diving
Supervisor
MUT-13
DSV
ADMA / OPCO /
NPCC
Zakum and
Umm Elshaiff
fields
Abu Dhabi
3. 3 | P a g e
CURRICULUM VITAE
2016
May - July 2015
MUTAWA
Marine
Pre-Engineering Survey for Boat
Landing & Riser Finder Replacement
& 8'' J-TUBE & Anodes Installation
Boat landing and riser
finder members marine
growth removal using HP.W
Jet and hand tools
Measurements & GVI & CVI
Anodes Replacement.
J-tube clamps installation
Impact and torque wrench
spanner tighten.
CP Measure pre and post
electrical continuity bolts
connecting.
8'' J-tube Installation
GVI and Still photo
As Built video survey
Diving
Supervisor
DSV
MUTAWA
13
ADMA / OPCO /
NPCC
Zakum and
Umm Elshaiff
fields
Abu Dhabi
April - May 2015
MUTAWA
Marine
8'' J-TUBE & ANODES Installation
Old Anodes Removal.
J-tube clamps installation
Impact, Torque wrench
tighten.
Butterfly, Sled and Single
anodes installation
CP Measure pre and post
electrical continuity bolts
connecting.
8'' J-tube Installation
GVI and Still photo
As Built video survey
Diving
Supervisor
DSV
MUTAWA
13
ADMA / OPCO /
NPCC
Zakum and
Umm Elshaiff
fields
Abu Dhabi
Jul 2014 – Oct 2014
MUTAWA
Marine
(IRM)
Inspection, Repair and Maintenance
UT of the Loading Jetty P/Fs
Anodes Replacement & CP
Reading
GVI /Maintenance of
flowing Buoys:
16 Maritime Exclusion Zone
(MEZ),
6 cardinals, 2 laterals, and 7
coral
GVI of the Hull Tug Boats,
Navy Boats and Patrol Boats
Current Sensor Inspection,
Cleaning
Diving
Supervisor
SRP YLNG Company
4. 4 | P a g e
CURRICULUM VITAE
2016
Feb2014–Mar 2014 I.N.W 24'' Riser Repairing
Cold Cutting using Hydraulic
Wax Cutter Machine
24'' Riser Cleaning using
hydraulic grandeur
Smart Flange Plus
Connector installation
Installation new Riser
Portion
Tighten using 100% Hydra
tight Subsea Bolts
tensioners,
Leak Test
Post installation video
survey.
Diving
Supervisor
M/V 55 GUPCO/BP
Sep 2011 –Oct 2012 CCC Inspection Job for P/Fs
P/Fs: IS-30 & IS-19 & PS-1W & PS-1Q
& IS-15 & IS-12
All job using Underwater Positioning
Nodes and Members:
General Visual Inspection
(GVI)
Grit blast Cleaning SA 2.5
level
Cathode Potential(CP)
Ultrasonic Thickness (UT)
Alternating Current Field
measurement (ACFM)
Flooded Member Detection
(FMD)
Inspection.
Diving
Supervisor
DP2 Vessel
ZAKHER
PILECAN
OXY QATAR
June 2012 I.N.W Inspection Job Drilling Rig
UWILD for Drilling Rig:
Grit Blast cleaning SA 2.5
level.
GVI of the spud cans welds
Area
MPI for the cleaned welds.
UT for the ABS required
area
Still Photo Survey.
Post installation video
survey for Inspected welds
areas
Inspection.
Diving
Supervisor
DSV
PEGASUS1
1
TRANS
OCEAN/BP
5. 5 | P a g e
CURRICULUM VITAE
2016
Apr 2010 – Jul 2010
Mutawa
Marine
Various jobs 14” Pipelines and
Risers
# Project # 8053For:
IGD HAP pipeline campaign
# Project # 7079 For:
WHT US-251
Pipe laying Campaign
# Project # 9068For:
8” Pipe laying of Pipelines & Risers
at Mubarraz Field
14'' & 3'' Pipe laying – (2 P/L’s)
Connect hold back cable to
P/F legs.
Connect hold back cable to
14''P/Lpuling head.
Stinger installation in the
Barge.
Stinger check and 14'' P/L
Profile.
Surveying on the P/Ls Cross
over’s.
Pre Laying temporary
concrete sleeper's
installation.
Floating buoys on the P/Ls
and removal.
Disconnect lay down head.
14''Riser installation
Cutting of D.M.A wire
between P/F leg and 14'' P/L
puling head.
Old Riser fender removal
(Using U.W Cutting Torch).
Riser & Spool Metrology
Measure.
Barge Davits connect to
14''P/L.
Attaching Air Bags
Removal and break the old
grouting spillage from the
spool piece route using
hydraulic jack hammer.
Tie in riser/ Spool Piece
installation @ 14''Riser
clamps.
Excavate under the spool
piece using Air Lift.
New P/F Boat Landing installation.
Disconnect davits from 14''P/L.
Spool Piece Knee brace removal.
Post construction video survey.
Diving
Supervisor
NPCC DLP
750 Barge
For 24
Hours
Operation
ADMA/OPCO
6. 6 | P a g e
CURRICULUM VITAE
2016
Nov 2009–Feb 2010
Mutawa
Marine
Installation 30''Sleeves(Protection
Clamps) between30''P/L and
concrete Sleepers at crossing Area.
# Project #6021
Das Island & Raas Al Qilla
Scope of work includes24 Hours
Operation for:
Marking the Sleeves
locations on the 30'' P/L on
the concrete Sleepers.
Lifting 30'' P/L 2m using Air
Bags.
Sleeves/Sleepers
Installation.
Air Bags disconnect,
recovery surface
Bolts tighten using Turk
spanner.
30'' P/L Sleeves/Sleepers
post installation survey
Diving
Supervisor
NPCC DLP
750 Barge
For 24
Hours
Operation
GASCO
7. 7 | P a g e
CURRICULUM VITAE
2016
Feb2009– Sep 2009
Mutawa
Marine
14'' Riser Clamps Installation
for the flowing ( 9 ) Plat forms:
ZK 172 P/F &ZK 129 P/F &ZK 39
P/F &ZK 149 P/F &ZK 116 P/F &ZK
246 P/F &U.SH 82 P/F
14'' Riser Clamps
measurement and marking
location.
Riser Clamps Installation
and tighten using hydraulic
impact wrench
Riser Clamps Alignment
checks.
18'' steel Pipe Temporary sleeper
replacement by Grouting bags
sleeper installation
Grout Bag install, Grouting
under P/L
Removal 18'' steel Pipe
Temporary sleeper from
under 14'' P/L Using U.W
Hot Cutting Torch and
Recovery to surface
following for (8) Crossings :
CL4PX13 &CL4PX 8 &CL4PX10
&CL4PX16 CL4PX11 &CL4PX 9
&CL5PX19 &CL5PX18
Diving
Supervisor
DSV
MARCAP-II
ADMA/OPCO
Zakum field &
Umm shaif field
8. 8 | P a g e
CURRICULUM VITAE
2016
Oct 2008–Dec 2008 Mutawa
Marine
Various jobs 14” Pipelines and
Risers
14'' P/L Tie in Spools and Risers
installation for following : 9 tie in
ZK119-ZK135 & ZK288-ZK135 & ZK255-ZK135
ZK256-ZK113 & ZK113-ZK255 & ZK255-ZK113
ZK255-ZK120 & ZK120-ZK255 & ZK120-ZK151
Cutting of D.M.A wire
between P/F leg and 14'' P/L
puling head.
Old Riser fender removal
(Using U.W Cutting Torch).
Riser & Spool
Measurements using U.W
Spool Piece Metrology.
Barge Davits connect to
14''P/L and side walk
Attaching Air Lift Bags to
14''P/L.
Removal and break the old
grouting spillage from the
spool piece route using
hydraulic jack hammer.
Tie in riser/ Spool Piece
installation @ 14''Riser
clamps.
Excavate under the spool
piece using Air Lift.
New P/F Boat Landing
installation.
Disconnect davits from
14''P/L.
Spool Piece Knee brace
removal.
Diving
Supervisor
NPCC DLP
750 Barge
For 24
Hours
Operation
ADMA/OPCO
Zakum field
Jul 2008 – Sep 2008
Mutawa
Marine
14'' Riser Clamps Installation
14'' Riser Clamps
measurement and marking
location.
Riser Clamps Installation
and tighten using hydraulic
impact wrench
Riser Clamps Alignment
checks.
Diving
Supervisor
DSV
MARCAP-II
ADMA/OPCO
Zakum field &
Umm shaif field
9. 9 | P a g e
CURRICULUM VITAE
2016
Apr2008– May2008
PMS
Petroleum
Marine
Services
Old Plat Form Supporting (Helal P/F)
supporting clams installing
Two bracing panels
Three conductors
Installation
12'' P/L Demolition
Using Cold cutting hydraulic
cutter machine.
Removal the 12'' P/L pieces
and lifting to the surface.
Assistant
Diving
Operation
Manager
Tim Barge GUPCO(BP)
Feb. – Mar. 2008
PMS
Petroleum
Marine
Services
Various jobs 24” Pipeline, Crossing
and J-TUBs
24'' P/L from SFNY 900 to TP-17
(60 Tons) Gravity anchor
survey to located and
marking
Pipe laying including sea
bed survey
Stinger check, pipe line
profile
Pre Laying temporary
sleeper in crossing location
installation
Alignment frame
deployment using
Underwater Positioning
Transponder Beacon survey
Disconnecting lay down
cable
Gravity anchor removal and
lifting to the surface.
Wet store for 24'' spools on
seabed.
6'' J-TUBs No. of 18 Riser
electric cable guide wire
installation
Diving
Supervisor
DLP Barge
PMS 12For
24 Hours
Operation
Saudi
ARAMCO
SFNY Field
10. 10 | P a g e
CURRICULUM VITAE
2016
Dec2007 – Jan 2008 PMS
Petroleum
Marine
Services
22''Gas P/L Repairing
Repair at 22'' P/L using
MORGRIP mechanical
connectors.
Excavating under P/L
Cutting 22'' P/L using
hydraulic cold wrench cutter
22'' P/L Concrete removal
using hydraulic cutting disk
and hydraulic jack hammer
polyethylene removal and
Chamfering P/L end
Grit blast Cleaning SA3 level,
Grind seam weld
4 MORGRIP mechanical
connectors installation
Miso-tech sonar support for
P/L survey at bad visibility
and during deployment of
A-frame and spool piece
Installation for 2 spool
pieces using air lift bags and
A-frame and Tighten
Flanges bolts using impact
wrench and hydra tight
equipment.
Diving
Supervisor
DP2Barge
PMS 17For
24 Hours
Operation
NOSPCO
Sep2007 – Oct 2007
PMS
Petroleum
Marine
Services
Laying 30'' P/L
F/L ZULF 370 to ZULF TP
Survey and marking to the
existing 30"P/L pipelines at
assigned location
Marking crossing at
assigned location
30'' riser clamps location at
the P/F measuring and
marking
30'' Spool piece
measurement using U.W
Spool Piece Metrology.
Diving
Supervisor
DLP Barge
PMS 12For
24 Hours
Operation
Saudi
ARAMCO
ZULF Field
11. 11 | P a g e
CURRICULUM VITAE
2016
Feb – Jun 2007
PMS
Petroleum
Marine
Services
Free Span Correction
20" Trunk P/L from
P/F Morgan 36 to MWF P/F
Free Span Correction:
Using grout bags and Sand cement
bags support
Post installation video survey
Assistant
Diving
Operation
Manager
Tim Barge GUPCO(BP)
Aug–Sep 20067
PMS
Petroleum
Marine
Services
22" P/L laying
Pre laying Pitch hull survey
3'' wire for 22'' P/L pulling
head transferring to the
shore.
Connect hold back cable to
22'' P/L pulling head.
Stinger installation in the
Barge.
Stinger check and 22'' P/L
Profile.
Cross over’s installation of
temporary concrete
sleepers.
Floating buoys removal and.
Disconnects lay down head.
Offshore Platform Structure
Installation(North Siena).
Notes :
(new plat form installation)
Installing plat form including
sea bed survey.
Debris Removal.
Sand bags at legs mud
mate's installation.
22'' Spool Piece Tie in
installation.
Barge Pampers Installation
Boat landing installation
Stabbing guide clamp
installation.
Disconnect 6'' wire it lifting
Platform.
After P/F installation:
Post installation video
survey Recording
Diving
Supervisor
DLP Barge
PMS 12For
24 Hours
Operation
NOSPCO
12. 12 | P a g e
CURRICULUM VITAE
2016
Apr 2006 – Jul 2006
PMS
Petroleum
Marine
Services
Laying 16" Pipeline and PLEM &
SPM Maintenance
Laying 16" Pipeline from the pitch to
the PLEM.SPM
Pre laying Pitch hull survey
3'' wire for 16'' P/L pulling
head transferring to the
shore.
Connect hold back cable to
16'' P/L pulling head.
Stinger installation in the
Barge.
Stinger check and 16'' P/L
Profile.
Video survey for the
crossing P/Ls and the SPM
anchor chains.
Inspection and fixation of all
under water PLEM flanges.
Configuration check for 8"
hoses
Replacement of 8" hoses.
Diving
Supervisor
DLP Barge
PMS 12For
24 Hours
Operation
SUCO
Sues
13. 13 | P a g e
CURRICULUM VITAE
2016
Mar – Apr 2006
PMS
Petroleum
Marine
Services
Tow Crossings Repairing
Pipe Lines Repairing:
M36–M160 12" & 22'' P/Ls:
Tow Crossings Repairing using
PLEDCO Clamp and Hydra tight
Connector
12'' P/L concrete and bully
Ethylene removal by
hydraulic grinder.
12'' P/L Grit blast Cleaning
SA3 level
12'' PLEDCO Clamp
installation at two sides.
12'' spool piece
measurement and
installation.
Tighten with hydra bolt
tensional
12'' P/L pressure test.
22'' P/L concrete and bully
Ethylene removal by
hydraulic grinder.
22'' P/L Grit blast Cleaning
SA3 level.
22'' Hydra tight connector
installation at two sides.
22'' spool piece
measurement and
installation.
Tighten with hydra bolt
tensional
22'' P/L pressure test.
Post installation video
survey Recording.
Laying 20" pipeline Offshore
Loading Jetty Platform Structure
Installation
20" P/L Pre- Laing Survey
Mattress installation.
60 t Concrete Sleeper
installation.
Concrete blocks installation
using U.W position system.
Diving
Supervisor
DLP Barge
PMS 12For
24 Hours
Operation
GUPCO(BP)
Morgan Field
14. 14 | P a g e
CURRICULUM VITAE
2016
Sep 2005 –Oct 2005
PMS
Petroleum
Marine
Services
Offshore Loading Jetty Platform
Structure Installation
DUBA Offshore Loading
Jetty Platform Structure
Installation
J. Type riser installation.
No of 3 Impressed Current
Anode installations.
Painting platform piles using
splash zone.
Trenching Impressed
Current Anode cable
covering by sand cement
bags.
Post installation As Built
Video survey.
Diving
Supervisor
DLP Barge
PMS 12For
24 Hours
Operation
Saudi
ARAMCO
DUBA Offshore
Feb – Jun 2005
PMS
Petroleum
Marine
Services
Various jobs 18” Pipeline
MORGAN 55 P/F
Cutting 18" Riser using cold
cutting machine
Conductor clamp
installation
18" Riser clamp and riser
installation
18" Spool piece installation
Diving
Supervisor
DLP Barge
PMS 12For
24 Hours
Operation
GUPCO(BP)
Morgan Field
15. 15 | P a g e
CURRICULUM VITAE
2016
July 2004 – Jan
2005
PMS
Petroleum
Marine
Services
Various jobs Laying, Free span
Correction and P/F Structure
Installation
Laying 22"P/L Simian , 22"P/L Sappier
Notes: Pipe laying including sea bed
survey for the pre lay supports, pre
lay supports, beach pull, buoyancy
tanks removal, stinger check, pipe
line profile, disconnecting lay down
cable, video survey for the P/L and
Free Spans.
Offshore Platform Structure
Installation
(ROSITA) New plat form installation
Installation of the: barge
pampers, boat landing
stabbing guide clamp and
boat landing.
Platform 6'' lifting wire
disconnecting
Platform GVI and video
survey after P/F installation.
Ass. Diving
Supervisor
IMCA Air
Diver
DLP Barge
PMS 12For
24 Hours
Operation
Technip
Jan – May 2004
PMS
Petroleum
Marine
Services
Laying
4.5" Cold Coil Pipeline
Laying
160' water depth free spans
crossings and tie-ins
Risers clamps installation
Two risers installation
6No. of the Spool Pieces
installation.
Ass. Diving
Supervisor
IMCA Air
Diver
Barge PMS
17For 24
Hours
Operation
AGIBA
16. 16 | P a g e
CURRICULUM VITAE
2016
Nov 2003 – Dec
2003
PMS
Petroleum
Marine
Services
Various Jobs: Decks installation,
piles injection, 26", 12" , 3" P/L
Laying, Risers, Spools, Free span
Decks installation, piles
injections
26", 12" , 3" Risers and
Spools (No. of 15 spools +
No. of 6 risers) installations
at platforms of PORT
FOUAD RPP, NOURAS-
A,NOURAS-B and DARFEEL
p/fs
26",12",3" Pipelines hydro
test, radius jacket injection
18" pipeline VCR for all
Mattresses installation
while laying
Ass. Diving
Supervisor
IMCA Air
Diver
DLP Barge
PMS 12For
24 Hours
Operation
PETROBEL
Aug 2003 – Nov
2003
PMS
Petroleum
Marine
Services
Riser Clamps Tie In Spool
Submerged Stinger
12" Riser Clamps
Installation.
12'' Riser Installation.
12'' Tie In Spool Piece
Installation.
Floating the Submerged
Stinger@ 35 meter W/D
using Air bags.
Ass. Diving
Supervisor
IMCA Air
Diver
DLP Barge
PMS 12For
24 Hours
Operation
GUPCO(BP)
Morgan Field
17. 17 | P a g e
CURRICULUM VITAE
2016
May 2002 – Apr
2003
PMS
Petroleum
Marine
Services
Lot of the Various Jobs:
Carry out the following duties:-
Two 8" Risers installations
8" KESMA P/L (piggy back)
laying, free spans, crossings
&riser tie ins
Submerged Fishing Boat
lifting up from 44 meter
W/D using air bags and
Barge Big Rig
July 59P/F (24"-18" & 12")
P/Ls Repairing using
PLEDCO Clamp, HYDRO TEC
&SMART FLANGES
R1-R4 8" pipeline free span
corrections and crossings
HAPPY P/F centralization
conductors clamp
installations
Repairing 18" Morgan P/L
leakage
Offshore Platform (EDFOU)
Structure Installation
Ass. Diving
Supervisor
IMCA Air
Diver
DLP Barge
PMS 12For
24 Hours
Operation
GUPCO(BP)
Morgan Field
Morgan-8 &
Morgan-36
Mar 2002 – Apr
2002
PMS
Petroleum
Marine
Services
24'' & 36'' P/L and Spool Piece
Flanges installation
24'' Burullus P/L Shifting and
alignment using air Lift, Air
Bags & Barge Davits.
24'' Spool Piece Flanges
installation, Hydra tight
36" burullus P/L lifting up
(was buried 60:90 cun.)
using Air Lift, Air Bags &
Barge Davits.
IMCA Air
Diver
DLP Barge
PMS 12For
24 Hours
Operation
STOLT
Sep 2001
PMS
Petroleum
Marine
Services
8" P/L Laying, Risers, Spools,
Free span crossing.
R1 – R4 P/F 8" riser clamps
installation
Morgan-36 8''pipeline
laying
8''Riserinstallation, tie in
Free spans correction and
crossings
IMCA Air
Diver
DLP Barge
PMS 12For
24 Hours
Operation
GUPCO(BP)
Morgan Field
18. 18 | P a g e
CURRICULUM VITAE
2016
Apr 2001 – august
2001
PMS
Petroleum
Marine
Services
12'' & 9'' & 3'' P/L Spool
Piece Flanges installation
12" & 3" PORT FOUAD P/F
pipelines hydro test
12" & 3" PORT FOUAD
(S.W1-S.W2) P/Fs
Riser's installation, No of (2
risers 12"and3" Riser).
Spool Pieces installation, No
of(3 spools 12'' & 9
&3"spools).
6" & 4" TEMSAH P/F Risers
replacement, By Air diving &
Sat. diving teams
IMCA Air
Diver
DLP Barge
PMS 12For
24 Hours
Operation
PETROBEL
Aug 2000 – Mar
2001
PMS
Petroleum
Marine
Services
Visual inspection for sea
lines and anchor chains
Inspect fixation of all under
water Fangs.
Hoses configuration checks
Replacement of 8" hose and
hose string
(GVI) & Video survey
Air Diver
DLP Barge
PMS 12For
24 Hours
Operation
Sues S.P.O.CO
Feb1995– Aug 2000
PETROLEUM
PROJECT &
TECHNICAL
SUPPORT CO.
(PETROJET)
Various Jobs.
All kinds of underwater installation
i.e.
Plat forms, riser clamps,
anodes, risers, spool
pieces, jackets. PLEMS,
valves, grout bags support
etc.
PLEDCO clamps, smart
flanges, mess alignment &
hydro Tech flanges.
Boat landing & riser guard.
PLEM installations with all
of its facilities base
PLEM-Guiro-Piles-
Manifold-PLEM- cover
protection installation, etc)
Marine growth cleaning,
Sand blasting,
Painting splash zone area
Air Diver
PETROJET
11, 12, 17
Barges
PETROBEL &
GUPCO & AGYBA
19. 19 | P a g e
CURRICULUM VITAE
2016
Apr 1994 – Jan
1995
MARIDIVE
OIL &
SERVICES
COMPANY
Marine growth cleaning,
sand blasting, painting
splash zone area
Cutting & welding
Under water clamps,
conductors, anodes etc
installations
Grouting operations
Sea bed survey
Drilling Rigs Leg
penetration.
Air Diver
PETROBEL
&GUPCO
Jun 1993– Apr 1994
Free-lance
diver at
different
jobs with
RED SEA
Marine Works
Company
Marine growth cleaning,
sand blasting, painting
splash zone area
Cutting & welding
Under water clamps,
conductors, anodes etc
installations
Grouting operations
Sea bed survey
Drilling Rigs Leg penetration.
Air Diver
PETROBEL
&GUPCO