LeadSubseaControlsTSP
2014
WilliamPowellTolerJr
Lead Subsea Controls Technician experienced at Completions,
Decommissions, Workovers, Interventions and Subsea equipment
testing at dock and SIT's. I have experience with Enhanced Vertical
Subsea Tree's, Enhanced Horizontal Subsea Trees, Tubing Hangers/TH
Running Tools, and Polyethylene Subsea Tree Caps, TRT’s, ROV
operations, HPU's and Subsea Hardware Trouble Shooting during
installations/removals. I am also experienced with ETU and Smart Tool
software and trending reports during monitoring operations and excel as
a team player.
FMC Technologies
11220 TC JesterHouston, TX 77067
(281) 591-4000
Curriculum Vitae
Personal Information
William Powell Toler Jr
Lead Controls TSP
Hometown - Cypress, TX
Key Qualifications
Lead Subsea Controls Technician experienced at Completions, Decommissions, Workovers, Interventions
and Subsea equipment testing at dock and SIT's. I have experience with Enhanced Vertical Subsea Tree's,
Enhanced Horizontal Subsea Trees, Tubing Hangers/TH Running Tools, and Polyethylene Subsea Tree
Caps, TRT’s, ROV operations, HPU's and Subsea Hardware Trouble Shooting during installations/removals.
I am also experienced with ETU and Smart Tool software and trending reports during monitoring
operations and excel as a team player.
Languages
English
Education
Subsea Apprentice Program
Jan 2010 - June 2010
Houston, TX
ECPI College of Technology
1997-1999
Associates Degree in Computer Systems Administration with a Major in Networking
Lafayette High School
Class of 1990
Williamsburg, VA
Valid Certificates
Human Recources
It's All about Respect: Recognizing Harassment in a Diverse Workplace
HSE
Back Safety
Confined Space Entry: Inside Maneuvers
Defensive Driving
Ergonomics
Fall Protection
Fire Safety- Alert, Aware, Alive
Forklift Certification
Hearing protection
Indoor Cranes
Lock Out/Tag Out- Controlling the Beast
Personal Protective Equipment
Safety Orientation: On Alert
Stairways and Ladders
Walking and Working Surfaces
Working Safely With Power Tools
Live Incident Free Everyday
Pressure Testing Competence LWI LSC FS/T 004 Module CBT
DOT Physical
Wireless Device Policy
Vocation Tech Education
Fatigue Policy
Huet Training
TSP Competency Process Awareness Training
TWIC Enrollment Procedure
BP 6/1 Training
Boisett Offshore Training
Canadian BST Offshore Training
Offshore Work Experience
March, 2010- Present
FMC Technologies, Houston, TX
Controls Subsea Field Service Technician
Companies
 Shell Perdido
 Shell Princess
 Shell Europa
 Shell Llano
 Shell Popeye
 Shell Troika
 BP Thunderhorse
 Oxy
 Devon
 LLOG
 Petrobas Cascade
 Anadarko
 Nexen
 Suncor (Canada)
 SNEPCo. (Shell Nigeria)
Completions: 6
 Shell Perdido
 Shell Llano 3
 Shell Glider
 LLOG Who Dat (2 EHXT)
 Suncor (Canada)
Tree Installations: 3
 Shell Llano 3
 LLOG Who Dat (2 EHXT)
Decompletions: 8
 Shell Llano 3
 Shell Popeye
 Shell Macaroni
 Shell UI2
 Shell PI1
 Shell Princess
 Shell Mensa
 Suncor (Canada)
Interventions: 6
 Shell Troika
 Shell Serrano
 Shell Princess Waterflood
 Shell Llano
 Shell UI2
 Shell PI1
Subsea Tree System Integrated Tests/Dock Tests: 6
 Shell Llano
 Shell Perdido
 LLOG Who Dat (2 EHXT)
 Shell Macaroni
 Suncor
 Shell SNEPCo. Bonga (1 EVDT)
November 11 – December 12th 2014
Controls Night Lead
Bonga NW, Nigeria
I was assigned as a Controls Night Lead on the SNEPCo, Bonga NW team in Nigeria. I acted within a team
that was responsible for all equipment coming and going for offshore operations. During this hitch I tested
a TIC (Tree Interface Cap), THRA (Tubing Hanger Running Assembly), rebuilt a Torus IV connector that
was having issues with hump pressure, and did various PSM (Preventative Service Maintenance) on
equipment. During all operations I was in charge of HPU operations, fluid sample readings, building
manifolds for pressure testing and chart readings. Also help create a PSM tracking list for the team to use
so we knew what work was on going and what was completed, as well as being responsible for all sign offs
on any books for equipment that I was working on.
October 3rd – October 7th 2014
Lead TSP
Suncor Canada
Worked as Lead TSP on installation of HP cap for Suncor. The cap is actually a Vetco Grey TRT that was
slightly modified to act as a HP cap to form a secondary barrier on a HXT. Retrieved debris cap handling
tool from HGR rig and pulled debris cap from top of HXT. Preformed pressure test on primary L and U/L
circuits as well as secondary L and U/L circuit before splashing and locking on HXT. Also did a As/Is and
As/Left survey of the HXT.
August 25th – August 31st 2014
Controls TSP
Suncor Canada
Worked as Controls TSP lead on the Atlantic Eagle vessel in Terra Nova field for Suncor. Job required
moving around field and assisting in ROV operations by functioning valves on manifolds and VXT’s, and
completing As/Is and As/Left surveys of manifolds and VXT’s in the field.
May 28th – June 17th 2014
Controls TSP
Suncor Canada
Worked as a Controls TSP for Suncor decompletion. Responsible for HPU operation, pressure and function
testing of VXT, THRT, XT reel operations, THRT reel operations. Setup and establish comms with VXT via
ETU software. Operations of valves on VXT, monitoring of VXT valve functions, and trending PT sensors
during operations.
April 1st – April 23rd 2014
Controls TSP
Suncor – Canada
Worked in FMC Canada shop on various Suncor equipment doing MOB and Demob jobs on equipment
going offshore and coming from offshore.
December 11 2013- April 20 2014
Lead TSP
Shell Princess/Shell Mensa Campaign
Temporary Abandonment of 15K EVXT system with a TVD of 70+ degrees. WOM IRS, FMC TRT, HFL, EFL
and down hole comms via ETU were utilized and worked flawless. XT cap removal and operations were
utilized to ensure successful project with direction and recommendation from myself to my technicians,
ROV crew, driller, subsea engineer and company reps. Down hole reading were conducted for down hole
ops such as plug setting and cement jobs. Jumper flush ops were successful (gas lift and oil producing) ROV
valve manipulations, hydraulic function of xt valves, XT removal from THS, Tubing hanger removal all
completed open water from the Q4K. Retrieved the last Mensa feild Lower and Upper XT on A2, hydraulic
jumpers and flowline line jumpers. During the campaign, also retrieved Mensa A1 jumpers, A3 THS and
jumpers, UI3 XT, tubing hanger and THS, P7 XT, tubing hanger, and THS. Very successful campaign with
positive customer feedback.
October 9-October 25 2013
Lead TSP
Shell P3 XT Swap
Job's objective was to kill p3 well,remove P3 XT and replaceitwith a new 15K XT. Equipment utilized was FMC's
15K TRT and WOM's IRS to Kill thewell, establish comms with the XT via ETU/SPCTU and function the XT per the
customers request from topside.Configured the WOM IRS with HFL hydraulic capabilitiesin casethe field had
failed hydraulics.Job was completed within the customers time frame and successfully with 100 % customer
satisfaction.Job was completed with 100% uptime consistingof hundreds of hours and zero downtime.
August 22nd – September 16th 2013
Lead Technician
Shell UI2 and PI1
Finish decomplete that started in April
Acted as lead technician and re-visited UI2 and PI1 wells for Shell to finish decomplete. Responsibilities
included managing crew of 5, inventory of equipment. Deck testing of THRT assembly with ROV panel
installed for a open water retrieval of a TH. Completed JSA’s and held meetings on the drill floor discussing
work to be done. Assisted in ROV operations, as well as clear communications with Shell logistics
coordinator for procuring equipment to and from the dock. Pulled TH up to production tubing and broke
THRT from TH. Pulled XT, THS, and Dry Hole XT’s from well heads. Sent equipment back to beach for
NORM checks to be completed and equipment to be prepped to be restored and used later in the job when
wells are recompleted.
July 3rd – August 3rd 2013
Lead Technician
Shell Gryfalcon/DPDP
Well Kill and Decomplete
Lead technician on high profile job for Shell. Responsibilities included running a crew of 12 for a kill and
decompletion. Work scope included inventory of equipment, nitrogen pre charges of accumulators on
Monobore HPU and accumulators on EDP/LRP. Completed deck testing on the rig. Managed crane ops
and JSA meetings before RIH and POOH. Set up 24 hour monitoring of equipment via Smart Tool, as well
as 24 hour monitoring of pressures on HPU. Monitoring on HPU was done through Smart Tool as well as
physically for redundancy. Setup 30 min checks on HPU to verify pressures were being maintained.
Constant communication with FMC engineers, Shell CM and 3rd party companies involved with job to
ensure quality work and to verify no steps were being missed. End of job break down of all equipment
completed and shipped back to Houston.
May25th – June 20th 2013
Lead Technician
Shell PI1 Workover
I was responsible for complete testing of TRT and a crew of 5. Function tested lock, un lock and secondary
unlock function of tool We made up TRT to SILS adapter to bottom of WOM IRS system. Tested and
setup all electrical components for communications with the EHVXT. Created folders for monitoring and
trending data for Shell. Function valves on XT to line up for flushing operations and to allow for CT and
Wire line jobs to pass through. End of job break down of equipment and back load of equipment back to
dock.
April 10th – May 6th 2013
Lead Technician
Shell UI2 Workover
I was responsible for complete testing of TRT and a crew of 5. Function tested lock, un lock and secondary
unlock function of tool We made up TRT to SILS adapter to bottom of WOM IRS system. Tested and
setup all electrical components for communications with the EHVXT. Created folders for monitoring and
trending data for Shell. Function valves on XT to line up for flushing operations and to allow for CT and
Wire line jobs to pass through. End of job break down of equipment and back load of equipment back to
dock.
March 18th – April 4th 2013
Lead Controls
LLOG EHXT Completion SS03 – E4 EHXT
Test and run TH via THRT at end of Expro spanner joint. Hanger locked into EHXT an tested. Installed
and configured DH coefficients for Baker Hughs DH gauges. Loaded onto ETU disk to operate XT SCM pod
functions. Set up and operated SPCTU and ETU functions. Collect and log data from all operations and
supply to Cetco via excel format. I also setup network connection from Cetco to FMC ETU laptop so they
could view our ETU screen from their location on the rig. Over see ROV operations which included
function of TST and UPST valves via hand held tool. Also engaged EH5 penetrator with class 4 ROV tool.
RIH with lower and upper crown plugs and install XT cap to finish job.
Feb 13th – March 12th 2013
Lead Technician
Shell Gryfalcon DPDP SIT
Lead technician on high profile job for Shell. Responsible for all JSA’s and employees involved in work. In
charge of overall operations and communication with 3rd party rep for Shell and project team for FMC.
Made sure all parts and equipment for the job was available and ready for use. Over saw HPU operations
and testing on EDP/LRP system with engineers and Shell representatives. Over saw all crane operations
and testing of equipment through jobs entirety. At the completion of SIT made sure everything that was
going to be used for the job offshore was intact, and shipped to one location for easy shipping once job was
ready to start.
Jan 20th – Jan 25th 2013
Lead Controls
LLOG EHXT Install SS03 – E4 EHXT
Ride out on XT install boat. Get to well lower XT down onto well head and using MTRT guide XT onto well
head. Once MTRT is pulled from XT have functioned lock cycle to lock it onto well head. Personnel move
to rig to complete sub sea testing of XT using Oceaneering IWOCS system. Start up communications via
FMC ETU software to SCM on XT.
December 28th 2012 – Jan 2nd 2013
Lead Controls
LLOG Dock Test SS03 – E4 EHXT
Complete dock test in Fourchon. Flush fluid to get NAS 6 cleanliness for SCM operation and valve
functions. Operate XT valves and HP/LP functions via ETU through SCM. Build manifolds for pressure
testing of MTRT and EHXT. Finish and trend pressure tests on valves. Complete silicon fill of SCM via
silicon fill kit.
December 2012
Lead Controls
Shell MAC-A2 Dock Test
Dock test of VXT. Flush valves to fluid level NAS 6. Also flushed tote of fluid to NAS 6 for SCM functions.
Set up manifolds for pressure testing, operate HPU and send signals for DH gauge readings for Well
Dynamics to verify good electrical continuity for DH gauges.
November 2012
Controls
Shell MAC-A2 Decomplete
Leads Controls
Responsible for operating IWOCS HPU, IWOCS Reel, and Annulus line. R/U hoses for HPU and IWOCS
Reel. Hook annulus line into rig lines for flushing purposes. Take fluid samples to ensure NAS 6 or better
fluid was being used in system. Assisted in the installation and testing of IWOCS box onto drill string.
Flushed MQC lines on HFL before connecting to IWOCS box. Did electrical testing on EFL’s and setup of
SPCTU and ETU software for electrical communications down hole to SCM pod on XT. RIH with IWOCS
reel and annulus reel. Retrieved TH and XT from subsea floor.
.
October 18th – November 2nd 2012
Controls
Shell Glider Completion
Assist in Shell Glider completion. Operate IWOCS Reel and IWOCS HPU to function THRT. Also RIH
with IWOCS reel and POOH with IWOCS reel. Also before completion I was responsible for filling POD in
Fourchon with Silicon via silicon fill kit before XT was ran 4300 feet sub sea.
Sept 30 – October 12th 2012
Day Controls Lead
LLOG Who Dat Tree #14 Completion
Test and run TH via THRT at end of Expro spanner joint. Hanger locked into EHXT an tested. Installed
and configured DH coefficients for Baker Hughs DH gauges. Loaded onto ETU disk to operate XT SCM pod
functions. Set up and operated SPCTU and ETU functions. Collect and log data from all operations and
supply to Cetco via excel format. Over see ROV operations which included function of TST and UPST
valves via hand held tool. Also engaged EH5 penetrator with class 4 ROV tool. RIH with lower and upper
crown plugs and install XT cap to finish job.
Sept 10 – Sept 17th 2012
Day Controls Lead
LLOG Who Dat Tree #14 Dock Test and XT install
Complete dock test in Fourchon. Operate XT valves and HP/LP functions via ETU through SCM. Finish
and trend pressure tests on valves. Complete silicon fill of SCM and load onto boat. Ride out on XT install
boat. Get to well lower XT down onto well head and using MTRT guide XT onto well head. Once MTRT is
pulled from XT have functioned lock cycle to lock it onto well head. Personnel move to rig to complete sub
sea testing of XT using Oceaneering IWOCS system. Start up communications via FMC ETU software to
SCM on XT.
August 12 – August 31st 2012
Day Controls Lead
LLOG Who Dat Tree #14 SIT
Operation of HPU to function valves on EHXT through MQC plate. Install SCM, hook up and function
SPCTU and ETU software to communicate with XT. Preformed high and low pressure test. Due to issues
with connector also assisted in removing connector from XT, redressing connector and re installing in XT.
May 12 – May 23rd 2012
Day Controls Lead
Nexxen
SIT for Nexxen. Set up and operate HPU for Nexxen SIT. Completed nitrogen pre charge of accumulators
on HPU and SCM for PLET. Installed SCM on PLET. Vented fluid and nitrogen from HPU and had it ready
for shipment at end of SIT.
March 8 – April 3rd 2012
Day Controls Lead
Shell Llano 3
Decomplete of Shell Llano 3 15k EVXT. Testing of electrical testing of EFL’s, Run and secure EFL’s on to
BOP stack. Run e-line reel. Set up ETU software to function valves on XT and to log and trend data to send
to Shell offices for review.
March 3 – March 4 2012
Controls Lead
Shell Diemos
MOB of 15k TRT. Performed pressure test, functionality of Lock, UL, and Secondary UL circuits in Port
Fourchon,.
February 11-March 3 2012
Day Lead Controls
Shell Princess Waterflood
Well Intervention- Responsibilities include managing and coordinating ETU setup and monitoring, daily
planning with customer rep, Houston engineering communication for planning of positive outcome, driller
communication for installation of subsea equipment, future planning on subsea equipment installation and
testing, communicating with other team members and ensure the same goal is met for customer
satisfaction. Some of the technical responsibilities included transfer of XT communication from host
platform to FMC on the Q4k, monitoring of PT sensors and functioning of valves for down hole work via
ETU, installation/removal of TRT for IRS to conduct intervention, ROV operations such as XT cap removal,
installations, operation and rig up of EFL reel and HFL, technical troubleshooting on subsea hardware,
Deck pressure testing and Connector functioning, Job was completed with zero down time and zero
injuries. Responsibilities included 3 team members and equipment.
11 Jan -25 Jan 2012
Subsea Controls Service Technician
Shell Popeye
M/U of TRT to Expro Bore Selector and attach to Vetco XT. Setup and break down of equipment.
30 Dec 2011 -7 Jan 2012
Subsea Controls Service Technician
Shell Perdido Completion
Preformed pressure test on THRT and functionality. Read fluid samples from THRT lines and verified fluid
cleanliness levels via microscope kit. Monitored pressures on umbilical reel and preformed checks every
2000 ft. while running hanger D/H. Worked in conjunction with Well Dynamics and Oceaneering to
complete task. Completed HST verification on THRT and Lock and U/L functions. Maintained reel
operations while RIH and POOH. Inventory and break down of equipment.
.
16 Nov -7 Dec 20011
Subsea Controls Service Technician
BP Thunder Horse
Pressure testing of Primary and Secondary Spanner Joints w/THRT installed. Pressure testing of THRT
umbilical reel and IWOCS reel. Electrical testing of Spanner Joints and THRT, and IWOCS reels. Inventory
of CWOR work shop.
17 Aug -22 Aug 2011
Subsea Controls Service Technician
Shell Serrano Preservations
Preservations of 1 EHVXT, 2 THS, and 4 jumpers. Work scope included functioning of valves and
connectors on XT and THS as well as jumpers. Functioning of everything through ROV panels using HS
and HPU. Filled bores with preservation fluid and sealed off and greased connectors on all equipment.
2 Aug -7 Aug 2011
Subsea Controls Service Technician
Shell Crosby
Installations of HFL’s from UTAJ frame to HDM. Pulled Logic Cap, cut lines for 2 couplers and replaced
with 2 blank couplers. Instruct ROV operations on torque values and rotations to remove and install
HFL’s. Pre-charge of HLF’s on deck before running subsea.
30 July -31 July 2011
Subsea Controls Service Technician
Shell Crosby SIT for TRT
Preformed 8500 psi and 5000 psi 15 min pressure test on Lock and U/L functions on 10k TRT. After testing
locked TRT onto test stump and loaded onto truck for travel to port.
8 July -14 July 2011
Subsea Controls Service Technician
Shell Llano (Q4000)
Responsible for functioning and monitoring of ETU software and operations of valves. Assisted in break
down of FMC equipment and loading onto boat for transport.
16 March -22 May 2011
Subsea Controls Service Technician
Shell Monobore (Q4000) (TA3 and TA6, Serrano SE1 and SE3)
Setup and function of HPU system to run EDP/LRP Monobore system. Valve functionality was done from
RCS connex using Smart Tool and HMI setup. Built manifolds for pressure testing and to tie HPU to
IWOCS umbilical reel. Other responsibilities included filling out Permit to Work forms, JSA’s, running
clamps in moon pool, inventory or connex and spares. Provided real time trending and historical data to
CM and Shell Engineer via Smart Tool. Transfer trend data to Excel spread sheet with charts to show
trending on a time and pressure scale.
27 Dec 2010 -24 Feb 2011
Subsea Controls Service Technician
Surface Well Head and Frac Stack Tech
(Temporary surface assignment in Odessa Texas)
Assembly of surface tubing heads, well heads, surface trees and frac valves. Pressure testing and
maintenance of Frac systems as well as nipple up and nipple down of frac stacks. Performed slip jobs which
included setting slip around casing and then cutting casing with torch so BOP could be removed and tubing
head installed.
23 Nov -30 Nob 2010
Subsea Controls Service Technician
Cobalt
Test fit Cobalt IWOCS system to Ensco 8503 rig BOP and associated testing and equipment modifications.
Testing included pressure test of individual components and complete system test and troubleshooting.
8 Aug -13 Aug 2010
Subsea Controls Service Technician
Petrobas Cascade EHXT Preservations
Provide assistance with setup of SPCTU and PTU, and use of Smart Tool software to strok valves and fill
bore with fluid. Use of HIP up to 5k pressure. Moved EHXT’s to inspection stand and inspected connector.
Moved SCM from one EHXT to another to duplicate preservation steps.
7 July -8 July 2010
Subsea Controls Service Technician
Anadarko (EHXT #35)
Provided assistance in relieving 10k trapped pressure from Subsea XT. Test and function of tools required
to complete job. (SLT, handling tool, and H-tool.) Install SLT into bore, install H-tool. Begin rotation of
H-tool until a slight pop and pressure release was heard. Function valve with torque tool (150 ft lbs, 13.5
rotations) to relieve trapped pressure.
25 May -16 June 2010
Subsea Controls Service Technician
BP Atlantis/Thunder Horse
Set up comms via HPU, FTU and ETU software to various SCM’s for BP Atlantis and Thunderhorse projects.
Once comms were established testing and monitoring of valves and pressures were completed. Also
provided nitrogen pre-charge to SCM and removed and replaced couplers on bottom of SCM.
24 May -24 May 2010
Subsea Controls Service Technician (Apprentice)
Shell Monobore
Inspect and function E-Line reel. Used grinding tool to remove debris from reel, and lubed and tested basic
motorized functions of reel.
28 April -13 May 2010
Subsea Controls Service Technician
Shell (EDP/LRP Monobore) SIT
Removed SCM from EDP and replaced with dummy SCM. Installed handling tool and moved to inspection
stand where gaskets were installed to bottom of EDP. Then moved back to test stand and locked into place
with a SL II connector. Filled dampener bottles on EDP to 1800 psi. Leak tested EDP WSCM ports at 5000
psi. Tested production valve at 10,000 psi to put pressure upstream. Cycled RPIV valve on LEP at 550 ft lbs.
Serviced and charged accumulator bottles on LRP to 200 psi. Pressure tested secondary lock and U/L
functions. Clean and inspected stabs, connector and cycled valves. Prepared electrical check for LRP.
Pressure tested hydraulic control lines to 3000 psi and stroked all valves and checked accumulator pressure
for any leaks. 5 min and 15 min pressure test of 10,000 psi and 250 psi.
27 April -27 April 2010
Subsea Controls Service Technician (Apprentice)
Rental Tools HPU testing
Assisted in testing of 3x3 HPU and IWOCS HPU. On 3x3 unit pressure tested LP to 6k and HP to 15k and
tested functionality of needle valves. On IWOCS HPU LP side pressure tested to 5400k and HP side
pressure tested up to 18k. 5 and 15 min test. Once pressured up fittingswere inspected to ensure no leaks
detected. Test completed and pressure vented off.
November 2008 – December 2009 Sungard Data Systems
Hosting Specialist 1
Responsible fortroubleshootingandmaintainingcustomerhardware,rackbuildouts,andcablingfor
customerequipment,aswell asSungardinternal hardware ina10,000 square footdatacenter. Duties
includedbutnotlimitedtomonitoringandtroubleshootingof ATSsystems,CRACunits,chillerunits,and
UPS systemsthatfunctionedascore piecesof equipmentessential torunningthe Sungarddatacenter.
Face to face contact withcustomersandvendorswithpositiverepresentationof SungardData Systems
alsoa dailyrequirement.
March 2004 – October 2008 Media Services
Network Administrator
Responsible forconfiguringandmaintainingcompanyfirewallsandconnectionsfromthe outside world
intothe MSG environment
SetupandmaintainedVPN tunnelsforall MSG officesandcustomerVPN’sintothe MSGnetwork
Keptinventoryof all networkinghardware andIPaddressesinuse onthe network,alongwith
maintainingaVisiodocumentof the MSG logical networkwhichincludedportopenings,IP’sassignedto
servers,andVPN tunnels
Maintainedall office networkswhichspreadfromvariouslocationsinthe US,Canada,and the UK
OtherresponsibilitiesincludedsettingupMicrosoftExchange accounts,Active Directoryaccounts,and
ftpaccounts for customeraccessManagedand maintainedcompanyvirusprotectionsoftware
installationandlicensing
Createdandmaintainedcablingfor4serverracks at Level 3 facilitiesinHoustonandPhoenix
Responsibilitiesalsoincludedhelpinginternal enduserswithlaptop/desktopissuessuchashardware
and software installationsandrebuildsif necessary.
Workedcloselywithvendorstoensure contractsandlicensingwere uptodate for companyCisco
productswhichincluded12 CiscoPIX’sthatrangedfrom 506e, to 515 and 525 models.
2001 – 2004 VeriCenter, Inc
Network OperationsCenterEngineer
SeasonedTier2 positioninthe datacenter
Providedtechnical supportformultiple branchesincludingheadquartersforone of the nation’slargest
multi-familydevelopers
Troubleshootall office programs,Windows95,98, 2000, printingissues,usedSMSandPC Anywhere to
remotelyhelpusers
Monitorednetworkforover500 serversandoff site routers
Securedmonitoringforviruses/backersusingHPOpenView
Providedhome supportforcustomerwebsite issues
Installedandsupportof numerousWindows2000,2000 AdvancedandNT servers
Upgradedhardware and software formultipleaccounts
Providedall DNSentriesforcustomerdomains
Createdandmaintainedcablingfromserverrackstothe switch racks
Installedandconfigurationof NICcards
Providednewemployeesandcustomersaccesstothe network,includingsettingUserID’s,mapping
networkdrives,settingupemail accountsandothernetworkfunctions
2000 – 2001 Enova Software
IT Trainer / Help Desk Technician
Providedassistance andtrainingfornewhiresoncompanypolicy,phone proceduresaswell as
troubleshootingandconfiguringof the companycreatedfilteringsoftware,KidProof
Responsible fortroubleshootingof customerPC Hardware,Software,PrinterandOSinstallations
Accountable forcreatingcompanytrainingmanualsandentrance examforthe tier1 support
In depthknowledge of WindowsOperatingSystems
2000 Sprint Broad Band
InstallationSupport Technician
Implementationandsupportof a wirelessnetworkforbusinessesandhome users
Providedassistance andtrainingtoendusersinbasicnetworkfunctionality
InstallationandconfiguringNICCards
Knowledgeof all WindowsOS
2000 Gentronics
HelpDesk Technician
Providingtechnical supportforendusersonthe East Coast Bell AtlanticDSLAccount
Knowledgeof Windows95,98, NT,2000
Knowledgeof businessnetworks
1999 Convergy’s
CustomerSupport Representative
Providedtechnical supportforCompaq desktopsandprinterforhome users
Supportedothertechnical advisorson-site
Supportedall integratedsoftware installedonCompaqdesktop
William Powell Toler Jr CV 2014

William Powell Toler Jr CV 2014

  • 1.
    LeadSubseaControlsTSP 2014 WilliamPowellTolerJr Lead Subsea ControlsTechnician experienced at Completions, Decommissions, Workovers, Interventions and Subsea equipment testing at dock and SIT's. I have experience with Enhanced Vertical Subsea Tree's, Enhanced Horizontal Subsea Trees, Tubing Hangers/TH Running Tools, and Polyethylene Subsea Tree Caps, TRT’s, ROV operations, HPU's and Subsea Hardware Trouble Shooting during installations/removals. I am also experienced with ETU and Smart Tool software and trending reports during monitoring operations and excel as a team player. FMC Technologies 11220 TC JesterHouston, TX 77067 (281) 591-4000
  • 2.
    Curriculum Vitae Personal Information WilliamPowell Toler Jr Lead Controls TSP Hometown - Cypress, TX Key Qualifications Lead Subsea Controls Technician experienced at Completions, Decommissions, Workovers, Interventions and Subsea equipment testing at dock and SIT's. I have experience with Enhanced Vertical Subsea Tree's, Enhanced Horizontal Subsea Trees, Tubing Hangers/TH Running Tools, and Polyethylene Subsea Tree Caps, TRT’s, ROV operations, HPU's and Subsea Hardware Trouble Shooting during installations/removals. I am also experienced with ETU and Smart Tool software and trending reports during monitoring operations and excel as a team player. Languages English Education Subsea Apprentice Program Jan 2010 - June 2010 Houston, TX ECPI College of Technology 1997-1999 Associates Degree in Computer Systems Administration with a Major in Networking Lafayette High School Class of 1990 Williamsburg, VA Valid Certificates
  • 3.
    Human Recources It's Allabout Respect: Recognizing Harassment in a Diverse Workplace HSE Back Safety Confined Space Entry: Inside Maneuvers Defensive Driving Ergonomics Fall Protection Fire Safety- Alert, Aware, Alive Forklift Certification Hearing protection Indoor Cranes Lock Out/Tag Out- Controlling the Beast Personal Protective Equipment Safety Orientation: On Alert Stairways and Ladders Walking and Working Surfaces Working Safely With Power Tools Live Incident Free Everyday Pressure Testing Competence LWI LSC FS/T 004 Module CBT DOT Physical Wireless Device Policy Vocation Tech Education Fatigue Policy Huet Training TSP Competency Process Awareness Training TWIC Enrollment Procedure BP 6/1 Training Boisett Offshore Training Canadian BST Offshore Training Offshore Work Experience March, 2010- Present FMC Technologies, Houston, TX Controls Subsea Field Service Technician
  • 4.
    Companies  Shell Perdido Shell Princess  Shell Europa  Shell Llano  Shell Popeye  Shell Troika  BP Thunderhorse  Oxy  Devon  LLOG  Petrobas Cascade  Anadarko  Nexen  Suncor (Canada)  SNEPCo. (Shell Nigeria) Completions: 6  Shell Perdido  Shell Llano 3  Shell Glider  LLOG Who Dat (2 EHXT)  Suncor (Canada) Tree Installations: 3  Shell Llano 3  LLOG Who Dat (2 EHXT) Decompletions: 8  Shell Llano 3  Shell Popeye  Shell Macaroni  Shell UI2  Shell PI1  Shell Princess  Shell Mensa  Suncor (Canada)
  • 5.
    Interventions: 6  ShellTroika  Shell Serrano  Shell Princess Waterflood  Shell Llano  Shell UI2  Shell PI1 Subsea Tree System Integrated Tests/Dock Tests: 6  Shell Llano  Shell Perdido  LLOG Who Dat (2 EHXT)  Shell Macaroni  Suncor  Shell SNEPCo. Bonga (1 EVDT) November 11 – December 12th 2014 Controls Night Lead Bonga NW, Nigeria I was assigned as a Controls Night Lead on the SNEPCo, Bonga NW team in Nigeria. I acted within a team that was responsible for all equipment coming and going for offshore operations. During this hitch I tested a TIC (Tree Interface Cap), THRA (Tubing Hanger Running Assembly), rebuilt a Torus IV connector that was having issues with hump pressure, and did various PSM (Preventative Service Maintenance) on equipment. During all operations I was in charge of HPU operations, fluid sample readings, building manifolds for pressure testing and chart readings. Also help create a PSM tracking list for the team to use so we knew what work was on going and what was completed, as well as being responsible for all sign offs on any books for equipment that I was working on. October 3rd – October 7th 2014 Lead TSP Suncor Canada Worked as Lead TSP on installation of HP cap for Suncor. The cap is actually a Vetco Grey TRT that was slightly modified to act as a HP cap to form a secondary barrier on a HXT. Retrieved debris cap handling tool from HGR rig and pulled debris cap from top of HXT. Preformed pressure test on primary L and U/L
  • 6.
    circuits as wellas secondary L and U/L circuit before splashing and locking on HXT. Also did a As/Is and As/Left survey of the HXT. August 25th – August 31st 2014 Controls TSP Suncor Canada Worked as Controls TSP lead on the Atlantic Eagle vessel in Terra Nova field for Suncor. Job required moving around field and assisting in ROV operations by functioning valves on manifolds and VXT’s, and completing As/Is and As/Left surveys of manifolds and VXT’s in the field. May 28th – June 17th 2014 Controls TSP Suncor Canada Worked as a Controls TSP for Suncor decompletion. Responsible for HPU operation, pressure and function testing of VXT, THRT, XT reel operations, THRT reel operations. Setup and establish comms with VXT via ETU software. Operations of valves on VXT, monitoring of VXT valve functions, and trending PT sensors during operations. April 1st – April 23rd 2014 Controls TSP Suncor – Canada Worked in FMC Canada shop on various Suncor equipment doing MOB and Demob jobs on equipment going offshore and coming from offshore. December 11 2013- April 20 2014 Lead TSP Shell Princess/Shell Mensa Campaign Temporary Abandonment of 15K EVXT system with a TVD of 70+ degrees. WOM IRS, FMC TRT, HFL, EFL and down hole comms via ETU were utilized and worked flawless. XT cap removal and operations were utilized to ensure successful project with direction and recommendation from myself to my technicians, ROV crew, driller, subsea engineer and company reps. Down hole reading were conducted for down hole ops such as plug setting and cement jobs. Jumper flush ops were successful (gas lift and oil producing) ROV
  • 7.
    valve manipulations, hydraulicfunction of xt valves, XT removal from THS, Tubing hanger removal all completed open water from the Q4K. Retrieved the last Mensa feild Lower and Upper XT on A2, hydraulic jumpers and flowline line jumpers. During the campaign, also retrieved Mensa A1 jumpers, A3 THS and jumpers, UI3 XT, tubing hanger and THS, P7 XT, tubing hanger, and THS. Very successful campaign with positive customer feedback. October 9-October 25 2013 Lead TSP Shell P3 XT Swap Job's objective was to kill p3 well,remove P3 XT and replaceitwith a new 15K XT. Equipment utilized was FMC's 15K TRT and WOM's IRS to Kill thewell, establish comms with the XT via ETU/SPCTU and function the XT per the customers request from topside.Configured the WOM IRS with HFL hydraulic capabilitiesin casethe field had failed hydraulics.Job was completed within the customers time frame and successfully with 100 % customer satisfaction.Job was completed with 100% uptime consistingof hundreds of hours and zero downtime. August 22nd – September 16th 2013 Lead Technician Shell UI2 and PI1 Finish decomplete that started in April Acted as lead technician and re-visited UI2 and PI1 wells for Shell to finish decomplete. Responsibilities included managing crew of 5, inventory of equipment. Deck testing of THRT assembly with ROV panel installed for a open water retrieval of a TH. Completed JSA’s and held meetings on the drill floor discussing work to be done. Assisted in ROV operations, as well as clear communications with Shell logistics coordinator for procuring equipment to and from the dock. Pulled TH up to production tubing and broke THRT from TH. Pulled XT, THS, and Dry Hole XT’s from well heads. Sent equipment back to beach for NORM checks to be completed and equipment to be prepped to be restored and used later in the job when wells are recompleted. July 3rd – August 3rd 2013 Lead Technician Shell Gryfalcon/DPDP Well Kill and Decomplete Lead technician on high profile job for Shell. Responsibilities included running a crew of 12 for a kill and decompletion. Work scope included inventory of equipment, nitrogen pre charges of accumulators on Monobore HPU and accumulators on EDP/LRP. Completed deck testing on the rig. Managed crane ops
  • 8.
    and JSA meetingsbefore RIH and POOH. Set up 24 hour monitoring of equipment via Smart Tool, as well as 24 hour monitoring of pressures on HPU. Monitoring on HPU was done through Smart Tool as well as physically for redundancy. Setup 30 min checks on HPU to verify pressures were being maintained. Constant communication with FMC engineers, Shell CM and 3rd party companies involved with job to ensure quality work and to verify no steps were being missed. End of job break down of all equipment completed and shipped back to Houston. May25th – June 20th 2013 Lead Technician Shell PI1 Workover I was responsible for complete testing of TRT and a crew of 5. Function tested lock, un lock and secondary unlock function of tool We made up TRT to SILS adapter to bottom of WOM IRS system. Tested and setup all electrical components for communications with the EHVXT. Created folders for monitoring and trending data for Shell. Function valves on XT to line up for flushing operations and to allow for CT and Wire line jobs to pass through. End of job break down of equipment and back load of equipment back to dock. April 10th – May 6th 2013 Lead Technician Shell UI2 Workover I was responsible for complete testing of TRT and a crew of 5. Function tested lock, un lock and secondary unlock function of tool We made up TRT to SILS adapter to bottom of WOM IRS system. Tested and setup all electrical components for communications with the EHVXT. Created folders for monitoring and trending data for Shell. Function valves on XT to line up for flushing operations and to allow for CT and Wire line jobs to pass through. End of job break down of equipment and back load of equipment back to dock. March 18th – April 4th 2013 Lead Controls LLOG EHXT Completion SS03 – E4 EHXT Test and run TH via THRT at end of Expro spanner joint. Hanger locked into EHXT an tested. Installed and configured DH coefficients for Baker Hughs DH gauges. Loaded onto ETU disk to operate XT SCM pod functions. Set up and operated SPCTU and ETU functions. Collect and log data from all operations and supply to Cetco via excel format. I also setup network connection from Cetco to FMC ETU laptop so they
  • 9.
    could view ourETU screen from their location on the rig. Over see ROV operations which included function of TST and UPST valves via hand held tool. Also engaged EH5 penetrator with class 4 ROV tool. RIH with lower and upper crown plugs and install XT cap to finish job. Feb 13th – March 12th 2013 Lead Technician Shell Gryfalcon DPDP SIT Lead technician on high profile job for Shell. Responsible for all JSA’s and employees involved in work. In charge of overall operations and communication with 3rd party rep for Shell and project team for FMC. Made sure all parts and equipment for the job was available and ready for use. Over saw HPU operations and testing on EDP/LRP system with engineers and Shell representatives. Over saw all crane operations and testing of equipment through jobs entirety. At the completion of SIT made sure everything that was going to be used for the job offshore was intact, and shipped to one location for easy shipping once job was ready to start. Jan 20th – Jan 25th 2013 Lead Controls LLOG EHXT Install SS03 – E4 EHXT Ride out on XT install boat. Get to well lower XT down onto well head and using MTRT guide XT onto well head. Once MTRT is pulled from XT have functioned lock cycle to lock it onto well head. Personnel move to rig to complete sub sea testing of XT using Oceaneering IWOCS system. Start up communications via FMC ETU software to SCM on XT. December 28th 2012 – Jan 2nd 2013 Lead Controls LLOG Dock Test SS03 – E4 EHXT Complete dock test in Fourchon. Flush fluid to get NAS 6 cleanliness for SCM operation and valve functions. Operate XT valves and HP/LP functions via ETU through SCM. Build manifolds for pressure testing of MTRT and EHXT. Finish and trend pressure tests on valves. Complete silicon fill of SCM via silicon fill kit.
  • 10.
    December 2012 Lead Controls ShellMAC-A2 Dock Test Dock test of VXT. Flush valves to fluid level NAS 6. Also flushed tote of fluid to NAS 6 for SCM functions. Set up manifolds for pressure testing, operate HPU and send signals for DH gauge readings for Well Dynamics to verify good electrical continuity for DH gauges. November 2012 Controls Shell MAC-A2 Decomplete Leads Controls Responsible for operating IWOCS HPU, IWOCS Reel, and Annulus line. R/U hoses for HPU and IWOCS Reel. Hook annulus line into rig lines for flushing purposes. Take fluid samples to ensure NAS 6 or better fluid was being used in system. Assisted in the installation and testing of IWOCS box onto drill string. Flushed MQC lines on HFL before connecting to IWOCS box. Did electrical testing on EFL’s and setup of SPCTU and ETU software for electrical communications down hole to SCM pod on XT. RIH with IWOCS reel and annulus reel. Retrieved TH and XT from subsea floor. . October 18th – November 2nd 2012 Controls Shell Glider Completion Assist in Shell Glider completion. Operate IWOCS Reel and IWOCS HPU to function THRT. Also RIH with IWOCS reel and POOH with IWOCS reel. Also before completion I was responsible for filling POD in Fourchon with Silicon via silicon fill kit before XT was ran 4300 feet sub sea. Sept 30 – October 12th 2012 Day Controls Lead LLOG Who Dat Tree #14 Completion Test and run TH via THRT at end of Expro spanner joint. Hanger locked into EHXT an tested. Installed and configured DH coefficients for Baker Hughs DH gauges. Loaded onto ETU disk to operate XT SCM pod functions. Set up and operated SPCTU and ETU functions. Collect and log data from all operations and supply to Cetco via excel format. Over see ROV operations which included function of TST and UPST
  • 11.
    valves via handheld tool. Also engaged EH5 penetrator with class 4 ROV tool. RIH with lower and upper crown plugs and install XT cap to finish job. Sept 10 – Sept 17th 2012 Day Controls Lead LLOG Who Dat Tree #14 Dock Test and XT install Complete dock test in Fourchon. Operate XT valves and HP/LP functions via ETU through SCM. Finish and trend pressure tests on valves. Complete silicon fill of SCM and load onto boat. Ride out on XT install boat. Get to well lower XT down onto well head and using MTRT guide XT onto well head. Once MTRT is pulled from XT have functioned lock cycle to lock it onto well head. Personnel move to rig to complete sub sea testing of XT using Oceaneering IWOCS system. Start up communications via FMC ETU software to SCM on XT. August 12 – August 31st 2012 Day Controls Lead LLOG Who Dat Tree #14 SIT Operation of HPU to function valves on EHXT through MQC plate. Install SCM, hook up and function SPCTU and ETU software to communicate with XT. Preformed high and low pressure test. Due to issues with connector also assisted in removing connector from XT, redressing connector and re installing in XT. May 12 – May 23rd 2012 Day Controls Lead Nexxen SIT for Nexxen. Set up and operate HPU for Nexxen SIT. Completed nitrogen pre charge of accumulators on HPU and SCM for PLET. Installed SCM on PLET. Vented fluid and nitrogen from HPU and had it ready for shipment at end of SIT. March 8 – April 3rd 2012 Day Controls Lead Shell Llano 3 Decomplete of Shell Llano 3 15k EVXT. Testing of electrical testing of EFL’s, Run and secure EFL’s on to BOP stack. Run e-line reel. Set up ETU software to function valves on XT and to log and trend data to send to Shell offices for review. March 3 – March 4 2012
  • 12.
    Controls Lead Shell Diemos MOBof 15k TRT. Performed pressure test, functionality of Lock, UL, and Secondary UL circuits in Port Fourchon,. February 11-March 3 2012 Day Lead Controls Shell Princess Waterflood Well Intervention- Responsibilities include managing and coordinating ETU setup and monitoring, daily planning with customer rep, Houston engineering communication for planning of positive outcome, driller communication for installation of subsea equipment, future planning on subsea equipment installation and testing, communicating with other team members and ensure the same goal is met for customer satisfaction. Some of the technical responsibilities included transfer of XT communication from host platform to FMC on the Q4k, monitoring of PT sensors and functioning of valves for down hole work via ETU, installation/removal of TRT for IRS to conduct intervention, ROV operations such as XT cap removal, installations, operation and rig up of EFL reel and HFL, technical troubleshooting on subsea hardware, Deck pressure testing and Connector functioning, Job was completed with zero down time and zero injuries. Responsibilities included 3 team members and equipment. 11 Jan -25 Jan 2012 Subsea Controls Service Technician Shell Popeye M/U of TRT to Expro Bore Selector and attach to Vetco XT. Setup and break down of equipment. 30 Dec 2011 -7 Jan 2012 Subsea Controls Service Technician Shell Perdido Completion Preformed pressure test on THRT and functionality. Read fluid samples from THRT lines and verified fluid cleanliness levels via microscope kit. Monitored pressures on umbilical reel and preformed checks every 2000 ft. while running hanger D/H. Worked in conjunction with Well Dynamics and Oceaneering to complete task. Completed HST verification on THRT and Lock and U/L functions. Maintained reel operations while RIH and POOH. Inventory and break down of equipment. .
  • 13.
    16 Nov -7Dec 20011 Subsea Controls Service Technician BP Thunder Horse Pressure testing of Primary and Secondary Spanner Joints w/THRT installed. Pressure testing of THRT umbilical reel and IWOCS reel. Electrical testing of Spanner Joints and THRT, and IWOCS reels. Inventory of CWOR work shop. 17 Aug -22 Aug 2011 Subsea Controls Service Technician Shell Serrano Preservations Preservations of 1 EHVXT, 2 THS, and 4 jumpers. Work scope included functioning of valves and connectors on XT and THS as well as jumpers. Functioning of everything through ROV panels using HS and HPU. Filled bores with preservation fluid and sealed off and greased connectors on all equipment. 2 Aug -7 Aug 2011 Subsea Controls Service Technician Shell Crosby Installations of HFL’s from UTAJ frame to HDM. Pulled Logic Cap, cut lines for 2 couplers and replaced with 2 blank couplers. Instruct ROV operations on torque values and rotations to remove and install HFL’s. Pre-charge of HLF’s on deck before running subsea. 30 July -31 July 2011 Subsea Controls Service Technician Shell Crosby SIT for TRT Preformed 8500 psi and 5000 psi 15 min pressure test on Lock and U/L functions on 10k TRT. After testing locked TRT onto test stump and loaded onto truck for travel to port. 8 July -14 July 2011 Subsea Controls Service Technician Shell Llano (Q4000) Responsible for functioning and monitoring of ETU software and operations of valves. Assisted in break down of FMC equipment and loading onto boat for transport. 16 March -22 May 2011 Subsea Controls Service Technician Shell Monobore (Q4000) (TA3 and TA6, Serrano SE1 and SE3)
  • 14.
    Setup and functionof HPU system to run EDP/LRP Monobore system. Valve functionality was done from RCS connex using Smart Tool and HMI setup. Built manifolds for pressure testing and to tie HPU to IWOCS umbilical reel. Other responsibilities included filling out Permit to Work forms, JSA’s, running clamps in moon pool, inventory or connex and spares. Provided real time trending and historical data to CM and Shell Engineer via Smart Tool. Transfer trend data to Excel spread sheet with charts to show trending on a time and pressure scale. 27 Dec 2010 -24 Feb 2011 Subsea Controls Service Technician Surface Well Head and Frac Stack Tech (Temporary surface assignment in Odessa Texas) Assembly of surface tubing heads, well heads, surface trees and frac valves. Pressure testing and maintenance of Frac systems as well as nipple up and nipple down of frac stacks. Performed slip jobs which included setting slip around casing and then cutting casing with torch so BOP could be removed and tubing head installed. 23 Nov -30 Nob 2010 Subsea Controls Service Technician Cobalt Test fit Cobalt IWOCS system to Ensco 8503 rig BOP and associated testing and equipment modifications. Testing included pressure test of individual components and complete system test and troubleshooting. 8 Aug -13 Aug 2010 Subsea Controls Service Technician Petrobas Cascade EHXT Preservations Provide assistance with setup of SPCTU and PTU, and use of Smart Tool software to strok valves and fill bore with fluid. Use of HIP up to 5k pressure. Moved EHXT’s to inspection stand and inspected connector. Moved SCM from one EHXT to another to duplicate preservation steps. 7 July -8 July 2010 Subsea Controls Service Technician Anadarko (EHXT #35) Provided assistance in relieving 10k trapped pressure from Subsea XT. Test and function of tools required to complete job. (SLT, handling tool, and H-tool.) Install SLT into bore, install H-tool. Begin rotation of H-tool until a slight pop and pressure release was heard. Function valve with torque tool (150 ft lbs, 13.5 rotations) to relieve trapped pressure.
  • 15.
    25 May -16June 2010 Subsea Controls Service Technician BP Atlantis/Thunder Horse Set up comms via HPU, FTU and ETU software to various SCM’s for BP Atlantis and Thunderhorse projects. Once comms were established testing and monitoring of valves and pressures were completed. Also provided nitrogen pre-charge to SCM and removed and replaced couplers on bottom of SCM. 24 May -24 May 2010 Subsea Controls Service Technician (Apprentice) Shell Monobore Inspect and function E-Line reel. Used grinding tool to remove debris from reel, and lubed and tested basic motorized functions of reel. 28 April -13 May 2010 Subsea Controls Service Technician Shell (EDP/LRP Monobore) SIT Removed SCM from EDP and replaced with dummy SCM. Installed handling tool and moved to inspection stand where gaskets were installed to bottom of EDP. Then moved back to test stand and locked into place with a SL II connector. Filled dampener bottles on EDP to 1800 psi. Leak tested EDP WSCM ports at 5000 psi. Tested production valve at 10,000 psi to put pressure upstream. Cycled RPIV valve on LEP at 550 ft lbs. Serviced and charged accumulator bottles on LRP to 200 psi. Pressure tested secondary lock and U/L functions. Clean and inspected stabs, connector and cycled valves. Prepared electrical check for LRP. Pressure tested hydraulic control lines to 3000 psi and stroked all valves and checked accumulator pressure for any leaks. 5 min and 15 min pressure test of 10,000 psi and 250 psi. 27 April -27 April 2010 Subsea Controls Service Technician (Apprentice) Rental Tools HPU testing Assisted in testing of 3x3 HPU and IWOCS HPU. On 3x3 unit pressure tested LP to 6k and HP to 15k and tested functionality of needle valves. On IWOCS HPU LP side pressure tested to 5400k and HP side pressure tested up to 18k. 5 and 15 min test. Once pressured up fittingswere inspected to ensure no leaks detected. Test completed and pressure vented off. November 2008 – December 2009 Sungard Data Systems Hosting Specialist 1
  • 16.
    Responsible fortroubleshootingandmaintainingcustomerhardware,rackbuildouts,andcablingfor customerequipment,aswell asSungardinternalhardware ina10,000 square footdatacenter. Duties includedbutnotlimitedtomonitoringandtroubleshootingof ATSsystems,CRACunits,chillerunits,and UPS systemsthatfunctionedascore piecesof equipmentessential torunningthe Sungarddatacenter. Face to face contact withcustomersandvendorswithpositiverepresentationof SungardData Systems alsoa dailyrequirement. March 2004 – October 2008 Media Services Network Administrator Responsible forconfiguringandmaintainingcompanyfirewallsandconnectionsfromthe outside world intothe MSG environment SetupandmaintainedVPN tunnelsforall MSG officesandcustomerVPN’sintothe MSGnetwork Keptinventoryof all networkinghardware andIPaddressesinuse onthe network,alongwith maintainingaVisiodocumentof the MSG logical networkwhichincludedportopenings,IP’sassignedto servers,andVPN tunnels Maintainedall office networkswhichspreadfromvariouslocationsinthe US,Canada,and the UK OtherresponsibilitiesincludedsettingupMicrosoftExchange accounts,Active Directoryaccounts,and ftpaccounts for customeraccessManagedand maintainedcompanyvirusprotectionsoftware installationandlicensing Createdandmaintainedcablingfor4serverracks at Level 3 facilitiesinHoustonandPhoenix Responsibilitiesalsoincludedhelpinginternal enduserswithlaptop/desktopissuessuchashardware and software installationsandrebuildsif necessary. Workedcloselywithvendorstoensure contractsandlicensingwere uptodate for companyCisco productswhichincluded12 CiscoPIX’sthatrangedfrom 506e, to 515 and 525 models. 2001 – 2004 VeriCenter, Inc Network OperationsCenterEngineer SeasonedTier2 positioninthe datacenter
  • 17.
    Providedtechnical supportformultiple branchesincludingheadquartersforoneof the nation’slargest multi-familydevelopers Troubleshootall office programs,Windows95,98, 2000, printingissues,usedSMSandPC Anywhere to remotelyhelpusers Monitorednetworkforover500 serversandoff site routers Securedmonitoringforviruses/backersusingHPOpenView Providedhome supportforcustomerwebsite issues Installedandsupportof numerousWindows2000,2000 AdvancedandNT servers Upgradedhardware and software formultipleaccounts Providedall DNSentriesforcustomerdomains Createdandmaintainedcablingfromserverrackstothe switch racks Installedandconfigurationof NICcards Providednewemployeesandcustomersaccesstothe network,includingsettingUserID’s,mapping networkdrives,settingupemail accountsandothernetworkfunctions 2000 – 2001 Enova Software IT Trainer / Help Desk Technician Providedassistance andtrainingfornewhiresoncompanypolicy,phone proceduresaswell as troubleshootingandconfiguringof the companycreatedfilteringsoftware,KidProof Responsible fortroubleshootingof customerPC Hardware,Software,PrinterandOSinstallations Accountable forcreatingcompanytrainingmanualsandentrance examforthe tier1 support In depthknowledge of WindowsOperatingSystems 2000 Sprint Broad Band InstallationSupport Technician Implementationandsupportof a wirelessnetworkforbusinessesandhome users
  • 18.
    Providedassistance andtrainingtoendusersinbasicnetworkfunctionality InstallationandconfiguringNICCards Knowledgeof allWindowsOS 2000 Gentronics HelpDesk Technician Providingtechnical supportforendusersonthe East Coast Bell AtlanticDSLAccount Knowledgeof Windows95,98, NT,2000 Knowledgeof businessnetworks 1999 Convergy’s CustomerSupport Representative Providedtechnical supportforCompaq desktopsandprinterforhome users Supportedothertechnical advisorson-site Supportedall integratedsoftware installedonCompaqdesktop