SlideShare a Scribd company logo
1 of 3
James Swearengin – Pilot Tech I
SUMMARY EXPERIENCE
Military trained electrical technician. 8
Years of experience with
electronic Control systems, 8 years of experience troubleshooting electri
cal, Mechanical, and hydraulic systems operations. Conduct daily
safety Meetings and construct Pre job JSEA’s. Maintain all logs and com
munications with supervisor, crewmembers, and client. Develop strong w
orking relationship with crew members.
 516 hours flying during pile installation, conductor installation,
completions, drill support, P&A, and pipeline survey.
-105 hours Millennium Plus
-411 hours Schilling UHD
 Conductor Installation
 Template Installation
 BOP and Marine Riser Installations
 Pile and Conductor installation
 Caisson inspection
 Tendon installation
 TLP installation
 Current Monitoring and Logging
 Manifold jumper installation
 Subsea Trees Installation
 Pipeline surveys
 Exploratory well Drilling
 Clients; HMC, BP, BHP Billiton, Marathon, Noble Energy
 Operation of tooling including torque tools, high pressure hot
stabs and subsea rigging, BOP intervention skid, AX-ring tool
 AX Ring gasket installation
 Flex Joint inspection and Cleaning
 Well Head inspection and cleanin
 HFL/EFL installation and removal
 Seabed and debris survey
 Drill/Rig support Operations
 Operation of manipulators including; Conan, Atlas, T4, and Rig
master
 Operation and maintenance of LARS systems; Dynacon and
Cetix
 Pre and Post dive Checks
 SEANET inspection and repair
 Co-pilot Operations
 Tether Retermination
 Umbilical Retermination
 Maintain ROV compensation system
 Maintain Accurate dive record and Video Logs
 Ensure all system maintenance is completed and up to date
 Conduct repairs and troubleshooting
-ensure safe working environment
-Maintain clear communications
-Identify task and priorities
ROVSYSTEM EXPERIENCE
 Millennium Plus Rov
 Schilling UHD
TRAINING/CERTIFICATIONS
 BOSIET
 SAFEGULF
 SIMMS
 FIRSTAID/CPR
 WELL CONTROL
WORK HISTORY
 C-Innovation: Sept.2014 – Present
 Oceaneering.: May 2013 – Sept
2014
 United States Coast Guard :2006 –
2011
Date Client
Workin
g Project
Project
Job Task ROV Vessel
Depth Location
July-Aug
2013
BHP 3,500ft
SAKE Explorat
ory well
GOM
Drill support, Seabed Sur
vey, Cement assist
Mill23 DD1
SEP
2013
BHP 3,500ft
SAKE Explorat
ory Well
GOM
AX Ring installation
Drill support,
BOP install,
HFL/EFL Installation
Mill23 DD1
Nov
2013
BHP 2,500ft
Jumper installa
tion
GOM
HFL/EFL installation,
Jumper Survey/ Mill38
C.R.
Luigs
Dec 2013-
March
2014 BHP N/A
SD01 Plug an
d
Abandonment
GOM
Torque tool operations
HFL/EFL installation
BOP installation and
removal
Mill23 DD1
April-may
2014
Nobel 3,000ft Drill Support GOM
Torque tool operations
HFL/EFL Installation
LMRP inspection
Mill44
Ensco
8501
June
2014
Marathon N/A Drill support GOM
LMRP inspection,
Riser inspection
Mill42
Ensco
8503
July
2014
Nobel 6,000ft Drill support GOM
Seabed Survey,
BOP installation
AX ring installation
Torque tool Operations
Mill53
Atwood
Advantage
August-sept
2014
Nobel 6000ft Completions GOM
Torque tool operation
HFL/EFL installation
LMRP install/removal
Mill53
Atwood
Advantage
Oct-Nov
2014
Williams
7,000ft-
500ft
KCC pigging
Survey
GOM
Pipeline inspection
Jumper inspection
Pig tracking
UHD59
Island
Intervention
Dec 2014-
Jan 2015
Heerema
Marine
Constractors
(HMC)
760
meters
MOHO NORD
Pointe Noire,
Congo
Mooring line installation
Template installation
Pile installation
Conductor installation
UHD35 Thiaf
March 2015 BP
15ft-
200ft
BP Trinidad
Caisson
Inspection
Trinidad
Caisson inspection
Pipeline inspection
Rig move assistance
UHD21
Max
Chouest
June 2015-
July 2015
Heerema
Marine
Contractors
HMC
100M
IVAR AASEN
Jacket
North Sea
Jacket
installation
UHD36 Thiaf
Aug 2015-
Sept 2015
Heerema
Marine
Contractors
(HMC)
100M
Johan Swered
Template
Installation
North Sea
Template
installation UHD35 Thiaf
Jan 2016
Heerema
Marine
Contractors
(HMC)
15-760
Meters
MOHO NORD
Pointe Noire,
Congo
Tendon and TLP
Installation
UHD38 Hermod
CV.James Swearengin.3-2015

More Related Content

What's hot

General Pulse Structural Monitoring
General Pulse Structural MonitoringGeneral Pulse Structural Monitoring
General Pulse Structural MonitoringBoQan
 
tims resume spring 2015 new
tims resume spring 2015 newtims resume spring 2015 new
tims resume spring 2015 newTim Stenger
 
Agr Field Operations Pipeline Inspection
Agr Field Operations Pipeline InspectionAgr Field Operations Pipeline Inspection
Agr Field Operations Pipeline Inspectionjsthetford
 
JKBernard_Resume_July15_doc
JKBernard_Resume_July15_docJKBernard_Resume_July15_doc
JKBernard_Resume_July15_docJohn Bernard
 
Quang CV - SEAMAP
Quang CV - SEAMAPQuang CV - SEAMAP
Quang CV - SEAMAPPham Quang
 
IMCA Inspection Acceptance Discard-criteria rev.3
IMCA Inspection Acceptance Discard-criteria rev.3IMCA Inspection Acceptance Discard-criteria rev.3
IMCA Inspection Acceptance Discard-criteria rev.3LRweird
 
NewSTS Brochure
NewSTS BrochureNewSTS Brochure
NewSTS BrochureFranco R
 

What's hot (19)

CV.William Miles Jr.07-2016
CV.William Miles Jr.07-2016CV.William Miles Jr.07-2016
CV.William Miles Jr.07-2016
 
Resume CV
Resume CVResume CV
Resume CV
 
2015_J_Kilmister_Resume
2015_J_Kilmister_Resume2015_J_Kilmister_Resume
2015_J_Kilmister_Resume
 
General Pulse Structural Monitoring
General Pulse Structural MonitoringGeneral Pulse Structural Monitoring
General Pulse Structural Monitoring
 
Glenn Ross-CV
Glenn Ross-CVGlenn Ross-CV
Glenn Ross-CV
 
tims resume spring 2015 new
tims resume spring 2015 newtims resume spring 2015 new
tims resume spring 2015 new
 
Agr Field Operations Pipeline Inspection
Agr Field Operations Pipeline InspectionAgr Field Operations Pipeline Inspection
Agr Field Operations Pipeline Inspection
 
Resume 08-13-2015s
Resume 08-13-2015sResume 08-13-2015s
Resume 08-13-2015s
 
Short Resume
Short Resume Short Resume
Short Resume
 
A.Bremner c.v
A.Bremner c.vA.Bremner c.v
A.Bremner c.v
 
Gamma BP Profile
Gamma BP ProfileGamma BP Profile
Gamma BP Profile
 
JKBernard_Resume_July15_doc
JKBernard_Resume_July15_docJKBernard_Resume_July15_doc
JKBernard_Resume_July15_doc
 
Hanks 2015 CV-3 updated
Hanks 2015 CV-3 updatedHanks 2015 CV-3 updated
Hanks 2015 CV-3 updated
 
CV_mki2015Nov
CV_mki2015NovCV_mki2015Nov
CV_mki2015Nov
 
Quang CV - SEAMAP
Quang CV - SEAMAPQuang CV - SEAMAP
Quang CV - SEAMAP
 
IMCA Inspection Acceptance Discard-criteria rev.3
IMCA Inspection Acceptance Discard-criteria rev.3IMCA Inspection Acceptance Discard-criteria rev.3
IMCA Inspection Acceptance Discard-criteria rev.3
 
NewSTS Brochure
NewSTS BrochureNewSTS Brochure
NewSTS Brochure
 
Pgt resume 042416
Pgt resume 042416Pgt resume 042416
Pgt resume 042416
 
Jeffrey Wood
Jeffrey WoodJeffrey Wood
Jeffrey Wood
 

Similar to CV.James Swearengin.3-2015

OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014Dylan Olivier
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draftJohn Grover
 
Steven Wilson CV New
Steven Wilson CV NewSteven Wilson CV New
Steven Wilson CV NewSteven Wilson
 
julian sharman CV 2016
julian sharman CV 2016julian sharman CV 2016
julian sharman CV 2016Julian Sharman
 
Rob Gill_CV_Sep_2015
Rob Gill_CV_Sep_2015Rob Gill_CV_Sep_2015
Rob Gill_CV_Sep_2015Rob Gill
 
Morritt andrew cv 2017 ref
Morritt andrew cv 2017 refMorritt andrew cv 2017 ref
Morritt andrew cv 2017 refAndy Morritt
 
MORRITT Andrew CV 2017 Ref
MORRITT Andrew CV 2017 RefMORRITT Andrew CV 2017 Ref
MORRITT Andrew CV 2017 RefAndy Morritt
 
Isaac Turner Resume
Isaac Turner ResumeIsaac Turner Resume
Isaac Turner ResumeIsaac Turner
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Charlie Reith
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & ToubroJAIPRAKASH PATIL
 
D E Marsden - Marine CV
D E Marsden - Marine CVD E Marsden - Marine CV
D E Marsden - Marine CVDan Marsden
 
Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross
 
Michael Forbes updated CV
Michael Forbes updated CVMichael Forbes updated CV
Michael Forbes updated CVMichael Forbes
 
Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross
 

Similar to CV.James Swearengin.3-2015 (20)

KOM 15082014 HUC
KOM 15082014 HUCKOM 15082014 HUC
KOM 15082014 HUC
 
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draft
 
edward jacob cv
edward jacob cvedward jacob cv
edward jacob cv
 
CV.William Miles Jr.07-2016
CV.William Miles Jr.07-2016CV.William Miles Jr.07-2016
CV.William Miles Jr.07-2016
 
Steven Wilson CV New
Steven Wilson CV NewSteven Wilson CV New
Steven Wilson CV New
 
julian sharman CV 2016
julian sharman CV 2016julian sharman CV 2016
julian sharman CV 2016
 
EZENWANKWO, EMMANUEL UCHECHUKWU CV
EZENWANKWO, EMMANUEL UCHECHUKWU CVEZENWANKWO, EMMANUEL UCHECHUKWU CV
EZENWANKWO, EMMANUEL UCHECHUKWU CV
 
Rob Gill_CV_Sep_2015
Rob Gill_CV_Sep_2015Rob Gill_CV_Sep_2015
Rob Gill_CV_Sep_2015
 
Morritt andrew cv 2017 ref
Morritt andrew cv 2017 refMorritt andrew cv 2017 ref
Morritt andrew cv 2017 ref
 
MORRITT Andrew CV 2017 Ref
MORRITT Andrew CV 2017 RefMORRITT Andrew CV 2017 Ref
MORRITT Andrew CV 2017 Ref
 
OJB Resume 2016
OJB Resume 2016OJB Resume 2016
OJB Resume 2016
 
Isaac Turner Resume
Isaac Turner ResumeIsaac Turner Resume
Isaac Turner Resume
 
Henrys Resume 2016 Q3
Henrys Resume 2016 Q3Henrys Resume 2016 Q3
Henrys Resume 2016 Q3
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & Toubro
 
D E Marsden - Marine CV
D E Marsden - Marine CVD E Marsden - Marine CV
D E Marsden - Marine CV
 
Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross CV .doc 1
Glenn Ross CV .doc 1
 
Michael Forbes updated CV
Michael Forbes updated CVMichael Forbes updated CV
Michael Forbes updated CV
 
Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross CV .doc 1
Glenn Ross CV .doc 1
 

CV.James Swearengin.3-2015

  • 1. James Swearengin – Pilot Tech I SUMMARY EXPERIENCE Military trained electrical technician. 8 Years of experience with electronic Control systems, 8 years of experience troubleshooting electri cal, Mechanical, and hydraulic systems operations. Conduct daily safety Meetings and construct Pre job JSEA’s. Maintain all logs and com munications with supervisor, crewmembers, and client. Develop strong w orking relationship with crew members.  516 hours flying during pile installation, conductor installation, completions, drill support, P&A, and pipeline survey. -105 hours Millennium Plus -411 hours Schilling UHD  Conductor Installation  Template Installation  BOP and Marine Riser Installations  Pile and Conductor installation  Caisson inspection  Tendon installation  TLP installation  Current Monitoring and Logging  Manifold jumper installation  Subsea Trees Installation  Pipeline surveys  Exploratory well Drilling  Clients; HMC, BP, BHP Billiton, Marathon, Noble Energy  Operation of tooling including torque tools, high pressure hot stabs and subsea rigging, BOP intervention skid, AX-ring tool  AX Ring gasket installation  Flex Joint inspection and Cleaning  Well Head inspection and cleanin  HFL/EFL installation and removal  Seabed and debris survey  Drill/Rig support Operations  Operation of manipulators including; Conan, Atlas, T4, and Rig master  Operation and maintenance of LARS systems; Dynacon and Cetix  Pre and Post dive Checks  SEANET inspection and repair  Co-pilot Operations  Tether Retermination  Umbilical Retermination  Maintain ROV compensation system  Maintain Accurate dive record and Video Logs  Ensure all system maintenance is completed and up to date  Conduct repairs and troubleshooting -ensure safe working environment -Maintain clear communications -Identify task and priorities ROVSYSTEM EXPERIENCE  Millennium Plus Rov  Schilling UHD TRAINING/CERTIFICATIONS  BOSIET  SAFEGULF  SIMMS  FIRSTAID/CPR  WELL CONTROL WORK HISTORY  C-Innovation: Sept.2014 – Present  Oceaneering.: May 2013 – Sept 2014  United States Coast Guard :2006 – 2011
  • 2. Date Client Workin g Project Project Job Task ROV Vessel Depth Location July-Aug 2013 BHP 3,500ft SAKE Explorat ory well GOM Drill support, Seabed Sur vey, Cement assist Mill23 DD1 SEP 2013 BHP 3,500ft SAKE Explorat ory Well GOM AX Ring installation Drill support, BOP install, HFL/EFL Installation Mill23 DD1 Nov 2013 BHP 2,500ft Jumper installa tion GOM HFL/EFL installation, Jumper Survey/ Mill38 C.R. Luigs Dec 2013- March 2014 BHP N/A SD01 Plug an d Abandonment GOM Torque tool operations HFL/EFL installation BOP installation and removal Mill23 DD1 April-may 2014 Nobel 3,000ft Drill Support GOM Torque tool operations HFL/EFL Installation LMRP inspection Mill44 Ensco 8501 June 2014 Marathon N/A Drill support GOM LMRP inspection, Riser inspection Mill42 Ensco 8503 July 2014 Nobel 6,000ft Drill support GOM Seabed Survey, BOP installation AX ring installation Torque tool Operations Mill53 Atwood Advantage August-sept 2014 Nobel 6000ft Completions GOM Torque tool operation HFL/EFL installation LMRP install/removal Mill53 Atwood Advantage Oct-Nov 2014 Williams 7,000ft- 500ft KCC pigging Survey GOM Pipeline inspection Jumper inspection Pig tracking UHD59 Island Intervention Dec 2014- Jan 2015 Heerema Marine Constractors (HMC) 760 meters MOHO NORD Pointe Noire, Congo Mooring line installation Template installation Pile installation Conductor installation UHD35 Thiaf March 2015 BP 15ft- 200ft BP Trinidad Caisson Inspection Trinidad Caisson inspection Pipeline inspection Rig move assistance UHD21 Max Chouest June 2015- July 2015 Heerema Marine Contractors HMC 100M IVAR AASEN Jacket North Sea Jacket installation UHD36 Thiaf Aug 2015- Sept 2015 Heerema Marine Contractors (HMC) 100M Johan Swered Template Installation North Sea Template installation UHD35 Thiaf Jan 2016 Heerema Marine Contractors (HMC) 15-760 Meters MOHO NORD Pointe Noire, Congo Tendon and TLP Installation UHD38 Hermod