SlideShare a Scribd company logo
1 of 5
Curriculum Vitae
Name BOUBANGA ITSISSA
Myster
E-mail boubangaitsissa@yahoo.fr
(personnel adress) ↑
myster.boubanga@halliburton.com
myster.boubanga@external.total.com
Job Function Slickline supervisor Phone 00 242 05 359 18 83
00 242 06 650 19 71
Oil Field
Experience
8 years and 1 month
of experience in
Slickline
PSL: WPS/ Slick line
Marital status Married, 4 children
(2 children of mine
&
2 adopted children)
Location: PNR / CONGO-BRAZZAVILLE
Nationality Congolese
Career History
FEB 2016 UNTIL NOW HALLIBURTON CONGO, WORK IN TOTAL
OFFSHORE PRODUCTION & DRILLING WELL SITE,
Work as: Slickline Field Supervisor
 Wax cutting
 RIH EXPRO Guns for perforating purpose
 RIH RL 2.81 for water injection well
 Set FB2 2”75
 Control & test Tubings
 TR-SCSSV & HAS control line pressure test by using the control panel
 RIH Schlumberger gauges for pressures recording
JUN 2015 to FEB 2016 HALLIBURTON GABON, WORK IN PERENCO
GABON OFF-SHORE & ON-SHORE WELL SITE,
Worked on Work-over Unit as: Slickline Field Supervisor
 RIH 2.56 FB2 Standing Valve
 RIH FWG 2"56Tubing drift with gauge cutter
 Rih 2" 79 Junk basket
 RIH Otis type A Perforator 3" & perforating the tubing
 RIH CCL
 RIH 42Bo146 self-releasing shifting tool, shifted SSD 2.75
 RIH 1.75" Sand bailer
 RIH LIB 5"
 Set & test FB2 2"75 standing valve in F 2.75 nipple profile in the test
Bay @ the base
 RIH RB 2"1/2 latch FB2 2"56, pooh
 RIH Merla 3” + JDC 1”1/4 VGL pooh
 RIH Merla 3” + JK VGL set

MAR 2015 - JUN 2015 HALLIBURTON CONGO,
YANGA-SENDJI PRODUCTION
OFFSHORE FIELD, TOTAL E&P CONGO
Worked as: Junior Slick line Supervisor
 RIH Junk Basket, Gas lift valve catcher
 Gas lift valve change out
 Tubing drift with gauge cutter
 Wax cutting
 Down hole BFVE safety valve change out
 RIH sand bailer to take bottom hole sample
 RIH FB2 to set Packer and pressure testing completion
JUN 2012 – MAR 2015 HALLIBURTON CONGO,
PNGF NORD YANGA-SENDJI
OFFSHORE FIELD, PRODUCTION JOB: TOTAL E&P CONGO
Worked as: Slick line Supervisor Trainee under assistance
 RIH Gas lift 1” with KOT CAMCO OK1D and Merla TMP
 RIH Memory Gauges (MPLT) record Pressure and temperature
 Re-dress and test Spring Jar 1.1/2” and 1.7/8”,
 Re-dress and test Roller Boogies
 Re-dress and test JDC pulling tool
 Re-dress and test FB2, RB2, FWG/B, RZG/B plugs.
 RIH Gauge Cutters: Tubing drift and Wax Cutting,
 Re-dress and test Sand and Pump Type Bailers.
 Assistance for coiled tubing operations (Set Isolation Sleeves).
 Assistancefor Electric Line operations, watching control panel (TRSV)
 Drift. Sizes: 2.7/8, 3.5¨, 4.5 Tubings,
 RIH 42BO shifting tool, (selective and non-selective)
 RIH Selective and non-Selective Test tool with SSJ running tool
 RIH Otis type A Perforator,
 School training for setting F Slips Tubing Stop,
 Supervise new Slick line workers
 RIH Plugs: FWG/B, RZG/B. Standing valves (FB2, RB2).
 Train local New Operators Assistant.
 RIH Sand Bailer, Hydrostatic Bailer and Pump Bailers.
 RIH RB & SB and GS, GR Series Pulling tools
 Worked with (0.092 and 0.108) of Slickline sizes
 Set and pull Gas lift change out
 School training for opened & closed SSD
 Re-dress and test RB & SB and GS, GR Series Pulling tools.
 Order and maintain spare parts of equipment in shop.
MAR 2012 – JUN 2012 HALLIBURTON CONGO,
PNGF NORD YANGA-SENDJI OFFSHORE FIELD,
MAMOLA SERENITY U122 WORK OVER UNIT
& BASE DRILL RIG ALPHA, COMPLETION JOB:
TOTAL E&P CONGO
Worked as: Slick line Supervisor Trainee under assistance
 RIH Gauge Cutters :Tubing drift
 Assistance for coiled tubing operations watching control panel(TRSV)
 Drift. Completion equipment before to run
 RIH Otis type A Perforator,
 RIH Gyro Data and Drop Bare,
 School training for setting Tubing Stop,
 Supervise new Slick line workers
 Assist RIH Plugs: FWG/B, RZG/B. Standing valves (FB2, RB2).
 Train local New Operators Assistant.
 RIH RB & SB and GS, GR Series Pulling tools
 Worked with (0.092 , 0.108 ) of Slickline sizes
 Assist set and pull Gas lift valve change out
 Re-dress and test RB & SB and GS, GR Series Pulling tools.
 RIH Gas lift: BK1, Dummy with OK5and Marla KOT.
 Order and maintain spare parts of equipment in shop.
FEV 2010 – MAR 2012 HALLIBURTON CONGO, NKOSSA OFFSHORE FIELD,
PRODUCTION JOB: TOTAL E&P CONGO
Worked as: Operator Slick line
 Assist RIH Storm Chokes / Ambient valves
 Re-dress and test X and R Line equipment (X and R Plugs, X Selective
Running Tool, Test tool, 142BO Positioning tool.)
 Assist RIH RXN, X and R Running tool to set PXX, PXN, PRR and
PRN
 Assist RIH XR Pump through plug
 Assist RIH Gas lift with RK latch with OM and Marla KOT TP.
 Assist RIH RXN, R Running tool to set RPT plugs High pressure and
H2S and deviated wells.
 Assist RIH Gas lift 1”1/2 with KOT Merla TP
 Assist RIH Memory Gauges (MPLT) record Pressure and temperature
 Re-dress and test Spring Jar 1.7/8” ,
 Re-dress and test Roller Boogies
 Re-dress and test JDC 1”5/8 pulling tool
 Assist RIH Gauge Cutters :Tubing drift
 Re-dress and test Sand and Pump Type Bailers.
 Assistance for coiled tubing operations (Assist Set Isolation Sleeves).
 Assistance for Electric Line operations, watching control panel (TRSV)
 Drift. Sizes: 4.5” Tubings ,
 Assist RIH RPT plugs High pressure and H2S wells
 Assist RIH 42BO shifting tool, (selective and non-selective)
 Assist RIH Selective Test tool
 Assist RIH Otis type A Perforator
 Assist RIH Sand Bailer, Hydrostatic Bailer and Pump Bailers.
 Assist RIH RB & SB and GS, GR Series Pulling tools
 Worked with (0.125) of Slickline sizes
 Assist Set and pull Gas lift change out
 Assist Opened & closed a Shifting sleeve of TRSV.
 Re-dress and test RB & SB and GS, GR Series Pulling tools.
 Maintain spare parts of equipment in shop.
JUN 2009 – FEV 2010 HALLIBURTON CONGO, MOHO BILONDO OFFSHORE FIELD,
GSF 135 DRILL RIG, COMPLETION JOB: TOTAL E&P CONGO
Worked as: Operator Slick line
 Assist RIH Gas lift 11/2” with KOT OM and Merla TP
 Redress and test Compact tool string 3”750
 Re-dress and test Spring Jar 1.7/8”,
 Re-dress and test JDC pulling tool
 Assist RIH Gauge Cutters :Tubing drift
 Drift. Sizes: 4.5 Tubings ,
 Assist RIH RPT plugs High pressure and H2S wells
 Assist RIH MCX Water Injection Down Hole valve
 Assist RIH Overshot tool to pull a piece of Coil tubing
 Assist RIH PCE Plug
 Assist RIH RB & SB and GS, GR Series Pulling tools
 Worked with (0.125 SS) of Slickline sizes
 Assist RIH Gas lift change out
 Re-dress and test RB & SB and GS, GR Series Pulling tools.
 Assist RIH Gauge Cutters :Tubing drift
 Drift. Completion equipment at surface before to run
 Assist RIH RB & SB and GS, GR Series Pulling tools
 Worked with (0.125 SS) of Slickline sizes
 Assist set and pull Gas lift valve change out
 Re-dress and test RB & SB and GS, GR Series Pulling tools.
 Assist RIH Gas lift: RK1 RT with OM and Marla KOT TP.
 Order and maintain spare parts of equipment in shop.
JAN 2009 – JUN 2009 HALLIBURTON CONGO, NKOSSA OFFSHORE FIELD, WEST
MENANG DRILL RIG, COMPLETION JOB: TOTAL E&P CONGO
Worked as: Slickline Assistant Operator
 Re-dress and test Spring Jar 1.7/8” ,
 Re-dress and test Roller Boogies
 Re-dress and test JDC pulling tool
 Assistance for Electric Line operations, watching control panel (TRSV
and SSV)
 Assist a Fishing job ( wire + tools string + RPT plug)
 Re-dress and test RB & SB and GS, GR Series Pulling tools.
 Re-dress and test RB & SB and GS, GR Series Pulling tools.
 Order and maintain spare parts of equipment in shop.
JUN 2008 – JAN 2009 HALLIBURTON CONGO, PNGF SUD TCHIBOUELA
OFFSHORE FIELD, PRODUCTION JOB: TOTAL E&P CONGO
Worked as: Slick line Assistant Operator
 Re-dress and test Spring Jar 1.1/2” and 1.7/8”,
 Re-dress and test Roller Boogies
 Re-dress and test JDC pulling tool
 Re-dress and test FB2, RB2, FWG/B, RZG/B plugs.
 Re-dress and test Sand and Pump Type Bailers.
 Assistance for coiled tubing operations (Set Isolation Sleeves).
 Assistancefor Electric Line operations, watching control panel (TRSV)
 Re-dress and test RB & SB and GS, GR Series Pulling tools.
 Order and maintain spare parts of equipment in shop.
Education and Professional Development
2000: GCSE’S under C grade (D-G) (Congo)
2003: French high-school diploma in Mechanical Design (Congo)
2007: Mechanical Design Superior Technician Diploma from INSFP Es-senia
(Algerian National Professional Institute)
2008: Work at S.N. Plasco (Eau MAYO) mineral water Company as Maintenance
Technician for 04 months (from 1rst February to 31rst May)
2008: From 1rst June Current HALLIBURTON SLICKLINE
2012: 06 months of training in USA SLAL OA, SO & Slickline I
2013: 10 days of training in CONGO DPU PES HE3
2013: 15 days of training in SCOTLAND (UK) Slickline II
2014: IWCF Level 2, Pointe-Noire, CONGO BRAZZAVILLE March the 1st
2016: IWCF Level 4, Pointe-Noire, CONGO BRAZZAVILLE February the 26th
Competence
 Basic Fire Fighting, and professional behavior in Oil field
Installation (BOSIET Training)
 HUET (Helicopter UnderWater Egress Techniques)
 H2S awareness
 Offshore survival
 Work Permit check training
 Experience on Offshore & Onshore operations
 simultaneous operations experience
 Discussed with the customer on field ,planed the job and sent job report
 Prepare working permit and check certificates of all equipment to be on date
 Check tools before running, equipment inventory and do equipment transfer
 Participate on safety stop card program
 Slickline operations in 3 ½’’ Completions
 French written, read and spoken fluently
 English school level

More Related Content

What's hot

02 wireline
02 wireline02 wireline
02 wirelineJohan RC
 
Subsurface safety valves
Subsurface safety valvesSubsurface safety valves
Subsurface safety valvesAkhilesh Maurya
 
Charles Carter's Wireline Operator Resume 2020
Charles Carter's Wireline Operator Resume 2020 Charles Carter's Wireline Operator Resume 2020
Charles Carter's Wireline Operator Resume 2020 CharlesCarter55
 
Subsurface flow controls external
Subsurface flow controls externalSubsurface flow controls external
Subsurface flow controls externalBladimir R
 
Wireline Operations
Wireline OperationsWireline Operations
Wireline OperationsMubarik Rao
 
Landing nipples X & XN
Landing nipples X & XN Landing nipples X & XN
Landing nipples X & XN Elsayed Amer
 
Completion equipment part 1
Completion equipment part 1Completion equipment part 1
Completion equipment part 1Elsayed Amer
 
Scsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveScsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveElsayed Amer
 
4th Presentation
4th Presentation4th Presentation
4th PresentationBarun
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2Elsayed Amer
 
Trsv overview external
Trsv overview externalTrsv overview external
Trsv overview externalManuel Coxe
 
10 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 2910 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 29Will Butler, P.Eng
 
07121 1603c-th-design-study-flapper-style-sssv-xhpht-applications-11-01-09-p
07121 1603c-th-design-study-flapper-style-sssv-xhpht-applications-11-01-09-p07121 1603c-th-design-study-flapper-style-sssv-xhpht-applications-11-01-09-p
07121 1603c-th-design-study-flapper-style-sssv-xhpht-applications-11-01-09-pfatehfodil
 
Well_Intervention_Presentation
Well_Intervention_PresentationWell_Intervention_Presentation
Well_Intervention_PresentationMuhammad Hassaan
 
Tubing Landing nipples in petroleum industry
Tubing Landing nipples in petroleum industryTubing Landing nipples in petroleum industry
Tubing Landing nipples in petroleum industryPE Mahmoud Jad
 
perforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointperforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointElsayed Amer
 

What's hot (20)

02 wireline
02 wireline02 wireline
02 wireline
 
Subsurface safety valves
Subsurface safety valvesSubsurface safety valves
Subsurface safety valves
 
Charles Carter's Wireline Operator Resume 2020
Charles Carter's Wireline Operator Resume 2020 Charles Carter's Wireline Operator Resume 2020
Charles Carter's Wireline Operator Resume 2020
 
Mudline Suspension (MLS)
Mudline Suspension (MLS)Mudline Suspension (MLS)
Mudline Suspension (MLS)
 
Subsurface flow controls external
Subsurface flow controls externalSubsurface flow controls external
Subsurface flow controls external
 
Wireline Operations
Wireline OperationsWireline Operations
Wireline Operations
 
Landing nipples X & XN
Landing nipples X & XN Landing nipples X & XN
Landing nipples X & XN
 
Wellhead
WellheadWellhead
Wellhead
 
Completion equipment part 1
Completion equipment part 1Completion equipment part 1
Completion equipment part 1
 
Scsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveScsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valve
 
4th Presentation
4th Presentation4th Presentation
4th Presentation
 
Production packer
Production packerProduction packer
Production packer
 
Completion equipment packer part #2
Completion equipment packer part #2Completion equipment packer part #2
Completion equipment packer part #2
 
Ssd spm
Ssd   spmSsd   spm
Ssd spm
 
Trsv overview external
Trsv overview externalTrsv overview external
Trsv overview external
 
10 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 2910 Well Abandonment Presentation Jan 29
10 Well Abandonment Presentation Jan 29
 
07121 1603c-th-design-study-flapper-style-sssv-xhpht-applications-11-01-09-p
07121 1603c-th-design-study-flapper-style-sssv-xhpht-applications-11-01-09-p07121 1603c-th-design-study-flapper-style-sssv-xhpht-applications-11-01-09-p
07121 1603c-th-design-study-flapper-style-sssv-xhpht-applications-11-01-09-p
 
Well_Intervention_Presentation
Well_Intervention_PresentationWell_Intervention_Presentation
Well_Intervention_Presentation
 
Tubing Landing nipples in petroleum industry
Tubing Landing nipples in petroleum industryTubing Landing nipples in petroleum industry
Tubing Landing nipples in petroleum industry
 
perforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointperforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast joint
 

Similar to CV_Myster slickline supervisor

Monitor drilling performance
Monitor drilling performanceMonitor drilling performance
Monitor drilling performanceAndi Anriansyah
 
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquén
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquénIapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquén
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquénJuan Carlos Bonapace
 
d2_400_318_Alzuabi.pdf
d2_400_318_Alzuabi.pdfd2_400_318_Alzuabi.pdf
d2_400_318_Alzuabi.pdfSathiaShekar1
 
Piping material-specification
Piping material-specificationPiping material-specification
Piping material-specificationChiragShah127
 
LeanValueStreamOrg-wKanban-FeketeIstvanPic
LeanValueStreamOrg-wKanban-FeketeIstvanPicLeanValueStreamOrg-wKanban-FeketeIstvanPic
LeanValueStreamOrg-wKanban-FeketeIstvanPicIstvan Fekete
 
Automationforum Interview Questions
Automationforum  Interview QuestionsAutomationforum  Interview Questions
Automationforum Interview Questionsautomationforum
 
Inst Sr.Tech new
Inst Sr.Tech newInst Sr.Tech new
Inst Sr.Tech newJob Jose
 
INDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARS
INDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARSINDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARS
INDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARSbkshivkumar012
 
CV Siam Update 31-10-2016
CV  Siam Update 31-10-2016CV  Siam Update 31-10-2016
CV Siam Update 31-10-2016siam sayed
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Emeka Ngwobia
 
PRODUCT CATALOG RAPPID VALVES
PRODUCT CATALOG RAPPID VALVESPRODUCT CATALOG RAPPID VALVES
PRODUCT CATALOG RAPPID VALVESGaurav Dalal
 
Toyota 5 fbc20 battery forklift service repair manual
Toyota 5 fbc20 battery forklift service repair manualToyota 5 fbc20 battery forklift service repair manual
Toyota 5 fbc20 battery forklift service repair manualfhsjejkdmem
 
Toyota 30 5 fbch20 battery forklift service repair manual
Toyota 30 5 fbch20 battery forklift service repair manualToyota 30 5 fbch20 battery forklift service repair manual
Toyota 30 5 fbch20 battery forklift service repair manualfjjskmdmem
 
Toyota 5 fbc15 battery forklift service repair manual
Toyota 5 fbc15 battery forklift service repair manualToyota 5 fbc15 battery forklift service repair manual
Toyota 5 fbc15 battery forklift service repair manualfhsjejkdmem
 
Toyota 5 fbc28 battery forklift service repair manual
Toyota 5 fbc28 battery forklift service repair manualToyota 5 fbc28 battery forklift service repair manual
Toyota 5 fbc28 battery forklift service repair manualfhsjejkdmem
 
Toyota 5 fbch25 battery forklift service repair manual
Toyota 5 fbch25 battery forklift service repair manualToyota 5 fbch25 battery forklift service repair manual
Toyota 5 fbch25 battery forklift service repair manualfjskekxcddmmme
 

Similar to CV_Myster slickline supervisor (20)

Monitor drilling performance
Monitor drilling performanceMonitor drilling performance
Monitor drilling performance
 
Yokogawa Variable Area Flowmeter
Yokogawa Variable Area FlowmeterYokogawa Variable Area Flowmeter
Yokogawa Variable Area Flowmeter
 
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquén
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquénIapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquén
Iapg jornadas shale neuquén vaca muerta a regional vision- 2013 neuquén
 
TOH.pptx
TOH.pptxTOH.pptx
TOH.pptx
 
d2_400_318_Alzuabi.pdf
d2_400_318_Alzuabi.pdfd2_400_318_Alzuabi.pdf
d2_400_318_Alzuabi.pdf
 
Michael McIntosh New CV 2
Michael McIntosh New CV 2Michael McIntosh New CV 2
Michael McIntosh New CV 2
 
Piping material-specification
Piping material-specificationPiping material-specification
Piping material-specification
 
Perfect Engineers, Mumbai, Camlock Coupler
Perfect Engineers, Mumbai, Camlock CouplerPerfect Engineers, Mumbai, Camlock Coupler
Perfect Engineers, Mumbai, Camlock Coupler
 
LeanValueStreamOrg-wKanban-FeketeIstvanPic
LeanValueStreamOrg-wKanban-FeketeIstvanPicLeanValueStreamOrg-wKanban-FeketeIstvanPic
LeanValueStreamOrg-wKanban-FeketeIstvanPic
 
Automationforum Interview Questions
Automationforum  Interview QuestionsAutomationforum  Interview Questions
Automationforum Interview Questions
 
Inst Sr.Tech new
Inst Sr.Tech newInst Sr.Tech new
Inst Sr.Tech new
 
INDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARS
INDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARSINDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARS
INDUSTRIAL TRAINING REPORT AT PRABHULINGESHWAR SUGARS
 
CV Siam Update 31-10-2016
CV  Siam Update 31-10-2016CV  Siam Update 31-10-2016
CV Siam Update 31-10-2016
 
Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.Hydrotest REPORT FOR 4'' 158m Line.
Hydrotest REPORT FOR 4'' 158m Line.
 
PRODUCT CATALOG RAPPID VALVES
PRODUCT CATALOG RAPPID VALVESPRODUCT CATALOG RAPPID VALVES
PRODUCT CATALOG RAPPID VALVES
 
Toyota 5 fbc20 battery forklift service repair manual
Toyota 5 fbc20 battery forklift service repair manualToyota 5 fbc20 battery forklift service repair manual
Toyota 5 fbc20 battery forklift service repair manual
 
Toyota 30 5 fbch20 battery forklift service repair manual
Toyota 30 5 fbch20 battery forklift service repair manualToyota 30 5 fbch20 battery forklift service repair manual
Toyota 30 5 fbch20 battery forklift service repair manual
 
Toyota 5 fbc15 battery forklift service repair manual
Toyota 5 fbc15 battery forklift service repair manualToyota 5 fbc15 battery forklift service repair manual
Toyota 5 fbc15 battery forklift service repair manual
 
Toyota 5 fbc28 battery forklift service repair manual
Toyota 5 fbc28 battery forklift service repair manualToyota 5 fbc28 battery forklift service repair manual
Toyota 5 fbc28 battery forklift service repair manual
 
Toyota 5 fbch25 battery forklift service repair manual
Toyota 5 fbch25 battery forklift service repair manualToyota 5 fbch25 battery forklift service repair manual
Toyota 5 fbch25 battery forklift service repair manual
 

CV_Myster slickline supervisor

  • 1. Curriculum Vitae Name BOUBANGA ITSISSA Myster E-mail boubangaitsissa@yahoo.fr (personnel adress) ↑ myster.boubanga@halliburton.com myster.boubanga@external.total.com Job Function Slickline supervisor Phone 00 242 05 359 18 83 00 242 06 650 19 71 Oil Field Experience 8 years and 1 month of experience in Slickline PSL: WPS/ Slick line Marital status Married, 4 children (2 children of mine & 2 adopted children) Location: PNR / CONGO-BRAZZAVILLE Nationality Congolese Career History FEB 2016 UNTIL NOW HALLIBURTON CONGO, WORK IN TOTAL OFFSHORE PRODUCTION & DRILLING WELL SITE, Work as: Slickline Field Supervisor  Wax cutting  RIH EXPRO Guns for perforating purpose  RIH RL 2.81 for water injection well  Set FB2 2”75  Control & test Tubings  TR-SCSSV & HAS control line pressure test by using the control panel  RIH Schlumberger gauges for pressures recording JUN 2015 to FEB 2016 HALLIBURTON GABON, WORK IN PERENCO GABON OFF-SHORE & ON-SHORE WELL SITE, Worked on Work-over Unit as: Slickline Field Supervisor  RIH 2.56 FB2 Standing Valve  RIH FWG 2"56Tubing drift with gauge cutter  Rih 2" 79 Junk basket  RIH Otis type A Perforator 3" & perforating the tubing  RIH CCL  RIH 42Bo146 self-releasing shifting tool, shifted SSD 2.75  RIH 1.75" Sand bailer  RIH LIB 5"  Set & test FB2 2"75 standing valve in F 2.75 nipple profile in the test Bay @ the base  RIH RB 2"1/2 latch FB2 2"56, pooh  RIH Merla 3” + JDC 1”1/4 VGL pooh  RIH Merla 3” + JK VGL set
  • 2.  MAR 2015 - JUN 2015 HALLIBURTON CONGO, YANGA-SENDJI PRODUCTION OFFSHORE FIELD, TOTAL E&P CONGO Worked as: Junior Slick line Supervisor  RIH Junk Basket, Gas lift valve catcher  Gas lift valve change out  Tubing drift with gauge cutter  Wax cutting  Down hole BFVE safety valve change out  RIH sand bailer to take bottom hole sample  RIH FB2 to set Packer and pressure testing completion JUN 2012 – MAR 2015 HALLIBURTON CONGO, PNGF NORD YANGA-SENDJI OFFSHORE FIELD, PRODUCTION JOB: TOTAL E&P CONGO Worked as: Slick line Supervisor Trainee under assistance  RIH Gas lift 1” with KOT CAMCO OK1D and Merla TMP  RIH Memory Gauges (MPLT) record Pressure and temperature  Re-dress and test Spring Jar 1.1/2” and 1.7/8”,  Re-dress and test Roller Boogies  Re-dress and test JDC pulling tool  Re-dress and test FB2, RB2, FWG/B, RZG/B plugs.  RIH Gauge Cutters: Tubing drift and Wax Cutting,  Re-dress and test Sand and Pump Type Bailers.  Assistance for coiled tubing operations (Set Isolation Sleeves).  Assistancefor Electric Line operations, watching control panel (TRSV)  Drift. Sizes: 2.7/8, 3.5¨, 4.5 Tubings,  RIH 42BO shifting tool, (selective and non-selective)  RIH Selective and non-Selective Test tool with SSJ running tool  RIH Otis type A Perforator,  School training for setting F Slips Tubing Stop,  Supervise new Slick line workers  RIH Plugs: FWG/B, RZG/B. Standing valves (FB2, RB2).  Train local New Operators Assistant.  RIH Sand Bailer, Hydrostatic Bailer and Pump Bailers.  RIH RB & SB and GS, GR Series Pulling tools  Worked with (0.092 and 0.108) of Slickline sizes  Set and pull Gas lift change out  School training for opened & closed SSD  Re-dress and test RB & SB and GS, GR Series Pulling tools.  Order and maintain spare parts of equipment in shop.
  • 3. MAR 2012 – JUN 2012 HALLIBURTON CONGO, PNGF NORD YANGA-SENDJI OFFSHORE FIELD, MAMOLA SERENITY U122 WORK OVER UNIT & BASE DRILL RIG ALPHA, COMPLETION JOB: TOTAL E&P CONGO Worked as: Slick line Supervisor Trainee under assistance  RIH Gauge Cutters :Tubing drift  Assistance for coiled tubing operations watching control panel(TRSV)  Drift. Completion equipment before to run  RIH Otis type A Perforator,  RIH Gyro Data and Drop Bare,  School training for setting Tubing Stop,  Supervise new Slick line workers  Assist RIH Plugs: FWG/B, RZG/B. Standing valves (FB2, RB2).  Train local New Operators Assistant.  RIH RB & SB and GS, GR Series Pulling tools  Worked with (0.092 , 0.108 ) of Slickline sizes  Assist set and pull Gas lift valve change out  Re-dress and test RB & SB and GS, GR Series Pulling tools.  RIH Gas lift: BK1, Dummy with OK5and Marla KOT.  Order and maintain spare parts of equipment in shop. FEV 2010 – MAR 2012 HALLIBURTON CONGO, NKOSSA OFFSHORE FIELD, PRODUCTION JOB: TOTAL E&P CONGO Worked as: Operator Slick line  Assist RIH Storm Chokes / Ambient valves  Re-dress and test X and R Line equipment (X and R Plugs, X Selective Running Tool, Test tool, 142BO Positioning tool.)  Assist RIH RXN, X and R Running tool to set PXX, PXN, PRR and PRN  Assist RIH XR Pump through plug  Assist RIH Gas lift with RK latch with OM and Marla KOT TP.  Assist RIH RXN, R Running tool to set RPT plugs High pressure and H2S and deviated wells.  Assist RIH Gas lift 1”1/2 with KOT Merla TP  Assist RIH Memory Gauges (MPLT) record Pressure and temperature  Re-dress and test Spring Jar 1.7/8” ,  Re-dress and test Roller Boogies  Re-dress and test JDC 1”5/8 pulling tool  Assist RIH Gauge Cutters :Tubing drift  Re-dress and test Sand and Pump Type Bailers.  Assistance for coiled tubing operations (Assist Set Isolation Sleeves).  Assistance for Electric Line operations, watching control panel (TRSV)  Drift. Sizes: 4.5” Tubings ,  Assist RIH RPT plugs High pressure and H2S wells  Assist RIH 42BO shifting tool, (selective and non-selective)  Assist RIH Selective Test tool  Assist RIH Otis type A Perforator  Assist RIH Sand Bailer, Hydrostatic Bailer and Pump Bailers.
  • 4.  Assist RIH RB & SB and GS, GR Series Pulling tools  Worked with (0.125) of Slickline sizes  Assist Set and pull Gas lift change out  Assist Opened & closed a Shifting sleeve of TRSV.  Re-dress and test RB & SB and GS, GR Series Pulling tools.  Maintain spare parts of equipment in shop. JUN 2009 – FEV 2010 HALLIBURTON CONGO, MOHO BILONDO OFFSHORE FIELD, GSF 135 DRILL RIG, COMPLETION JOB: TOTAL E&P CONGO Worked as: Operator Slick line  Assist RIH Gas lift 11/2” with KOT OM and Merla TP  Redress and test Compact tool string 3”750  Re-dress and test Spring Jar 1.7/8”,  Re-dress and test JDC pulling tool  Assist RIH Gauge Cutters :Tubing drift  Drift. Sizes: 4.5 Tubings ,  Assist RIH RPT plugs High pressure and H2S wells  Assist RIH MCX Water Injection Down Hole valve  Assist RIH Overshot tool to pull a piece of Coil tubing  Assist RIH PCE Plug  Assist RIH RB & SB and GS, GR Series Pulling tools  Worked with (0.125 SS) of Slickline sizes  Assist RIH Gas lift change out  Re-dress and test RB & SB and GS, GR Series Pulling tools.  Assist RIH Gauge Cutters :Tubing drift  Drift. Completion equipment at surface before to run  Assist RIH RB & SB and GS, GR Series Pulling tools  Worked with (0.125 SS) of Slickline sizes  Assist set and pull Gas lift valve change out  Re-dress and test RB & SB and GS, GR Series Pulling tools.  Assist RIH Gas lift: RK1 RT with OM and Marla KOT TP.  Order and maintain spare parts of equipment in shop. JAN 2009 – JUN 2009 HALLIBURTON CONGO, NKOSSA OFFSHORE FIELD, WEST MENANG DRILL RIG, COMPLETION JOB: TOTAL E&P CONGO Worked as: Slickline Assistant Operator  Re-dress and test Spring Jar 1.7/8” ,  Re-dress and test Roller Boogies  Re-dress and test JDC pulling tool  Assistance for Electric Line operations, watching control panel (TRSV and SSV)  Assist a Fishing job ( wire + tools string + RPT plug)  Re-dress and test RB & SB and GS, GR Series Pulling tools.  Re-dress and test RB & SB and GS, GR Series Pulling tools.  Order and maintain spare parts of equipment in shop. JUN 2008 – JAN 2009 HALLIBURTON CONGO, PNGF SUD TCHIBOUELA OFFSHORE FIELD, PRODUCTION JOB: TOTAL E&P CONGO Worked as: Slick line Assistant Operator
  • 5.  Re-dress and test Spring Jar 1.1/2” and 1.7/8”,  Re-dress and test Roller Boogies  Re-dress and test JDC pulling tool  Re-dress and test FB2, RB2, FWG/B, RZG/B plugs.  Re-dress and test Sand and Pump Type Bailers.  Assistance for coiled tubing operations (Set Isolation Sleeves).  Assistancefor Electric Line operations, watching control panel (TRSV)  Re-dress and test RB & SB and GS, GR Series Pulling tools.  Order and maintain spare parts of equipment in shop. Education and Professional Development 2000: GCSE’S under C grade (D-G) (Congo) 2003: French high-school diploma in Mechanical Design (Congo) 2007: Mechanical Design Superior Technician Diploma from INSFP Es-senia (Algerian National Professional Institute) 2008: Work at S.N. Plasco (Eau MAYO) mineral water Company as Maintenance Technician for 04 months (from 1rst February to 31rst May) 2008: From 1rst June Current HALLIBURTON SLICKLINE 2012: 06 months of training in USA SLAL OA, SO & Slickline I 2013: 10 days of training in CONGO DPU PES HE3 2013: 15 days of training in SCOTLAND (UK) Slickline II 2014: IWCF Level 2, Pointe-Noire, CONGO BRAZZAVILLE March the 1st 2016: IWCF Level 4, Pointe-Noire, CONGO BRAZZAVILLE February the 26th Competence  Basic Fire Fighting, and professional behavior in Oil field Installation (BOSIET Training)  HUET (Helicopter UnderWater Egress Techniques)  H2S awareness  Offshore survival  Work Permit check training  Experience on Offshore & Onshore operations  simultaneous operations experience  Discussed with the customer on field ,planed the job and sent job report  Prepare working permit and check certificates of all equipment to be on date  Check tools before running, equipment inventory and do equipment transfer  Participate on safety stop card program  Slickline operations in 3 ½’’ Completions  French written, read and spoken fluently  English school level