SlideShare a Scribd company logo
1 of 6
Resume Prepared by
Tim H. Stenger
Summary of Experience:
Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part
replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves.
Assisted in removal, disassembly, repair, test, and reinstallation of safety relief/relief valves. Able to follow and
apply routine commands in use and maintenance of heavy equipment vehicles. Performed numerous repairs
according to directives on heavy equipment vehicle engines, drive shafts, transmissions and brake systems.
Practical ability in the use and upkeep of various maintenance vehicles, including an ability to repair vehicle
hydraulic lines, air tanks, and leaks. Evaluated and constructed portable bridges. Followed procedural orders to
perform mine/explosive device sweeps including removal of such devices. Proven supervisory experience
throughout different occupations, including US Army Reserves, health care, and administration. Knowledgeable
of Quality Assurance practices and guidelines, especially pertaining to hospital insurance needs. Experienced in
problem solving in various trades. Accomplished ability to train across multiple skill levels in numerous fields.
Proficient in office disciplines including but not limited to MS Office, payroll, and scheduling. Showed
willingness to adapt to various shifts. Proven ability to work with minimal supervision, including fire watch
experience. Skilled in practical use of power and hand tools, including automotive tools regarding small engine
repair.
Education & Certifications:
University of Cincinnati-Claremont 1989
Computer Certified
Morehead State University 1988
Math and Computer Certified
Tarleton State University 1986-1988
Undergraduate Studies, Math Major
Georgetown High School 1982-1986
College Prep General Studies
Relevant Work History:
Surry nuclear Power Station 10/15-11/15
AOV Technician /Valve Technician
Disassembled, inspected, repaired/overhauled and reassembled the following type AOV,s: Fisher, Masoneilan,
Copes and Bettis and internal valve components
Stenger Page | 1
Resume Prepared by
Millstone Nuclear Station
AOV Technician/ Valve Technician 09/18-10/15
Disassembled, inspected, repaired/overhauled and reassembled the following type AOV’s: Fisher, Masoneilan,
Copes and Bettis and internal valve components; Performed numerous valve disassemblies, inspections, blue
checks, critical measurements, and part replacements for multiple valve types including but not limited to gate,
globe, check, butterfly, and ball valves
Surry Nuclear Power Station 04/15-05/15
AOV Technician
Disassembled, inspected, repaired/overhauled and reassembled the following type AOV,s: Fisher, Masoneilan,
Copes and Bettis and internal valve components.
North Anna Nuclear Power Station 02/15-03/15
AOV Technician
Disassembled, inspected, repaired/overhauled and reassembled the following type AOV,s: Fisher, Masoneilan,
Copes and Bettis and internal valve components.
Millstone Nuclear Station 09/14-11/14
AOV Technician/ Valve Technician
Disassembled, inspected, repaired/overhauled and reassembled the following type AOV’s: Fisher, Masoneilan,
Copes and Bettis and internal valve components; Performed numerous valve disassemblies, inspections, blue
checks, critical measurements, and part replacements for multiple valve types including but not limited to gate,
globe, check, butterfly, and ball valves
Millstone Nuclear Station 04/14-05/14
AOV Technician/ Valve Technician
Disassembled, inspected, repaired/overhauled and reassembled the following type AOV’s: Fisher, Masoneilan,
Copes and Bettis and internal valve components; Performed numerous valve disassemblies, inspections, blue
checks, critical measurements, and part replacements for multiple valve types including but not limited to gate,
globe, check, butterfly, and ball valves
Fermi 01/14-03/14
AOV Technician
Disassembled, inspected, repaired/overhauled and reassembled the following type AOV,s: Fisher, Masoneilan,
Copes and Bettis and internal valve components.
Sharon Harris 10/13-12/13
Valve Technician
Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part
replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves.
Stenger Page | 2
Resume Prepared by
H.B. Robinson 08/13-10/13
Valve Technician
Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part
replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves.
Millstone Nuclear Station 03/13-05/13
AOV Technician/ Valve Technician
Disassembled, inspected, repaired/overhauled and reassembled the following type AOV’s: Fisher, Masoneilan,
Copes and Bettis and internal valve components; Performed numerous valve disassemblies, inspections, blue
checks, critical measurements, and part replacements for multiple valve types including but not limited to gate,
globe, check, butterfly, and ball valves
Turkey Point Nuclear Plant 11/12-3/13
AOV Technician/ Valve Technician
Disassembled, inspected, repaired/overhauled and reassembled the following type AOV’s: Fisher, Masoneilan,
Copes and Bettis and internal valve components; Performed numerous valve disassemblies, inspections, blue
checks, critical measurements, and part replacements for multiple valve types including but not limited to gate,
globe, check, butterfly, and ball valves
Millstone Nuclear Station 10/12-11/12
AOV Technician/ Valve Technician
Disassembled, inspected, repaired/overhauled and reassembled the following type AOV’s: Fisher, Masoneilan,
Copes and Bettis and internal valve components; Performed numerous valve disassemblies, inspections, blue
checks, critical measurements, and part replacements for multiple valve types including but not limited to gate,
globe, check, butterfly, and ball valves
Turkey Point Nuclear Plant 02/12-10/12
AOV Technician/ Valve Technician
Disassembled, inspected, repaired/overhauled and reassembled the following type AOV’s: Fisher, Masoneilan,
Copes and Bettis and internal valve components; Performed numerous valve disassemblies, inspections, blue
checks, critical measurements, and part replacements for multiple valve types including but not limited to gate,
globe, check, butterfly, and ball valves
Millstone Nuclear Station 08/11-11/11
AOV Technician
Disassembled, inspected, repaired/overhauled and reassembled the following type AOV,s: Fisher, Masoneilan,
Copes and Bettis and internal valve components.
Millstone Nuclear Station 06/11-06/11
Valve Technician
Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part
replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves.
Millstone Nuclear Station 03/11-05/11
Stenger Page | 3
Resume Prepared by
AOV Technician
Disassembled, inspected, repaired/overhauled and reassembled the following type AOV,s: Fisher, Masoneilan,
Copes and Bettis and internal valve components.
Point Beach Nuclear Station 02/11-03/11
Valve Technician
Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part
replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves.
Turkey Point Nuclear Plant 09/10-10/10
Valve Technician - Junior
Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part
replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves.
Millstone Nuclear Station 03/10-05/10
Valve Technician
Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part
replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves.
Received the Connecticut VT-2 certification.
Millstone Nuclear Station 09/09-11/09
Valve Technician - Junior
Assisted with numerous valve disassemblies, inspections, blue checks, critical measurements, and part
replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves.
Rent-to-Own 06/07-03/09
Account Manager
Rumpke 04/06-06/07
Driver
Brown County Counseling 09/05-12/05
Account Specialist
Mercy Health Partners 01/04-09/05
HealthCare Manager
Anderson Mercy Hospital 07/02-01/04
Registrar
Mercy Health Partners-Blue Ash 06/01-07/02
QA Agent
State of Ohio 02/93-04/01
Therapy Program Worker
Stenger Page | 4
Resume Prepared by
United States Army Reserve 08/92-02/99
Combat Engineer Specialist, E-4
Stenger Page | 5
Resume Prepared by
United States Army Reserve 08/92-02/99
Combat Engineer Specialist, E-4
Stenger Page | 5

More Related Content

What's hot

APLNG OVERVIEW rev 2
APLNG OVERVIEW rev 2APLNG OVERVIEW rev 2
APLNG OVERVIEW rev 2Bart Cummings
 
CV Siam Update 31-10-2016
CV  Siam Update 31-10-2016CV  Siam Update 31-10-2016
CV Siam Update 31-10-2016siam sayed
 
My Updated CV Aug 2016
My Updated CV Aug 2016My Updated CV Aug 2016
My Updated CV Aug 2016David Scott
 
Testing for design validation & structural health monitoring for offshore str...
Testing for design validation & structural health monitoring for offshore str...Testing for design validation & structural health monitoring for offshore str...
Testing for design validation & structural health monitoring for offshore str...Pieter Jan Jordaens
 
Routine Underwater Pipeline Inspection Services
Routine Underwater Pipeline Inspection ServicesRoutine Underwater Pipeline Inspection Services
Routine Underwater Pipeline Inspection ServicesCSUGulfCoast
 
Intervention Engineering IWS Methodology
Intervention Engineering IWS MethodologyIntervention Engineering IWS Methodology
Intervention Engineering IWS MethodologySarolta Pudney
 
Post tensioned-bridges-diagnosing-remediating-corrosive-conditions
Post tensioned-bridges-diagnosing-remediating-corrosive-conditionsPost tensioned-bridges-diagnosing-remediating-corrosive-conditions
Post tensioned-bridges-diagnosing-remediating-corrosive-conditionsstevendsanders
 
CV E. Viner Updated
CV E. Viner UpdatedCV E. Viner Updated
CV E. Viner UpdatedEric Viner
 

What's hot (10)

APLNG OVERVIEW rev 2
APLNG OVERVIEW rev 2APLNG OVERVIEW rev 2
APLNG OVERVIEW rev 2
 
Resume 2014
Resume 2014Resume 2014
Resume 2014
 
CV Siam Update 31-10-2016
CV  Siam Update 31-10-2016CV  Siam Update 31-10-2016
CV Siam Update 31-10-2016
 
My Updated CV Aug 2016
My Updated CV Aug 2016My Updated CV Aug 2016
My Updated CV Aug 2016
 
Testing for design validation & structural health monitoring for offshore str...
Testing for design validation & structural health monitoring for offshore str...Testing for design validation & structural health monitoring for offshore str...
Testing for design validation & structural health monitoring for offshore str...
 
Routine Underwater Pipeline Inspection Services
Routine Underwater Pipeline Inspection ServicesRoutine Underwater Pipeline Inspection Services
Routine Underwater Pipeline Inspection Services
 
Intervention Engineering IWS Methodology
Intervention Engineering IWS MethodologyIntervention Engineering IWS Methodology
Intervention Engineering IWS Methodology
 
Post tensioned-bridges-diagnosing-remediating-corrosive-conditions
Post tensioned-bridges-diagnosing-remediating-corrosive-conditionsPost tensioned-bridges-diagnosing-remediating-corrosive-conditions
Post tensioned-bridges-diagnosing-remediating-corrosive-conditions
 
CV E. Viner Updated
CV E. Viner UpdatedCV E. Viner Updated
CV E. Viner Updated
 
Engineering & Design - January
Engineering & Design - JanuaryEngineering & Design - January
Engineering & Design - January
 

Similar to tims resume spring 2015 new

Jeremy L Hardin Updated Resume11-04-16
Jeremy L Hardin Updated Resume11-04-16Jeremy L Hardin Updated Resume11-04-16
Jeremy L Hardin Updated Resume11-04-16Jeremy Hardin
 
Industrial Check Valves, EPIC Series
Industrial Check Valves, EPIC SeriesIndustrial Check Valves, EPIC Series
Industrial Check Valves, EPIC SeriesCTi Controltech
 
CV (Phillip A Evans)
CV (Phillip A Evans)CV (Phillip A Evans)
CV (Phillip A Evans)Phillip Evans
 
Rob Gibb - updated CV
Rob Gibb - updated CVRob Gibb - updated CV
Rob Gibb - updated CVRobert Gibb
 
MARTIN_BOGUE_CURRENT_CV_2
MARTIN_BOGUE_CURRENT_CV_2MARTIN_BOGUE_CURRENT_CV_2
MARTIN_BOGUE_CURRENT_CV_2martin bogue
 
Sealweld commissioning enhancement
Sealweld commissioning enhancementSealweld commissioning enhancement
Sealweld commissioning enhancementkokan007
 
TonyPerez CWI Resume
TonyPerez CWI ResumeTonyPerez CWI Resume
TonyPerez CWI ResumeTony Perez
 
CV 20 -2-15 Offshore Mech Tech
CV 20 -2-15 Offshore Mech TechCV 20 -2-15 Offshore Mech Tech
CV 20 -2-15 Offshore Mech TechDanny Neville
 
Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2 Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2 dieselpub
 
Eric Eckles resume
Eric Eckles resumeEric Eckles resume
Eric Eckles resumeEric Eckles
 
CV - Bill Robb 2014
CV - Bill Robb 2014CV - Bill Robb 2014
CV - Bill Robb 2014William Robb
 

Similar to tims resume spring 2015 new (20)

Jeremy L Hardin Updated Resume11-04-16
Jeremy L Hardin Updated Resume11-04-16Jeremy L Hardin Updated Resume11-04-16
Jeremy L Hardin Updated Resume11-04-16
 
Field Services Webinar
Field Services WebinarField Services Webinar
Field Services Webinar
 
Field Services: Installation & Maintenance
Field Services: Installation & MaintenanceField Services: Installation & Maintenance
Field Services: Installation & Maintenance
 
Industrial Check Valves, EPIC Series
Industrial Check Valves, EPIC SeriesIndustrial Check Valves, EPIC Series
Industrial Check Valves, EPIC Series
 
CV (Phillip A Evans)
CV (Phillip A Evans)CV (Phillip A Evans)
CV (Phillip A Evans)
 
Rob Gibb - updated CV
Rob Gibb - updated CVRob Gibb - updated CV
Rob Gibb - updated CV
 
MARTIN_BOGUE_CURRENT_CV_2
MARTIN_BOGUE_CURRENT_CV_2MARTIN_BOGUE_CURRENT_CV_2
MARTIN_BOGUE_CURRENT_CV_2
 
DNV Survey Report_Wawasan Murni_POSPONEMENT OF RCH, BOTTOM & STATUTORY SURVEYS
DNV Survey Report_Wawasan Murni_POSPONEMENT OF RCH,  BOTTOM & STATUTORY SURVEYSDNV Survey Report_Wawasan Murni_POSPONEMENT OF RCH,  BOTTOM & STATUTORY SURVEYS
DNV Survey Report_Wawasan Murni_POSPONEMENT OF RCH, BOTTOM & STATUTORY SURVEYS
 
Sealweld commissioning enhancement
Sealweld commissioning enhancementSealweld commissioning enhancement
Sealweld commissioning enhancement
 
TonyPerez CWI Resume
TonyPerez CWI ResumeTonyPerez CWI Resume
TonyPerez CWI Resume
 
CV 20 -2-15 Offshore Mech Tech
CV 20 -2-15 Offshore Mech TechCV 20 -2-15 Offshore Mech Tech
CV 20 -2-15 Offshore Mech Tech
 
Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2 Root Cause Of Piping Failures | COMPRESSORtech2
Root Cause Of Piping Failures | COMPRESSORtech2
 
API 653 TANK INSPECTION.pdf
API 653 TANK INSPECTION.pdfAPI 653 TANK INSPECTION.pdf
API 653 TANK INSPECTION.pdf
 
new_cv-2016
new_cv-2016new_cv-2016
new_cv-2016
 
Asirvatharavi Mech
Asirvatharavi MechAsirvatharavi Mech
Asirvatharavi Mech
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
Eric Eckles resume
Eric Eckles resumeEric Eckles resume
Eric Eckles resume
 
CV - Bill Robb 2014
CV - Bill Robb 2014CV - Bill Robb 2014
CV - Bill Robb 2014
 
new cv
new cvnew cv
new cv
 
CVbillyno3-
CVbillyno3-CVbillyno3-
CVbillyno3-
 

tims resume spring 2015 new

  • 1. Resume Prepared by Tim H. Stenger Summary of Experience: Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves. Assisted in removal, disassembly, repair, test, and reinstallation of safety relief/relief valves. Able to follow and apply routine commands in use and maintenance of heavy equipment vehicles. Performed numerous repairs according to directives on heavy equipment vehicle engines, drive shafts, transmissions and brake systems. Practical ability in the use and upkeep of various maintenance vehicles, including an ability to repair vehicle hydraulic lines, air tanks, and leaks. Evaluated and constructed portable bridges. Followed procedural orders to perform mine/explosive device sweeps including removal of such devices. Proven supervisory experience throughout different occupations, including US Army Reserves, health care, and administration. Knowledgeable of Quality Assurance practices and guidelines, especially pertaining to hospital insurance needs. Experienced in problem solving in various trades. Accomplished ability to train across multiple skill levels in numerous fields. Proficient in office disciplines including but not limited to MS Office, payroll, and scheduling. Showed willingness to adapt to various shifts. Proven ability to work with minimal supervision, including fire watch experience. Skilled in practical use of power and hand tools, including automotive tools regarding small engine repair. Education & Certifications: University of Cincinnati-Claremont 1989 Computer Certified Morehead State University 1988 Math and Computer Certified Tarleton State University 1986-1988 Undergraduate Studies, Math Major Georgetown High School 1982-1986 College Prep General Studies Relevant Work History: Surry nuclear Power Station 10/15-11/15 AOV Technician /Valve Technician Disassembled, inspected, repaired/overhauled and reassembled the following type AOV,s: Fisher, Masoneilan, Copes and Bettis and internal valve components Stenger Page | 1
  • 2. Resume Prepared by Millstone Nuclear Station AOV Technician/ Valve Technician 09/18-10/15 Disassembled, inspected, repaired/overhauled and reassembled the following type AOV’s: Fisher, Masoneilan, Copes and Bettis and internal valve components; Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves Surry Nuclear Power Station 04/15-05/15 AOV Technician Disassembled, inspected, repaired/overhauled and reassembled the following type AOV,s: Fisher, Masoneilan, Copes and Bettis and internal valve components. North Anna Nuclear Power Station 02/15-03/15 AOV Technician Disassembled, inspected, repaired/overhauled and reassembled the following type AOV,s: Fisher, Masoneilan, Copes and Bettis and internal valve components. Millstone Nuclear Station 09/14-11/14 AOV Technician/ Valve Technician Disassembled, inspected, repaired/overhauled and reassembled the following type AOV’s: Fisher, Masoneilan, Copes and Bettis and internal valve components; Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves Millstone Nuclear Station 04/14-05/14 AOV Technician/ Valve Technician Disassembled, inspected, repaired/overhauled and reassembled the following type AOV’s: Fisher, Masoneilan, Copes and Bettis and internal valve components; Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves Fermi 01/14-03/14 AOV Technician Disassembled, inspected, repaired/overhauled and reassembled the following type AOV,s: Fisher, Masoneilan, Copes and Bettis and internal valve components. Sharon Harris 10/13-12/13 Valve Technician Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves. Stenger Page | 2
  • 3. Resume Prepared by H.B. Robinson 08/13-10/13 Valve Technician Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves. Millstone Nuclear Station 03/13-05/13 AOV Technician/ Valve Technician Disassembled, inspected, repaired/overhauled and reassembled the following type AOV’s: Fisher, Masoneilan, Copes and Bettis and internal valve components; Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves Turkey Point Nuclear Plant 11/12-3/13 AOV Technician/ Valve Technician Disassembled, inspected, repaired/overhauled and reassembled the following type AOV’s: Fisher, Masoneilan, Copes and Bettis and internal valve components; Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves Millstone Nuclear Station 10/12-11/12 AOV Technician/ Valve Technician Disassembled, inspected, repaired/overhauled and reassembled the following type AOV’s: Fisher, Masoneilan, Copes and Bettis and internal valve components; Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves Turkey Point Nuclear Plant 02/12-10/12 AOV Technician/ Valve Technician Disassembled, inspected, repaired/overhauled and reassembled the following type AOV’s: Fisher, Masoneilan, Copes and Bettis and internal valve components; Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves Millstone Nuclear Station 08/11-11/11 AOV Technician Disassembled, inspected, repaired/overhauled and reassembled the following type AOV,s: Fisher, Masoneilan, Copes and Bettis and internal valve components. Millstone Nuclear Station 06/11-06/11 Valve Technician Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves. Millstone Nuclear Station 03/11-05/11 Stenger Page | 3
  • 4. Resume Prepared by AOV Technician Disassembled, inspected, repaired/overhauled and reassembled the following type AOV,s: Fisher, Masoneilan, Copes and Bettis and internal valve components. Point Beach Nuclear Station 02/11-03/11 Valve Technician Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves. Turkey Point Nuclear Plant 09/10-10/10 Valve Technician - Junior Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves. Millstone Nuclear Station 03/10-05/10 Valve Technician Performed numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves. Received the Connecticut VT-2 certification. Millstone Nuclear Station 09/09-11/09 Valve Technician - Junior Assisted with numerous valve disassemblies, inspections, blue checks, critical measurements, and part replacements for multiple valve types including but not limited to gate, globe, check, butterfly, and ball valves. Rent-to-Own 06/07-03/09 Account Manager Rumpke 04/06-06/07 Driver Brown County Counseling 09/05-12/05 Account Specialist Mercy Health Partners 01/04-09/05 HealthCare Manager Anderson Mercy Hospital 07/02-01/04 Registrar Mercy Health Partners-Blue Ash 06/01-07/02 QA Agent State of Ohio 02/93-04/01 Therapy Program Worker Stenger Page | 4
  • 5. Resume Prepared by United States Army Reserve 08/92-02/99 Combat Engineer Specialist, E-4 Stenger Page | 5
  • 6. Resume Prepared by United States Army Reserve 08/92-02/99 Combat Engineer Specialist, E-4 Stenger Page | 5