SlideShare a Scribd company logo
1 of 5
Curriculum Vitae
Henry (Hank) Talamantes
Disciplines
 Tender
 Offshore Surface Mixed Gas Diver and Supervisor
 Bell Diver
 LST/LSS
 Bell Supervisor
 Dive Superintendent
 Offshore Construction Mgr.
Personal Details
Tele No. 702-218-1652
Email htalamantes@msn.com
Nationality United States of America
Passport No. USA - Current
Seaman’s Book SRB237284-00
Number of Supervised Bell Dives 3000
Number of Supervised LST/LSS 1080
Number of Supervised Surface Dives 3000
Number of Saturation Days 380
Number of Surface Gas Dives 300
Number of Surface Air Dives 360
Education, Training & Certifications
 Divers Institute Of Technology, Seattle WA. 1989
 Canadian Standards Assoc. Air Diving Supervisor Cert No. Z275.4 & Z275.5
 IMCA Saturation Trainee Bell Diving Supervisor Cert No. CD -06-12T
 IMCA Saturation Assistant Life Support Tech. Cert No. CD-06-3A
 Oxygen First Aid And Basic Plus First Aid Exp. 06/27/16
 Falck Alford Opito Including Huet & EBS Cert No. 5858
 TWIC Exp. 08/26/16
 Mobil Equatorial Guinea Inc Sea Survival –Huet Fire Fighting Cert No. 0413371 Exp. 06/16
 ISN Cert No. 0237370
 Class A-Rigger Training API RP2D Exp. 09/19/17
 Water Survival, HUET, METS, Swing Rope Exp. 11/19/16
 Safegulf PEC1013305 No Expiration
 IMCA Air/Bell Diving Supervisor/ALST Taken
 IIF Supervisor Skills Taken
 Cal Dive International Supervisor Training Taken
 Qualification of Pipeline Personnel 49 CFR Part 192, Subpart N
 Safety Management Systems H2S Awareness
 Falk Rigger Safety API 2D 6th edition APIU approved Exp. 04/09/19
 Falk Fall User/Rescue Exp. N/A
 Brain Storm Training. Personal & Professional Growth
 PSI “Personal Success & Personal Development Strategy”
Copiesof Certificationsare available uponrequest.
Curriculum Vitae
Henry (Hank) Talamantes
Work Overview
Harkand Group Jul. – Sept. 2015
Air/Saturation Supervisor Supervised air and sat dives for riser clamp/riser installation @ Ayatsil A
Swiber Quetzal, 8 riser clamps from 120 msw to 5 msw. Pressure test 16” p/l w/ Enermec
Bay of Campeche equip. @ 110 msw. Install valve guard and concrete matts. Push pigs
Ayatsil Field from Lay down to platform. Sweep 8” pipeline.
Dives, Air - 20 hours.Bell Lock out – 135 hours.
Harkand Group Jun – Jul 2015
Offshore Mgr. Overall Supervision of Surface dive spread onboard Sapura Kencana
Sapura Kencana 3500. in the Bay of Campeche Mexico. 24”, and 36” pipelay in
3500 pipelay Tsmin and Xanub field. Stinger checks, submar matts and burning of
Tsimin/Xanub fields sacrificial laydown cables.
Total air dives,28. Depths 10/30 msw.
Harkand Group Apr – Jun 2015
Air/Saturation Supervisor Supervised Logistic, mobilization of air and saturation package for
Swiber Quetzal, diving operations in Bay of Campeche Mexico. Supervised air/sat
Bay of Campeche dives from 5 meters to 120 meters water depth. Prep, install 8”/16” riser
Ayatsil Field clamps. Utilizing burning, grinding and buffing. Total number of air/ sat
Dives, Air- 37.92 hours.Bell Lock out – 58.5 hours.
Legacy Offshore, LLC Feb – Mar 2015
Air/Saturation Supervisor Supervised air/bell dives for U-WILD inspection involving grit blasting
TLP/SPAR Bennu Titan water blasting on upper / lower columns, fairleads and pontoons for
MississippiCanyon 941 thickness gauge readings using Cygnus digital gauge. Final ABS insp.
Total number of air/bell dives Air – 120 min. Bell lock out 80 hours
Cal Dive International, GOM May – June 2014
Air/Saturation Supervisor Supervised air/bell dives to inspect p/l, crossings,spoolpiece,
Offshore Construction Mgr. riser clamps installations. Assist in demobilizing platforms of equip.
DSV Texas, Bay Of Campeche Temporarily assigned as Offshore Construction Mgr. Overall
Supervision of 220’ spoolpiece installation at Abkatun – A.
Total number of diver lock out,90 hours.
Cal Dive International, GOM
Air/Saturation Supervisor
DSV Texas, Bay Of Campeche
Apr – May 2014
Supervised bell dives to install 5 x 20” spoolpieces ranging from 160
feet to 220 feet in length for client Pemex in Ayatsil field line 4 at
depths ranging from 112 meters to 127 meters. Utilizing jetting,
impacting, fugro survey to profile spools,crane to sweep spools,
tuggers,misalignment ball flange. Profile line 7 ditch checks after
dredging w/ Reef T- 8000 Rotech tool. Total number of diver lock out
hours,120.
Cal Dive International, GOM
Air/Saturation Supervisor
DSV Texas, Bay Of Campeche
Feb – Mar 2014
Supervising surface dive x 2 to burn old riser guard bolts and remove
old riser guard and install new. 13 meters. 180 min.
Supervising bell dives from 43 meters to 129 meters. Jetting, for submar
matts installation, Installing 8 lift bags to sweep 20” p/l. Rigging 4” bull
hose for pushing pigs. Install submar matts and 3n1 bags to support p/l
and side taps. Total Number of 10 hour bell runs = 15
Curriculum Vitae
Henry (Hank) Talamantes
Cal Dive International , GOM
Air/Saturation Supervisor
DSV Texas, Bay Of Campeche
Nov – Dec 2013
Supervising surface dives x 10 cleaning platform leg for leg clamp
installation from depths 3 meters to 15 meters at Platform Taratunich
201. Total number of dives = 10 at 2000 min.
Supervising bell dives from 30 meters to 120 meters. P/L inspection,
submar matt installation, 3n1 to support p/l crossings and side taps.
Total Number of 10 hour bell runs = 28
Cal Dive International , GOM
Air/Saturation Supervisor
DSV Texas, Bay Of Campeche
18th Oct. – 24th Oct. 2013
Supervising surface dives x 2 cleaning platform leg for riser clamp
installation from depths of 5 meters to 10 meters at Taratunich TF.
Total number of surface dives = x 2 at 180 min.
Supervising bell dives from 54 meters to 80 meters Installing matts and
riser clamps
Cal Dive International , GOM
Air/Saturation Supervisor
DSV Texas, Bay Of Campeche
1st Sept. – 16th Sept. 2013
Supervising surface dives x 2 cleaning platform leg for riser clamp
installation from depths of5 meters to 10 meters at Taratunich TF.
Total number of surface dives = x 2 at 82 min.
Supervising bell dives from 45 meters to 65 meters. Installing submar
matts at multiple locations for bridging of 8” & 20” p/l.
Total Number of 10 hourbell runs = 6.6
Cal Dive International , GOM
Air/Saturation Supervisor
DSV Texas, Bay Of Campeche
25th Aug – 31st Aug 2013
Supervising bell dives from 45 meters to 65 meters. Installing submar
matts at multiple locations for bridging of 8” & 20” p/l, DMA, and lay
down head support.
Total Number of 10 hourbell runs = 6.6
Cal Dive International, PTE
Ravenna Italy
Dive Supervisor/Coordinator
Stat Marine/SBM Equatorial
Guinea
Dive Supt./Client Rep
FPSO SERPENTINA
Cal Dive International, PTE
Ravenna, Italy
Dive Supervisor/Coordinator
DSV/Barge Crawler
20th May. – 31st May. 2013
Completed inventory of S-4 air/sat equip. using Microsoft word, excel,
power point. Coordinate w/ local logistic company, trucking company,
port authorities, and local/federal customs agencies with loading
transport and offloading for transport back to Singapore. Procedural
writing of all necessary documents as per request.
10th Apr – 21st Apr 2013
Dive Supt. For Smit Diving South Africa. Client Rep. for SBM
Offshore. Malabo. Supervising and overseeing U-Wild 5 year hull
inspection onboard The FPSO Serpentina. Coordinating day light air
dives w/ Smit Diving Supervisor and Serpentina Ships Captain w/
compliance to ABS, IMCA and DNV inspection and recertification of
ships hull. Including NDT, video, visual inspection. Procedural writing
in compliance w/ SBM and Smit Diving South Africa JSA’s,
assessments and HSE reports.
16th Nov – 16th Dec 2012
Oversee demobilization, transporting,staging of S-4 air/sat equip.
Coordinating and supervising w/ local logistics/trucking companies
involving heavy lifting, transporting of equip. to Cal Dive PTE
office/yard in Ravenna. Writing documents/procedures forPort
authorities, local and federal customs agencies in night time transport of
S-4 equip. using Microsoft word, excel, and power point.
23rd Oct – 1st Nov 2012
Curriculum Vitae
Henry (Hank) Talamantes
Cal Dive International, PTE
Tuzla Turkey
Dive Supervisor/Coordinator
DSV/Barge Crawler
Cal Dive International, PTE
Novorossiysk Russia, Black Sea
Air/Sat Dive Supervisor
DSV/Barge Crawler
Cal Dive International, PTE
Chalkida Greece
Dive Supervisor/Coordinator
DSV/Barge Crawler
Legacy Offshore Inc.
Broussard LA.
Sat Dive Supervisor
DSV Adams Vision
Supervising demobilization of entire S-4 equip. from DSV Crawler onto
equip. barge for transport to Ravenna Italy. Coordinating heavy lifting
and staging of air/sat equip w/ deck foreman and crane operator.
1st Sept – 19th Oct 2012
Caspian Sea Consortium Pipeline Expansion Project. Laying 42”, 5 km
long pipeline for Single Point Mooring station.Hydro testing,Blind
flange removal / Receiving head installation for dewatering. Verify pig
reception and valve manipulation. Recover pig receiver with pigs.
Pipeline End Manifold (PLEM) installation. Six Suction AnchorPile
with chains and buoys installation. Spool Metrology from pipeline to
PLEM. Spool installation. SPM buoy installation. Subsea Hose
installation. Floating Hoses installation. Utilizing all tools and equip. are
as follows, 500 ton crane. Tuggers, Lift Bags, Jet Pump. S-4 air and sat
equip. Ceramic Leak Detector. Hydra Tight tensioning tool. Impact
tools. Video for final inspection.
Total Air dives – 12 at 10 meters =1800 min.
Total bell runs - 73.5 / 8 hour bell runs / 55 meters = 588 hours.
7th Jul – 21st Jul 2012
Supervising mobilization of entire S-4 equip. from Cargo ship sailing
from Singapore to the DSV Crawler. Coordinating w/ local agents,Port
Authorities, and federal Customs agencies w/ inventory and transport of
S-4 equip. Coordinating heavy lifting and staging of sat equip w/ deck
foreman and crane operator. Assist Dive Tech’s w/ installation of S-4
Sat System and equip. onboard Crawler.
Load testing and pressure test systemto 300 meters As per Cal Dive,
IMCA, DNV protocol.
1st Feb – 30th Mar 2011
Pipeline and platform abandonment for Client Anglo Suise. Supervising
sat dives utilizing 3-D mapping, site clearance, well kill, well and
platform removal. Utilizing tools are as follows, Fugro 3-D survey,
Diamond wire saws, Wach guillotine saws,Jet pumps, Down Hole
equip. Rotech dredging tool, Cement mixers, 100 ton heave
compensating crane.
Total Number of 10 hourbell runs = 56
Curriculum Vitae
Henry (Hank) Talamantes
References
Name Jim Robinson “Sr. Project Manager, Harkand Group”.
Address Houston Texas
Phone # 713-377-8028
Name Wayne Burridge “Dive Tech”
Address Crawley England, UK
Phone # +441295512592
Name John Prior “Dive Superintendent”
Address Alva Scotland UK
Phone # 00447584410907

More Related Content

What's hot

Preparation of the Cargo Plan
Preparation of the Cargo PlanPreparation of the Cargo Plan
Preparation of the Cargo PlanDivine Greatman
 
CV.James Swearengin.3-2015
CV.James Swearengin.3-2015CV.James Swearengin.3-2015
CV.James Swearengin.3-2015James Swearengin
 
Copy of Saudi resume-1
Copy of Saudi resume-1Copy of Saudi resume-1
Copy of Saudi resume-1Ron Murphy
 
SEAMANSHIP WEEKEND
SEAMANSHIP WEEKENDSEAMANSHIP WEEKEND
SEAMANSHIP WEEKENDJuan corradi
 
Quang CV - SEAMAP
Quang CV - SEAMAPQuang CV - SEAMAP
Quang CV - SEAMAPPham Quang
 
Ships Husbandry Mission Brief CONOP
Ships Husbandry Mission Brief CONOPShips Husbandry Mission Brief CONOP
Ships Husbandry Mission Brief CONOPAnthony Garcia
 
JKBernard_Resume_Dec16_doc
JKBernard_Resume_Dec16_docJKBernard_Resume_Dec16_doc
JKBernard_Resume_Dec16_docJohn Bernard
 
MARTIN JC - JD_FSV_OpsMan_signed
MARTIN JC - JD_FSV_OpsMan_signedMARTIN JC - JD_FSV_OpsMan_signed
MARTIN JC - JD_FSV_OpsMan_signedJean-Charles Martin
 
_OFFICIAL Safety Department PRESENTATION
_OFFICIAL Safety Department PRESENTATION_OFFICIAL Safety Department PRESENTATION
_OFFICIAL Safety Department PRESENTATIONKelly Weaver
 
updated youssef cv 8- 2016
updated  youssef cv 8- 2016updated  youssef cv 8- 2016
updated youssef cv 8- 2016Youssef Shalaby
 
Staff Call Slides 21 Feb 2012
Staff Call Slides 21 Feb 2012Staff Call Slides 21 Feb 2012
Staff Call Slides 21 Feb 2012GSU Army ROTC
 

What's hot (19)

Preparation of the Cargo Plan
Preparation of the Cargo PlanPreparation of the Cargo Plan
Preparation of the Cargo Plan
 
CV.James Swearengin.3-2015
CV.James Swearengin.3-2015CV.James Swearengin.3-2015
CV.James Swearengin.3-2015
 
Captain Robert Pearcey current
Captain Robert Pearcey currentCaptain Robert Pearcey current
Captain Robert Pearcey current
 
Copy of Saudi resume-1
Copy of Saudi resume-1Copy of Saudi resume-1
Copy of Saudi resume-1
 
edward jacob cv
edward jacob cvedward jacob cv
edward jacob cv
 
SEAMANSHIP WEEKEND
SEAMANSHIP WEEKENDSEAMANSHIP WEEKEND
SEAMANSHIP WEEKEND
 
Quang CV - SEAMAP
Quang CV - SEAMAPQuang CV - SEAMAP
Quang CV - SEAMAP
 
Ships Husbandry Mission Brief CONOP
Ships Husbandry Mission Brief CONOPShips Husbandry Mission Brief CONOP
Ships Husbandry Mission Brief CONOP
 
DMassey resume
DMassey resumeDMassey resume
DMassey resume
 
Bambi Bucket CONOP
Bambi Bucket CONOPBambi Bucket CONOP
Bambi Bucket CONOP
 
JKBernard_Resume_Dec16_doc
JKBernard_Resume_Dec16_docJKBernard_Resume_Dec16_doc
JKBernard_Resume_Dec16_doc
 
MARTIN JC - JD_FSV_OpsMan_signed
MARTIN JC - JD_FSV_OpsMan_signedMARTIN JC - JD_FSV_OpsMan_signed
MARTIN JC - JD_FSV_OpsMan_signed
 
Anthony Covelli's CV
Anthony Covelli's CVAnthony Covelli's CV
Anthony Covelli's CV
 
_OFFICIAL Safety Department PRESENTATION
_OFFICIAL Safety Department PRESENTATION_OFFICIAL Safety Department PRESENTATION
_OFFICIAL Safety Department PRESENTATION
 
updated youssef cv 8- 2016
updated  youssef cv 8- 2016updated  youssef cv 8- 2016
updated youssef cv 8- 2016
 
A.Bremner c.v
A.Bremner c.vA.Bremner c.v
A.Bremner c.v
 
Short Resume
Short Resume Short Resume
Short Resume
 
Aaron's Resume 2014 new
Aaron's Resume 2014 newAaron's Resume 2014 new
Aaron's Resume 2014 new
 
Staff Call Slides 21 Feb 2012
Staff Call Slides 21 Feb 2012Staff Call Slides 21 Feb 2012
Staff Call Slides 21 Feb 2012
 

Similar to Hanks 2015 CV-3 updated

OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014Dylan Olivier
 
my resume' jan. '16
my resume' jan. '16  my resume' jan. '16
my resume' jan. '16 audie samaroo
 
CV Siam Update 31-10-2016
CV  Siam Update 31-10-2016CV  Siam Update 31-10-2016
CV Siam Update 31-10-2016siam sayed
 
Tim Bailey CV updated July 2015
Tim Bailey CV updated July 2015Tim Bailey CV updated July 2015
Tim Bailey CV updated July 2015Tim Bailey
 
Mr. Scott Cheney Cyber Toolpusher-Cyber Driller-C.V.
Mr. Scott Cheney  Cyber Toolpusher-Cyber Driller-C.V.Mr. Scott Cheney  Cyber Toolpusher-Cyber Driller-C.V.
Mr. Scott Cheney Cyber Toolpusher-Cyber Driller-C.V.scott cheney
 
Lugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - CopyLugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - Copydarren williams
 
Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015Alistair Lamont
 
brian cv march 2014.
brian cv march 2014.brian cv march 2014.
brian cv march 2014.brian timpson
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie ResumeBert Savoie
 
Michael Doolan Resume July 2016
Michael Doolan Resume July 2016Michael Doolan Resume July 2016
Michael Doolan Resume July 2016Michael Doolan
 
M. Miller CV 12 winch rigger
M. Miller CV 12 winch riggerM. Miller CV 12 winch rigger
M. Miller CV 12 winch riggerMartin Miller
 

Similar to Hanks 2015 CV-3 updated (20)

CURRICULUM VITAE drilling
CURRICULUM   VITAE drillingCURRICULUM   VITAE drilling
CURRICULUM VITAE drilling
 
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
 
my resume' jan. '16
my resume' jan. '16  my resume' jan. '16
my resume' jan. '16
 
CV Siam Update 31-10-2016
CV  Siam Update 31-10-2016CV  Siam Update 31-10-2016
CV Siam Update 31-10-2016
 
F KRUGER diving cv
F KRUGER diving cvF KRUGER diving cv
F KRUGER diving cv
 
CV.William Miles Jr.07-2016
CV.William Miles Jr.07-2016CV.William Miles Jr.07-2016
CV.William Miles Jr.07-2016
 
Tim Bailey CV updated July 2015
Tim Bailey CV updated July 2015Tim Bailey CV updated July 2015
Tim Bailey CV updated July 2015
 
Mr. Scott Cheney Cyber Toolpusher-Cyber Driller-C.V.
Mr. Scott Cheney  Cyber Toolpusher-Cyber Driller-C.V.Mr. Scott Cheney  Cyber Toolpusher-Cyber Driller-C.V.
Mr. Scott Cheney Cyber Toolpusher-Cyber Driller-C.V.
 
Lugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - CopyLugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - Copy
 
Resume 08-13-2015s
Resume 08-13-2015sResume 08-13-2015s
Resume 08-13-2015s
 
CV operator Oil movement
CV operator Oil movementCV operator Oil movement
CV operator Oil movement
 
Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015
 
Michael McIntosh New CV 2
Michael McIntosh New CV 2Michael McIntosh New CV 2
Michael McIntosh New CV 2
 
Updated CV
Updated CVUpdated CV
Updated CV
 
brian cv march 2014.
brian cv march 2014.brian cv march 2014.
brian cv march 2014.
 
Leonardo Fortuin Resume.2
Leonardo Fortuin Resume.2Leonardo Fortuin Resume.2
Leonardo Fortuin Resume.2
 
Bert Savoie Resume
Bert Savoie ResumeBert Savoie Resume
Bert Savoie Resume
 
Michael Doolan Resume July 2016
Michael Doolan Resume July 2016Michael Doolan Resume July 2016
Michael Doolan Resume July 2016
 
M. Miller CV 12 winch rigger
M. Miller CV 12 winch riggerM. Miller CV 12 winch rigger
M. Miller CV 12 winch rigger
 
Dwain's Resume2016
Dwain's Resume2016Dwain's Resume2016
Dwain's Resume2016
 

Hanks 2015 CV-3 updated

  • 1. Curriculum Vitae Henry (Hank) Talamantes Disciplines  Tender  Offshore Surface Mixed Gas Diver and Supervisor  Bell Diver  LST/LSS  Bell Supervisor  Dive Superintendent  Offshore Construction Mgr. Personal Details Tele No. 702-218-1652 Email htalamantes@msn.com Nationality United States of America Passport No. USA - Current Seaman’s Book SRB237284-00 Number of Supervised Bell Dives 3000 Number of Supervised LST/LSS 1080 Number of Supervised Surface Dives 3000 Number of Saturation Days 380 Number of Surface Gas Dives 300 Number of Surface Air Dives 360 Education, Training & Certifications  Divers Institute Of Technology, Seattle WA. 1989  Canadian Standards Assoc. Air Diving Supervisor Cert No. Z275.4 & Z275.5  IMCA Saturation Trainee Bell Diving Supervisor Cert No. CD -06-12T  IMCA Saturation Assistant Life Support Tech. Cert No. CD-06-3A  Oxygen First Aid And Basic Plus First Aid Exp. 06/27/16  Falck Alford Opito Including Huet & EBS Cert No. 5858  TWIC Exp. 08/26/16  Mobil Equatorial Guinea Inc Sea Survival –Huet Fire Fighting Cert No. 0413371 Exp. 06/16  ISN Cert No. 0237370  Class A-Rigger Training API RP2D Exp. 09/19/17  Water Survival, HUET, METS, Swing Rope Exp. 11/19/16  Safegulf PEC1013305 No Expiration  IMCA Air/Bell Diving Supervisor/ALST Taken  IIF Supervisor Skills Taken  Cal Dive International Supervisor Training Taken  Qualification of Pipeline Personnel 49 CFR Part 192, Subpart N  Safety Management Systems H2S Awareness  Falk Rigger Safety API 2D 6th edition APIU approved Exp. 04/09/19  Falk Fall User/Rescue Exp. N/A  Brain Storm Training. Personal & Professional Growth  PSI “Personal Success & Personal Development Strategy” Copiesof Certificationsare available uponrequest.
  • 2. Curriculum Vitae Henry (Hank) Talamantes Work Overview Harkand Group Jul. – Sept. 2015 Air/Saturation Supervisor Supervised air and sat dives for riser clamp/riser installation @ Ayatsil A Swiber Quetzal, 8 riser clamps from 120 msw to 5 msw. Pressure test 16” p/l w/ Enermec Bay of Campeche equip. @ 110 msw. Install valve guard and concrete matts. Push pigs Ayatsil Field from Lay down to platform. Sweep 8” pipeline. Dives, Air - 20 hours.Bell Lock out – 135 hours. Harkand Group Jun – Jul 2015 Offshore Mgr. Overall Supervision of Surface dive spread onboard Sapura Kencana Sapura Kencana 3500. in the Bay of Campeche Mexico. 24”, and 36” pipelay in 3500 pipelay Tsmin and Xanub field. Stinger checks, submar matts and burning of Tsimin/Xanub fields sacrificial laydown cables. Total air dives,28. Depths 10/30 msw. Harkand Group Apr – Jun 2015 Air/Saturation Supervisor Supervised Logistic, mobilization of air and saturation package for Swiber Quetzal, diving operations in Bay of Campeche Mexico. Supervised air/sat Bay of Campeche dives from 5 meters to 120 meters water depth. Prep, install 8”/16” riser Ayatsil Field clamps. Utilizing burning, grinding and buffing. Total number of air/ sat Dives, Air- 37.92 hours.Bell Lock out – 58.5 hours. Legacy Offshore, LLC Feb – Mar 2015 Air/Saturation Supervisor Supervised air/bell dives for U-WILD inspection involving grit blasting TLP/SPAR Bennu Titan water blasting on upper / lower columns, fairleads and pontoons for MississippiCanyon 941 thickness gauge readings using Cygnus digital gauge. Final ABS insp. Total number of air/bell dives Air – 120 min. Bell lock out 80 hours Cal Dive International, GOM May – June 2014 Air/Saturation Supervisor Supervised air/bell dives to inspect p/l, crossings,spoolpiece, Offshore Construction Mgr. riser clamps installations. Assist in demobilizing platforms of equip. DSV Texas, Bay Of Campeche Temporarily assigned as Offshore Construction Mgr. Overall Supervision of 220’ spoolpiece installation at Abkatun – A. Total number of diver lock out,90 hours. Cal Dive International, GOM Air/Saturation Supervisor DSV Texas, Bay Of Campeche Apr – May 2014 Supervised bell dives to install 5 x 20” spoolpieces ranging from 160 feet to 220 feet in length for client Pemex in Ayatsil field line 4 at depths ranging from 112 meters to 127 meters. Utilizing jetting, impacting, fugro survey to profile spools,crane to sweep spools, tuggers,misalignment ball flange. Profile line 7 ditch checks after dredging w/ Reef T- 8000 Rotech tool. Total number of diver lock out hours,120. Cal Dive International, GOM Air/Saturation Supervisor DSV Texas, Bay Of Campeche Feb – Mar 2014 Supervising surface dive x 2 to burn old riser guard bolts and remove old riser guard and install new. 13 meters. 180 min. Supervising bell dives from 43 meters to 129 meters. Jetting, for submar matts installation, Installing 8 lift bags to sweep 20” p/l. Rigging 4” bull hose for pushing pigs. Install submar matts and 3n1 bags to support p/l and side taps. Total Number of 10 hour bell runs = 15
  • 3. Curriculum Vitae Henry (Hank) Talamantes Cal Dive International , GOM Air/Saturation Supervisor DSV Texas, Bay Of Campeche Nov – Dec 2013 Supervising surface dives x 10 cleaning platform leg for leg clamp installation from depths 3 meters to 15 meters at Platform Taratunich 201. Total number of dives = 10 at 2000 min. Supervising bell dives from 30 meters to 120 meters. P/L inspection, submar matt installation, 3n1 to support p/l crossings and side taps. Total Number of 10 hour bell runs = 28 Cal Dive International , GOM Air/Saturation Supervisor DSV Texas, Bay Of Campeche 18th Oct. – 24th Oct. 2013 Supervising surface dives x 2 cleaning platform leg for riser clamp installation from depths of 5 meters to 10 meters at Taratunich TF. Total number of surface dives = x 2 at 180 min. Supervising bell dives from 54 meters to 80 meters Installing matts and riser clamps Cal Dive International , GOM Air/Saturation Supervisor DSV Texas, Bay Of Campeche 1st Sept. – 16th Sept. 2013 Supervising surface dives x 2 cleaning platform leg for riser clamp installation from depths of5 meters to 10 meters at Taratunich TF. Total number of surface dives = x 2 at 82 min. Supervising bell dives from 45 meters to 65 meters. Installing submar matts at multiple locations for bridging of 8” & 20” p/l. Total Number of 10 hourbell runs = 6.6 Cal Dive International , GOM Air/Saturation Supervisor DSV Texas, Bay Of Campeche 25th Aug – 31st Aug 2013 Supervising bell dives from 45 meters to 65 meters. Installing submar matts at multiple locations for bridging of 8” & 20” p/l, DMA, and lay down head support. Total Number of 10 hourbell runs = 6.6 Cal Dive International, PTE Ravenna Italy Dive Supervisor/Coordinator Stat Marine/SBM Equatorial Guinea Dive Supt./Client Rep FPSO SERPENTINA Cal Dive International, PTE Ravenna, Italy Dive Supervisor/Coordinator DSV/Barge Crawler 20th May. – 31st May. 2013 Completed inventory of S-4 air/sat equip. using Microsoft word, excel, power point. Coordinate w/ local logistic company, trucking company, port authorities, and local/federal customs agencies with loading transport and offloading for transport back to Singapore. Procedural writing of all necessary documents as per request. 10th Apr – 21st Apr 2013 Dive Supt. For Smit Diving South Africa. Client Rep. for SBM Offshore. Malabo. Supervising and overseeing U-Wild 5 year hull inspection onboard The FPSO Serpentina. Coordinating day light air dives w/ Smit Diving Supervisor and Serpentina Ships Captain w/ compliance to ABS, IMCA and DNV inspection and recertification of ships hull. Including NDT, video, visual inspection. Procedural writing in compliance w/ SBM and Smit Diving South Africa JSA’s, assessments and HSE reports. 16th Nov – 16th Dec 2012 Oversee demobilization, transporting,staging of S-4 air/sat equip. Coordinating and supervising w/ local logistics/trucking companies involving heavy lifting, transporting of equip. to Cal Dive PTE office/yard in Ravenna. Writing documents/procedures forPort authorities, local and federal customs agencies in night time transport of S-4 equip. using Microsoft word, excel, and power point. 23rd Oct – 1st Nov 2012
  • 4. Curriculum Vitae Henry (Hank) Talamantes Cal Dive International, PTE Tuzla Turkey Dive Supervisor/Coordinator DSV/Barge Crawler Cal Dive International, PTE Novorossiysk Russia, Black Sea Air/Sat Dive Supervisor DSV/Barge Crawler Cal Dive International, PTE Chalkida Greece Dive Supervisor/Coordinator DSV/Barge Crawler Legacy Offshore Inc. Broussard LA. Sat Dive Supervisor DSV Adams Vision Supervising demobilization of entire S-4 equip. from DSV Crawler onto equip. barge for transport to Ravenna Italy. Coordinating heavy lifting and staging of air/sat equip w/ deck foreman and crane operator. 1st Sept – 19th Oct 2012 Caspian Sea Consortium Pipeline Expansion Project. Laying 42”, 5 km long pipeline for Single Point Mooring station.Hydro testing,Blind flange removal / Receiving head installation for dewatering. Verify pig reception and valve manipulation. Recover pig receiver with pigs. Pipeline End Manifold (PLEM) installation. Six Suction AnchorPile with chains and buoys installation. Spool Metrology from pipeline to PLEM. Spool installation. SPM buoy installation. Subsea Hose installation. Floating Hoses installation. Utilizing all tools and equip. are as follows, 500 ton crane. Tuggers, Lift Bags, Jet Pump. S-4 air and sat equip. Ceramic Leak Detector. Hydra Tight tensioning tool. Impact tools. Video for final inspection. Total Air dives – 12 at 10 meters =1800 min. Total bell runs - 73.5 / 8 hour bell runs / 55 meters = 588 hours. 7th Jul – 21st Jul 2012 Supervising mobilization of entire S-4 equip. from Cargo ship sailing from Singapore to the DSV Crawler. Coordinating w/ local agents,Port Authorities, and federal Customs agencies w/ inventory and transport of S-4 equip. Coordinating heavy lifting and staging of sat equip w/ deck foreman and crane operator. Assist Dive Tech’s w/ installation of S-4 Sat System and equip. onboard Crawler. Load testing and pressure test systemto 300 meters As per Cal Dive, IMCA, DNV protocol. 1st Feb – 30th Mar 2011 Pipeline and platform abandonment for Client Anglo Suise. Supervising sat dives utilizing 3-D mapping, site clearance, well kill, well and platform removal. Utilizing tools are as follows, Fugro 3-D survey, Diamond wire saws, Wach guillotine saws,Jet pumps, Down Hole equip. Rotech dredging tool, Cement mixers, 100 ton heave compensating crane. Total Number of 10 hourbell runs = 56
  • 5. Curriculum Vitae Henry (Hank) Talamantes References Name Jim Robinson “Sr. Project Manager, Harkand Group”. Address Houston Texas Phone # 713-377-8028 Name Wayne Burridge “Dive Tech” Address Crawley England, UK Phone # +441295512592 Name John Prior “Dive Superintendent” Address Alva Scotland UK Phone # 00447584410907