1. MUHAMMAD SHARIF
O B J E C T I V E
Utilizing my present skills and experience in a recognized company..
E D U C A T I O N
Metric With Science Board of intermediate &
secondary Education Bahawal pur
565/850 66%
FSc. intermediate &
secondary Education Bahawal pur
683/1100 62%
BSc Shah Abdul Latif University Khair Pur
Sindh
823/1650 50%
NATIONALITY : PAKISTAN
NOTICE PERIOD : No
Date of Birth : 03-11-1968
Domicile : Punjab(province)
APPRENTICESHIP
2. FAUJI FERTILIZER COMPANY
APPRENTICE SHIP 1988-1990
During my 02 years of apprenticeship first 6 months I gain theoretical knowledge of Process
control,instrumentation and short about mechanical equipments/machinery from the
technical training centre of FFC. and in remaining 18 months I gain on going training and
experience by assisting my seniors and having independent duty at the plant.
EXPERIENCE
TOTAL : +23-YEARS(Ammonia Plant Operation)
FAUJI FERTILIZER COMPANY
1991-TO 2008 (17- YEARS)
1- 1991 to 2002 Fauji Fertilizer Company-Goth Machhi(about 11 years)
2-2002 to-2008 Fauji Fertilizer Company-Mir Pur Mathelo(about 6 years)
3-FATIMA FERTILIZER COMPANY LIMITED
:OCTOBER 2008- till now(+05 – years)
Mailing address
E-02 FATIMA FERTILIZER TOWN SHIP SADIK ABAD RAHIM YAR KHAN
PAKISTAN E.MAIL
sharifmahar@yahoo.com
CONTACT NO: +923213501176/03006756083 and +923216771504
AREAS OF EXPERIENCE
AMMONIA BACK END
This section consist of heavy duty centrifugal compressors for Air,Synthesis gas and Ammonia.
REFORMING &SHIFT CONVERSION
PRE-REFORMER
it is adiabatic reformer 20% methane is reformed in pre reformer
DESULPHURIZATION SECTION
It consists of two reactors filled with HTZ-05 catalyst .
PRIMARY REFORMER
It is induced draft rectangle type furnace consist of 260 tubes filled with “Ni” (17%) based
catalyst, 160 burners
SECONDARY REFORMER
It is auto thermal reformer having 12 air nozzels for combustion
WASTE HEAT BOILER
At the end of secondary reformer K.S steam boiler is installed .Capacity of boiler is 260
tons/hr.
HIGH TEMPERATURE SHIFT CONVERTER
This reactor is filled with pyrophoric “Fe3O4”.
LOW TEMPERATURE SHIFT CONVERTOR
This reactor is filled with “Cu” (lk-820 Holder Topsoe) catalyst
CO2 REMOVAL & METHANATION
3. I have worked on co2 recovery i.e, CATACARB .
CO2 ABSORBER:
K2CO3 solution is used to absorb CO2 at 29kg/cm2
. Semi-lean solution is showered from middle at 130Co
and lean
solution showered from top at 95Co
.Absorber consisting of 05 Bed of packing material.
CO2 STRIPPER:
Two CO2 strippers having 03 Bed of packing material each 02 bubble cap trays. Operating
pressure 0.5kg/cm2
.
CO2 REBOILER:
02 Thermosyphon Reboilers are used to strip out CO2 and for heat input to the solution.
METHANATION:
NiO2 Catalyst, single bed is used to convert CO and CO2 in to Methane. CO2 at outlet gas is <10 ppm.
CONDENSATE RECOVERY UNIT:
It consist of condensate stripper, condenser,accumulator, reflux condensate transfer
pump.
DEAERATOR AREA
This unit consist of three heavy multistage centrifugal pumps
ACHIEVEMENTS
• Commissioning and decommissioning of Ammonia storage tanks
• Commissioning of DCS Yokogawa Centum CS 3000 from conventional panel
• Replacement of Ammonia Converter basket from S-200 to S-300
• Trained as a first aid provider.
• Experience of working with China’s errection Company CNCEC.
PRESENT JOB
I am working as a Shift Engineer in Fatima Fertilizer company limited .I have more than
10 years of experience as a Shift Supervisor.
LAND MARK
THE COMMISSIONING OF FATIMA FERTILIZER RELOCATED AMMONIA PLANT.
WE ARE WORKING ON IMS(INTEGRATED MANAGEMENT SYSTEM) .
UNDER THIS SYSTEMWE CAN EVALUATE DPR( DAILY PRODUCTION REPORT)
MWR
( MAINTENANCE WORK REQUEST) ,MOC( MANAGEMENT CHANGE),MIV
(MATERIAL ISSUE VOUCHER) ETC.
• ASSIGNMENT CAN DO
Keep plant in good condition to receive best production.
Handle emergencies ,like plant upsets .ammonia leakage,Oil leakage and
fire.
Carry out HAZOP survey.
ERRECTION AND COMMISSIONING of plant AS A PROCESS TEAM.
ESTABLISH START UP AND SHUT DOWN PROCEDURES.
Establish first investigation report of any accidient.
WORKING MACHINES
4. I HAHE WORKED ON FOLLOWING MACHINES.
HEAVY DUTY CENTRIFUGAL COMPRESSORS,STEAM TURBINES,P.D.COMPRESSORS, HEAVY DUTY
CENTRIFUGAL/P.DPUMPS.AND KNOWLEDGE OF MARK-VI GAS TURBINE.
WORKING EQUIPMENTS
I HAVE THE EXPERIENCE WORKING ON FOLLOWING EQUIPMENTS
HEAVY DUTY INDUCED DRAFT FURNACE,ABSORBTION AND DISTILATION COLUMN,REACTORS
,DEAERATOR,STEAM DRUM AND COLD BOX.
HSE AWAIRNESS
I am validated to issue PTW .I am the member of ERT( Emergency Response team).we
carryout toolbox talk weekly.We carryout risk assisment before handover a job. We carryout
HAZOP survey on yearly basis.We are now PSM certified