Goal
 Recovering the oil from the oil-water mixture
that is exist inside drain pit and pumping it to
the oil line or vacuum truck with minimum cot
,minimum time and minimum consumption for
machines and equipments.
Machines and
equipments
1-Boiler (2 ton vapor / hour)
2-Pumps (quantity=2)
3-Settling Tank (10 cubic meter)
4-Solar Tank+ water tank
5-Hoses and cables.
Layout of oil recovering system
Water
Tank
Drain pit
Boiler
solar
Mixing
Tank
pump
1
pump
2
s.
v
P
sw
c.
v
drain
Oil line
chemical
in
out
in
out
Process steps
1-operate the generator, then ,operate the boiler to
increase the temperature of the water.
2-In the same time operate the pump to make
circulation of the oil-water mixture by using the
water in the bottom
3-After approximately 40min the pressure of the
vapor become 5 bar, immerse the vapor hose
inside the drain pit then open the output valve of
the vapor.
This action has two advantages:
First: increase the viscosity
Process steps(continue)
4-Move the suction hose of the pump to high
point to pump low viscosity oil-water mixture to
the tank
5-fill the tank, wait to settle the water in the
bottom then open the drain valve.
6-Repeat 4 and 5 until filling the tank with the oil
7-Add the chemical
8-Pump the oil through the oil line or to the
vaccum truck
Daily works
Sunday(3/2/2013)
1-Circulation for 3hours.
2-Filling the 10 cubic meter tank.
3-Adding the chemical.
4-Settling and drain the water.
5-Adding another amount of sludge and
repeating step 4 until exiting the oil through the
drain.
Daily works(continue)
6-Taking three samples at the upper, middle and
the bottom of the tank.
7-Pumping the sludge into the vacuum truck.
8-Pumping another amount of sludge directly.
from the drain pit.
Observations
1-Heating of the oil-water mixture in drain pit is
not done
2-One cubic meter=6.89barrel
3-Volume of vacuum truck=136 barrel
4-Samples of mixture at different points of the
tank cannot convey about the exact volume of
the raw oil, the number of raw oil barrels is
calculated roughly.
5-The vacuum truck doesn’t has certain time to
com.
Daily works(continue)
Monday
1-circulation and heating for 3 hours.
2-Filling the tank, settling then draining.
3-Repeating step 2 until filling the tank with oil.
4-At 4:00pm ,we took three samples and the results
of the chemical laboratory were 86%,26% and50%
.The average was 54%=4.6 cubic meter.
5-Filling the tank with oil-water mixture from the drain
pit.
6-leaving the site.
Daily works(continue)
Tuesday
1-Drain the tank.
2-At 8:00am, we began the circulation.
3-At 10:00am stopping the circulation and
feeding the tank.
Problems and suggestions
Problem suggestion
1-The oil-water mixture has unknown
viscosity and contains sand affects on
the pump , the pump works at certain
viscosity and temperature.
1-insturment to measure the viscosity
and thermometer
2-we have not any instrument to
measure the alignment of the pump
2-Dial gauge.
3-unknown amount of oil-water
mixture is pumped through the oil line.
3-we need to flow meter to calculate
the pumped oil where
4-Bearings or mechanical seal may
has failure at any time.
4- spare parts to replacement the
defective parts of the pumps.
5-The tank is the bottle neck of the oil
recovering process.
5-we need to large tank to increase
the amount of recovering oil with
respect to time.
Problem suggestion
6- clogging the hoses and pipes. 6-washing process by water must be
done after finishing the work every
day.
7-The pump1 has defective built-in
safety valve.
7-Repair it or purchasing built-out
safety valve to protect the pump.
8-Driver of the vacuum truck said the
volume of the tank is 136 barrel but
another driver said the volume is 132
barrel.
8-Measuring the volume of the tank
but we had not any instruments to
measure the lengths.
9-The previous problem with
converting the volume units, cubic
meter and barrel.
9-putting the used units and
conversions inside the contract.
10-Some times, we calculate the
volume of the oil inside the tank
roughly, where no tool to measure the
volume.
10-Ensuring that the tank is full.
11-
Informations
1-Immersion is the reaction between oil and
water, we have two types.
 light immersion
We can separate the reaction by vibration or
heating.
 heavy immersion
Chemical material will add to separate them.
2-Boiler has setup time to heating the water
approximately 40min.
Informations
3-we open the steam valve at 5bar.
4-Boiler operates between 6 bar and 9 bar.
5-1cubic meter=6.82 barrel.
QUESTION
S

More Related Content

What's hot

Petro Palayesh Nik Yazd
Petro Palayesh Nik YazdPetro Palayesh Nik Yazd
Petro Palayesh Nik Yazd
Ali Shahvazian
 
internship report by usama
internship report by usamainternship report by usama
internship report by usama
muhammad usama
 
Ig system & equipment oil tankers
Ig system &  equipment oil tankersIg system &  equipment oil tankers
Ig system & equipment oil tankers
jabbar2002pk200
 
4 b = 58 p 45 basic ur plant description 06.09.2021-1
4 b = 58 p  45 basic ur plant description 06.09.2021-14 b = 58 p  45 basic ur plant description 06.09.2021-1
4 b = 58 p 45 basic ur plant description 06.09.2021-1
ameermudasar
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
Nagesh H
 

What's hot (20)

Reverse rotaion of co2 compressor
Reverse rotaion of co2 compressorReverse rotaion of co2 compressor
Reverse rotaion of co2 compressor
 
Petro Palayesh Nik Yazd
Petro Palayesh Nik YazdPetro Palayesh Nik Yazd
Petro Palayesh Nik Yazd
 
Various Mechanical Units Involved in The Bottling Of LPG cylinders
Various Mechanical Units Involved in The Bottling Of LPG cylindersVarious Mechanical Units Involved in The Bottling Of LPG cylinders
Various Mechanical Units Involved in The Bottling Of LPG cylinders
 
Process
ProcessProcess
Process
 
Ic engine shailesh k10708
Ic engine shailesh k10708Ic engine shailesh k10708
Ic engine shailesh k10708
 
Husky 60
Husky 60Husky 60
Husky 60
 
Jvd Presentation Well Pad Process Diagram
Jvd Presentation Well Pad Process DiagramJvd Presentation Well Pad Process Diagram
Jvd Presentation Well Pad Process Diagram
 
THERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSTHERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONS
 
C3.2.1. Topside Separation_2020
C3.2.1. Topside Separation_2020C3.2.1. Topside Separation_2020
C3.2.1. Topside Separation_2020
 
FillingCylinders
FillingCylindersFillingCylinders
FillingCylinders
 
internship report by usama
internship report by usamainternship report by usama
internship report by usama
 
Ig system & equipment oil tankers
Ig system &  equipment oil tankersIg system &  equipment oil tankers
Ig system & equipment oil tankers
 
4 b = 58 p 45 basic ur plant description 06.09.2021-1
4 b = 58 p  45 basic ur plant description 06.09.2021-14 b = 58 p  45 basic ur plant description 06.09.2021-1
4 b = 58 p 45 basic ur plant description 06.09.2021-1
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
 
Pipe system
Pipe systemPipe system
Pipe system
 
Tank Cleaning
Tank CleaningTank Cleaning
Tank Cleaning
 
POWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEPOWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINE
 
Petroleum refining
Petroleum refiningPetroleum refining
Petroleum refining
 
Cook flow power 1
Cook flow power 1Cook flow power 1
Cook flow power 1
 
Ammonia stripper
Ammonia stripperAmmonia stripper
Ammonia stripper
 

Viewers also liked

James G Browning resume - technical april 2016
James G Browning   resume - technical april 2016James G Browning   resume - technical april 2016
James G Browning resume - technical april 2016
Greg Browning
 
TESIS CARACTERIZACIÓN DE LOS CASOS DE CÁNCER EN EL MUNICIPIO PALMIRA. 2004-2012
TESIS CARACTERIZACIÓN DE LOS CASOS DE CÁNCER EN EL MUNICIPIO PALMIRA. 2004-2012TESIS CARACTERIZACIÓN DE LOS CASOS DE CÁNCER EN EL MUNICIPIO PALMIRA. 2004-2012
TESIS CARACTERIZACIÓN DE LOS CASOS DE CÁNCER EN EL MUNICIPIO PALMIRA. 2004-2012
Nery Josué Perdomo
 

Viewers also liked (7)

Linked data 101: Getting Caught in the Semantic Web
Linked data 101: Getting Caught in the Semantic Web Linked data 101: Getting Caught in the Semantic Web
Linked data 101: Getting Caught in the Semantic Web
 
James G Browning resume - technical april 2016
James G Browning   resume - technical april 2016James G Browning   resume - technical april 2016
James G Browning resume - technical april 2016
 
Avon
AvonAvon
Avon
 
Presentación chris argyris
Presentación chris argyrisPresentación chris argyris
Presentación chris argyris
 
Una nutrición balanceada como principal aliada de nuestra salud y del desempe...
Una nutrición balanceada como principal aliada de nuestra salud y del desempe...Una nutrición balanceada como principal aliada de nuestra salud y del desempe...
Una nutrición balanceada como principal aliada de nuestra salud y del desempe...
 
Calculus in real life (Differentiation and integration )
Calculus in real life (Differentiation and integration )Calculus in real life (Differentiation and integration )
Calculus in real life (Differentiation and integration )
 
TESIS CARACTERIZACIÓN DE LOS CASOS DE CÁNCER EN EL MUNICIPIO PALMIRA. 2004-2012
TESIS CARACTERIZACIÓN DE LOS CASOS DE CÁNCER EN EL MUNICIPIO PALMIRA. 2004-2012TESIS CARACTERIZACIÓN DE LOS CASOS DE CÁNCER EN EL MUNICIPIO PALMIRA. 2004-2012
TESIS CARACTERIZACIÓN DE LOS CASOS DE CÁNCER EN EL MUNICIPIO PALMIRA. 2004-2012
 

Similar to drain pit(1)

ARKOIL Technologies_oil tank cleaning_final
ARKOIL Technologies_oil tank cleaning_finalARKOIL Technologies_oil tank cleaning_final
ARKOIL Technologies_oil tank cleaning_final
Amir Dzugatti
 
Case study on boiler & boiler's mountings and accessories
Case study on boiler & boiler's mountings and accessoriesCase study on boiler & boiler's mountings and accessories
Case study on boiler & boiler's mountings and accessories
Yagnesh Virani
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
applesam8
 
2212208 distillation-of-herbs
2212208 distillation-of-herbs2212208 distillation-of-herbs
2212208 distillation-of-herbs
Hassan325
 
Project Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- AdityaProject Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- Aditya
Aditya Bhattacharjee
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
Ashley May
 
Qsusa treatment report 26th june 2012-1
Qsusa treatment report   26th june 2012-1Qsusa treatment report   26th june 2012-1
Qsusa treatment report 26th june 2012-1
QuickSilverUSA/// -
 

Similar to drain pit(1) (20)

Final Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptxFinal Turbine rolling ppt Akshay.pptx
Final Turbine rolling ppt Akshay.pptx
 
Sabardairy Training Report
Sabardairy Training ReportSabardairy Training Report
Sabardairy Training Report
 
sugar mill ss.pptx
sugar mill ss.pptxsugar mill ss.pptx
sugar mill ss.pptx
 
Wind turbine gearbox oil changers
Wind turbine gearbox oil changersWind turbine gearbox oil changers
Wind turbine gearbox oil changers
 
SUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONSUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTION
 
MEM’s for HO-EOR evaluation
MEM’s for HO-EOR evaluationMEM’s for HO-EOR evaluation
MEM’s for HO-EOR evaluation
 
ARKOIL Technologies_oil tank cleaning_final
ARKOIL Technologies_oil tank cleaning_finalARKOIL Technologies_oil tank cleaning_final
ARKOIL Technologies_oil tank cleaning_final
 
Case study on boiler & boiler's mountings and accessories
Case study on boiler & boiler's mountings and accessoriesCase study on boiler & boiler's mountings and accessories
Case study on boiler & boiler's mountings and accessories
 
Seal Oil System.pptx
Seal Oil System.pptxSeal Oil System.pptx
Seal Oil System.pptx
 
Inplant training report
Inplant training reportInplant training report
Inplant training report
 
Combustion cycle
Combustion cycleCombustion cycle
Combustion cycle
 
2212208 distillation-of-herbs
2212208 distillation-of-herbs2212208 distillation-of-herbs
2212208 distillation-of-herbs
 
Six stroke engine
Six stroke engineSix stroke engine
Six stroke engine
 
Project Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- AdityaProject Report on Analysis of Boiler- Aditya
Project Report on Analysis of Boiler- Aditya
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 
Qsusa treatment report 26th june 2012-1
Qsusa treatment report   26th june 2012-1Qsusa treatment report   26th june 2012-1
Qsusa treatment report 26th june 2012-1
 
OIL RECOVERY TECHNIQUES
OIL RECOVERY TECHNIQUESOIL RECOVERY TECHNIQUES
OIL RECOVERY TECHNIQUES
 
Power Plant
Power PlantPower Plant
Power Plant
 
Engine Cooling System (ppt).pptx
Engine Cooling System (ppt).pptxEngine Cooling System (ppt).pptx
Engine Cooling System (ppt).pptx
 
OIL PROCESSING
OIL PROCESSINGOIL PROCESSING
OIL PROCESSING
 

drain pit(1)

  • 3. Contents 1-Goal 2-Machines and equipments. 3-Layout of oil recovering oil system 4-Process steps. 5-Problems and suggestions. 6-Informations.
  • 4. Goal  Recovering the oil from the oil-water mixture that is exist inside drain pit and pumping it to the oil line or vacuum truck with minimum cot ,minimum time and minimum consumption for machines and equipments.
  • 5. Machines and equipments 1-Boiler (2 ton vapor / hour) 2-Pumps (quantity=2) 3-Settling Tank (10 cubic meter) 4-Solar Tank+ water tank 5-Hoses and cables.
  • 6. Layout of oil recovering system Water Tank Drain pit Boiler solar Mixing Tank pump 1 pump 2 s. v P sw c. v drain Oil line chemical in out in out
  • 7. Process steps 1-operate the generator, then ,operate the boiler to increase the temperature of the water. 2-In the same time operate the pump to make circulation of the oil-water mixture by using the water in the bottom 3-After approximately 40min the pressure of the vapor become 5 bar, immerse the vapor hose inside the drain pit then open the output valve of the vapor. This action has two advantages: First: increase the viscosity
  • 8. Process steps(continue) 4-Move the suction hose of the pump to high point to pump low viscosity oil-water mixture to the tank 5-fill the tank, wait to settle the water in the bottom then open the drain valve. 6-Repeat 4 and 5 until filling the tank with the oil 7-Add the chemical 8-Pump the oil through the oil line or to the vaccum truck
  • 9. Daily works Sunday(3/2/2013) 1-Circulation for 3hours. 2-Filling the 10 cubic meter tank. 3-Adding the chemical. 4-Settling and drain the water. 5-Adding another amount of sludge and repeating step 4 until exiting the oil through the drain.
  • 10. Daily works(continue) 6-Taking three samples at the upper, middle and the bottom of the tank. 7-Pumping the sludge into the vacuum truck. 8-Pumping another amount of sludge directly. from the drain pit.
  • 11. Observations 1-Heating of the oil-water mixture in drain pit is not done 2-One cubic meter=6.89barrel 3-Volume of vacuum truck=136 barrel 4-Samples of mixture at different points of the tank cannot convey about the exact volume of the raw oil, the number of raw oil barrels is calculated roughly. 5-The vacuum truck doesn’t has certain time to com.
  • 12. Daily works(continue) Monday 1-circulation and heating for 3 hours. 2-Filling the tank, settling then draining. 3-Repeating step 2 until filling the tank with oil. 4-At 4:00pm ,we took three samples and the results of the chemical laboratory were 86%,26% and50% .The average was 54%=4.6 cubic meter. 5-Filling the tank with oil-water mixture from the drain pit. 6-leaving the site.
  • 13. Daily works(continue) Tuesday 1-Drain the tank. 2-At 8:00am, we began the circulation. 3-At 10:00am stopping the circulation and feeding the tank.
  • 15. Problem suggestion 1-The oil-water mixture has unknown viscosity and contains sand affects on the pump , the pump works at certain viscosity and temperature. 1-insturment to measure the viscosity and thermometer 2-we have not any instrument to measure the alignment of the pump 2-Dial gauge. 3-unknown amount of oil-water mixture is pumped through the oil line. 3-we need to flow meter to calculate the pumped oil where 4-Bearings or mechanical seal may has failure at any time. 4- spare parts to replacement the defective parts of the pumps. 5-The tank is the bottle neck of the oil recovering process. 5-we need to large tank to increase the amount of recovering oil with respect to time.
  • 16. Problem suggestion 6- clogging the hoses and pipes. 6-washing process by water must be done after finishing the work every day. 7-The pump1 has defective built-in safety valve. 7-Repair it or purchasing built-out safety valve to protect the pump. 8-Driver of the vacuum truck said the volume of the tank is 136 barrel but another driver said the volume is 132 barrel. 8-Measuring the volume of the tank but we had not any instruments to measure the lengths. 9-The previous problem with converting the volume units, cubic meter and barrel. 9-putting the used units and conversions inside the contract. 10-Some times, we calculate the volume of the oil inside the tank roughly, where no tool to measure the volume. 10-Ensuring that the tank is full. 11-
  • 17. Informations 1-Immersion is the reaction between oil and water, we have two types.  light immersion We can separate the reaction by vibration or heating.  heavy immersion Chemical material will add to separate them. 2-Boiler has setup time to heating the water approximately 40min.
  • 18. Informations 3-we open the steam valve at 5bar. 4-Boiler operates between 6 bar and 9 bar. 5-1cubic meter=6.82 barrel.