SlideShare a Scribd company logo
1 of 11
OPENINGS: WINDOWS AND DOORS
1
1. INTRODUCTION
The construction site which we found is located on Eskişehir Yolu, Konutkent 1,
across Konutkent 1 Boulevard. We observed what the materials they use for doors and
windows and some technical information given by the site manager. The building has still
been going on, they did not allow us to observe the construction of the doors and windows
totally because of the safety issues. That’s why we can only observe both finished doors and
windows and the ones which have not completed yet and took photographs. The site manager
gave the information outside of the building.
In this site report we are going to give information about what is learnt from the site
manager and documents that he gave us: which of these information are what the technical
requirements and materials for installing door and windows and how it is done in the site with
the help of the photos that we took in the site and what are the benefits to observe installation
of the doors and windows in the site for us.
2. OBSERVATION AND EXPECTATIONS
2.1. TECHNICAL OBSERVATION AND EXPERIENCES
2.1.1. WINDOWS
There are thousand types of and windows in the market. Every single material has
different properties. This is the reason that every construction site prefers different materials.
The construction site which we found prefers to use Alkapen AluTech System W75
SeriesW8-2 T as a window frame which has high level of heat insulation (34 mm polyamide
hear barrier is used for reinforcement of the thermal insulation) and sound insulation. (Figure
OPENINGS: WINDOWS AND DOORS
2
1) If there is any situation which needs to increase in the insulation, the insulation material
can be improved. In the contract, the information is given as;
 For the windows which has thermal insulation, 4+16+4 löw-e (Low Emissivity)
 For the windows which has not thermal insulation, 4+16+4 löw-e
 For the windows which is curtain facade,6+16+6 löw-e and green glasses have to be
used.
Figure 1
2.1.2. DOORS
Alkapen AluTech System W75 SeriesW8-2 T series does not only consist of the
windows but also have doors. Also, this series do not have only one door, we can only
observed one of them in the construction site. (Interior doors) The other ones have not
installed the building yet. Also, they want to use same series because of the good appearances.
Different from the windows, this series do not have glass and thermal insulation materials
because they are mostly used in the interior doors, it does not need to thermal insulation.
(Figure 2).
6 mm
16 mm
Air
Gap
6 mm
Thermal Insulation:
Polyamide
OPENINGS: WINDOWS AND DOORS
3
Figure 2
2.1.3. INSTALLATION OF DOORS AND WINDOWS
The first thing that has to be taken into the consideration is the level of the floor
whether it is straight or not. If the floor is not on the level, some corrections on the floor are
needed. After the floor come to the level, the door frame (they used aluminum doorframes the
construction site in order to decrease the change of any problems in the future.) was fitted into
the rough opening (Photograph 2). In order to not buckle, they fit the doorframe into the wall
with welding (Photograph 3). They placed the door into the doorframe and sticked them with
the hinges. (Mostly they used 2 hinges per door) (Photograph 4). After they put the door
OPENINGS: WINDOWS AND DOORS
4
frame and door leave together, they used foam materials and cement in order to cover it
perfectly for the void part between wall and the door frame. Finally, they installed the
hardware of the door which is the easiest part of the installation of doors.
The process is more or less same with the windows as well. They have to take reference
points like the level in the floor for doors. They install the window frame into the wall with
the help of welding. After they put the window frame on the wall, they did process of filling
the thermal insulation materials (Polyamide). Also, they controlled the level of doors and
windows in order to prevent possible problems.
2.2. SOCIAL OBSERVATION AND EXPERIENCES
Before we enter the construction site, Serra met with site manager. Firstly, he did not
allow entering the construction site because of the safety precautions. That’s why Serra went
to construction site again and again in order to convince the site manager. Finally he
convinced but not allowed to enter the building which has been still in the construction. There
are 6 different apartments. The site manager did not allowed entering in the working time, so
we went to construction site in the lunch time of the personnel. We saw lots of construction
materials around the site since those materials mostly trashed ones. (Especially there are lots
of marbles and rebars and nobody cares how dangerous it is) Observing an unfinished
building is different because everything has different procedure and we had a change to not
observe only the doors and windows but also thermal insulation of the facade (rock wool), the
usage of the roof tiles and gutter system (We can only see from a distance, but it can identify
them as a concealed gutter system.) and the water insulation in the balconies and terrace
(mastic asphalt). The thing we came across is we can only observe the ground floor because
of the safety.
OPENINGS: WINDOWS AND DOORS
5
3. CONCLUSION
The construction site experience was beneficial for us to understand the details of the
doors and windows, although the site has safety precautions we cannot observe the process in
details. On the other hand, this experience makes the theoretical information which is given in
the lecture easy to understand. The only thing which makes the situation more difficult to
understand is the Turkish names of the materials.
We learnt some of the terminological terms in Turkish. In addition, we learnt how the
doors installed and what are the materials used in the doors, doorframes (Photograph 2),
hinges (Photograph 4), sliding and where the doors have to be opened. Also we learnt the
materials used in windows. For example, we learnt what the throating is and how it is done in
the wood structures in the lectures given by Necmiye Şule Aybar. However, the construction
site do not have any wood windows structures, they preferred to use aluminum. That’s why
we had a change to observe throating in aluminum structures and be aware of the differences
between wood and steel throating. On the other hand, not only we compare the theoretical
information that is given in the lecture we also have a chance to compare the difference in the
doors and windows. For example, the glass which is used in the doors is different than the
windows. For the windows they used double glazed glass (For thermal insulation purpose.)
because it is integrated with the exteriors. For the doors they used regular glass because of the
decoration purpose. Basically, this experience made some information clear in our minds and
gave the opportunity to observe.
OPENINGS: WINDOWS AND DOORS
6
4. GRAPHIC DOCUMENDATION
4.1. FRONT VIEW AND SECTION
Figure 3: Front View and Section of Windows
Figure 4: Front View and Section of Door
OPENINGS: WINDOWS AND DOORS
7
4.2. PHOTOGRAPHS
Photograph 1: Construction Site
Photograph 2: Placing Door Frame into the Opening
OPENINGS: WINDOWS AND DOORS
8
Photograph 3: Placing Door Frame into the Wall with Bars by Using Welding
Photograph 4: Completed Door (Hinge, Reveals and Jamb)
Hinge
Reveals
Jamb
OPENINGS: WINDOWS AND DOORS
9
Photograph 5: Windows Sill
Photograph 6: Window Throating in Aluminum Joinery
Throating
OPENINGS: WINDOWS AND DOORS
10
Photograph 7: Completed Window
Photograph 8: Completed Window
OPENINGS: WINDOWS AND DOORS
11
5. BIBLIOGRAPHY
Alkapen AluTech System W75 SeriesW8-2 T (n.d) Retrieved from
http://www.alutech.com.tr/en/W7-W8-W75--Yalitimli-Pencere-Ve-Kapi-Seri.html

More Related Content

What's hot

Oria - Bespoke Fenestration
Oria - Bespoke FenestrationOria - Bespoke Fenestration
Oria - Bespoke Fenestration
vinayvs
 
Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3
Aden Saitabau Kumary
 
Architectural conservation arc3413 king street penang
Architectural conservation arc3413 king street penangArchitectural conservation arc3413 king street penang
Architectural conservation arc3413 king street penang
Gary Yeow
 
清新蓝色
清新蓝色清新蓝色
清新蓝色
Ivy wang
 

What's hot (20)

portfolio_linework
portfolio_lineworkportfolio_linework
portfolio_linework
 
Everhaus brochure info
Everhaus brochure infoEverhaus brochure info
Everhaus brochure info
 
Presentation on door & window
Presentation on door & window Presentation on door & window
Presentation on door & window
 
Catalogo fujin
Catalogo fujinCatalogo fujin
Catalogo fujin
 
Building science 1 "Analyzing Passive Building Design Strategies"
Building science 1 "Analyzing Passive Building Design Strategies"Building science 1 "Analyzing Passive Building Design Strategies"
Building science 1 "Analyzing Passive Building Design Strategies"
 
Floor plans
Floor plansFloor plans
Floor plans
 
Elevations & sections-Architecture school 4th yr project 3
Elevations & sections-Architecture school 4th yr project  3Elevations & sections-Architecture school 4th yr project  3
Elevations & sections-Architecture school 4th yr project 3
 
Studio View Improvements
Studio View ImprovementsStudio View Improvements
Studio View Improvements
 
Methods to increase energy efficient performance for windows&doors,curtai...
Methods to increase energy efficient performance for windows&doors,curtai...Methods to increase energy efficient performance for windows&doors,curtai...
Methods to increase energy efficient performance for windows&doors,curtai...
 
Floor plans
Floor plansFloor plans
Floor plans
 
Elevations & sections
Elevations & sectionsElevations & sections
Elevations & sections
 
Lamp permenpupr22 2018 (harga jasa perencanaan)
Lamp permenpupr22 2018 (harga jasa perencanaan)Lamp permenpupr22 2018 (harga jasa perencanaan)
Lamp permenpupr22 2018 (harga jasa perencanaan)
 
Aluminium doors and Windows
Aluminium doors and WindowsAluminium doors and Windows
Aluminium doors and Windows
 
Oria - Bespoke Fenestration
Oria - Bespoke FenestrationOria - Bespoke Fenestration
Oria - Bespoke Fenestration
 
Teeyeo Aluminum and upvc window catalog
Teeyeo Aluminum and upvc window catalogTeeyeo Aluminum and upvc window catalog
Teeyeo Aluminum and upvc window catalog
 
How to install false ceiling
How to install false ceilingHow to install false ceiling
How to install false ceiling
 
Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3Section-Architecture school University of Nairobi 4th year project 3
Section-Architecture school University of Nairobi 4th year project 3
 
Architectural conservation arc3413 king street penang
Architectural conservation arc3413 king street penangArchitectural conservation arc3413 king street penang
Architectural conservation arc3413 king street penang
 
Mbqs75 thermal break aluminium folding doors
Mbqs75 thermal break aluminium folding doorsMbqs75 thermal break aluminium folding doors
Mbqs75 thermal break aluminium folding doors
 
清新蓝色
清新蓝色清新蓝色
清新蓝色
 

Similar to IAED 251 Construction and Materials i-Report

B con hehe
B con heheB con hehe
B con hehe
Yue Yun
 
BLDG 476 - HEAT TRANSFER
BLDG 476 - HEAT TRANSFERBLDG 476 - HEAT TRANSFER
BLDG 476 - HEAT TRANSFER
Rupali Patel
 
Building Industry catalague 2015
Building Industry catalague 2015Building Industry catalague 2015
Building Industry catalague 2015
Lesley Lloyd
 

Similar to IAED 251 Construction and Materials i-Report (20)

Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
B con hehe
B con heheB con hehe
B con hehe
 
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
Angeline Kon_Kee Hooi_0302068_BTech1-P1-Alternative Construction Solution and...
 
Energy efficientventilationsystembs
Energy efficientventilationsystembsEnergy efficientventilationsystembs
Energy efficientventilationsystembs
 
Double skin facade
Double skin facade Double skin facade
Double skin facade
 
Technical details of Energy Efficient HVAC System
Technical details of  Energy Efficient HVAC SystemTechnical details of  Energy Efficient HVAC System
Technical details of Energy Efficient HVAC System
 
Site report
Site reportSite report
Site report
 
BLDG 476 - HEAT TRANSFER
BLDG 476 - HEAT TRANSFERBLDG 476 - HEAT TRANSFER
BLDG 476 - HEAT TRANSFER
 
Openings
OpeningsOpenings
Openings
 
BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT BTECH 1 PROJECT 2 FINAL REPORT
BTECH 1 PROJECT 2 FINAL REPORT
 
Assessment report template
Assessment report templateAssessment report template
Assessment report template
 
Building Industry catalague 2015
Building Industry catalague 2015Building Industry catalague 2015
Building Industry catalague 2015
 
Lesson4 construction materials
Lesson4 construction materialsLesson4 construction materials
Lesson4 construction materials
 
Door and window fenestration system
Door and window fenestration systemDoor and window fenestration system
Door and window fenestration system
 
Cool roof - How to choose one ?
Cool roof - How to choose one ?Cool roof - How to choose one ?
Cool roof - How to choose one ?
 
Standardization of Door Systems
Standardization of Door SystemsStandardization of Door Systems
Standardization of Door Systems
 
Site report
Site reportSite report
Site report
 
B tech project 2
B tech project 2B tech project 2
B tech project 2
 
components of building.pptx
components of building.pptxcomponents of building.pptx
components of building.pptx
 
Construction technology assignment
Construction technology assignmentConstruction technology assignment
Construction technology assignment
 

More from Serra's Art Studio

More from Serra's Art Studio (20)

Hist200
Hist200Hist200
Hist200
 
A1 turkce-makale
A1 turkce-makaleA1 turkce-makale
A1 turkce-makale
 
A1 turkce-ozdegerlendirme
A1 turkce-ozdegerlendirmeA1 turkce-ozdegerlendirme
A1 turkce-ozdegerlendirme
 
Chema Madoz Sergi Yorumu
Chema Madoz Sergi YorumuChema Madoz Sergi Yorumu
Chema Madoz Sergi Yorumu
 
IAED 342-Research Homework
IAED 342-Research HomeworkIAED 342-Research Homework
IAED 342-Research Homework
 
IAED 342-Research Presentation
IAED 342-Research PresentationIAED 342-Research Presentation
IAED 342-Research Presentation
 
IAED 381-Field Trip Report
IAED 381-Field Trip ReportIAED 381-Field Trip Report
IAED 381-Field Trip Report
 
IAED 221 Case Study
IAED 221 Case StudyIAED 221 Case Study
IAED 221 Case Study
 
IAED 463 Presentation
IAED 463 PresentationIAED 463 Presentation
IAED 463 Presentation
 
IAED 463-Report
IAED 463-ReportIAED 463-Report
IAED 463-Report
 
IAED 322 Term Project-Part 1
IAED 322 Term Project-Part 1IAED 322 Term Project-Part 1
IAED 322 Term Project-Part 1
 
IAED 301 Research Presentation
IAED 301 Research PresentationIAED 301 Research Presentation
IAED 301 Research Presentation
 
COMD 210 Location Description
COMD 210 Location DescriptionCOMD 210 Location Description
COMD 210 Location Description
 
COMD 210 Chocolate Aisle
COMD 210 Chocolate AisleCOMD 210 Chocolate Aisle
COMD 210 Chocolate Aisle
 
ADA 264-Assignment 5
ADA 264-Assignment 5ADA 264-Assignment 5
ADA 264-Assignment 5
 
Mathematical Exploration
Mathematical ExplorationMathematical Exploration
Mathematical Exploration
 
Physics Lab Report 2
Physics Lab Report 2Physics Lab Report 2
Physics Lab Report 2
 
Physics Lab Report 1
Physics Lab Report 1Physics Lab Report 1
Physics Lab Report 1
 
Chemistry Lab Report 2
Chemistry Lab Report 2Chemistry Lab Report 2
Chemistry Lab Report 2
 
Chemistry Lab Report 3
Chemistry Lab Report 3Chemistry Lab Report 3
Chemistry Lab Report 3
 

Recently uploaded

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Recently uploaded (20)

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 

IAED 251 Construction and Materials i-Report

  • 1. OPENINGS: WINDOWS AND DOORS 1 1. INTRODUCTION The construction site which we found is located on Eskişehir Yolu, Konutkent 1, across Konutkent 1 Boulevard. We observed what the materials they use for doors and windows and some technical information given by the site manager. The building has still been going on, they did not allow us to observe the construction of the doors and windows totally because of the safety issues. That’s why we can only observe both finished doors and windows and the ones which have not completed yet and took photographs. The site manager gave the information outside of the building. In this site report we are going to give information about what is learnt from the site manager and documents that he gave us: which of these information are what the technical requirements and materials for installing door and windows and how it is done in the site with the help of the photos that we took in the site and what are the benefits to observe installation of the doors and windows in the site for us. 2. OBSERVATION AND EXPECTATIONS 2.1. TECHNICAL OBSERVATION AND EXPERIENCES 2.1.1. WINDOWS There are thousand types of and windows in the market. Every single material has different properties. This is the reason that every construction site prefers different materials. The construction site which we found prefers to use Alkapen AluTech System W75 SeriesW8-2 T as a window frame which has high level of heat insulation (34 mm polyamide hear barrier is used for reinforcement of the thermal insulation) and sound insulation. (Figure
  • 2. OPENINGS: WINDOWS AND DOORS 2 1) If there is any situation which needs to increase in the insulation, the insulation material can be improved. In the contract, the information is given as;  For the windows which has thermal insulation, 4+16+4 löw-e (Low Emissivity)  For the windows which has not thermal insulation, 4+16+4 löw-e  For the windows which is curtain facade,6+16+6 löw-e and green glasses have to be used. Figure 1 2.1.2. DOORS Alkapen AluTech System W75 SeriesW8-2 T series does not only consist of the windows but also have doors. Also, this series do not have only one door, we can only observed one of them in the construction site. (Interior doors) The other ones have not installed the building yet. Also, they want to use same series because of the good appearances. Different from the windows, this series do not have glass and thermal insulation materials because they are mostly used in the interior doors, it does not need to thermal insulation. (Figure 2). 6 mm 16 mm Air Gap 6 mm Thermal Insulation: Polyamide
  • 3. OPENINGS: WINDOWS AND DOORS 3 Figure 2 2.1.3. INSTALLATION OF DOORS AND WINDOWS The first thing that has to be taken into the consideration is the level of the floor whether it is straight or not. If the floor is not on the level, some corrections on the floor are needed. After the floor come to the level, the door frame (they used aluminum doorframes the construction site in order to decrease the change of any problems in the future.) was fitted into the rough opening (Photograph 2). In order to not buckle, they fit the doorframe into the wall with welding (Photograph 3). They placed the door into the doorframe and sticked them with the hinges. (Mostly they used 2 hinges per door) (Photograph 4). After they put the door
  • 4. OPENINGS: WINDOWS AND DOORS 4 frame and door leave together, they used foam materials and cement in order to cover it perfectly for the void part between wall and the door frame. Finally, they installed the hardware of the door which is the easiest part of the installation of doors. The process is more or less same with the windows as well. They have to take reference points like the level in the floor for doors. They install the window frame into the wall with the help of welding. After they put the window frame on the wall, they did process of filling the thermal insulation materials (Polyamide). Also, they controlled the level of doors and windows in order to prevent possible problems. 2.2. SOCIAL OBSERVATION AND EXPERIENCES Before we enter the construction site, Serra met with site manager. Firstly, he did not allow entering the construction site because of the safety precautions. That’s why Serra went to construction site again and again in order to convince the site manager. Finally he convinced but not allowed to enter the building which has been still in the construction. There are 6 different apartments. The site manager did not allowed entering in the working time, so we went to construction site in the lunch time of the personnel. We saw lots of construction materials around the site since those materials mostly trashed ones. (Especially there are lots of marbles and rebars and nobody cares how dangerous it is) Observing an unfinished building is different because everything has different procedure and we had a change to not observe only the doors and windows but also thermal insulation of the facade (rock wool), the usage of the roof tiles and gutter system (We can only see from a distance, but it can identify them as a concealed gutter system.) and the water insulation in the balconies and terrace (mastic asphalt). The thing we came across is we can only observe the ground floor because of the safety.
  • 5. OPENINGS: WINDOWS AND DOORS 5 3. CONCLUSION The construction site experience was beneficial for us to understand the details of the doors and windows, although the site has safety precautions we cannot observe the process in details. On the other hand, this experience makes the theoretical information which is given in the lecture easy to understand. The only thing which makes the situation more difficult to understand is the Turkish names of the materials. We learnt some of the terminological terms in Turkish. In addition, we learnt how the doors installed and what are the materials used in the doors, doorframes (Photograph 2), hinges (Photograph 4), sliding and where the doors have to be opened. Also we learnt the materials used in windows. For example, we learnt what the throating is and how it is done in the wood structures in the lectures given by Necmiye Şule Aybar. However, the construction site do not have any wood windows structures, they preferred to use aluminum. That’s why we had a change to observe throating in aluminum structures and be aware of the differences between wood and steel throating. On the other hand, not only we compare the theoretical information that is given in the lecture we also have a chance to compare the difference in the doors and windows. For example, the glass which is used in the doors is different than the windows. For the windows they used double glazed glass (For thermal insulation purpose.) because it is integrated with the exteriors. For the doors they used regular glass because of the decoration purpose. Basically, this experience made some information clear in our minds and gave the opportunity to observe.
  • 6. OPENINGS: WINDOWS AND DOORS 6 4. GRAPHIC DOCUMENDATION 4.1. FRONT VIEW AND SECTION Figure 3: Front View and Section of Windows Figure 4: Front View and Section of Door
  • 7. OPENINGS: WINDOWS AND DOORS 7 4.2. PHOTOGRAPHS Photograph 1: Construction Site Photograph 2: Placing Door Frame into the Opening
  • 8. OPENINGS: WINDOWS AND DOORS 8 Photograph 3: Placing Door Frame into the Wall with Bars by Using Welding Photograph 4: Completed Door (Hinge, Reveals and Jamb) Hinge Reveals Jamb
  • 9. OPENINGS: WINDOWS AND DOORS 9 Photograph 5: Windows Sill Photograph 6: Window Throating in Aluminum Joinery Throating
  • 10. OPENINGS: WINDOWS AND DOORS 10 Photograph 7: Completed Window Photograph 8: Completed Window
  • 11. OPENINGS: WINDOWS AND DOORS 11 5. BIBLIOGRAPHY Alkapen AluTech System W75 SeriesW8-2 T (n.d) Retrieved from http://www.alutech.com.tr/en/W7-W8-W75--Yalitimli-Pencere-Ve-Kapi-Seri.html