Digital Communication Essentials: DPCM, DM, and ADM .pptx
Sathish project mgmt_pmp_9+yrs
1. Sathish Kumar PMP
sathishshyamala@gmail.com
+91 9886907262
SUMMARY:
I am a PMI - PMP certified Project Manager with expertise in project life cycles like
Initiation, planning, executing, controlling and closing with projects delivering business value
and delighting stakeholders.
EXPERIENCE SUMMARY:
I have 9 years 8 Months in the field of automotive, avionics, embedded system, RTOS
and DSP with Project Management exposure. Handled the New Product Development,
enhancement, configuration, Integration and testing activity projects.
EDUCATION:
Bachelor of Engineering (B.E-Electronics and Communication Engg.)
L.C.R. College of Engineering and Technology, Thiruvallur
Anna University, Chennai – 600 025.
Year of Completion : 2005
Percentage Secured : 66%
Master of Business Administration (M.B.A.)
Institute of Correspondence Education,
University of Madras, Chennai – 600 005
Year of Completion : 2009
Percentage Secured : 63%
Diploma in Electrical and Electronics Engineering (D.E.E.E)
Murugappa Polytechnic, Chennai – 600 062.
Year of Completion : 2002
Percentage Secured : 78%
CERTIFICATION:
Project Management Institute (PMI) certified Project Management Professional (PMP),
Certified on 24-Dec-2015.
WORK EXPERIENCE : 9 yrs 8 Months
• Worked as a Project Manager in Symphony Teleca (Harman International) for the IVI HMI
project from Mar 2015 to Nov 2015 (8 Months).
• Worked as a Project Lead in UTC Aerospace (formerly Goodrich), Bangalore from Nov 2014
to Mar 2015. (4 month).
Page 1 of 6
2. Sathish Kumar
sathishshyamala@gmail.com
• Worked as an Associate Project Manager in Robert Bosch, Coimbatore from Mar 2013 to
Nov 2014. (1 yr 8 months).
• Worked as Senior Engineer in Honeywell Technology Solutions Lab, Bangalore from Nov
2008 to Feb 2013. (4 yrs 4 months).
• Worked as Software Developer in iThink, Chennai from April 2007 to Oct 2008. (1yr 7
months).
• Worked as Software Developer in Imbpulse Embedded Systems, Chennai from March 2006 to
March 2007(1 yr 1 month).
IT SKILLS
Skill Type Skill Name
Language Assembly, C ,C++ and ADA
Microcontroller & Microprocessors FreeScale iMX27, 8051, 80X86.
Digital Signal Processor Analog devices Blackfin processor BF-561.
RTOS VDK, µ -cos – II, FreeRTOS, VxWorks
Embedded Tools (IDEs)
VS 2005.
Visual DSP++ 4.5 for Analog device processor.
IAR Embedded Work Bench for iMX27.
VectorCast 5.5
Multi
Mentor Graphics(VSX)
UML Design tool MagicDraw 16.5, Enterprise Architect
Codec MPEG4 (H.264), JPEG
Operating System Windows 2000 and xp and Linux Fedora 4.0
Configuration Management ClearCase, RTC, CM21(Honeywell Proprietary)
Protocols SPI, I2C , CAN
Change Management ClearQuest, CM21(Honeywell Proprietary), JIRA
UI Knowledge Widget modelling
Standards DO178b, ARINC 744 , ARINC 610B
Debugger GDB
Tracing tool TeamCenter 9, DOORS
Scheduling Tool Microsoft Project (MPP)
PROJECT DETAILS
Project Title : In Vehicle Infotainment - HMI.
Page 2 of 6
3. Sathish Kumar
sathishshyamala@gmail.com
Job Nature : Project Manager
Duration : Mar 2015 – Nov 2015.
Responsibilities:
• Analyze and involve in the project acquisitions, kick offs and Initiation.
• Daily planning and tracking, SPOC for multiple stakeholders like customer, Internal and
External QA, Customer, Finance, Senior Management etc.,
• Customer interaction , milestone preparation, Resource planning, etc.,
• Create and baseline the Project Plan and Schedule plan.
• Task and defects planning for sprints and milestones.
• Handling Requirements activities, Status reporting, Billing, Procurement, Release activities.
• Complete cost analysis and estimation for the projects.
Project Title : Fire Protection Systems.
Job Nature : Project Lead
Duration : Nov 2014 – Mar 2015.
Responsibilities:
• Analyze and involve in the project acquisitions, kick offs and Initiation.
• Selection of the Hardware components for the test lab and software procurement.
• Create and baseline the Project Plan, Schedule plan and Milestone plan.
• Complete cost analysis and estimation for the projects.
• Participate in the SOI audits.
• Working as the ICT manager for the offshore projects.
• Working in PMO.
• Participating in Change Control Board (CCB).
• Participating in the IPT meetings.
• Vendor interaction and procurement management.
• Create the WBS for the projects.
• Estimation of the tasks.
• Resource planning.
• Customer interaction.
• Reports preparations like Weekly bill utilization, Monthly Management Reports
and Quality Metrics analysis.
• Scheduling and Tracking.
• Stakeholders meetings.
Project Title : BMW35up.
Job Nature : Project Management, Development of Software Components,
Diagnosis and BAC.
Duration : Mar 2013 – Nov 2014.
Language : C
IDE : Multi
Responsibilities:
• Create and baseline the Project Plan, Schedule plan and Milestone plan.
• Creating release plans and iteration plans.
Page 3 of 6
4. Sathish Kumar
sathishshyamala@gmail.com
• Participating in Change Control Board (CCB).
• Create the WBS for the tasks.
• Estimation of the tasks.
• Resource planning.
• Customer interaction.
• Requirement analysis before each milestone.
• Reports preparations like Project Status Report(PSR), Management Review Progress(MRP),
Defect Metrics, Cumulative Project Cockpit(CPC), Quality Metrics analysis.
• Scheduling and Tracking.
• Stakeholders meetings.
• Hardware procurement and inventory.
• Experience on the Agile framework and SCRUM methodologies.
• Defect Management for the complete product.
• Participation of Surveys and audits like ASPICE, QA , CSAT,etc.,
• Architectural changes.
• Involved in development of Applications, BAC, AUTOSAR and Diagnosis.
• Appraisal, Interviews, Resource Planning and Billing Efficiency.
Project Title : Next Generation Flight Management Systems (NGFMS-SPL).
Job Nature : Development of Reports Management, Printer Proxy and Simsoft.
Duration : Jan 2011 – Feb 2013.
Language : C++
IDE : Visual Studio 2005
Responsibilities:
• SLR, HLR, LLR, Code and Integration.
• Planning and Estimation, maintaining low level metrics
• Involved in development of UIL_RPT, SSL_PPX, UIL_SIM and SSL_SIM.
• Escalate issues/risks in a timely manner with high quality.
Project Title : NGFMS(Non SPL)
Job Nature : Development of IOE input and output Manager.
Duration : Nov 2009 - Dec 2010.
Language : C
IDE : Visual Studio 2005
Responsibilities:
• SCD, SRD, SDD and code.
• Planning and Estimation, maintaining low level metrics
• Tracking the team members.
• Involved in development for all partitions of IOE.
• Mentoring team members.
• Escalate issues/risks in a timely manner with high quality.
Project Title : NGFMS (Non SPL)
Job Nature : Development of Maintenance Partition (MNP).
Page 4 of 6
5. Sathish Kumar
sathishshyamala@gmail.com
Duration : May 2009 - Oct 2009.
Language : C
IDE : Visual Studio 2005
Responsibilities:
• Analysis and Estimation of the requirements.
• Application development for the MNP inputs and validation.
• Initiating the CMC test requests and reporting to the CMC.
• Validating the test conditions and test progress monitor.
• Bit rating and message timing monitor.
• Posting the requested message information to the partition by validating the parameter.
Project Title : NGFMS (Non SPL).
Job Nature : Development of Built In Test Equipment (BITE) functional area.
Duration : Nov 2008 – April 2009.
Language : C
IDE : Visual Studio 2005
Responsibilities:
• Development of the functional level input validation from the partitions.
• Fault recording, analyze and detect the fault input.
• Fault segregation like software/non-software faults through TAM.
• Event storage in the respective buffer area.
• Health Management in all partitions at regular intervals.
Project Title : Finger Print Recognition and Access Control.
Job Nature : RTOS kernel and UART Development for ports.
Duration : June 2008 – October 2008.
Language : C and Assembly of ARM9E.
Compiler : IAR Embedded Work Bench V5.11.
Responsibilities:
• This project involved development of the RTOS Micro Kernel for the iMX27 multimedia
processor.
• The kernel is ported with all the synchronization and inters task communication mechanisms.
• Responsibilities include implementation of interrupt handler for each module.
• DMA access for each module for data transfer.
• Testing the modules in for correctness in the Simulator for ARM9E by IAR.
Project Title : Video over IP.
Duration : Apr 2007 – May 2008.
Language : C and assembly for BF561.
Compiler : Visual DSP++ 4.5 for BF-561.
Operating System : Windows xp and Linux
Responsibilities:
• This project involved development of the video conferencing code, a DSP based stand
alone embedded system product.
• Initially tested the performance of BF561 using JPEG algorithm.
Page 5 of 6
6. Sathish Kumar
sathishshyamala@gmail.com
• Implementation of the image capturing in ITU-R656 standard in PAL/NTSC mode.
• Each frame is taken for the MPEG4 compression algorithm.
• The profile used in the MPEG4 is the Advanced Real Time Simple (ARTS).
• The MPEG4 algorithm is implemented with the New Prediction and Reduced Resolution
Conversion.
• Porting VDSP code to suit uClinux.
• Debugging the code and reducing the latency issues.
• Hardware study and testing of the Board.
Project Title : Multi-Purpose Security and Remote Access using the
Embedded System
Duration : Nov 2006 – Mar 2007.
Controller Used : AT89C51.
Language : C and Embedded C
Compiler : Keil C
Responsibilities:
• Design and Development of a prototype for the desired application.
• Coding for the controller application.
• Testing the modules for the functionality.
Project Title : Movement Control of Robot using Mobile Communication
Duration : Mar 2006 – Oct 2006.
Controller Used : AT89C51.
Language : C and Embedded C
Compiler : Keil C
Responsibilities:
• Design and Development of a prototype for the desired application.
• Coding for the controller application excluding the RF module.
• Testing the modules for the functionality.
• Hardware implementation for the board.
Personal Information:
Date of Birth : 10-01-1981
Sex : Male.
Nationality : Indian.
Marital Status : Married.
Project Management Institute
(PMI) member ID : 3154487
PMP Number : 1886263
Passport : L5974344
Present Address : No.86, Flat no : 1’C’, Karthik Residency,
9th
Cross, 16th
main,
BTM layout 1st
stage,Bangalore- 560029, Karnataka.
Permanent Address : No. 18, Agaram Street,
Tiruvallur - 602001, Tiruvallur Taluk & District,
TamilNadu.
Page 6 of 6