M.K.KAILASH
Email: mkkailash@yahoo.com

Techno-Managerial professional with 12 years & 6 months of experience in
software development. Have extensive knowledge of C, C++, C# & OOP
development. Excel at project management and building high-performance
teams through empowerment and implementation of continuous improvement
programs.

Professional Experience:
    October 2007 to Till Date, Working as Software Development – Grade 9 in
      McAfee Software (India) Pvt. Ltd., Bangalore (www.McAfee.com).
    March 2006 to September 2007, Worked as Project Manager in
      Applied Materials India Pvt. Ltd., Bangalore (www.Amat.com).
    February 2005 to February 2006, Worked as Core Software Engineer in
      Siebel Systems Inc, Bangalore (www.Siebel.com).
    November 2002 to January 2005, Worked as Principal Engineer in
      Honeywell Technology Solutions Lab, Bangalore (www.Honeywell.com).
    July 2000 to October 2002, Worked as Software Engineer in
      Nirvana Technologies Pvt. Ltd., Mumbai (www.Nirvanatec.com).


Skill Profile:
   • Programming Languages: C, C++, C#, Objective-C.
   • Windows Software Development: Win32, MFC, COM, ATL, .NET, STL
   • DB & Web Design(Basic Exp) : SQL , PostgresSQL, ASP.NET,
       JavaScript, XSL
   • Operating Systems: Windows, DEOS (RTOS) , Mac-Os
   • Configuration Management: SVN, PVCS, CVS-Tortoise, Clearcase.
   • Computer Graphics: OpenGL 3D API.
   • Quality Process: Six Sigma Green Belt Certified Professional.
   • Involved in the team writing white paper on “Design consideration for
       using C++ in safety critical avionics systems”.

Education Details:
  • Master of Engineering, February 2000
           College of Engineering, Guindy. Anna University, Chennai, India.
  • Bachelor of Engineering May 1998
           Bharathidasan University, Tiruchirappalli, India.




Email: mkkailash@yahoo.com
Projects Handled:

Title: Health-Check Suite for McAfee Products.
Duration: October 2007 – Till Date.

Assignments and Responsibility:
   • Responsible for writing engineering response documents, project
      proposals, Engineering Roadmaps.
   • Managed engineers who were in different geographical locations.
   • Involved extensively in project planning and implemented AGILE process.
   • Experience in doing program management for engineering team.
   • Successful adaptor of early defect removal process to engineering team.
   • Hiring: 70% of current team members have been personally interviewed
      by me and recommended.
   • Setting, tracking, assessing goals for team engineers and involved in
      doing the appraisal cycles with my reporting manager.
   • Involved in writing the efficient algorithms that loops through huge volume
      of data and presenting the content in an intuitive manner. This will help the
      users to browse categories & sub-categories for finding a solution to their
      problem and hence deflecting an escalation to a higher-cost channel.
   • Designed and developed the core components in the suite using rule
      based approaches that does the detection, remediation and collection.
   • Involved in designing the Seal Healer for McAfee Products.
Environment:
      C++, STL, Win32,COM, ATL,.NET,C#,COCOA,Objective-C,SQL.

Title: Linear Sputter – Physical Vapor Deposition System.
Duration: March 2006 – September 2007.

Assignments and Responsibility:
   • Worked with teams spread across different geographical location.
   • Responsible for career development of the team.
   • Interacted with Process Engineering group to gather the top level
      requirements and based on that designed the different software module.
   • Developed the complex Wafer movement/sequencer algorithm.
   • Involved in writing the C++ based simulator.
   • Designed various devices like Heat Exchanger, Generator, Chamber
      Magnetron, Pressure Gauge, Rough Pump, Vacuum system etc in
      Reusable Device Module so that it can be used across by different
      software baselines.
Environment:
      C++, C#, STL, .NET, DeviceNet Protocols.


Email: mkkailash@yahoo.com
Title: COD Integration with Siebel Enterprise.
Duration: February 2005 – February 2006.

Assignments and Responsibility:
   • Interacted with Product management group to gather the top level
      requirement and based on that designed & implemented the feature.
   • Coordinated with 3rd party vendor Telephony@Work for seamless
      integration.
   • Developed the network layer for sending & receiving the SOAP
      communication.
   • Developed the Multithreaded driver layer plug-in into Siebel
      Communication Service manager.
   • Developed Log file analyzer which is used for debugging the Agent life
      cycle and Interaction life cycle.
   • Involved in fixing the change request in CTI & Communication server.
Environment:
      C++, C#, STL, COM, ATL, MFC, Xercer Parser,SQL.



Title: EPIC -DU Core Software for DU-1310 && DU-1080 Cockpit Displays.
Duration: November 2002 – January 2005.

Assignments and Responsibility:
   • Maintenance of the OpenGL based graphics software. This includes bug
      fixing and change request processing.
   • Responsible for design and development of OpenGL based Graphics
      support library the displays applications. These libraries includes API’s for
      rendering Attitude Direction Indicator, CircularDial, CircularTape,
      BarChart, Arc, Circle, Curve, Pie, FilledCircle, FilledPie etc.
   • Written System requirement Specifications (SRS) and the System
      Requirement Detailed Document (SRDD) for the various DO178B Level A
      graphics components.
   • Experience in implementation/porting of the OpenGL pipeline in different
      environments as DO178B Level A software.
   • Responsible of certifying the graphics library by writing DEOS based
      graphics applications using C/C++.
   • Six Sigma Green belt project on the productivity and quality improvement.
Environment:
      C, C++, DEOS Operating System, OpenGL.




Email: mkkailash@yahoo.com
Title: Nesting Software - PLUS2D & PLUS1D
Duration: December 2001 to October 2002 & February 2001 to April 2001

Assignments and Responsibility:
   • Developed the sophisticated algorithms that generate high utilization
      layouts.
   • Developed CAD interface through DXF export using OpenDwg Library.
   • Developed the interface for creating user defined patterns for non-
      rectangular parts that can be combined to form nearly rectangular
      patterns.
   • Responsible for designing the Parametric Part library, Part assemblies
      and integrating the package with inventory database.
Environment:
      C++, Visual C++ 6.0, Win32, MFC, STL, OpenDwg.


Title: UNI-CAD
Duration: May 2001 to November 2001.
Client: UNI Elektronics Gmbh, Germany.

Assignments and Responsibility:
   • Worked in comprehensive algorithm development and enhancement
   • Complete revamp of user interface.
   • Developed 3D view for the package using OPENGL.
   • Developed Macro language for Parametric Roofs.
Environment:
       C++, Visual C++ 6.0, Win32, MFC, OPENGL, GSM.

Title: Structural Engineering Product Suite.
Duration: July 2000 to October 2000.
Client: Comp ser im Ingenierurbur, Gmbh, Germany. (www.csi-gmbh.de)

Assignments and Responsibility:
   • Enhancement and Maintenance of the packages.
   • Involved in bug fixing and user interface modifications.

Environment:
       C++, Visual C++ 6.0, Win32, MFC.




Email: mkkailash@yahoo.com

Mkkailashbio

  • 1.
    M.K.KAILASH Email: mkkailash@yahoo.com Techno-Managerial professionalwith 12 years & 6 months of experience in software development. Have extensive knowledge of C, C++, C# & OOP development. Excel at project management and building high-performance teams through empowerment and implementation of continuous improvement programs. Professional Experience:  October 2007 to Till Date, Working as Software Development – Grade 9 in McAfee Software (India) Pvt. Ltd., Bangalore (www.McAfee.com).  March 2006 to September 2007, Worked as Project Manager in Applied Materials India Pvt. Ltd., Bangalore (www.Amat.com).  February 2005 to February 2006, Worked as Core Software Engineer in Siebel Systems Inc, Bangalore (www.Siebel.com).  November 2002 to January 2005, Worked as Principal Engineer in Honeywell Technology Solutions Lab, Bangalore (www.Honeywell.com).  July 2000 to October 2002, Worked as Software Engineer in Nirvana Technologies Pvt. Ltd., Mumbai (www.Nirvanatec.com). Skill Profile: • Programming Languages: C, C++, C#, Objective-C. • Windows Software Development: Win32, MFC, COM, ATL, .NET, STL • DB & Web Design(Basic Exp) : SQL , PostgresSQL, ASP.NET, JavaScript, XSL • Operating Systems: Windows, DEOS (RTOS) , Mac-Os • Configuration Management: SVN, PVCS, CVS-Tortoise, Clearcase. • Computer Graphics: OpenGL 3D API. • Quality Process: Six Sigma Green Belt Certified Professional. • Involved in the team writing white paper on “Design consideration for using C++ in safety critical avionics systems”. Education Details: • Master of Engineering, February 2000 College of Engineering, Guindy. Anna University, Chennai, India. • Bachelor of Engineering May 1998 Bharathidasan University, Tiruchirappalli, India. Email: mkkailash@yahoo.com
  • 2.
    Projects Handled: Title: Health-CheckSuite for McAfee Products. Duration: October 2007 – Till Date. Assignments and Responsibility: • Responsible for writing engineering response documents, project proposals, Engineering Roadmaps. • Managed engineers who were in different geographical locations. • Involved extensively in project planning and implemented AGILE process. • Experience in doing program management for engineering team. • Successful adaptor of early defect removal process to engineering team. • Hiring: 70% of current team members have been personally interviewed by me and recommended. • Setting, tracking, assessing goals for team engineers and involved in doing the appraisal cycles with my reporting manager. • Involved in writing the efficient algorithms that loops through huge volume of data and presenting the content in an intuitive manner. This will help the users to browse categories & sub-categories for finding a solution to their problem and hence deflecting an escalation to a higher-cost channel. • Designed and developed the core components in the suite using rule based approaches that does the detection, remediation and collection. • Involved in designing the Seal Healer for McAfee Products. Environment: C++, STL, Win32,COM, ATL,.NET,C#,COCOA,Objective-C,SQL. Title: Linear Sputter – Physical Vapor Deposition System. Duration: March 2006 – September 2007. Assignments and Responsibility: • Worked with teams spread across different geographical location. • Responsible for career development of the team. • Interacted with Process Engineering group to gather the top level requirements and based on that designed the different software module. • Developed the complex Wafer movement/sequencer algorithm. • Involved in writing the C++ based simulator. • Designed various devices like Heat Exchanger, Generator, Chamber Magnetron, Pressure Gauge, Rough Pump, Vacuum system etc in Reusable Device Module so that it can be used across by different software baselines. Environment: C++, C#, STL, .NET, DeviceNet Protocols. Email: mkkailash@yahoo.com
  • 3.
    Title: COD Integrationwith Siebel Enterprise. Duration: February 2005 – February 2006. Assignments and Responsibility: • Interacted with Product management group to gather the top level requirement and based on that designed & implemented the feature. • Coordinated with 3rd party vendor Telephony@Work for seamless integration. • Developed the network layer for sending & receiving the SOAP communication. • Developed the Multithreaded driver layer plug-in into Siebel Communication Service manager. • Developed Log file analyzer which is used for debugging the Agent life cycle and Interaction life cycle. • Involved in fixing the change request in CTI & Communication server. Environment: C++, C#, STL, COM, ATL, MFC, Xercer Parser,SQL. Title: EPIC -DU Core Software for DU-1310 && DU-1080 Cockpit Displays. Duration: November 2002 – January 2005. Assignments and Responsibility: • Maintenance of the OpenGL based graphics software. This includes bug fixing and change request processing. • Responsible for design and development of OpenGL based Graphics support library the displays applications. These libraries includes API’s for rendering Attitude Direction Indicator, CircularDial, CircularTape, BarChart, Arc, Circle, Curve, Pie, FilledCircle, FilledPie etc. • Written System requirement Specifications (SRS) and the System Requirement Detailed Document (SRDD) for the various DO178B Level A graphics components. • Experience in implementation/porting of the OpenGL pipeline in different environments as DO178B Level A software. • Responsible of certifying the graphics library by writing DEOS based graphics applications using C/C++. • Six Sigma Green belt project on the productivity and quality improvement. Environment: C, C++, DEOS Operating System, OpenGL. Email: mkkailash@yahoo.com
  • 4.
    Title: Nesting Software- PLUS2D & PLUS1D Duration: December 2001 to October 2002 & February 2001 to April 2001 Assignments and Responsibility: • Developed the sophisticated algorithms that generate high utilization layouts. • Developed CAD interface through DXF export using OpenDwg Library. • Developed the interface for creating user defined patterns for non- rectangular parts that can be combined to form nearly rectangular patterns. • Responsible for designing the Parametric Part library, Part assemblies and integrating the package with inventory database. Environment: C++, Visual C++ 6.0, Win32, MFC, STL, OpenDwg. Title: UNI-CAD Duration: May 2001 to November 2001. Client: UNI Elektronics Gmbh, Germany. Assignments and Responsibility: • Worked in comprehensive algorithm development and enhancement • Complete revamp of user interface. • Developed 3D view for the package using OPENGL. • Developed Macro language for Parametric Roofs. Environment: C++, Visual C++ 6.0, Win32, MFC, OPENGL, GSM. Title: Structural Engineering Product Suite. Duration: July 2000 to October 2000. Client: Comp ser im Ingenierurbur, Gmbh, Germany. (www.csi-gmbh.de) Assignments and Responsibility: • Enhancement and Maintenance of the packages. • Involved in bug fixing and user interface modifications. Environment: C++, Visual C++ 6.0, Win32, MFC. Email: mkkailash@yahoo.com