1. A C E G H I L M NB JD F K
ED1 ED2
D001
D002 D003
ED4
D101 D102 D109 D110D103 D111D117
D217 D211D203 D210D209D202D201
D322 D316D301 D302 D308D303
D414 D409D406D404D402D401 D403 D405 D408
D012
W118
W217
W419
W321
W108
W309
W207
W308
W206
W107
W409 W410
27 m²
Stair way
RN316
194 m²
Corridor to MA &
Stairway
RN211
194 m²
Connection to MA
RN111
245 m²
Galler y and Entr ance
RN009
101 m²
1st floor corridor
RN119
101 m²
1st floor corridor
RN119
101 m²
2nd floor corridor
RN219
101 m²
2nd floor corridor
RN219
101 m²
3rd floor corridor
RN323
101 m²
3rd floor corridor
RN323
118 m²
4th floor corridor
RN414 118 m²
4th floor corridor
RN414
27 m²
Stair way
RN406
33153000300030003600
2400240024002400
2400
2145
21452145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
2145
211021102110
2100
24002400240024002400
900600
240024002400240015002400
3900
3900
Area for water
tanks
1000
1585
3000
2090
-
---
3
Detail
-
---
10
Detail
300030003000
71 m²
Classroom 13
RN319
71 m²
Classr oom 8
RN214
71 m²
Classr oom 3
RN114
108 m²
Lab 3
RN412
108 m²
Lab 7
RN402
134 m²
Large classroom 6
RN302
134 m²
Large classroom 4
RN202
101 m²
Lecture Theatre
RN002
245 m²
Galler y and Entr ance
RN009
101 m²
1st floor corridor
RN119
101 m²
2nd floor corridor
RN219
101 m²
3rd floor corridor
RN323
3 m²
Disabled
RN412
123456781011 9
W303
W203
W103
W313
W211
W112
D002
D114
D111
D211 D214
D316
D409D406
W302
W404
W003W002 W001
W414
D319
ED2
535 535
1100
1100
134 m²
Large classroom 2
RN102
39003295
30003000300030003295
2400240024002600
33002400240024002600
900900900
900900900
21452145
13870
2991
10650
13870
13870
13870
12200 1510
12200
Servicevoid
900
118 m²
4th floor corridor
RN414
2600
240024002452
900
214521452145
2145
White boardWhite board
-
---
9
Detail
-
---
8
Detail
-
---
2
detail
-
---
1
detail
-
---
7
detail
-
---
6
Detail
-
---
4
Detail
-
---
5
Detail
www.autodesk.com/revit
SCALE (@ A1)
CHECKED BY
TITLE
PROJECT NUMBER
CLIENT
PROJECT
DRAWING NUMBER REV
DRAWN BY DATE
1 : 100
22/05/201519:06:00
sections
SL987
Science Block
University of W-ton
Andrew
Cunningham
SL020 & SL022
Samson
Oakley
22/05/15
1 : 100
longitudal section
1
1 : 100
South Section
2
Foundations (see structural engineers plans for confirmed depths and witdths)
DPC Masonary work
Powder coated aluminum windows
service void
service void
service void
service void
precast concreat slab
connecting wall to MI stairway
Roof lights
Aluminuim cladded gullwing roof
please refer to mechanical enginneers drawings
steel beams (refer to structural engineer for exact measurments
100mm internal block work
Armtrong suspended 600mmx 600mm grid ceiling
Foundations
Car park
Roof gully
service void to carry rainwater pipes and svps to ground floor
aluminum powder coated windows
precast concrete slab finished with 25mm screed
100mm internal blockwork with 12.5mm plasterboard and 13mm skim
rainscreed cladding system
powdercoated railing to match building colour
teird seating
Ground level
Ground level
All foundation are subject to structural
enginneer approval
for fixed furniture details see drawings
SL
for lab layout and fixed furniture details see drawing s SL030, SL031
For lecture theatre lay out see drawing SL034
for disabled toilet laout see drawing SL029
SL020
SL022
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)