2. e-ee-e
f-ff-f
g-gg-g
h-hh-h
d-dd-d
c-cc-c
51 3 6
4
2
1 2 3 4
5
6
H
E
B
C
F
G
D
H
E
B
C
F
G
D
living
room
cycle store
& storage
w/c
utility
kitchen
dining
breakfast
entrance
hall
cpd.
W3
D1 W11 W1
W2
W4
W6
W5
W10
W7
W8
W9
D2
a-aa-a
b-bb-b
rwp
rwp
rwprwp
rwp
DG/02 (950x2100)
DG/03 (950x2100)
DG/04 (950x2100)
DG/05 (950x2100)
900x750mm
clear zone to
front of wc pan
SVP
(with access
rodding point)
laundry
chute
AAV
(with access
rodding point)
SVP
(with access
rodding point)
Span of floor joists over
as specified by Greencore Construction
Span of floor joists over
as specified by Greencore Construction
Span of floor joists over
as specified by Greencore Construction
Span of floor joists over
as specified by Greencore Construction
Span of floor joists over
as specified by Greencore Construction
Span of floor joists over
as specified by Greencore Construction
(15 l/s)
final layout by others
(30 l/s)
(30 l/s)
2800
final layout by others
final layout by others
AAV
(with access
rodding point)
mains interlinked
smoke detector with
battery backup
Internal stair to
specialist
manufacturer's design
and detail. Supporting
structure to be
coordinated to suit final
design.
3003 3758 2894 1440
1801
1275
2516
1802 3334
4162
4662
5738
3003 3758
3334
7768
1
:
Ground Floor Plan
102
01
50
5.
12.
11.
10.
9.
8.
7.
6.
4.
13.
3.
2.
1.
14.
OUTLINE SPECIFICATION
E1 CONCRETE FOUNDATIONS AND FLOORS
Foundations: Specialist foundations to S.Eng design.
Ground Floor Structure: Proprietary beam and block floor to specialist design.
F1 MASONRY WALLING
Substructure Walls: 7N Thermal/concrete aggregate block work as per drawings; min 3 courses
of frost resistant brick to outer skin below DPC or wherever outer skin is exposed above finished
ground levels.
G1 PACKAGED FRAMES AND STRUCTURAL STEELWORK
Timber Superstructure: In strict accordance with Greencore Construction.
Pitched Roof Structure: In strict accordance with Greencore Construction.
G2 STRUCTURAL TIMBER AND GENERAL CARPENTRY
H2 BOARD AND SHEET EXTERNAL CLADDING AND SOFFITS
Roof Soffits: Dales Eaves RG10 321 & G20 950 Dales kwikfix soffit system or similar approved.
Colour tbc by client
Metal Cladding: NedZink Nova standing seam. Installed in accordance with manufacturers
instructions.
Brick Slips: Cheshire Orange. Installed in accordance with manufacturers instructions.
J1 FLAT ROOF COVERINGS
Main pitched Roof: Metal Cladding: NedZinc Noir standing seam. Installed in accordance with
manufacturers instructions.
K1 WOOD INTERNAL FLOORING, LININGS AND TRIM
Ground Floor Generally: Client to confirm.
First Floor Generally: Client to confirm.
Skirting, Architraves: Client to confirm
Window Boards: Client to confirm.
L1 WINDOWS, ROOF WINDOWS AND PATENT GLAZING
Windows & Doors: Ideal Combi Futura + Triple Glazed Composite windows; RAL 7012 outside /
RAL 9010 Matt inside Client to confirm.
L2 DOORS AND FRAMES
Internal Doorsets: Client to confirm.
External Doors (main entrance): Urban Front.
Garage Door: Hormann Mribb Sectional insulated silkgrain
Garage Side Door: Hormann door to match garage
L3 STAIRS AND GUARDING
Main Stair: Bespoke staircase to specialist design. Client to confirm.
M1 PLASTERING, RENDERING AND SCREEDING
Ground Floor Screed: 75mm Gyvlon flowing screed on 220mm PUR insulation boards
Internal Walls and Ceilings Generally: 12.5mm plasterboard with skim finish.
Internal Walls and Ceilings (Bathrooms): 12.5mm Moisture resistant vapour check plasterboard
with skim finish.
External Render: StoLit Render Finish. reinforcement Mesh. Sto Rend Flex Coat. StoVentec
Carrier Board. Colour: White
M4 SHEET AND TILE INTERNAL FINISHES
Tiled floors: Client to confirm.
Tiled walls: Full height tiles to shower walls and vanity/toilet boxed sections. Client to confirm.
M6 PAINTING, STAINING AND VARNISHING
51 3 6
4
2
1 2 3 4
5
6
H
E
B
C
F
G
D
H
E
B
C
F
G
D
e-ee-e
f-ff-f
g-gg-g
h-hh-h
b-bb-b
c-cc-c
d-dd-d
en-suite
walk in
wardrobe
master
bedroom
family
bathroom
bedroom 3
bedroom 2
gallery
W20
W19
W17
W18
W21
W16
W14
W15
W12 W13
a-aa-a
rwp
rwp
rwprwp
rwp
DF/07 (950x2100)
laundry
chute
Span of roof joists over
as specified by Greencore Construction
DF/06 (950x2100)
DF/08 (950x2100)
DF/09 (950x2100)
DF/11 (950x2100)
DF/12
(950x2100)
DF/10
(980x2100)
hot water tank
SVP
(with access
rodding point)
SVP
(with access
rodding point)
Span of roof joists over
as specified by Greencore Construction
Span of roof joists over
as specified by Greencore Construction
Span of roof joists over
as specified by Greencore Construction
Span of roof joists over
as specified by Greencore Construction
Span of roof joists over
as specified by Greencore Construction
final layout by others
final layout by others
2800
(15 l/s)
1363
(15 l/s)
mains interlinked
smoke detector with
battery backup
Internal stair to
specialist
manufacturer's design
and detail. Supporting
structure to be
coordinated to suit final
design.
3003 3758 4398
4162
2872
23403309
3003 3758 4398
4680
1354
2992
2101
4398
5738
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
13.
2.
1.
14.
235
900
3055
cpd.
MVHR
1
:
First Floor Plan
102
02
50
M6 PAINTING, STAINING AND VARNISHING
Walls & Ceilings Generally: Dulux 3 coat paint system: Trade Diamond Matt: Colour - client to
confirm
Bathrooms: Dulux 3 coat paint system: Trade Diamond Matt: Colour - client to confirm
Skirting, Architraves & Window Boards: Dulux 3 coat paint system - Satinwood: Colour - client to
confirm
N1 APPLIANCES AND FITTINGS
Kitchen and bathrooms: Refer to kitchen/bathroom designers plan.
TONY HOLT DESIGN.
Bespoke Property Designer
Bournemouth:
Website:
Email:
01202 208331
info@tonyholt-design.co.uk
www.tonyholt-design.co.uk
project name
rev
dwg sheet
dwg no
dwg name Proposed Ground & First Floor Plan
102
A1 @ 1:50
Greenbanks, Sandy Lane, Kingsley
BUILDING REGS
IMPORTANT NOTE
All dimensions in millimeters . Where dimensions are not given, drawings must not be
scaled. In the event of any detail or dimensional conflict between drawings and site
conditions, the matter must be referred back to the author for clarification. All
dimensions and conditions are to be checked on site by the contractor prior to
commencing any work. The contractor is responsible for checking that there is no
conflict between site dimensions and figured dimensions. Drawings to be read in
conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist
Manufacturer's and Sub-contractor's drawings and specification.
20.04.16
3. W1
5 136
4
2
12346
5
"e"W12
1100
Zinc Standing
Seam - Colour
tbc
Acrylic
Render
W11W4
W15
"e"
Acrylic Render
Stone Cladding
Brand:Norstone
UK
Colour:Ochre
Blend
W3
Zinc Standing
Seam - Colour
tbc
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
Stone Cladding
Brand:Norstone
UK
Colour:Ochre
Blend
1100
Aluminum
Flashing
Aluminum
Flashing
Aluminum
Flashing
ramp
D1
Aluminum
Flashing
W13
1
:
West Elevation
110
01
50
Zinc Fascia Zinc Fascia
Zinc standing seam
roof wrapped down to form fascia
W7
HEB C F GD
HEB C F GD
W10
D2
Zinc Standing
Seam - Colour
tbc
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
Zinc Standing
Seam - Colour
tbc
W18
1
:
South Elevation
110
02
50
Zinc Fascia
Zinc Standing
Seam - Colour
tbc
Zinc Standing
Seam - Colour
tbc
Zinc standing seam
roof wrapped down to form fascia
Aluminum
Flashing
Frameless glass guarding
in accordance
with specialist design
Acrylic
Render
TONY HOLT DESIGN.
Bespoke Property Designer
Bournemouth:
Website:
Email:
01202 208331
info@tonyholt-design.co.uk
www.tonyholt-design.co.uk
project name
rev
dwg sheet
dwg no
dwg name West & South Elevation
110
A1 @ 1:50
Greenbanks, Sandy Lane, Kingsley
BUILDING REGS
IMPORTANT NOTE
All dimensions in millimeters . Where dimensions are not given, drawings must not be
scaled. In the event of any detail or dimensional conflict between drawings and site
conditions, the matter must be referred back to the author for clarification. All
dimensions and conditions are to be checked on site by the contractor prior to
commencing any work. The contractor is responsible for checking that there is no
conflict between site dimensions and figured dimensions. Drawings to be read in
conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist
Manufacturer's and Sub-contractor's drawings and specification.
20.04.16
4. W6
W20 "e"
W19
"e"
51 3 6
4
2
1 2 3 4 6
5
1100
1100
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
Zinc Standing
Seam - Colour
tbc
Zinc Standing
Seam - Colour
tbc
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
"e"
W17
W21
Zinc Standing
Seam - Colour
tbc
Acrylic
Render
Acrylic
Render
Aluminum
Flashing
Aluminum
Flashing
Aluminum
Flashing
Aluminum
Flashing
Aluminum
Flashing
W9 W8
1
:
East Elevation
111
01
50
Zinc Fascia Zinc Fascia
Aluminum
Flashing
Zinc standing seam
roof wrapped down to form fascia
Frameless glass guarding
in accordance
with specialist design
Zinc Standing
Seam - Colour
tbc
W2
H E BCFG D
H E BCFG D
W5
W16Zinc Standing
Seam - Colour
tbc
Stone Cladding
Brand:Norstone
UK
Colour:Ochre
Blend
W14
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
1
:
North Elevation
111
02
50
Zinc Fascia
Zinc Standing
Seam - Colour
tbc
Zinc Standing
Seam - Colour
tbc
Zinc standing seam
roof wrapped down to form fascia
TONY HOLT DESIGN.
Bespoke Property Designer
Bournemouth:
Website:
Email:
01202 208331
info@tonyholt-design.co.uk
www.tonyholt-design.co.uk
project name
rev
dwg sheet
dwg no
dwg name East & North Elevation
111
A1 @ 1:50
Greenbanks, Sandy Lane, Kingsley
BUILDING REGS
IMPORTANT NOTE
All dimensions in millimeters . Where dimensions are not given, drawings must not be
scaled. In the event of any detail or dimensional conflict between drawings and site
conditions, the matter must be referred back to the author for clarification. All
dimensions and conditions are to be checked on site by the contractor prior to
commencing any work. The contractor is responsible for checking that there is no
conflict between site dimensions and figured dimensions. Drawings to be read in
conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist
Manufacturer's and Sub-contractor's drawings and specification.
20.04.16
5. 51 3 6
4
2
1 2 3 4 6
5
ventilated void ventilated void ventilated void
Top of Deck
72.400
gallery
master
bedroom
en-suite
living
room
garage
ventilated void ventilated void
utility kitchen
bedroom 3
2717 2043
D1
"e" W12 W15
"e"
W11 W3 W4
253
2715
TopofBeam&Block
toU/SofJoist
2425
TopofScreed
toU/SofJoist
entrance
hall
12.0°
12.0°
W1
W13
1
:
Section A-A
120
01
50
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
51 3 6
4
2
1 2 3 4 6
5
Top of Deck
72.400
253
gallery
master
bedroom
en-suite
living
room
garage dining kitchen
family
bathroom
2715
TopofBeam&Block
toU/SofJoist
2425
TopofScreed
toU/SofJoist
"e" W12
D1
W11 W4
12.0°
12.0°
W1
W13
1
:
Section B-B
120
02
50
ventilated void ventilated void ventilated void ventilated void
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
E BCF D
E BCF D
Top of Deck
72.400
living
room
master
bedroom
ventilated void
1240
1
:
Section F-F
120
04
50
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
E BCF D
E BCF D
W10
D2
Top of Deck
72.400
en suite
walking
wardrobe
cycle
store
& storage
ventilated void
1240
1
:
Section E-E
120
03
50
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
TONY HOLT DESIGN.
Bespoke Property Designer
Bournemouth:
London:
Website:
Email:
0203 598 1665
01202 208331
info@tonyholt-design.co.uk
www.tonyholt-design.co.uk
project name
rev
dwg sheet
dwg no
dwg name Section A, B, E & F
120
A1 @ 1:50
Greenbanks, Sandy Lane, Kingsley
TENDER
PRELIMINARY
20.04.16
IMPORTANT NOTE
All dimensions in millimeters . Where dimensions are not given, drawings must not be
scaled. In the event of any detail or dimensional conflict between drawings and site
conditions, the matter must be referred back to the author for clarification. All
dimensions and conditions are to be checked on site by the contractor prior to
commencing any work. The contractor is responsible for checking that there is no
conflict between site dimensions and figured dimensions. Drawings to be read in
conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist
Manufacturer's and Sub-contractor's drawings and specification.
6. W20 "e"
ventilated void
253
gallery
ventilated void
dining breakfast
family
bathroom
2715
TopofBeam&Block
toU/SofJoist
2425
TopofScreed
toU/SofJoist
W4
51 3 6
4
2
1 2 3 4 6
5
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
W21
Metal Cladding
Color- TBC Top of Deck
72.400
W9
Aluminum
Flashing
W1
W13
1
:
Section C-C
121
01
50
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
W20 "e" W19
"e"
51 3 6
4
2
1 2 3 4 6
5
ventilated void
breakfast
bedroom 2
W4
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
Metal Cladding
Color- TBC
W21
Acrylic
Render
Acrylic
Render
Aluminum
Flashing
Aluminum
Flashing
Aluminum
Flashing
Aluminum
Flashing
W8
Top of Deck
72.400
W9
3225
1
:
Section D-D
121
02
50
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
W7
W2
H E BCFG D
H E BCFG D
Top of Deck
72.400
W14W18
bedroom 2
family
bathroom
bedroom 3
kitchenbreakfast
ventilated void
1
:
Section H-H
121
03
50
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
E BCF D
E BCF D
Top of Deck
72.400
entrance
hall
dining
gallery
ventilated void
Internal stair to
specialist
manufacturer's design
and detail. Supporting
structure to be
coordinated to suit final
design.
1
:
Section G-G
121
04
50
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
39.4°
TONY HOLT DESIGN.
Bespoke Property Designer
Bournemouth:
London:
Website:
Email:
0203 598 1665
01202 208331
info@tonyholt-design.co.uk
www.tonyholt-design.co.uk
project name
rev
dwg sheet
dwg no
dwg name Section C, D , G & H
121
A1 @ 1:50
Greenbanks, Sandy Lane, Kingsley
TENDER
PRELIMINARY
20.04.16
IMPORTANT NOTE
All dimensions in millimeters . Where dimensions are not given, drawings must not be
scaled. In the event of any detail or dimensional conflict between drawings and site
conditions, the matter must be referred back to the author for clarification. All
dimensions and conditions are to be checked on site by the contractor prior to
commencing any work. The contractor is responsible for checking that there is no
conflict between site dimensions and figured dimensions. Drawings to be read in
conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist
Manufacturer's and Sub-contractor's drawings and specification.