SlideShare a Scribd company logo
1 of 6
Download to read offline
e-ee-e
f-ff-f
g-gg-g
h-hh-h
d-dd-d
c-cc-c
51 3 6
4
2
1 2 3 4
5
6
H
E
B
C
F
G
D
H
E
B
C
F
G
D
living
room
cycle store
& storage
w/c
utility
kitchen
dining
breakfast
entrance
hall
cpd.
W3
D1 W11 W1
W2
W4
W6
W5
W10
W7
W8
W9
D2
a-aa-a
b-bb-b
rwp
rwp
rwprwp
rwp
DG/02 (950x2100)
DG/03 (950x2100)
DG/04 (950x2100)
DG/05 (950x2100)
900x750mm
clear zone to
front of wc pan
SVP
(with access
rodding point)
laundry
chute
AAV
(with access
rodding point)
SVP
(with access
rodding point)
Span of floor joists over
as specified by Greencore Construction
Span of floor joists over
as specified by Greencore Construction
Span of floor joists over
as specified by Greencore Construction
Span of floor joists over
as specified by Greencore Construction
Span of floor joists over
as specified by Greencore Construction
Span of floor joists over
as specified by Greencore Construction
(15 l/s)
final layout by others
(30 l/s)
(30 l/s)
2800
final layout by others
final layout by others
AAV
(with access
rodding point)
mains interlinked
smoke detector with
battery backup
Internal stair to
specialist
manufacturer's design
and detail. Supporting
structure to be
coordinated to suit final
design.
3003 3758 2894 1440
1801
1275
2516
1802 3334
4162
4662
5738
3003 3758
3334
7768
1
:
Ground Floor Plan
102
01
50
5.
12.
11.
10.
9.
8.
7.
6.
4.
13.
3.
2.
1.
14.
OUTLINE SPECIFICATION
E1 CONCRETE FOUNDATIONS AND FLOORS
Foundations: Specialist foundations to S.Eng design.
Ground Floor Structure: Proprietary beam and block floor to specialist design.
F1 MASONRY WALLING
Substructure Walls: 7N Thermal/concrete aggregate block work as per drawings; min 3 courses
of frost resistant brick to outer skin below DPC or wherever outer skin is exposed above finished
ground levels.
G1 PACKAGED FRAMES AND STRUCTURAL STEELWORK
Timber Superstructure: In strict accordance with Greencore Construction.
Pitched Roof Structure: In strict accordance with Greencore Construction.
G2 STRUCTURAL TIMBER AND GENERAL CARPENTRY
H2 BOARD AND SHEET EXTERNAL CLADDING AND SOFFITS
Roof Soffits: Dales Eaves RG10 321 & G20 950 Dales kwikfix soffit system or similar approved.
Colour tbc by client
Metal Cladding: NedZink Nova standing seam. Installed in accordance with manufacturers
instructions.
Brick Slips: Cheshire Orange. Installed in accordance with manufacturers instructions.
J1 FLAT ROOF COVERINGS
Main pitched Roof: Metal Cladding: NedZinc Noir standing seam. Installed in accordance with
manufacturers instructions.
K1 WOOD INTERNAL FLOORING, LININGS AND TRIM
Ground Floor Generally: Client to confirm.
First Floor Generally: Client to confirm.
Skirting, Architraves: Client to confirm
Window Boards: Client to confirm.
L1 WINDOWS, ROOF WINDOWS AND PATENT GLAZING
Windows & Doors: Ideal Combi Futura + Triple Glazed Composite windows; RAL 7012 outside /
RAL 9010 Matt inside Client to confirm.
L2 DOORS AND FRAMES
Internal Doorsets: Client to confirm.
External Doors (main entrance): Urban Front.
Garage Door: Hormann Mribb Sectional insulated silkgrain
Garage Side Door: Hormann door to match garage
L3 STAIRS AND GUARDING
Main Stair: Bespoke staircase to specialist design. Client to confirm.
M1 PLASTERING, RENDERING AND SCREEDING
Ground Floor Screed: 75mm Gyvlon flowing screed on 220mm PUR insulation boards
Internal Walls and Ceilings Generally: 12.5mm plasterboard with skim finish.
Internal Walls and Ceilings (Bathrooms): 12.5mm Moisture resistant vapour check plasterboard
with skim finish.
External Render: StoLit Render Finish. reinforcement Mesh. Sto Rend Flex Coat. StoVentec
Carrier Board. Colour: White
M4 SHEET AND TILE INTERNAL FINISHES
Tiled floors: Client to confirm.
Tiled walls: Full height tiles to shower walls and vanity/toilet boxed sections. Client to confirm.
M6 PAINTING, STAINING AND VARNISHING
51 3 6
4
2
1 2 3 4
5
6
H
E
B
C
F
G
D
H
E
B
C
F
G
D
e-ee-e
f-ff-f
g-gg-g
h-hh-h
b-bb-b
c-cc-c
d-dd-d
en-suite
walk in
wardrobe
master
bedroom
family
bathroom
bedroom 3
bedroom 2
gallery
W20
W19
W17
W18
W21
W16
W14
W15
W12 W13
a-aa-a
rwp
rwp
rwprwp
rwp
DF/07 (950x2100)
laundry
chute
Span of roof joists over
as specified by Greencore Construction
DF/06 (950x2100)
DF/08 (950x2100)
DF/09 (950x2100)
DF/11 (950x2100)
DF/12
(950x2100)
DF/10
(980x2100)
hot water tank
SVP
(with access
rodding point)
SVP
(with access
rodding point)
Span of roof joists over
as specified by Greencore Construction
Span of roof joists over
as specified by Greencore Construction
Span of roof joists over
as specified by Greencore Construction
Span of roof joists over
as specified by Greencore Construction
Span of roof joists over
as specified by Greencore Construction
final layout by others
final layout by others
2800
(15 l/s)
1363
(15 l/s)
mains interlinked
smoke detector with
battery backup
Internal stair to
specialist
manufacturer's design
and detail. Supporting
structure to be
coordinated to suit final
design.
3003 3758 4398
4162
2872
23403309
3003 3758 4398
4680
1354
2992
2101
4398
5738
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
13.
2.
1.
14.
235
900
3055
cpd.
MVHR
1
:
First Floor Plan
102
02
50
M6 PAINTING, STAINING AND VARNISHING
Walls & Ceilings Generally: Dulux 3 coat paint system: Trade Diamond Matt: Colour - client to
confirm
Bathrooms: Dulux 3 coat paint system: Trade Diamond Matt: Colour - client to confirm
Skirting, Architraves & Window Boards: Dulux 3 coat paint system - Satinwood: Colour - client to
confirm
N1 APPLIANCES AND FITTINGS
Kitchen and bathrooms: Refer to kitchen/bathroom designers plan.
TONY HOLT DESIGN.
Bespoke Property Designer
Bournemouth:
Website:
Email:
01202 208331
info@tonyholt-design.co.uk
www.tonyholt-design.co.uk
project name
rev
dwg sheet
dwg no
dwg name Proposed Ground & First Floor Plan
102
A1 @ 1:50
Greenbanks, Sandy Lane, Kingsley
BUILDING REGS
IMPORTANT NOTE
All dimensions in millimeters . Where dimensions are not given, drawings must not be
scaled. In the event of any detail or dimensional conflict between drawings and site
conditions, the matter must be referred back to the author for clarification. All
dimensions and conditions are to be checked on site by the contractor prior to
commencing any work. The contractor is responsible for checking that there is no
conflict between site dimensions and figured dimensions. Drawings to be read in
conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist
Manufacturer's and Sub-contractor's drawings and specification.
20.04.16
W1
5 136
4
2
12346
5
"e"W12
1100
Zinc Standing
Seam - Colour
tbc
Acrylic
Render
W11W4
W15
"e"
Acrylic Render
Stone Cladding
Brand:Norstone
UK
Colour:Ochre
Blend
W3
Zinc Standing
Seam - Colour
tbc
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
Stone Cladding
Brand:Norstone
UK
Colour:Ochre
Blend
1100
Aluminum
Flashing
Aluminum
Flashing
Aluminum
Flashing
ramp
D1
Aluminum
Flashing
W13
1
:
West Elevation
110
01
50
Zinc Fascia Zinc Fascia
Zinc standing seam
roof wrapped down to form fascia
W7
HEB C F GD
HEB C F GD
W10
D2
Zinc Standing
Seam - Colour
tbc
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
Zinc Standing
Seam - Colour
tbc
W18
1
:
South Elevation
110
02
50
Zinc Fascia
Zinc Standing
Seam - Colour
tbc
Zinc Standing
Seam - Colour
tbc
Zinc standing seam
roof wrapped down to form fascia
Aluminum
Flashing
Frameless glass guarding
in accordance
with specialist design
Acrylic
Render
TONY HOLT DESIGN.
Bespoke Property Designer
Bournemouth:
Website:
Email:
01202 208331
info@tonyholt-design.co.uk
www.tonyholt-design.co.uk
project name
rev
dwg sheet
dwg no
dwg name West & South Elevation
110
A1 @ 1:50
Greenbanks, Sandy Lane, Kingsley
BUILDING REGS
IMPORTANT NOTE
All dimensions in millimeters . Where dimensions are not given, drawings must not be
scaled. In the event of any detail or dimensional conflict between drawings and site
conditions, the matter must be referred back to the author for clarification. All
dimensions and conditions are to be checked on site by the contractor prior to
commencing any work. The contractor is responsible for checking that there is no
conflict between site dimensions and figured dimensions. Drawings to be read in
conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist
Manufacturer's and Sub-contractor's drawings and specification.
20.04.16
W6
W20 "e"
W19
"e"
51 3 6
4
2
1 2 3 4 6
5
1100
1100
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
Zinc Standing
Seam - Colour
tbc
Zinc Standing
Seam - Colour
tbc
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
"e"
W17
W21
Zinc Standing
Seam - Colour
tbc
Acrylic
Render
Acrylic
Render
Aluminum
Flashing
Aluminum
Flashing
Aluminum
Flashing
Aluminum
Flashing
Aluminum
Flashing
W9 W8
1
:
East Elevation
111
01
50
Zinc Fascia Zinc Fascia
Aluminum
Flashing
Zinc standing seam
roof wrapped down to form fascia
Frameless glass guarding
in accordance
with specialist design
Zinc Standing
Seam - Colour
tbc
W2
H E BCFG D
H E BCFG D
W5
W16Zinc Standing
Seam - Colour
tbc
Stone Cladding
Brand:Norstone
UK
Colour:Ochre
Blend
W14
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
1
:
North Elevation
111
02
50
Zinc Fascia
Zinc Standing
Seam - Colour
tbc
Zinc Standing
Seam - Colour
tbc
Zinc standing seam
roof wrapped down to form fascia
TONY HOLT DESIGN.
Bespoke Property Designer
Bournemouth:
Website:
Email:
01202 208331
info@tonyholt-design.co.uk
www.tonyholt-design.co.uk
project name
rev
dwg sheet
dwg no
dwg name East & North Elevation
111
A1 @ 1:50
Greenbanks, Sandy Lane, Kingsley
BUILDING REGS
IMPORTANT NOTE
All dimensions in millimeters . Where dimensions are not given, drawings must not be
scaled. In the event of any detail or dimensional conflict between drawings and site
conditions, the matter must be referred back to the author for clarification. All
dimensions and conditions are to be checked on site by the contractor prior to
commencing any work. The contractor is responsible for checking that there is no
conflict between site dimensions and figured dimensions. Drawings to be read in
conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist
Manufacturer's and Sub-contractor's drawings and specification.
20.04.16
51 3 6
4
2
1 2 3 4 6
5
ventilated void ventilated void ventilated void
Top of Deck
72.400
gallery
master
bedroom
en-suite
living
room
garage
ventilated void ventilated void
utility kitchen
bedroom 3
2717 2043
D1
"e" W12 W15
"e"
W11 W3 W4
253
2715
TopofBeam&Block
toU/SofJoist
2425
TopofScreed
toU/SofJoist
entrance
hall
12.0°
12.0°
W1
W13
1
:
Section A-A
120
01
50
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
51 3 6
4
2
1 2 3 4 6
5
Top of Deck
72.400
253
gallery
master
bedroom
en-suite
living
room
garage dining kitchen
family
bathroom
2715
TopofBeam&Block
toU/SofJoist
2425
TopofScreed
toU/SofJoist
"e" W12
D1
W11 W4
12.0°
12.0°
W1
W13
1
:
Section B-B
120
02
50
ventilated void ventilated void ventilated void ventilated void
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
E BCF D
E BCF D
Top of Deck
72.400
living
room
master
bedroom
ventilated void
1240
1
:
Section F-F
120
04
50
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
E BCF D
E BCF D
W10
D2
Top of Deck
72.400
en suite
walking
wardrobe
cycle
store
& storage
ventilated void
1240
1
:
Section E-E
120
03
50
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
TONY HOLT DESIGN.
Bespoke Property Designer
Bournemouth:
London:
Website:
Email:
0203 598 1665
01202 208331
info@tonyholt-design.co.uk
www.tonyholt-design.co.uk
project name
rev
dwg sheet
dwg no
dwg name Section A, B, E & F
120
A1 @ 1:50
Greenbanks, Sandy Lane, Kingsley
TENDER
PRELIMINARY
20.04.16
IMPORTANT NOTE
All dimensions in millimeters . Where dimensions are not given, drawings must not be
scaled. In the event of any detail or dimensional conflict between drawings and site
conditions, the matter must be referred back to the author for clarification. All
dimensions and conditions are to be checked on site by the contractor prior to
commencing any work. The contractor is responsible for checking that there is no
conflict between site dimensions and figured dimensions. Drawings to be read in
conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist
Manufacturer's and Sub-contractor's drawings and specification.
W20 "e"
ventilated void
253
gallery
ventilated void
dining breakfast
family
bathroom
2715
TopofBeam&Block
toU/SofJoist
2425
TopofScreed
toU/SofJoist
W4
51 3 6
4
2
1 2 3 4 6
5
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
W21
Metal Cladding
Color- TBC Top of Deck
72.400
W9
Aluminum
Flashing
W1
W13
1
:
Section C-C
121
01
50
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
W20 "e" W19
"e"
51 3 6
4
2
1 2 3 4 6
5
ventilated void
breakfast
bedroom 2
W4
Brick Slips
Colour - Cheshire Orange
Brand: Matclad
Metal Cladding
Color- TBC
W21
Acrylic
Render
Acrylic
Render
Aluminum
Flashing
Aluminum
Flashing
Aluminum
Flashing
Aluminum
Flashing
W8
Top of Deck
72.400
W9
3225
1
:
Section D-D
121
02
50
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
W7
W2
H E BCFG D
H E BCFG D
Top of Deck
72.400
W14W18
bedroom 2
family
bathroom
bedroom 3
kitchenbreakfast
ventilated void
1
:
Section H-H
121
03
50
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
E BCF D
E BCF D
Top of Deck
72.400
entrance
hall
dining
gallery
ventilated void
Internal stair to
specialist
manufacturer's design
and detail. Supporting
structure to be
coordinated to suit final
design.
1
:
Section G-G
121
04
50
NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site
39.4°
TONY HOLT DESIGN.
Bespoke Property Designer
Bournemouth:
London:
Website:
Email:
0203 598 1665
01202 208331
info@tonyholt-design.co.uk
www.tonyholt-design.co.uk
project name
rev
dwg sheet
dwg no
dwg name Section C, D , G & H
121
A1 @ 1:50
Greenbanks, Sandy Lane, Kingsley
TENDER
PRELIMINARY
20.04.16
IMPORTANT NOTE
All dimensions in millimeters . Where dimensions are not given, drawings must not be
scaled. In the event of any detail or dimensional conflict between drawings and site
conditions, the matter must be referred back to the author for clarification. All
dimensions and conditions are to be checked on site by the contractor prior to
commencing any work. The contractor is responsible for checking that there is no
conflict between site dimensions and figured dimensions. Drawings to be read in
conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist
Manufacturer's and Sub-contractor's drawings and specification.

More Related Content

What's hot

Portfolio 2019
Portfolio 2019Portfolio 2019
Portfolio 2019Ali Belal
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad SubmissionYolanda Sewpersad
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit projectMark Thornton
 
Residential house project sample, WD drawings, NSW
Residential house project sample, WD drawings, NSWResidential house project sample, WD drawings, NSW
Residential house project sample, WD drawings, NSWAlexeyRyabchenko
 
1050_25_SMALL_METER_HOUSE
1050_25_SMALL_METER_HOUSE1050_25_SMALL_METER_HOUSE
1050_25_SMALL_METER_HOUSERichard Worrall
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
portfolio june 24 finished portfolio
portfolio june 24 finished portfolioportfolio june 24 finished portfolio
portfolio june 24 finished portfolioAndrew Johnson
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1David Dinsdale
 
Farmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeFarmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeRichard Clark
 
2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit setSadaf Mohammadi
 
Oretsky Residence - Full Permit Set
Oretsky Residence - Full Permit SetOretsky Residence - Full Permit Set
Oretsky Residence - Full Permit SetSadaf Mohammadi
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014Martin Pauly
 

What's hot (20)

Assisi
AssisiAssisi
Assisi
 
Studiowork submission
Studiowork submission Studiowork submission
Studiowork submission
 
Portfolio 2019
Portfolio 2019Portfolio 2019
Portfolio 2019
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad Submission
 
Working drawings sample
Working drawings sampleWorking drawings sample
Working drawings sample
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit project
 
Residential house project sample, WD drawings, NSW
Residential house project sample, WD drawings, NSWResidential house project sample, WD drawings, NSW
Residential house project sample, WD drawings, NSW
 
1050_25_SMALL_METER_HOUSE
1050_25_SMALL_METER_HOUSE1050_25_SMALL_METER_HOUSE
1050_25_SMALL_METER_HOUSE
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
portfolio june 24 finished portfolio
portfolio june 24 finished portfolioportfolio june 24 finished portfolio
portfolio june 24 finished portfolio
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1
 
Farmers Agoura Hills CEO Office
Farmers Agoura Hills CEO OfficeFarmers Agoura Hills CEO Office
Farmers Agoura Hills CEO Office
 
2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set
 
Oretsky Residence - Full Permit Set
Oretsky Residence - Full Permit SetOretsky Residence - Full Permit Set
Oretsky Residence - Full Permit Set
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
6320 restrooms
6320 restrooms6320 restrooms
6320 restrooms
 
KFC - Surprise, AZ
KFC - Surprise, AZKFC - Surprise, AZ
KFC - Surprise, AZ
 
TechTown 1st Floor Renovation
TechTown 1st Floor RenovationTechTown 1st Floor Renovation
TechTown 1st Floor Renovation
 
You need the house plans
You need the house plansYou need the house plans
You need the house plans
 
Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014
 

Viewers also liked

Viewers also liked (14)

INFORMATICA
INFORMATICAINFORMATICA
INFORMATICA
 
Comienzos de la planificación estategicas carmen torrealba
Comienzos de la planificación estategicas  carmen torrealbaComienzos de la planificación estategicas  carmen torrealba
Comienzos de la planificación estategicas carmen torrealba
 
Plan of Action and Reflection Form
Plan of Action and Reflection FormPlan of Action and Reflection Form
Plan of Action and Reflection Form
 
Arte y tecnología
Arte y tecnologíaArte y tecnología
Arte y tecnología
 
La tecnología de la información
La tecnología de la informaciónLa tecnología de la información
La tecnología de la información
 
Tendenciapedagogica maría cuadrado vergara
Tendenciapedagogica maría cuadrado vergaraTendenciapedagogica maría cuadrado vergara
Tendenciapedagogica maría cuadrado vergara
 
lookbook tennis
lookbook tennislookbook tennis
lookbook tennis
 
yamnibel caro
yamnibel caro yamnibel caro
yamnibel caro
 
Tarea 4 luz
Tarea 4 luzTarea 4 luz
Tarea 4 luz
 
Perarakan Kemerdekaan
Perarakan KemerdekaanPerarakan Kemerdekaan
Perarakan Kemerdekaan
 
Connectors del PC
 Connectors del PC Connectors del PC
Connectors del PC
 
Los indicadores word
Los indicadores  wordLos indicadores  word
Los indicadores word
 
Ejercicios de amortizacion
Ejercicios de amortizacionEjercicios de amortizacion
Ejercicios de amortizacion
 
Ensayo
EnsayoEnsayo
Ensayo
 

Similar to Greenbanks

Leisure Centre
Leisure CentreLeisure Centre
Leisure CentreEdel Fox
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Studygrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
dual-key units: liv twice the excitement
dual-key units: liv twice the excitementdual-key units: liv twice the excitement
dual-key units: liv twice the excitementHuttons Asia Pte Ltd
 
Collins house material specifications
Collins house material specificationsCollins house material specifications
Collins house material specificationsAlicia Koo
 
SOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce DevelopmentSOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce DevelopmentCraigFensham
 
MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4siyabulela mxalisa
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residentialgrahamelanders
 
Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko
 
Mantri Pinnacle Free Brochure
Mantri Pinnacle Free BrochureMantri Pinnacle Free Brochure
Mantri Pinnacle Free BrochureRegrob.com
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the FutureEdel Fox
 
Build Something That Lasts
Build Something That LastsBuild Something That Lasts
Build Something That Lastslharback
 
Katie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson
 
Prestige point res and comm specification
Prestige point   res and comm specificationPrestige point   res and comm specification
Prestige point res and comm specificationchris1870
 
Bailey spec sheet 2
Bailey spec sheet 2Bailey spec sheet 2
Bailey spec sheet 2bluemcgowan
 

Similar to Greenbanks (20)

Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Study
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
dual-key units: liv twice the excitement
dual-key units: liv twice the excitementdual-key units: liv twice the excitement
dual-key units: liv twice the excitement
 
Collins house material specifications
Collins house material specificationsCollins house material specifications
Collins house material specifications
 
SOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce DevelopmentSOLD OUT - 8th on Fordyce Development
SOLD OUT - 8th on Fordyce Development
 
MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
 
Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016
 
Mantri Pinnacle Free Brochure
Mantri Pinnacle Free BrochureMantri Pinnacle Free Brochure
Mantri Pinnacle Free Brochure
 
15-106 3
15-106 315-106 3
15-106 3
 
School Buildings of the Future
School Buildings of the FutureSchool Buildings of the Future
School Buildings of the Future
 
DRT Portfolio Works
DRT Portfolio WorksDRT Portfolio Works
DRT Portfolio Works
 
Build Something That Lasts
Build Something That LastsBuild Something That Lasts
Build Something That Lasts
 
RSD Sample
RSD SampleRSD Sample
RSD Sample
 
Sectional Door System
Sectional Door SystemSectional Door System
Sectional Door System
 
Katie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson Portfolio
Katie Johnson Portfolio
 
Prestige point res and comm specification
Prestige point   res and comm specificationPrestige point   res and comm specification
Prestige point res and comm specification
 
Bailey spec sheet 2
Bailey spec sheet 2Bailey spec sheet 2
Bailey spec sheet 2
 

Greenbanks

  • 1.
  • 2. e-ee-e f-ff-f g-gg-g h-hh-h d-dd-d c-cc-c 51 3 6 4 2 1 2 3 4 5 6 H E B C F G D H E B C F G D living room cycle store & storage w/c utility kitchen dining breakfast entrance hall cpd. W3 D1 W11 W1 W2 W4 W6 W5 W10 W7 W8 W9 D2 a-aa-a b-bb-b rwp rwp rwprwp rwp DG/02 (950x2100) DG/03 (950x2100) DG/04 (950x2100) DG/05 (950x2100) 900x750mm clear zone to front of wc pan SVP (with access rodding point) laundry chute AAV (with access rodding point) SVP (with access rodding point) Span of floor joists over as specified by Greencore Construction Span of floor joists over as specified by Greencore Construction Span of floor joists over as specified by Greencore Construction Span of floor joists over as specified by Greencore Construction Span of floor joists over as specified by Greencore Construction Span of floor joists over as specified by Greencore Construction (15 l/s) final layout by others (30 l/s) (30 l/s) 2800 final layout by others final layout by others AAV (with access rodding point) mains interlinked smoke detector with battery backup Internal stair to specialist manufacturer's design and detail. Supporting structure to be coordinated to suit final design. 3003 3758 2894 1440 1801 1275 2516 1802 3334 4162 4662 5738 3003 3758 3334 7768 1 : Ground Floor Plan 102 01 50 5. 12. 11. 10. 9. 8. 7. 6. 4. 13. 3. 2. 1. 14. OUTLINE SPECIFICATION E1 CONCRETE FOUNDATIONS AND FLOORS Foundations: Specialist foundations to S.Eng design. Ground Floor Structure: Proprietary beam and block floor to specialist design. F1 MASONRY WALLING Substructure Walls: 7N Thermal/concrete aggregate block work as per drawings; min 3 courses of frost resistant brick to outer skin below DPC or wherever outer skin is exposed above finished ground levels. G1 PACKAGED FRAMES AND STRUCTURAL STEELWORK Timber Superstructure: In strict accordance with Greencore Construction. Pitched Roof Structure: In strict accordance with Greencore Construction. G2 STRUCTURAL TIMBER AND GENERAL CARPENTRY H2 BOARD AND SHEET EXTERNAL CLADDING AND SOFFITS Roof Soffits: Dales Eaves RG10 321 & G20 950 Dales kwikfix soffit system or similar approved. Colour tbc by client Metal Cladding: NedZink Nova standing seam. Installed in accordance with manufacturers instructions. Brick Slips: Cheshire Orange. Installed in accordance with manufacturers instructions. J1 FLAT ROOF COVERINGS Main pitched Roof: Metal Cladding: NedZinc Noir standing seam. Installed in accordance with manufacturers instructions. K1 WOOD INTERNAL FLOORING, LININGS AND TRIM Ground Floor Generally: Client to confirm. First Floor Generally: Client to confirm. Skirting, Architraves: Client to confirm Window Boards: Client to confirm. L1 WINDOWS, ROOF WINDOWS AND PATENT GLAZING Windows & Doors: Ideal Combi Futura + Triple Glazed Composite windows; RAL 7012 outside / RAL 9010 Matt inside Client to confirm. L2 DOORS AND FRAMES Internal Doorsets: Client to confirm. External Doors (main entrance): Urban Front. Garage Door: Hormann Mribb Sectional insulated silkgrain Garage Side Door: Hormann door to match garage L3 STAIRS AND GUARDING Main Stair: Bespoke staircase to specialist design. Client to confirm. M1 PLASTERING, RENDERING AND SCREEDING Ground Floor Screed: 75mm Gyvlon flowing screed on 220mm PUR insulation boards Internal Walls and Ceilings Generally: 12.5mm plasterboard with skim finish. Internal Walls and Ceilings (Bathrooms): 12.5mm Moisture resistant vapour check plasterboard with skim finish. External Render: StoLit Render Finish. reinforcement Mesh. Sto Rend Flex Coat. StoVentec Carrier Board. Colour: White M4 SHEET AND TILE INTERNAL FINISHES Tiled floors: Client to confirm. Tiled walls: Full height tiles to shower walls and vanity/toilet boxed sections. Client to confirm. M6 PAINTING, STAINING AND VARNISHING 51 3 6 4 2 1 2 3 4 5 6 H E B C F G D H E B C F G D e-ee-e f-ff-f g-gg-g h-hh-h b-bb-b c-cc-c d-dd-d en-suite walk in wardrobe master bedroom family bathroom bedroom 3 bedroom 2 gallery W20 W19 W17 W18 W21 W16 W14 W15 W12 W13 a-aa-a rwp rwp rwprwp rwp DF/07 (950x2100) laundry chute Span of roof joists over as specified by Greencore Construction DF/06 (950x2100) DF/08 (950x2100) DF/09 (950x2100) DF/11 (950x2100) DF/12 (950x2100) DF/10 (980x2100) hot water tank SVP (with access rodding point) SVP (with access rodding point) Span of roof joists over as specified by Greencore Construction Span of roof joists over as specified by Greencore Construction Span of roof joists over as specified by Greencore Construction Span of roof joists over as specified by Greencore Construction Span of roof joists over as specified by Greencore Construction final layout by others final layout by others 2800 (15 l/s) 1363 (15 l/s) mains interlinked smoke detector with battery backup Internal stair to specialist manufacturer's design and detail. Supporting structure to be coordinated to suit final design. 3003 3758 4398 4162 2872 23403309 3003 3758 4398 4680 1354 2992 2101 4398 5738 12. 11. 10. 9. 8. 7. 6. 5. 4. 3. 13. 2. 1. 14. 235 900 3055 cpd. MVHR 1 : First Floor Plan 102 02 50 M6 PAINTING, STAINING AND VARNISHING Walls & Ceilings Generally: Dulux 3 coat paint system: Trade Diamond Matt: Colour - client to confirm Bathrooms: Dulux 3 coat paint system: Trade Diamond Matt: Colour - client to confirm Skirting, Architraves & Window Boards: Dulux 3 coat paint system - Satinwood: Colour - client to confirm N1 APPLIANCES AND FITTINGS Kitchen and bathrooms: Refer to kitchen/bathroom designers plan. TONY HOLT DESIGN. Bespoke Property Designer Bournemouth: Website: Email: 01202 208331 info@tonyholt-design.co.uk www.tonyholt-design.co.uk project name rev dwg sheet dwg no dwg name Proposed Ground & First Floor Plan 102 A1 @ 1:50 Greenbanks, Sandy Lane, Kingsley BUILDING REGS IMPORTANT NOTE All dimensions in millimeters . Where dimensions are not given, drawings must not be scaled. In the event of any detail or dimensional conflict between drawings and site conditions, the matter must be referred back to the author for clarification. All dimensions and conditions are to be checked on site by the contractor prior to commencing any work. The contractor is responsible for checking that there is no conflict between site dimensions and figured dimensions. Drawings to be read in conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist Manufacturer's and Sub-contractor's drawings and specification. 20.04.16
  • 3. W1 5 136 4 2 12346 5 "e"W12 1100 Zinc Standing Seam - Colour tbc Acrylic Render W11W4 W15 "e" Acrylic Render Stone Cladding Brand:Norstone UK Colour:Ochre Blend W3 Zinc Standing Seam - Colour tbc Brick Slips Colour - Cheshire Orange Brand: Matclad Stone Cladding Brand:Norstone UK Colour:Ochre Blend 1100 Aluminum Flashing Aluminum Flashing Aluminum Flashing ramp D1 Aluminum Flashing W13 1 : West Elevation 110 01 50 Zinc Fascia Zinc Fascia Zinc standing seam roof wrapped down to form fascia W7 HEB C F GD HEB C F GD W10 D2 Zinc Standing Seam - Colour tbc Brick Slips Colour - Cheshire Orange Brand: Matclad Brick Slips Colour - Cheshire Orange Brand: Matclad Zinc Standing Seam - Colour tbc W18 1 : South Elevation 110 02 50 Zinc Fascia Zinc Standing Seam - Colour tbc Zinc Standing Seam - Colour tbc Zinc standing seam roof wrapped down to form fascia Aluminum Flashing Frameless glass guarding in accordance with specialist design Acrylic Render TONY HOLT DESIGN. Bespoke Property Designer Bournemouth: Website: Email: 01202 208331 info@tonyholt-design.co.uk www.tonyholt-design.co.uk project name rev dwg sheet dwg no dwg name West & South Elevation 110 A1 @ 1:50 Greenbanks, Sandy Lane, Kingsley BUILDING REGS IMPORTANT NOTE All dimensions in millimeters . Where dimensions are not given, drawings must not be scaled. In the event of any detail or dimensional conflict between drawings and site conditions, the matter must be referred back to the author for clarification. All dimensions and conditions are to be checked on site by the contractor prior to commencing any work. The contractor is responsible for checking that there is no conflict between site dimensions and figured dimensions. Drawings to be read in conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist Manufacturer's and Sub-contractor's drawings and specification. 20.04.16
  • 4. W6 W20 "e" W19 "e" 51 3 6 4 2 1 2 3 4 6 5 1100 1100 Brick Slips Colour - Cheshire Orange Brand: Matclad Zinc Standing Seam - Colour tbc Zinc Standing Seam - Colour tbc Brick Slips Colour - Cheshire Orange Brand: Matclad "e" W17 W21 Zinc Standing Seam - Colour tbc Acrylic Render Acrylic Render Aluminum Flashing Aluminum Flashing Aluminum Flashing Aluminum Flashing Aluminum Flashing W9 W8 1 : East Elevation 111 01 50 Zinc Fascia Zinc Fascia Aluminum Flashing Zinc standing seam roof wrapped down to form fascia Frameless glass guarding in accordance with specialist design Zinc Standing Seam - Colour tbc W2 H E BCFG D H E BCFG D W5 W16Zinc Standing Seam - Colour tbc Stone Cladding Brand:Norstone UK Colour:Ochre Blend W14 Brick Slips Colour - Cheshire Orange Brand: Matclad 1 : North Elevation 111 02 50 Zinc Fascia Zinc Standing Seam - Colour tbc Zinc Standing Seam - Colour tbc Zinc standing seam roof wrapped down to form fascia TONY HOLT DESIGN. Bespoke Property Designer Bournemouth: Website: Email: 01202 208331 info@tonyholt-design.co.uk www.tonyholt-design.co.uk project name rev dwg sheet dwg no dwg name East & North Elevation 111 A1 @ 1:50 Greenbanks, Sandy Lane, Kingsley BUILDING REGS IMPORTANT NOTE All dimensions in millimeters . Where dimensions are not given, drawings must not be scaled. In the event of any detail or dimensional conflict between drawings and site conditions, the matter must be referred back to the author for clarification. All dimensions and conditions are to be checked on site by the contractor prior to commencing any work. The contractor is responsible for checking that there is no conflict between site dimensions and figured dimensions. Drawings to be read in conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist Manufacturer's and Sub-contractor's drawings and specification. 20.04.16
  • 5. 51 3 6 4 2 1 2 3 4 6 5 ventilated void ventilated void ventilated void Top of Deck 72.400 gallery master bedroom en-suite living room garage ventilated void ventilated void utility kitchen bedroom 3 2717 2043 D1 "e" W12 W15 "e" W11 W3 W4 253 2715 TopofBeam&Block toU/SofJoist 2425 TopofScreed toU/SofJoist entrance hall 12.0° 12.0° W1 W13 1 : Section A-A 120 01 50 NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site 51 3 6 4 2 1 2 3 4 6 5 Top of Deck 72.400 253 gallery master bedroom en-suite living room garage dining kitchen family bathroom 2715 TopofBeam&Block toU/SofJoist 2425 TopofScreed toU/SofJoist "e" W12 D1 W11 W4 12.0° 12.0° W1 W13 1 : Section B-B 120 02 50 ventilated void ventilated void ventilated void ventilated void NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site E BCF D E BCF D Top of Deck 72.400 living room master bedroom ventilated void 1240 1 : Section F-F 120 04 50 NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site E BCF D E BCF D W10 D2 Top of Deck 72.400 en suite walking wardrobe cycle store & storage ventilated void 1240 1 : Section E-E 120 03 50 NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site TONY HOLT DESIGN. Bespoke Property Designer Bournemouth: London: Website: Email: 0203 598 1665 01202 208331 info@tonyholt-design.co.uk www.tonyholt-design.co.uk project name rev dwg sheet dwg no dwg name Section A, B, E & F 120 A1 @ 1:50 Greenbanks, Sandy Lane, Kingsley TENDER PRELIMINARY 20.04.16 IMPORTANT NOTE All dimensions in millimeters . Where dimensions are not given, drawings must not be scaled. In the event of any detail or dimensional conflict between drawings and site conditions, the matter must be referred back to the author for clarification. All dimensions and conditions are to be checked on site by the contractor prior to commencing any work. The contractor is responsible for checking that there is no conflict between site dimensions and figured dimensions. Drawings to be read in conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist Manufacturer's and Sub-contractor's drawings and specification.
  • 6. W20 "e" ventilated void 253 gallery ventilated void dining breakfast family bathroom 2715 TopofBeam&Block toU/SofJoist 2425 TopofScreed toU/SofJoist W4 51 3 6 4 2 1 2 3 4 6 5 Brick Slips Colour - Cheshire Orange Brand: Matclad W21 Metal Cladding Color- TBC Top of Deck 72.400 W9 Aluminum Flashing W1 W13 1 : Section C-C 121 01 50 NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site W20 "e" W19 "e" 51 3 6 4 2 1 2 3 4 6 5 ventilated void breakfast bedroom 2 W4 Brick Slips Colour - Cheshire Orange Brand: Matclad Metal Cladding Color- TBC W21 Acrylic Render Acrylic Render Aluminum Flashing Aluminum Flashing Aluminum Flashing Aluminum Flashing W8 Top of Deck 72.400 W9 3225 1 : Section D-D 121 02 50 NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site W7 W2 H E BCFG D H E BCFG D Top of Deck 72.400 W14W18 bedroom 2 family bathroom bedroom 3 kitchenbreakfast ventilated void 1 : Section H-H 121 03 50 NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site E BCF D E BCF D Top of Deck 72.400 entrance hall dining gallery ventilated void Internal stair to specialist manufacturer's design and detail. Supporting structure to be coordinated to suit final design. 1 : Section G-G 121 04 50 NOTE: External landscaping / final finished ground levels tbc on siteNOTE: External landscaping / final finished ground levels tbc on site 39.4° TONY HOLT DESIGN. Bespoke Property Designer Bournemouth: London: Website: Email: 0203 598 1665 01202 208331 info@tonyholt-design.co.uk www.tonyholt-design.co.uk project name rev dwg sheet dwg no dwg name Section C, D , G & H 121 A1 @ 1:50 Greenbanks, Sandy Lane, Kingsley TENDER PRELIMINARY 20.04.16 IMPORTANT NOTE All dimensions in millimeters . Where dimensions are not given, drawings must not be scaled. In the event of any detail or dimensional conflict between drawings and site conditions, the matter must be referred back to the author for clarification. All dimensions and conditions are to be checked on site by the contractor prior to commencing any work. The contractor is responsible for checking that there is no conflict between site dimensions and figured dimensions. Drawings to be read in conjunction with Structural Engineer's, Mechanical and Electrical Engineer's, Specialist Manufacturer's and Sub-contractor's drawings and specification.