1. RESUME
Md. Saleem
Surveyor / Document Controller
Mob: +97477279601
Email id: saleembasha9@gmail.com
Vuyyuru, India
CAREER OBJECTIVE:
To associate with a progressive organization that gives me scope to update my knowledge and skill per the latest
trends,also work as a team and contribute growth of organization.
Key Qualifications: (Technical Initial Task)
I have 8 years of practical work experience in the fields of survey & topography,and I independently handled several
projects. professional experience in surveying for industrial buildings & steel sheds, commercial buildings other
infrastructure projects including topographic survey &its implementation at site. is well versed with the use of modern
survey techniques and equipment's like GPS, total station, auto levels electronic theodolite. bridges, culvert, pilling,
pipeline, underground utilities (civil work). has also involved in soil field investigations. Establishing control points
co-ordinates data with leveling, Traversing, as built for cutting & filling, Excavation and formation, Piles cutting as
per design level, walls and columns, shifting of survey Penetration point with plummet instrument. Setting out Piles,
Grid Lines Stake Out & marking, Layout of footing and column, & Stake Out & Lay Out.
Additional Key Qualifications: (Technical Initial Task)
Document Controllers ensure that the documents on an organization are stored properly and accessible to the staff.
They need to coordinate their activity with other internal departments and implement document management and
control procedures. Successful resume samples emphasize qualifications such as leadership, flexibility, accuracy,
organizational skills, teamwork, communication abilities and computer competencies. Being honest and meeting
deadlines are key requirements and should can prioritize, manage time well, multitask and troubleshoot. Strong
interpersonal, communication and customer service skills are also essential becaus e document control specialists
regularly communicate with internal and external business partners.They must be computer-savvy and well-versed
in Microsoft Office products.Some employers also require experience with document controlsoftware, process map
software, and FTP clients, ISO, SharePoint and FileNet. Experience using a scanner is also important.
2. WORK EXPERIENCE:
Present Working.
June 2014 – Till date: Challenger Trading & Contracting, Doha, Qatar.
Role: Surveyor & Document Controller
Projects: Ummgarn Residential Villas & Bin Mahmoud Residential Buildings.
Locations: Ummgarn & Bin Mahmoud, Qatar.
Verify the accuracy of survey data including measurements and calculations conducted at
survey sites.
Search legal records, survey records, and land titles to obtain information about property
boundaries in areas to be surveyed.
Calculate heights, depths, relative positions, property lines, and other characteristics of terrain.
Prepare and maintain sketches,maps, reports, and legal descriptions of surveys to
describe, certify, and assume liability for work performed.
Full in charge for Structural, infrastructure, Landscape and finishing works .
Coordination with management, subcontractors and consultants.
Manage our Survey teams, Subcontractors survey teams and maintain the Accuracy
of the works and monitors all survey equipment’s within standard accuracy limits.
Manage the Design drawings, shop drawings, as‐ built drawings, office documents,
Calibration certificates, Survey helpers time sheets and site records.
Greenko Groups, Haridwar Infrastructure Ltd. (Dec 2011 – May 2014)
Role: Surveyor
Projects: Wind Power &hydro power Plants.
Locations: Maharashtra, Karnataka and Andhra Pradesh. India.
Survey of Land, Location, Electrical line, ROW of Forest, revenue - take reference of purchased land,
identify actual purchased/acquired land - reference points,marking align with village map and physically,
feasibility check on WTG location, Approach road survey.
ROW Clearance and Site handing over - Ensure no land dispute,final marking, ROW clearance (main road
to location), handing over.
3. Site visit with Govt officials, clients, project team.
Wind turbines boundary survey, including lands and roads connecting to
each wind turbine location, contours,controls points fixing with D.G.P.S& traversing with total station. 33
& 220kv sub-station grid line control rooms, roadworks, layout preparations.
3. S.B.E.C. Projects Ltd. (Mar 2011 – Dec 2011)
Role: Surveyor
Projects: GMRKamalanga Energy Ltd
Locations: Angul – Orissa, India
Works: This project consists ofconstruction work of security barrack, Admin block and commercial complex, Club
House. Marking with total station.
Verify the accuracy of survey data including measurements and calculations conducted at
survey sites.
Search legal records, survey records, and land titles to obtain information about property
boundaries in areas to be surveyed.
Calculate heights, depths, relative positions, property lines, and other characteristics of terrain.
Prepare and maintain sketches,maps, reports, and legal descriptions of surveys to
describe, certify, and assume liability for work performed.
I.V.R.C. L Infra Projects Pvt Ltd. (Jun 2009 – Mar 2011)
Role: Surveyor
Projects: Construction of RCC Buildings& Steel Sheds in White Oil Terminal
Locations: HPCL – Visakhapatnam, Andhra Pradesh India.
Works: This project consists of work of Piles & Pile Caps construction, Product Pump Houses , Fire Water pump
sheds, Garage and fire Station, Calibration Shed, Gantry-1&2. Piles Cap, marking with total station
Inspecting topographical coordinates with actual survey.
Fixing structural bolts in pedestalfor the purpose of mechanical structure erection.
Contour surveying,Leveling and marking machinery and manually Building marks and press
foundation marking and fixing Oil Pipe Line Work.
Preparing survey data for survey work in site, Set-out the shape & the orientation of the
buildings.
Piling setting out and as built, Topographical survey site wide.
Core wall setting out and as built, marking of grids, Layouts of the footings,walls, columns.
Checking of the civil works, prepare survey report & Coordinate inspection and testing with
the consultant.
Coordinating with Construction Managers,supervision teams and ensures that all necessary
information is available prior to commencement of works.
Piles cutting as per design level, walls and columns, shifting of survey Penetration point with plummet
instrument. Setting out Piles, Grid Lines Stake Out & marking, Layout of footing and column, & Stake Out
& Lay Out
4. Job Skills:
1. Topographical survey& contour survey, preparation of drawings on AutoCAD
2. Execution of road boundary wall, slab culvert, truck drain, catch drain &pipe culvert.
3. All structure layout marking at site major bridges, minor bridges, fly-over, culverts.
4. Traversing survey checking of GPS points from one another GPS.
5. Center line marking
6. Taking OGL& hard rock levels
7. Checking of TBM every month with consults and approval fromconsult.
8. Fixing of TBM pillar &row pillar fixing.
INSTRUMENTS KNOWN:
Sokia, Leica T.S. 206, Trimble M3 DR 1” & Auto Level.
EDUCATIONAL BACKGROUND
Land surveying at Govt. Polytechnic College, Gudlavalleru.
Diploma in civil (Discontinue).
COMPUTER SKILLS
MS-Office
Auto Cad 2d
PERSONAL DETAILS
Nationality: Indian
Date of Birth: 6th August, 1986
Sex: Male
Marital Status: Married
Languages Know: English, Hindi, Urdu and Telugu.
Passport No: K5496376
DECLARATION
I Md. Saleem, hereby declare that the above information enclosed by me is true to my knowledge and done by me in
honest.
Place: Qatar
Date: (Md. Saleem)