1. CURRICULUM VITAE
ERNESTO PITOS TUTING
SURVEYOR LAND / SITE SURVEYOR
10 years of experience in the field of surveying
E-mail : etuting@yahoo.com.ph
Skype Name : ernesto tuting
Skype account : efi-toneser
Address : 297 Brgy. Tugas,Tanjay City, Negros Oriental, Philippines
Mobile No : +63-9291246748 (Philippines)
0531618681 (Riyadh,KSA)
EDUCATIONAL QUALIFICATION
Bachelor of Science in Geodetic Engineering (University of Southern Philippines)
Coursework Includes:
Geodetic Engineering Laws
Theory and Practice (also involving mine survey)
Geodesy
Cartography
PROJECT INVOLVED :
Saudi Bin Laden Group/Alurage/Alumco Approval
Skylight Erection for Coordinated Elevation
2. Bracket Installation for Coordinated Elevation of Stick System
Bracket Installation for Coordinated Elevation Unitize
Installation of Glass for Coordinated Elevation of Spider
Mullion Fixing for Coordinated Elevation
Transom Fixing for Coordinated Elevation
Starter Sail/Starting Gutter Fixing for Coordinated Elevation
Panel Fixing for Coordinated Elevation
WORK EXPERIENCE:
December 2014 – At present
Land Surveyor at the Department of Agrarian Reform (DAR-Negros Oriental)
Duties and Responsibilities:
Take a short meeting with farmer beneficiary before conducting a survey
Checking the title what is the term of sharing of the land, or agreed sharing between farmer
beneficiary
Taking land used and subdivision that is given to the farmer beneficiaries
Measuring the land whether the land is within the prescribed area allowed by DAR
Checking the farmer beneficiary if it is one of the CLOA holder, if not report to the MARO
concerned
September 19, 2012 to September 19, 2014
Company : Saudi Bin Laden Group-Alurage-Alumco
Project : King Abdullah Financial District-Aluminum Division
Location : Riyadh, K.S.A.
Client : Rayadah Investment Company
Position : Site Surveyor
Duties and Responsibilities:
Make sure that the total station or the dumpy level is newly calibrated
3. The Instrument used must be calibrated each period of time as required by the general
contractor
Secure a working permit to the safety department
Putting bench mark and topographic mark in a particular site for lay outing
As- built the specific building if the given bench mark is good, or has a conflict between
construction department and aluminum department, and if not
correcting the bench mark with the other Sub-Contractor or General Contractor or
Request a join survey with the concern party
Checking the finish floor line (FFL) and structural slab level (SSL) if there is no conflict
between the aluminum division and the construction division
Transferring the bench mark for each floor level
Lay outing the boundary line of the building
Lay outing the grid lines for the in and out
Lay outing the point of elevation of the brackets
Lay outing the elevation of the starting seal/gutter
Lay outing the elevation of the panels
Lay outing the elevation points for transom and mullion
Checking the elevation of the up-stand
Lay outing the elevation of the up-stand
Checking the elevation of the balcony for bracketing
Lay outing and checking the elevation of the steel beams
Checking the elevation of the vertical steel beam of the sky light
Checking the elevation for the sky light
Lay outing and checking the elevation of the parapet for bottom and top bracket
Computing and checking the angle of degree of the sky light
As-built the still beam of the sky light for the glassing
Aligning and checking the elevation of the brackets
Aligning and checking the elevation panels for stick system
Signing up the Inspection Request (IR) for belling
4. January 1, 2010 to September 13, 2012
Company : Tanjay City Governtment
Project : City Planning and Development
Location : Tanjay City, Negros Oriental, Philippines
Client : People of Tanjay City
Position : Surveyor
Duties and Responsibilities:
Preparing and or computing the standard procedures of applying building permits
Preparing and or computing the standard procedures of application for taxation that includes
tax mapping
Evaluating the corresponding zonal value of a certain area covered within the city
Identifying the existing and potential business areas
Identifying the existing and potential residential areas
Identifying the existing and potential agricultural areas
Identifying the existing and potential industrial areas
Identifying the swampy areas
Identifying the timber land
Identifying the swampy areas
Identifying the idle areas
Identifying the plodding areas
Upgrading the Tanjay City map
Plotting the barangay map and its boundary for the purpose of tax mapping
Making a spot map and base map for hazardous areas which prone to land slide and flooded
areas
Upgrading the master drainage plan
Preparing a subdivision plan for urban poor and flood victims
Upgrading the remote barangay’s farm to market roads
April 2005 to December 31, 2010
5. Company : Catubig Surveying and Construction Services
Project : Surveying and Construction Services
Location : Tanjay City, Negros Oriental, Philippines
Client : People of Tanjay City and Region VII
Position : Surveyor
Duties and Responsibilities:
Office work personnel that attain the client by phone or in person
Prepare the billing and expense the team to be use
Make a cash voucher for the survey team
Received cash payment and issue a receipt from the client
Organized the survey instruments well, as well as the total station that we use
Carefully examine the amount of curvature, either simple or reverse, the tangency, and to be
fill or cut for the firmest of the constructed road
Maintain the accuracy of the field works make sure the erected building is on the right
vertical/located position fits
Monitor the computed difference in the elevation of the constructed drainage or sewage
Checked the order of the data’s to be gathered in the field
Responsible organized the survey team well and good
April 2004 to April 2005
Company : Mariño Surveying Services
Project : Surveying Services
Location : Dumaguete City, Negros Oriental, Philippines
Client : People of Dumaguete City and Region VII
Position : Surveyor
Duties and Responsibilities:
Prepare for all the papers to be use for the survey
6. Prepare for an actual research and slight field investigation regarding the situation of the land
to be survey
Prepare the survey instrument organize the co-worker
Maintain the verticality of the range pole use for foresight/back sight
Format onto the short and easy traverse point
Create a good traverse position for a good access to a layout
TYPE OF INSTRUMENT USED:
TOTAL STATION:
SOUTH S14891 (total station)
SOKKIA SET2 130R (total station)
SOKKIA SET2 120R (total station)
DUMPY LEVEL:
SOKKIA AND LAICA
EDUCATIONAL BACKGROUND:
Bachelor of Science in Geodetic Engineering
University of Southern Philippines, Cebu City, Philippines
SKILLS:
Knowledgeable in Microsoft Office
Knowledgeable in Microsoft Excel
Knowledgeable in AutoCAD
PERSONAL DATA:
Date of Birth : October 29, 1974
Nationality : Filipino
7. Civil Status : Married
Age : 40
Language : English, Tagalog
DECLARATION:
I hereby to declare that all the information mentioned above is true to the best of my knowledge
and belief.
Ernesto Pitos Tuting