1. Zia Ullah Khan Niazi
Address: Wanda Khago Khel,P/O Sultan Khel,Tehsil Essa Khel Distt Mianwali.
Ph No.00923002089485,+243826812057
E-mail ID :(kzia9400@gmail.com) &(kziaullah89@yahoo.com),
Personal Details
Father ‘Name : Maiz Ullah Khan Niazi
NIC No : 38301-1845242-3
Date of Birth : 08-03-1983
Gender : Male
Religion : Islam
Nationality : Pakistani
Passport No : TT4102421
Profession : Surveyor
Specialization : Highway & Infrastructure
Domicile : Sargodha (Punjab)
Marital Status : Married
Summary
I have gained more then fifteen years experience of highway & Infrastructure (2001 to Date)
Over 15 years of experience with digital surveying and mapping branch, technical services supervision
,details, drawings civil and surveying works in the field of cement plants, road, bridges, multipurpose
(covering all construction activities & familiarity with international standards)excellent management &
communication with leadership, problem solving ,negotiation, and team building skill, excellent computer
skill(drafting software auto cad, eagle point, civil 3D and MS office ,excel)setting out ,start to end work
detail layout grid line, offset out,& layout of tower
,hospital,mosque,school,excavation,lean,raft,footing,starter,plinth beam, column, top beam, slab, block &
plaster works civil & mechanical survey. execute field survey layout of centerlines, elevations, offset points
and reference lines of structure as per plan such as pipe racks, equipment’s vessel, process tanks etc.
perform initial and final survey inspection of all civil and mechanical works, checking the precise location
of anchor bolts and templates before concrete pouring, provided calculation of co-ordinates, elevation and
volumes of earthworks, prepare survey reports, miscellaneous drawing, sketches and as built to be
submitted for design purpose and quantity calculation .conduct topographic survey of proposed location of
road and bridge projects. Provide calculation of field survey data, horizontal curve and road profiles, with
the use of the major survey instrument utilized in the construction site
Languages
Urdu, Punjabi, Pashto, English
Education
Metric from Sargodha Board
Professional Qualification
Diploma of Surveyor from Rawalpindi
Computer Skill
Ms Excel, Ms Office, Auto cad
Eagle point
Civil 3D
2. Experience
Name of Employing Consultant M/S Loya Associate (PVT) LTD.
Name of Project Nyumba Ya Akiba –Cement Plant 3000 Tpd
Songololo DRC South Africa
Title of Position Chief Surveyor
Period of assignment July 2015 to till
Activities Supervision of the Building, lime stone crusher, clay
crushing, late rite crushing, sand intake, raw mill silo, kiln
feed raw mill substation, cyclone preheater, kiln rotary,
weigh bridge hv switchyards, clinker cooler ,clinker
silo cement mill packing plant cement silo ,electrical
trenches,pits,sumps,and manholes , Road Bridge, Culvert
Sewerage Water Supply Etc & Structure Work &
Topographic Survey Traverse & Close Leveling Etc
From April 2012 to June 2015
Name Of Employing Consultant M/S Osmani & co (PVT) Ltd
worked with osmani & co
(Pvt.) Ltd as Chief surveyor at
Name of Project
Project DHA city PHASE 9 Infrastructure project Karachi
Title of Position Chief Surveyor
Period of assignment 15 April2012 to June 2015
Activities supervision and layout of octagonal structure, Building
Road, Brides, Culverts water supply, sewerage, Drainage
marking of the coordinates for structure and shifting the
bench marks on octagonal structure, controlling the
excavation levels for foundation. Marking the slope of
mains gate top, laying out of water fall, lake, park and road
work & Structure Work
Name of Employing Consultant M/S ACE (PVT) Ltd
Worked with associated
ACE (Pvt.) Ltd as inspector cum senior surveyor
Name Of Project Dualization of main road from dunyapur city to
Dakota Chock road project District Lutheran
Title of Position Senior Surveyor
Period of assignment 8 Dec 2010 to 30-11-2011
Activities Supervision of Road, Earth Work
& Structure work Checking and Approving of
submittals on land survey work
Name of Employing Consultant Republic Engineering Corporation
(PVT) LTD.
Name of Project Punjab Worker Welfare Board Labour Colony
Muzaffar Garh
Title of Position Inspector cum Chief Surveyor
Period of assignment Oct 2008 to November 2010
Activities Responsibilities Responsible for layout of the entire
project as per approved, drawing, including civil, mep
and infrastructure Supervision of Buildings, Road,
water supply
Sewerage & Structure work.etc
3. Name of Employing Consultant Semec (JV) Engineering General
Consulting (EGC) (PVT) LTD.
Name of Project Rehabilitation of Earth Quick Damage Road Project
(NHIP) Muzaffar Abad to Chekhoti Road (AJK)
Title of Position LAND SURVEYOR
Period of assignment July 2007 to Oct 2008
Activities Earth work Subbase, Aggbase & Asphalt work
Supervision of D.S.T Stone Pitching & Lane Marking
Name of Employing Contractor M/S X/B (JV) M/S Matracon Pakistan
(PVT) LTD.
Name of Project Faisal Avenue + Jinnah Avenue Fly Over +Under
Pass +Approach Road Project Islamabad
Title of Position LAND SURVEYOR
Period of assignment Feb2006 to June 2007
Activities Earth work Subbase, Aggbase & Asphalt work
of D.S.T Stone Pitching & Lane Marking
Name of Employing Consultant M/S Loya Associate (PVT) LTD.
Name of Project Lucky Cement Factory Noori Abad Karachi
Title of Position LAND SURVEYOR
Period of assignment Dec 2004 to Jan 2006
Activities Work related survey checking the submitted Topo
drawing field editing using survey mapping software
records of survey supervises the site Supervision of
the Building, Road & Structure Work
Name of Employing Consultant M/S Engineering Associate (PVT) LTD.
Name of Project Karachi to Guwader Rail Link Project & Gas Pipe
Line Project Shikhupura to Rawalpindi
Title of Position LAND SURVEYOR
Period of assignment Aug 2003 to Nov 2004
Activities Topographic Survey Traverse & Close Leveling Etc Gas
Pipe line and Railway track 200 km length survey
Name of Employing Consultant M/S Engineering Consultant (PVT) LTD.
Name of Project Electricity power Line and road Project (AJK)
Title of Position LAND SURVEYOR
Period of assignment Aug 2001 to Feb 2003
Activities Topographic Survey Traverse & Close Leveling Etc
Electricity power line and existing road topographic
survey project 150 km length
4. INSTRUMENTS USED
Power set 2030
Power Set 2000 & 2010
Total Station 630/R & 610
Total Station set 2CII & Set 4CII
Pentex R 315
Topcon
Nicon
Theodolite all types
Level all types
DGPS