SlideShare a Scribd company logo
1 of 115
Summary (MasterFormat)COST SUMMARY
(MasterFormat)DIVISIONMATERIALLABOREQUIPMENTTO
TAL01 - General Requirements03 - Concrete04 - Masonry05 -
Metals06 - Wood07 - Thermal and Moisture Protection08 -
Openings09 - Finishes11 - Equipment22 - Plumbing23 -
Heating, Ventilating, and Air-Conditioning (HVAC)26 -
Electrical31 - Earthwork32 - Exterior ImprovementsGRAND
TOTAL$0.00$0.00$0.00$0.00
Summary (Uniformat II)COST SUMMARY (UNIFORMAT
II)Gross Floor AreaGSF = 2250
tc={1DF46D86-5353-E143-91BC-ED3DDF311C2D}: [Threaded
comment]
Your version of Excel allows you to read this threaded
comment; however, any edits to it will get removed if the file is
opened in a newer version of Excel. Learn more:
https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Input the correct area of the building
DivisionBreakdown$/GSFCostA
SubstructureA10 - Foundations2.154,846.40A20 - Basement
ConstructionB ShellB10 - SuperstructureB20 - Exterior
ClosureB30 - RoofingC InteriorsC10 - Interior
ConstructionC20 - StairsC30 - Interior FinishesD ServicesD10
- ConveyingD20 - PlumbingD30 - HVACD40 - Fire
ProtectionD50 - ElectricalE Equipment and FurnishingsE10 -
EquipmentE20 - FurnishingsF Special Construction and
DemolitionF10 - Special ConstructionF20 - Selective Building
DemoG Sitework and UtilitiesG10 - Site PreparationsG20 -
Site ImprovementsG30 - Site Civil/Mech. UtilitiesG40 - Site
Electrical UtilitiesG90 - Other Site ConstructionZ General
Conditions, Overhead, and ProfitZ10 - General ConditionsZ20 -
Other Indirect CostsZ30 - Contractor's Fees (Profit)GRAND
TOTAL2.154,846.40
Div. 3DIVISION 03 - CONCRETE
tc={3C06DEBA-FDB8-8E44-AF88-8AD084E72A88}:
[Threaded comment]
Your version of Excel allows you to read this threaded
comment; however, any edits to it will get removed if the file is
opened in a newer version of Excel. Learn more:
https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Copy as many division sheets as needed using this template
RS Means Item #Uniformat II CodeItem
DescriptionUnitQtyUnit Cost ($/unit)Cost ($)Total Cost
($)MaterialLaborEquipmentMaterialLaborEquipment0.000.000.
000.000.000.000.000.000.000.000.000.000.000.000.000.000.000
.000.000.000.000.000.000.000.000.000.000.000.000.000.000.00
GRAND TOTAL0.000.000.000.00
New Perspectives Word 365/2021 | Module 3: SAM Project 1a
New Perspectives Word 365/2021 | Module 3: SAM Project 1a
2
Glenbrook City Planning Division
Enhancing a reportGETTING STARTED
Save the file
NP_WD365_2021_3a_
FirstLastName_1.docx
as
NP_WD365_2021_3a_
FirstLastName_2.docx
Edit the file name by changing “1” to “2”.
If you do not see the
.docx file extension, do not type it. The file extension
will be added for you automatically.
With the file
NP_WD365_2021_3a_
FirstLastName_2.docx
open, ensure that your first and last name is displayed
in the footer.
If the footer does not display your name, delete the file and
download a new copy.
PROJECT STEPS
You are a member of the Glenbrook City Planning Division and
are completing the final draft of the division's report on a
neighborhood development project. Start by using the
Navigation pane to format headings and refine the organization
of the document as follows:
Demote the "Areas of Study" heading so that is uses the
Heading 2 style.
Promote the "Next Steps" heading so that it uses the
Heading 1 style.
On page 2, in the blank paragraph in the "Urban Village
Design" section, insert and format an informative diagram as
follows:
Insert the
Basic Venn SmartArt from the Relationship section of
the SmartArt gallery.
Enter the text shown in Figure 1 into the SmartArt, with each
word displaying in a separate SmartArt shape.
Resize the SmartArt to a height of
2.4" and a width of
5".
Figure 1: SmartArt with Text
In the blank paragraph in the "Designated Funding" section,
show the funding received by inserting a table with 3 columns
and 4 rows and then entering the data shown in Table 1.
Table 1: Funding Received
Purpose
2021
2022
Street banners
$16,000
$16,000
Trees
$24,000
$30,000
Benches
$20,000
$26,000
Format the table as follows to suit the design of the document:
Apply the
Grid Table 5 Dark—Accent 1 table style.
Remove the
First Column table style option.
On page 3, make the following changes to the table after the
"Additional Funding" heading so the table is easier to interpret:
Sort the table in
descending order by the "Good" column.
In the blank cell of the table, insert a formula that sums the
values to the left using the
0% number format.
Resize column A (the "Area" column) to its best fit.
The table after the "RSNDP Members" heading needs to be
updated because Harmony Brandt is no longer an intern for the
organization. The group also wants to show who is employed by
the city.
To make these changes, modify the table as follows:
Delete the row containing the text "Intern" and "Harmony
Brandt".
Insert a column to the right of the "Name" column and enter the
data shown in Table 2.
Table 2: New Table Column
City Employee
x
x
x
3
Format the "RSNDP Members" table as follows to suit the
design of the document:
Apply the
Grid Table 5 Dark—Accent 1 table style to the table.
Remove the
First Column table style option.
Apply
Align Center to the contents of column C.
Format the table to
AutoFit Contents.
Merge the first two cells in the last row (cells A8 and B8).
After the heading "Glenbrook Planning Division Staff", format
the list of job titles and employee names as follows to make
them easier to read:
On each line, beginning "Planning Manager Chris Canadeo" and
ending "Planner I Alex Rau", set a
3.5" left tab stop with option
2 (dotted) leaders.
Press TAB to replace the space between the job title and the
employee name so that the names are aligned with the new tab
stop.
Insert the
Ion Dark header, and then close the Header & Footer
Tools.
Insert a cover page as follows:
Insert the cover page using the
Slice (Dark) style.
Replace the Document Title placeholder with the following text:
City of Glenbrook
Replace the Document Subtitle placeholder with the following
text:
Planning Report
Your document should look like the Final Figure on the
following pages. Save your changes, close the document, and
then exit Word. Follow the directions on the website to submit
your completed project.
Final Figure
© Joseph Sohm/Shutterstock.com
image9.png
image10.jpeg
image11.jpeg
image12.jpeg
image13.jpeg
image14.jpeg
image6.png
image7.png
image8.png
HISTORY OF DRAWING ISSUED
DESCRIPTION DATE OF ISSUED
PROGRESS
PERMIT
CONSTRUCTION
REVISION BY
N
E
W
O
N
E
S
T
Y
.
R
E
S
I
D
E
N
C
E
F
O
R
:
M
A
K
U
H
O
M
E
S
D
E
V
E
L
O
P
E
R
S
I
N
C
.
1
4
9
1
6
S
W
1
3
9
P
L
.
M
I
A
M
I
,
F
L
A
R
C
H
I
T
E
C
T
U
R
E
-
P
L
A
N
N
I
N
G
.
M
I
G
U
E
L
A
.
G
O
N
Z
A
L
E
Z
A
R
C
H
I
T
E
C
T
L
I
C
E
N
S
E
#
A
R
5
0
5
3
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
-
S
.
M
I
A
M
I
F
L
3
3
1
4
3
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
M
I
A
M
I
,
F
L
O
R
I
D
A
3
3
1
4
3
G
R
O
U
P
I
N
C
T
E
L
(
3
0
5
)
6
6
8
3
3
5
0
-
F
A
X
(
3
0
5
)
6
6
7
9
1
2
1
A
A
C
#
0
0
2
1
5
8
DATE 03-22-14
SCALE AS NOTED
DRAWING Y.T.
JOB
SHEET
A-1
OF SHEETS
HISTORY OF DRAWING ISSUED
DESCRIPTION DATE OF ISSUED
PROGRESS
PERMIT
CONSTRUCTION
REVISION BY
N
E
W
O
N
E
S
T
Y
.
R
E
S
I
D
E
N
C
E
F
O
R
:
M
A
K
U
H
O
M
E
S
D
E
V
E
L
O
P
E
R
S
I
N
C
.
1
4
9
1
6
S
W
1
3
9
P
L
.
M
I
A
M
I
,
F
L
A
R
C
H
I
T
E
C
T
U
R
E
-
P
L
A
N
N
I
N
G
.
M
I
G
U
E
L
A
.
G
O
N
Z
A
L
E
Z
A
R
C
H
I
T
E
C
T
L
I
C
E
N
S
E
#
A
R
5
0
5
3
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
-
S
.
M
I
A
M
I
F
L
3
3
1
4
3
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
M
I
A
M
I
,
F
L
O
R
I
D
A
3
3
1
4
3
G
R
O
U
P
I
N
C
T
E
L
(
3
0
5
)
6
6
8
3
3
5
0
-
F
A
X
(
3
0
5
)
6
6
7
9
1
2
1
A
A
C
#
0
0
2
1
5
8
DATE 03-22-14
SCALE AS NOTED
DRAWING Y.T.
JOB
SHEET
A-2
OF SHEETS
HISTORY OF DRAWING ISSUED
DESCRIPTION DATE OF ISSUED
PROGRESS
PERMIT
CONSTRUCTION
REVISION BY
N
E
W
O
N
E
S
T
Y
.
R
E
S
I
D
E
N
C
E
F
O
R
:
M
A
K
U
H
O
M
E
S
D
E
V
E
L
O
P
E
R
S
I
N
C
.
1
4
9
1
6
S
W
1
3
9
P
L
.
M
I
A
M
I
,
F
L
A
R
C
H
I
T
E
C
T
U
R
E
-
P
L
A
N
N
I
N
G
.
M
I
G
U
E
L
A
.
G
O
N
Z
A
L
E
Z
A
R
C
H
I
T
E
C
T
L
I
C
E
N
S
E
#
A
R
5
0
5
3
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
-
S
.
M
I
A
M
I
F
L
3
3
1
4
3
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
M
I
A
M
I
,
F
L
O
R
I
D
A
3
3
1
4
3
G
R
O
U
P
I
N
C
T
E
L
(
3
0
5
)
6
6
8
3
3
5
0
-
F
A
X
(
3
0
5
)
6
6
7
9
1
2
1
A
A
C
#
0
0
2
1
5
8
DATE 03-22-14
SCALE AS NOTED
DRAWING Y.T.
JOB
SHEET
A-3
OF SHEETS
HISTORY OF DRAWING ISSUED
DESCRIPTION DATE OF ISSUED
PROGRESS
PERMIT
CONSTRUCTION
REVISION BY
1 05-15-14 BLDG. DEPT. COMM.
2 10-13-14 OWNERS REQUEST
A
R
C
H
I
T
E
C
T
U
R
E
-
P
L
A
N
N
I
N
G
.
M
I
G
U
E
L
A
.
G
O
N
Z
A
L
E
Z
N
E
W
O
N
E
S
T
Y
.
R
E
S
I
D
E
N
C
E
F
O
R
:
A
R
C
H
I
T
E
C
T
L
I
C
E
N
S
E
#
A
R
5
0
5
3
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
-
S
.
M
I
A
M
I
F
L
3
3
1
4
3
M
A
K
U
H
O
M
E
S
D
E
V
E
L
O
P
E
R
S
I
N
C
.
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
M
I
A
M
I
,
F
L
O
R
I
D
A
3
3
1
4
3
1
4
9
1
6
S
W
1
3
9
P
L
.
M
I
A
M
I
,
F
L
G
R
O
U
P
I
N
C
T
E
L
(
3
0
5
)
6
6
8
3
3
5
0
-
F
A
X
(
3
0
5
)
6
6
7
9
1
2
1
A
A
C
#
0
0
2
1
5
8
DATE 03-22-14
SCALE AS NOTED
DRAWING Y.T.
JOB
SHEET
OF SHEETS
E-1
HISTORY OF DRAWING ISSUED
DESCRIPTION DATE OF ISSUED
PROGRESS
PERMIT
CONSTRUCTION
REVISION BY
1 05-15-14 BLDG. DEPT. COMM.
2 10-13-14 OWNERS REQUEST
A
R
C
H
I
T
E
C
T
U
R
E
-
P
L
A
N
N
I
N
G
.
M
I
G
U
E
L
A
.
G
O
N
Z
A
L
E
Z
N
E
W
O
N
E
S
T
Y
.
R
E
S
I
D
E
N
C
E
F
O
R
:
A
R
C
H
I
T
E
C
T
L
I
C
E
N
S
E
#
A
R
5
0
5
3
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
-
S
.
M
I
A
M
I
F
L
3
3
1
4
3
M
A
K
U
H
O
M
E
S
D
E
V
E
L
O
P
E
R
S
I
N
C
.
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
M
I
A
M
I
,
F
L
O
R
I
D
A
3
3
1
4
3
1
4
9
1
6
S
W
1
3
9
P
L
.
M
I
A
M
I
,
F
L
G
R
O
U
P
I
N
C
T
E
L
(
3
0
5
)
6
6
8
3
3
5
0
-
F
A
X
(
3
0
5
)
6
6
7
9
1
2
1
A
A
C
#
0
0
2
1
5
8
DATE 03-22-14
SCALE AS NOTED
DRAWING Y.T.
JOB
SHEET
E-2
OF SHEETS
HISTORY OF DRAWING ISSUED
DESCRIPTION DATE OF ISSUED
PROGRESS
PERMIT
CONSTRUCTION
REVISION BY
N
E
W
O
N
E
S
T
Y
.
R
E
S
I
D
E
N
C
E
F
O
R
:
M
A
K
U
H
O
M
E
S
D
E
V
E
L
O
P
E
R
S
I
N
C
.
1
4
9
1
6
S
W
1
3
9
P
L
.
M
I
A
M
I
,
F
L
A
R
C
H
I
T
E
C
T
U
R
E
-
P
L
A
N
N
I
N
G
.
M
I
G
U
E
L
A
.
G
O
N
Z
A
L
E
Z
A
R
C
H
I
T
E
C
T
L
I
C
E
N
S
E
#
A
R
5
0
5
3
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
-
S
.
M
I
A
M
I
F
L
3
3
1
4
3
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
M
I
A
M
I
,
F
L
O
R
I
D
A
3
3
1
4
3
G
R
O
U
P
I
N
C
T
E
L
(
3
0
5
)
6
6
8
3
3
5
0
-
F
A
X
(
3
0
5
)
6
6
7
9
1
2
1
A
A
C
#
0
0
2
1
5
8
DATE 03-22-14
SCALE AS NOTED
DRAWING Y.T.
JOB
SHEET
M-1
OF SHEETS
HISTORY OF DRAWING ISSUED
DESCRIPTION DATE OF ISSUED
PROGRESS
PERMIT
CONSTRUCTION
REVISION BY
N
E
W
O
N
E
S
T
Y
.
R
E
S
I
D
E
N
C
E
F
O
R
:
M
A
K
U
H
O
M
E
S
D
E
V
E
L
O
P
E
R
S
I
N
C
.
1
4
9
1
6
S
W
1
3
9
P
L
.
M
I
A
M
I
,
F
L
A
R
C
H
I
T
E
C
T
U
R
E
-
P
L
A
N
N
I
N
G
.
M
I
G
U
E
L
A
.
G
O
N
Z
A
L
E
Z
A
R
C
H
I
T
E
C
T
L
I
C
E
N
S
E
#
A
R
5
0
5
3
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
-
S
.
M
I
A
M
I
F
L
3
3
1
4
3
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
M
I
A
M
I
,
F
L
O
R
I
D
A
3
3
1
4
3
G
R
O
U
P
I
N
C
T
E
L
(
3
0
5
)
6
6
8
3
3
5
0
-
F
A
X
(
3
0
5
)
6
6
7
9
1
2
1
A
A
C
#
0
0
2
1
5
8
DATE 03-22-14
SCALE AS NOTED
DRAWING Y.T.
JOB
SHEET
M-2
OF SHEETS
HISTORY OF DRAWING ISSUED
DESCRIPTION DATE OF ISSUED
PROGRESS
PERMIT
CONSTRUCTION
REVISION BY
N
E
W
O
N
E
S
T
Y
.
R
E
S
I
D
E
N
C
E
F
O
R
:
M
A
K
U
H
O
M
E
S
D
E
V
E
L
O
P
E
R
S
I
N
C
.
1
4
9
1
6
S
W
1
3
9
P
L
.
M
I
A
M
I
,
F
L
A
R
C
H
I
T
E
C
T
U
R
E
-
P
L
A
N
N
I
N
G
.
M
I
G
U
E
L
A
.
G
O
N
Z
A
L
E
Z
A
R
C
H
I
T
E
C
T
L
I
C
E
N
S
E
#
A
R
5
0
5
3
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
-
S
.
M
I
A
M
I
F
L
3
3
1
4
3
7
6
0
0
S
W
5
7
A
V
E
.
-
S
U
I
T
E
1
2
8
M
I
A
M
I
,
F
L
O
R
I
D
A
3
3
1
4
3
G
R
O
U
P
I
N
C
T
E
L
(
3
0
5
)
6
6
8
3
3
5
0
-
F
A
X
(
3
0
5
)
6
6
7
9
1
2
1
A
A
C
#
0
0
2
1
5
8
DATE 03-22-14
SCALE AS NOTED
DRAWING Y.T.
JOB
SHEET
P-1
OF SHEETS
A-1-Layout1A-2-Layout1A-3-Layout1E-1-E-1E-1-E-2M-1-M-
1M-1-M-2P-1-P-1S-1S-2S-3S-4S-5S-6
DEPT. OF CONSTRUCTION MANAGEMENT
BCN 3611 – CONST. COST ESTIMATING I
FALL 2021
Term Project Assignment 09/07/2021 Page 1| 3
TERM PROJECT ASSIGNMENT DESCRIPTION
One-Story Single Family House (MAKU Residence)
OBJECTIVE AND GENERAL REQUIREMENTS
The objective of the term project assignment is to prepare a Bid
Proposal for constructing a one-story single
family house (MAKU Residence). Students must approach the
assignment from the perspective of a
construction contractor attending a bid, and prepare a
professional price proposal using their knowledge,
skills and common sense. This requires proper efforts with
regards to:
• Reading and understanding plans;
• Recognizing construction work items;
• Surveying the quantity for various types of work;
• Using cost databases to acquire cost of construction efforts;
• Estimating indirect and total cost of construction; and
• Submitting and presenting a professional proposal of their cost
estimation.
General requirements of the proposal are as following:
• This is an individual assignment and students will not be
allowed to work in groups.
• Use the project plans and other reference material posted on
Canvas to identify the scope of work
in this project and complete the quantity take-off.
• Follow the CSI MasterFormat® (2004 Edition) in organizing
the cost estimate proposal.
• Use the R.S. Means Online website
(https://www.rsmeansonline.com) to get cost data for all
identified work items. It is the students’ responsibility to follow
up on the invitation email to setup
an account on the R.S. Means Online website and to inform the
instructor immediately if they have
not received such email (double check your email spam folder).
• In case of any missing or incomplete information, students can
make reasonable and justifiable
assumptions. All assumptions must be clearly listed in the
proper sections of the proposal, as
described later in this document.
MINIMUM SCOPE
This section describes the minimum scope of work required in
this project. This includes items from the
following 11 CSI MasterFormat® divisions:
Division 01: General Conditions and Requirements
• Identify all general requirement items that should apply to this
job, assuming 12 month duration
for entire construction. Students are encouraged to make
reasonable and justifiable assumptions
based on common sense and regular construction practices to
cover any missing information.
Division 03: Concrete (for Slab, Footings, and Foundations)
• Concrete forming and reinforcing steel, including required
accessories (use separate cost items)
• Concrete placement (including curing and finishing, wherever
applicable)
Division 04: Masonry
• Masonry units and accessories (including mortar and grout, if
needed)
• Bond Beams
https://www.rsmeansonline.com/
DEPT. OF CONSTRUCTION MANAGEMENT
BCN 3611 – CONST. COST ESTIMATING I
FALL 2021
Term Project Assignment 09/07/2021 Page 2| 3
Division 05: Metals
• Wall studs
Division 06: Wood
• Roof framing structure (prefabricated truss system) and
sheathing
• Others
Division 07: Thermal and Moisture Protection
• Below-grade moisture protection (primer, vapor barrier,
protection board, coving material, etc.)
• Walls (interior and exterior) and ceiling thermal insulation.
Use R-11 insulation for interior walls.
• Roof Tiles and accessories
Division 08: Openings
• Doors and Windows
Division 09: Finishes
• All wall, flooring and ceiling finishes
Division 11: Equipment
• Residential appliances such as kitchen equipment, washers and
dryers, etc.
Division 31: Earthwork
• Structural excavation and backfill (with compaction) – assume
2 feet of working space on all sides
and excavation slope of 1:1.
Division 32: Exterior Improvements
• Fencing, sidewalks and driveways …etc.
PROJECT REPORT
The final report must be submitted as a single PDF file
organized in the following sections:
• Cover Sheet: Your information and title of the report.
• Proposal Summary Sheets: summary table of cost estimates in
both CSI MasterFormat and AST
Uniformat II. (see spreadsheet templates posted on Canvas).
• Separate section for each CSI division, consisting of:
o Summary sheet including cost items identified for the
division. The description of each item
should be clear and written to describe the work item not the
description of the RS Means item
used for pricing (see cover table template on Canvas),
o Estimated cost of items and divisions, included in the above
summary table.
o List of all the assumptions made in order to complete the
quantity takeoffs, and
o Typed takeoff calculations of all quantities included in the
estimate or a scanned copy of neatly
written and properly-organized handwritten takeoff
calculations. You should:
applicable).
calculations.
In addition to the PDF file, the Microsoft Excel file used to
develop the cost summary sheets
mentioned above should also be submitted.
DEPT. OF CONSTRUCTION MANAGEMENT
BCN 3611 – CONST. COST ESTIMATING I
FALL 2021
Term Project Assignment 09/07/2021 Page 3| 3
EVALUATION CRITERIA
Submissions will be evaluated using the following rubric
Criterion Points
Organization and Presentation 15
Division 1 – General Requirements 10
Division 3 – Concrete 10
Division 4 – Masonry 10
Division 5 – Metals 5
Division 6 – Wood 10
Division 7 – Thermal and Moisture Protection 5
Division 8 – Openings 5
Division 9 – Finishes 10
Division 10 – Equipment 5
Division 31 – Earthwork 10
Division 32 – Exterior Improvements 4
Total 99
The grade for the 11 divisions will be based on:
• The comprehensiveness of the estimate (i.e. including all the
applicable items that need to be estimated)
• The accuracy of the quantity take-off
• The appropriateness of the cost items selected from RS Means
OBJECTIVE AND GENERAL REQUIREMENTSMINIMUM
SCOPEPROJECT REPORTEvaluation criteria

More Related Content

Similar to Summary (MasterFormat)COST SUMMARY (MasterFormat)DIVISIONMATERIALL.docx

CONCORDIA UNIVERSITY 
FACULTY OF ENGINEERING AND COMPUTER SC.docx
CONCORDIA UNIVERSITY 
FACULTY OF ENGINEERING AND COMPUTER SC.docxCONCORDIA UNIVERSITY 
FACULTY OF ENGINEERING AND COMPUTER SC.docx
CONCORDIA UNIVERSITY 
FACULTY OF ENGINEERING AND COMPUTER SC.docx
maxinesmith73660
 
ModuleWeek 5Homework AssignmentChapter 7 HomeworkPART 1.docx
ModuleWeek 5Homework AssignmentChapter 7 HomeworkPART 1.docxModuleWeek 5Homework AssignmentChapter 7 HomeworkPART 1.docx
ModuleWeek 5Homework AssignmentChapter 7 HomeworkPART 1.docx
adelaidefarmer322
 
End of chapter problem 6
End of chapter problem 6End of chapter problem 6
End of chapter problem 6
wkhairil80
 
Cdc up test_summary_report_template
Cdc up test_summary_report_templateCdc up test_summary_report_template
Cdc up test_summary_report_template
Sunil Pandey
 
37182661 make-sectors-help2
37182661 make-sectors-help237182661 make-sectors-help2
37182661 make-sectors-help2
luganoi
 
2009 ms project 2010 (2)
2009 ms project 2010 (2)2009 ms project 2010 (2)
2009 ms project 2010 (2)
constancemccrea
 
2010 ms project 2010 (2)
2010 ms project 2010 (2)2010 ms project 2010 (2)
2010 ms project 2010 (2)
douggillis
 
MS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docx
MS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docxMS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docx
MS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docx
rosemarybdodson23141
 
BMIS 325ModuleWeek 5 Homework AssignmentChapter 7 Homework.docx
BMIS 325ModuleWeek 5  Homework AssignmentChapter 7 Homework.docxBMIS 325ModuleWeek 5  Homework AssignmentChapter 7 Homework.docx
BMIS 325ModuleWeek 5 Homework AssignmentChapter 7 Homework.docx
hartrobert670
 
Part 1 - Microsoft AccessView GlossaryUse Access to create a.docx
Part 1 - Microsoft AccessView GlossaryUse Access to create a.docxPart 1 - Microsoft AccessView GlossaryUse Access to create a.docx
Part 1 - Microsoft AccessView GlossaryUse Access to create a.docx
honey690131
 

Similar to Summary (MasterFormat)COST SUMMARY (MasterFormat)DIVISIONMATERIALL.docx (20)

Internal tables in sap
Internal tables in sapInternal tables in sap
Internal tables in sap
 
Tabfile workspace making presentation
Tabfile workspace making presentationTabfile workspace making presentation
Tabfile workspace making presentation
 
Gantt excel
Gantt excelGantt excel
Gantt excel
 
EX16_WD_CH03_GRADER_CAP_AS (completed solution)
EX16_WD_CH03_GRADER_CAP_AS (completed solution)EX16_WD_CH03_GRADER_CAP_AS (completed solution)
EX16_WD_CH03_GRADER_CAP_AS (completed solution)
 
GO16_AC_CH01_GRADER_1G_AS - Open Houses (completed solution)
GO16_AC_CH01_GRADER_1G_AS - Open Houses (completed solution)GO16_AC_CH01_GRADER_1G_AS - Open Houses (completed solution)
GO16_AC_CH01_GRADER_1G_AS - Open Houses (completed solution)
 
CONCORDIA UNIVERSITY 
FACULTY OF ENGINEERING AND COMPUTER SC.docx
CONCORDIA UNIVERSITY 
FACULTY OF ENGINEERING AND COMPUTER SC.docxCONCORDIA UNIVERSITY 
FACULTY OF ENGINEERING AND COMPUTER SC.docx
CONCORDIA UNIVERSITY 
FACULTY OF ENGINEERING AND COMPUTER SC.docx
 
ModuleWeek 5Homework AssignmentChapter 7 HomeworkPART 1.docx
ModuleWeek 5Homework AssignmentChapter 7 HomeworkPART 1.docxModuleWeek 5Homework AssignmentChapter 7 HomeworkPART 1.docx
ModuleWeek 5Homework AssignmentChapter 7 HomeworkPART 1.docx
 
End of chapter problem 6
End of chapter problem 6End of chapter problem 6
End of chapter problem 6
 
GO16_WD_CH02_GRADER_2E_HW - Job Listings 1.0 (completed solution)
GO16_WD_CH02_GRADER_2E_HW - Job Listings 1.0 (completed solution)GO16_WD_CH02_GRADER_2E_HW - Job Listings 1.0 (completed solution)
GO16_WD_CH02_GRADER_2E_HW - Job Listings 1.0 (completed solution)
 
Cdc up test_summary_report_template
Cdc up test_summary_report_templateCdc up test_summary_report_template
Cdc up test_summary_report_template
 
Electrónica y PCB: Tutorial de Easyeda V6.4.3
Electrónica y PCB: Tutorial de Easyeda  V6.4.3Electrónica y PCB: Tutorial de Easyeda  V6.4.3
Electrónica y PCB: Tutorial de Easyeda V6.4.3
 
37182661 make-sectors-help2
37182661 make-sectors-help237182661 make-sectors-help2
37182661 make-sectors-help2
 
Modeling seismic analysis_and_design_of_rc_building_10_story
Modeling seismic analysis_and_design_of_rc_building_10_storyModeling seismic analysis_and_design_of_rc_building_10_story
Modeling seismic analysis_and_design_of_rc_building_10_story
 
DSD
DSDDSD
DSD
 
Microsoft project training manual
Microsoft project training manualMicrosoft project training manual
Microsoft project training manual
 
2009 ms project 2010 (2)
2009 ms project 2010 (2)2009 ms project 2010 (2)
2009 ms project 2010 (2)
 
2010 ms project 2010 (2)
2010 ms project 2010 (2)2010 ms project 2010 (2)
2010 ms project 2010 (2)
 
MS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docx
MS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docxMS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docx
MS Project - Lesson #1B - Basics of Project Scheduling - Part 2Obj.docx
 
BMIS 325ModuleWeek 5 Homework AssignmentChapter 7 Homework.docx
BMIS 325ModuleWeek 5  Homework AssignmentChapter 7 Homework.docxBMIS 325ModuleWeek 5  Homework AssignmentChapter 7 Homework.docx
BMIS 325ModuleWeek 5 Homework AssignmentChapter 7 Homework.docx
 
Part 1 - Microsoft AccessView GlossaryUse Access to create a.docx
Part 1 - Microsoft AccessView GlossaryUse Access to create a.docxPart 1 - Microsoft AccessView GlossaryUse Access to create a.docx
Part 1 - Microsoft AccessView GlossaryUse Access to create a.docx
 

More from rhetttrevannion

More from rhetttrevannion (20)

Discuss three (3) ways that large organizations are increasingly eng.docx
Discuss three (3) ways that large organizations are increasingly eng.docxDiscuss three (3) ways that large organizations are increasingly eng.docx
Discuss three (3) ways that large organizations are increasingly eng.docx
 
Discuss this week’s objectives with your team sharing related rese.docx
Discuss this week’s objectives with your team sharing related rese.docxDiscuss this week’s objectives with your team sharing related rese.docx
Discuss this week’s objectives with your team sharing related rese.docx
 
Discuss theoretical considerations or assumptions relevant to yo.docx
Discuss theoretical considerations or assumptions relevant to yo.docxDiscuss theoretical considerations or assumptions relevant to yo.docx
Discuss theoretical considerations or assumptions relevant to yo.docx
 
Discuss theprinciple events of PROCESS AND THREAD used in both t.docx
Discuss theprinciple events of PROCESS AND THREAD used in both t.docxDiscuss theprinciple events of PROCESS AND THREAD used in both t.docx
Discuss theprinciple events of PROCESS AND THREAD used in both t.docx
 
Discuss the Windows Registry System Hive1) What information.docx
Discuss the Windows Registry System Hive1) What information.docxDiscuss the Windows Registry System Hive1) What information.docx
Discuss the Windows Registry System Hive1) What information.docx
 
Discuss the way the idea of heroism develops from Gilgamesh th.docx
Discuss the way the idea of heroism develops from Gilgamesh th.docxDiscuss the way the idea of heroism develops from Gilgamesh th.docx
Discuss the way the idea of heroism develops from Gilgamesh th.docx
 
Discuss the ways in which the history of the U.S. was presented in t.docx
Discuss the ways in which the history of the U.S. was presented in t.docxDiscuss the ways in which the history of the U.S. was presented in t.docx
Discuss the ways in which the history of the U.S. was presented in t.docx
 
Discuss the value of Lean Systems Engineering to systems develop.docx
Discuss the value of Lean Systems Engineering to systems develop.docxDiscuss the value of Lean Systems Engineering to systems develop.docx
Discuss the value of Lean Systems Engineering to systems develop.docx
 
discuss the various pathways interest groups use to influence politi.docx
discuss the various pathways interest groups use to influence politi.docxdiscuss the various pathways interest groups use to influence politi.docx
discuss the various pathways interest groups use to influence politi.docx
 
Discuss the various tools and techniques used by an HCO to incre.docx
Discuss the various tools and techniques used by an HCO to incre.docxDiscuss the various tools and techniques used by an HCO to incre.docx
Discuss the various tools and techniques used by an HCO to incre.docx
 
Discuss the various means by which slaves resisted the slave system..docx
Discuss the various means by which slaves resisted the slave system..docxDiscuss the various means by which slaves resisted the slave system..docx
Discuss the various means by which slaves resisted the slave system..docx
 
Discuss the typica l clinical presentation of the diagnosis , Hip Os.docx
Discuss the typica l clinical presentation of the diagnosis , Hip Os.docxDiscuss the typica l clinical presentation of the diagnosis , Hip Os.docx
Discuss the typica l clinical presentation of the diagnosis , Hip Os.docx
 
Discuss the types of resources, tools, and methods that are availabl.docx
Discuss the types of resources, tools, and methods that are availabl.docxDiscuss the types of resources, tools, and methods that are availabl.docx
Discuss the types of resources, tools, and methods that are availabl.docx
 
Discuss the types of items that should be examined in a firewall log.docx
Discuss the types of items that should be examined in a firewall log.docxDiscuss the types of items that should be examined in a firewall log.docx
Discuss the types of items that should be examined in a firewall log.docx
 
Discuss the types of property, providing an example of each an.docx
Discuss the types of property, providing an example of each an.docxDiscuss the types of property, providing an example of each an.docx
Discuss the types of property, providing an example of each an.docx
 
Discuss the type of personality it takes to become a police officer..docx
Discuss the type of personality it takes to become a police officer..docxDiscuss the type of personality it takes to become a police officer..docx
Discuss the type of personality it takes to become a police officer..docx
 
Discuss the two major sources of crime statistics for the United Sta.docx
Discuss the two major sources of crime statistics for the United Sta.docxDiscuss the two major sources of crime statistics for the United Sta.docx
Discuss the two major sources of crime statistics for the United Sta.docx
 
Discuss the two most prominent theories related to the stage of adul.docx
Discuss the two most prominent theories related to the stage of adul.docxDiscuss the two most prominent theories related to the stage of adul.docx
Discuss the two most prominent theories related to the stage of adul.docx
 
Discuss the two elements required for the consent defense. In ad.docx
Discuss the two elements required for the consent defense. In ad.docxDiscuss the two elements required for the consent defense. In ad.docx
Discuss the two elements required for the consent defense. In ad.docx
 
Discuss the Truth in Lending Act and what role it places in financia.docx
Discuss the Truth in Lending Act and what role it places in financia.docxDiscuss the Truth in Lending Act and what role it places in financia.docx
Discuss the Truth in Lending Act and what role it places in financia.docx
 

Recently uploaded

Recently uploaded (20)

HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
Introduction to TechSoup’s Digital Marketing Services and Use Cases
Introduction to TechSoup’s Digital Marketing  Services and Use CasesIntroduction to TechSoup’s Digital Marketing  Services and Use Cases
Introduction to TechSoup’s Digital Marketing Services and Use Cases
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learning
 
How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17How to Manage Call for Tendor in Odoo 17
How to Manage Call for Tendor in Odoo 17
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdfUGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
UGC NET Paper 1 Unit 7 DATA INTERPRETATION.pdf
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Economic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food AdditivesEconomic Importance Of Fungi In Food Additives
Economic Importance Of Fungi In Food Additives
 
AIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.pptAIM of Education-Teachers Training-2024.ppt
AIM of Education-Teachers Training-2024.ppt
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
What is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptxWhat is 3 Way Matching Process in Odoo 17.pptx
What is 3 Way Matching Process in Odoo 17.pptx
 

Summary (MasterFormat)COST SUMMARY (MasterFormat)DIVISIONMATERIALL.docx