SlideShare a Scribd company logo
1 of 13
REYNALDO J. UNIDA
Pipindan, Binangonan, Rizal, Philippines
Contact #: +639998267676 (Phil’s.)
+639477141868
E-mail: rey_crane@yahoo.com
ARAMCO CERTIFICATE NO.B 7653 / Badge no. 7544177
SAUDI GOVERNMENT LICENSE # 2196137844
Objectives;
To obtain a positionthat will give an opportunity to
demonstrate my skill and allowme to developmy full potential to
become a well-roundedworker.crane operator expert,highlyskilledin
riggingworks. Deadline-drivenMachine Operator with10+ years
experience ina fast-pacedenvironment.Greatattentionto detail and
organizational skills..
Skills:Career Highlightand Strengths
Driving
ComputerLiterate
Clerical:MS word, Power Point,Excel
Career Highlightand Strengths
Hardworking, team player and abilityto work under pressure
Extensive experience withcrane'sequipment..mobilecrawlercrane's
Goodcommunication skills
Equipmentproblemresolution
Strong team player
Strong written and verbal communicationskills
Equipmentproblemresolution
Troubleshoot/repairof compressionequipment
ENPLOYMENT HISTORY:
FILMENERA.Resources corporation/cc.
ANTRAK.Logistics.
Puro.Aroroy.Masbate.Philippimes
Feb.2014 March.2015
JOB DESCRIPTION:
•.CopperGoldmine . processingPlant. crane operator..
• work undersupervisionofengr.maintenance.forall works in
processing.
WORK HISTORY:
 Maintainedcompliance withcompany standards to perform all
maintenance activities.
 Collaboratedwithrigging dept.to ensure smoothwork flowand
efficientorganizationoperations.
 Supported techniciansinequipmentmaintenance and repair.
 Followedcompanyproceduresto maintain work environmentina
neat and orderly condition.
 Communicatedoperational issuesand changesto supervisoron
regular basis.
 Accuratelyread, understood,and carried out writteninstructions.
 Attendedmonthlysafetymeetingsto ensure machine operation
safety.
TYPE OF CRANE OPERATED:
• XCMG Rough Terrain (50.ton’s)
• Tadano Crane – Rough Terrain Hydraulic ( Hydraulic Telescopic
Ton’s 50, 25, 20,)
D.M.CONSUNJI.INC.Engineer’s.Contructor’s
2x150MW.SLPGC.Powerplant.Project
CALACA.Batangas.Philippine’s
Aug.2013 Jan.2014
JOB DESCRIPTION:
 Liftingof Structural Materialsin Erection Loading and Un-loading
of Cargo Shipments
 RelieverofBauer. Clam Shell ofJetty and pump House intake.
Concrete Pilingworks.
WORK HISTORY:
 Maintainedcompliance withcompany standards to perform all
maintenance activities.
 Collaboratedwithrigging dept.to ensure smoothwork flowand
efficientorganizationoperations.
 Supportedtechniciansin equipmentmaintenance andrepair.
 Followedcompanyproceduresto maintain work environmentina
neat and orderly condition.
 Communicatedoperational issuesand changesto supervisoron
regular basis.
 Accuratelyread, understood,and carried out writteninstructions.
 Attendedmonthlysafetymeetingsto ensure machine operation
safety.
 TYPE OF CRANE OPERATED:
 KobelcoCrane – Crawler Crane ( 7100 Hydraulic 100 Ton’s )
 TerexCrane’s*(RoughTerrain)* RT100 – 90 ton’s(USton)
 LIEBHERR .crawlercrane.LR1750 (750 ton’s)
FIRST, QUANTUM, MINERALS LTD
The Trident Project, Sentinel Mine
P.O Box 230022, Zambia Road, Industrial Area.
Ndola, Zambia Africa.
November 28, 2012 – April 11, 2013
JOB DESCRIPTION:
 LiftingStructural, Materials
 Erection,Ball Mill,Sub mill , Parts
WORK HISTORY:
 Maintainedcompliance withcompany standards to perform all
maintenance activities.
 Collaboratedwithrigging dept.to ensure smoothwork flowand
efficientorganizationoperations.
 Supportedtechniciansin equipmentmaintenance andrepair.
 Followedcompanyproceduresto maintain work environmentina
neat and orderly condition.
 Communicatedoperational issuesand changesto supervisoron
regular basis.
 Accuratelyread, understood,and carried out writteninstructions.
 Attendedmonthlysafetymeetingsto ensure machine operation
safety.
TYPE OF CRANE OPERATED:
 Grove by Manitowoc*(truck all terrain)*GMK, 4100 (100 Ton’s)
GMK,5220 (220 Ton’s)
 Manitowoc, Crawler Crane* 5220, (300 Ton’s) 18000 (750 tons)55A
Boom with MAX-ER
 Terex Crane’s*(RoughTerrain)* RT100 – 90 ton’s(USton) RT75 – 75
ton’s82.7 ton’s (USton)
BIN QURAYA EST.HEAVY EQUIPMENT RENTAL DIVISION
P.O Box 32058 – AL-KHOBAR 31952, Saudi Arabia
July 13, 2003 – January 15, 2012
JOB DESCRIOTION:
 Rig MovingRig Upping.RefineryPlant Shut Down. Civil
construction BuildingRefineryplant.Oil well Services.
Coil Tubing .Wire line.Fracturing services.
WORK HISTORY:
 Maintainedcompliance withcompany standards to perform all
maintenance activities.
 Collaboratedwithrigging dept.to ensure smoothwork flowand
efficientorganizationoperations.
 Supportedtechniciansin equipmentmaintenance andrepair.
 Followedcompanyproceduresto maintain work environmentina
neat and orderly condition.
 Communicatedoperational issuesand changesto supervisoron
regular basis.
 Accuratelyread, understood,and carried out writteninstructions.
 Attendedmonthlysafetymeetingsto ensure machine operation
safety.
 Usedschematicdiagrams to plan work.
TYPE OF CRANE OPERATED:
 TADANO Faun ATF 110G-5,ATF 220G-5(100- 220.ton’s)*ALL
TERRAIN
 LIEBHERR LTM 1100, 1160, 1220.1300(100 up 300.ton’s)*ALL
TERRAIN
 LIEBHERR .crawlercrane.LR1750 (750 ton’s)
RAYTHEON – EBASCO OVERSEAS LTD. San Roque Multi Purpose Project
San Roque, San Manuel Pangasinan
March 07 – September 15, 2002
JOB DESCRIPTION:
 Erectionof Parts Material’sof Turbine Motor
 Erection ofSlab Girdersfor Spill way
WORK HISTORY:
 Maintainedcompliance withcompany standards to perform all
maintenance activities.
 Collaboratedwithrigging dept.to ensure smoothwork flowand
efficientorganization operations.
 Supportedtechniciansin equipmentmaintenance andrepair.
 Followedcompanyproceduresto maintain work environmentina
neat and orderly condition.
 Communicatedoperational issuesand changesto supervisoron
regular basis.
 Accuratelyread, understood,and carried out writteninstructions.
 Attendedmonthlysafetymeetingsto ensure machine operation
safety.
TYPE OF CRANE OPERATED:
 Manitowoc Crane – Truck Mountain ( 3900 Series#140 tons
)Mechanical cranes.
 Manitowoc Crane – Crawler Crane ( 888 Hydraulic 240 Ton’s
)Mechanical cranes.
 KobelcoCrane – Crawler Crane ( 7100 Hydraulic 100 Ton’s )
 Tadano Crane – Rough Terrain ( Hydraulic Telescopic Ton 50, 25, 20
)
 KobelcoCrane – Rough Terrain ( Hydraulic Telescopic Ton 45 )
 Link BeltCrane’s– (Rough Terrain) RTC-890 (90 tons) RTC-8065 Series
II (65 Tons)
MAXWELL HEAVY EQUIPMENT CORPORATION
# 198 Gregorio Araneta Avenue.Sta Mesa Quezon City
October 17, 1998 – March 01, 2001
JOB DESCRIPTION:
 Erection and Support Material In ConstructionWork.
WORK HISTORY:
 Maintainedcompliance withcompany standards to perform all
maintenance activities.
 Collaboratedwithrigging dept.to ensure smoothwork flowand
efficientorganizationoperations.
 Supportedtechniciansin equipmentmaintenance andrepair.
 Followedcompanyproceduresto maintain work environmentina
neat and orderly condition.
 Communicatedoperational issuesand changesto supervisoron
regular basis.
 Accuratelyread, understood,and carried out writteninstructions.
 Attendedmonthlysafetymeetingsto ensure machine operation
safety.
TYPE OF CRANE OPERATED:
 Tadano Crane – Rough Terrain Hydraulic ( Hydraulic Telescopic
Ton’s 50, 25, 20,)
SUAL CONSTRUCTION CORPORATION
1200 MW Coal Generated Power System Under the
Sought Energy Corporation Sual Pangasinan.
January 02, 1997 – January 02, 1998
JOB DESCRIPTION:
 Liftingof Structural Materials inErection Loading and Un-loading
of Cargo Shipments
 RelieverofBauer. Clam Shell ofJetty and pump House intake.
Concrete Pilingworks.
WORK HISTORY:
 Maintainedcompliance withcompany standards to perform all
maintenance activities.
 Collaboratedwithrigging dept.to ensure smoothwork flowand
efficientorganizationoperations.
 Supportedtechniciansin equipmentmaintenance andrepair.
 Followedcompanyproceduresto maintain work environmentina
neat and orderly condition.
 Communicatedoperational issuesand changesto supervisoron
regular basis.
 Accuratelyread, understood,and carried out writteninstructions.
 Attendedmonthlysafetymeetingsto ensure machine operation
safety.
TYPE OF CRANE OPERATED:
 ManitowocCrane -( Hydraulic and Mechanical 3900 / 100 Ton’s )
 ManitowocCrane -( Hydraulic and Mechanical 4000 / 150 Ton’s )
 ManitowocCrane -( Hydraulic and Mechanical 4100 / 200 Ton’s )
 LiebherrCrane -( Hydraulic Model 870 / 852 / 882 )
• KobelcoCrane - ( Hydraulic BM 800 / 90 Ton’s )
• Anthony P / H - ( TelescopicHydraulic75 Ton’s )
CEPA SLIP FROM POWER SYSTEM LIMITED
( 750 MW Coal Generated Power System )
Isla Grande Pagbilao Quezon
JOB DESCRIPTION:
 Liftingof Structural Materials inErection Loading and Un-loading
of Cargo Shipments
 RelieverofBauer. Clam Shell ofJetty and pump House intake.
Concrete Pilingworks.
WORK HISTORY:
 Maintainedcompliance withcompany standards to perform all
maintenance activities.
 Collaboratedwithrigging dept.to ensure smoothwork flowand
efficientorganizationoperations.
 Supportedtechniciansin equipmentmaintenance andrepair.
 Followedcompanyproceduresto maintain work environmentina
neat and orderly condition.
 Communicatedoperational issuesand changesto supervisoron
regular basis.
 Accuratelyread, understood,and carried out writteninstructions.
 Attendedmonthlysafetymeetings to ensure machine operation
safety.
TYPE OF CRANE OPERATED:
 ManitowocCrane -( Hydraulic and Mechanical 3900 / 100 Ton’s )
 ManitowocCrane -( Hydraulic and Mechanical 4000 / 150 Ton’s )
 ManitowocCrane -( Hydraulic and Mechanical 4100 / 200 Ton’s )
 LiebherrCrane -( Hydraulic Model 870 / 852 / 882 )
 KobelcoCrane - ( Hydraulic BM 800 / 90 Ton’s )
 AnthonyP / H -( TelescopicHydraulic75 Ton’s )
EDUCATION:
College : Technological Institute of the Philippines
Course - Marine Engineering
(Undergraduate)
Secondary : Tomas ClaudioMemorial High School
Year - April 1991
Primary: PipindanElementarySchool
Year – March 1983
Date of Birth : March 15, 1970
Nationality : Filipino
Height : 5’9’’
Philippine License : D19-99-000788
Code 238
I herebycertify that all informationand skillsare true and correct to the
best ofmy knowledge.
ReynaldoJ. Unida

More Related Content

What's hot

Matt Edwards Resume 1
Matt Edwards Resume 1Matt Edwards Resume 1
Matt Edwards Resume 1Matt Edwards
 
Ross Resume UPDATED!!!!
Ross Resume UPDATED!!!!Ross Resume UPDATED!!!!
Ross Resume UPDATED!!!!Ross Wedel
 
David M Shetterly resume1
David M Shetterly resume1David M Shetterly resume1
David M Shetterly resume1David Shetterly
 
David m shetterly resume1
David m shetterly resume1David m shetterly resume1
David m shetterly resume1David Shetterly
 
Talon Daniel Smith Resume
Talon Daniel Smith ResumeTalon Daniel Smith Resume
Talon Daniel Smith ResumeTalon Smith
 
World Welding Company Profile Feb 15
World Welding Company Profile Feb 15World Welding Company Profile Feb 15
World Welding Company Profile Feb 15David Graham
 
Lee Hummel's resume
Lee Hummel's resumeLee Hummel's resume
Lee Hummel's resumeLee Hummel
 
Shaun Rowe_Res may 16 the one copy
Shaun Rowe_Res may 16 the one copyShaun Rowe_Res may 16 the one copy
Shaun Rowe_Res may 16 the one copyShaun Rowe
 
Rick smith resume jun16
Rick smith resume jun16Rick smith resume jun16
Rick smith resume jun16Rick Smith
 
Gregory McDonald SR Resume Final 1 (1)
Gregory McDonald SR Resume Final 1 (1)Gregory McDonald SR Resume Final 1 (1)
Gregory McDonald SR Resume Final 1 (1)Macko mcdonald
 
Thomsen, Malcolm RESUME 2015
Thomsen, Malcolm RESUME 2015Thomsen, Malcolm RESUME 2015
Thomsen, Malcolm RESUME 2015Malcolm Thomsen
 
BRENDAN ANDREWS RESUME 2015
BRENDAN ANDREWS RESUME 2015BRENDAN ANDREWS RESUME 2015
BRENDAN ANDREWS RESUME 2015Brendan Andrews
 
Mullin Jonathan - Resume - Driller 2014 nitro
Mullin Jonathan - Resume - Driller 2014 nitroMullin Jonathan - Resume - Driller 2014 nitro
Mullin Jonathan - Resume - Driller 2014 nitroJon Mullin
 

What's hot (20)

ssrrrr
ssrrrrssrrrr
ssrrrr
 
Matt Edwards Resume 1
Matt Edwards Resume 1Matt Edwards Resume 1
Matt Edwards Resume 1
 
Ross Resume UPDATED!!!!
Ross Resume UPDATED!!!!Ross Resume UPDATED!!!!
Ross Resume UPDATED!!!!
 
David M Shetterly resume1
David M Shetterly resume1David M Shetterly resume1
David M Shetterly resume1
 
David m shetterly resume1
David m shetterly resume1David m shetterly resume1
David m shetterly resume1
 
Talon Daniel Smith Resume
Talon Daniel Smith ResumeTalon Daniel Smith Resume
Talon Daniel Smith Resume
 
CV DRILLER
CV DRILLERCV DRILLER
CV DRILLER
 
World Welding Company Profile Feb 15
World Welding Company Profile Feb 15World Welding Company Profile Feb 15
World Welding Company Profile Feb 15
 
G.McMORRAN - CV
G.McMORRAN - CV G.McMORRAN - CV
G.McMORRAN - CV
 
Lee Hummel's resume
Lee Hummel's resumeLee Hummel's resume
Lee Hummel's resume
 
Shaun Rowe_Res may 16 the one copy
Shaun Rowe_Res may 16 the one copyShaun Rowe_Res may 16 the one copy
Shaun Rowe_Res may 16 the one copy
 
CV-2015-JAVED
CV-2015-JAVEDCV-2015-JAVED
CV-2015-JAVED
 
Rick smith resume jun16
Rick smith resume jun16Rick smith resume jun16
Rick smith resume jun16
 
Gregory McDonald SR Resume Final 1 (1)
Gregory McDonald SR Resume Final 1 (1)Gregory McDonald SR Resume Final 1 (1)
Gregory McDonald SR Resume Final 1 (1)
 
Thomsen, Malcolm RESUME 2015
Thomsen, Malcolm RESUME 2015Thomsen, Malcolm RESUME 2015
Thomsen, Malcolm RESUME 2015
 
BRENDAN ANDREWS RESUME 2015
BRENDAN ANDREWS RESUME 2015BRENDAN ANDREWS RESUME 2015
BRENDAN ANDREWS RESUME 2015
 
Brandnew resume
Brandnew resumeBrandnew resume
Brandnew resume
 
GOPALSAMY-Updated resume
GOPALSAMY-Updated resumeGOPALSAMY-Updated resume
GOPALSAMY-Updated resume
 
Mullin Jonathan - Resume - Driller 2014 nitro
Mullin Jonathan - Resume - Driller 2014 nitroMullin Jonathan - Resume - Driller 2014 nitro
Mullin Jonathan - Resume - Driller 2014 nitro
 
Shane Covington - CV
 Shane Covington - CV Shane Covington - CV
Shane Covington - CV
 

Similar to Experienced Crane Operator Résumé

Similar to Experienced Crane Operator Résumé (20)

wilfredo guila resume crane operator
wilfredo guila resume crane operatorwilfredo guila resume crane operator
wilfredo guila resume crane operator
 
Waqar zeb cv
Waqar zeb cvWaqar zeb cv
Waqar zeb cv
 
ROD
RODROD
ROD
 
Troy Barrett Resume
Troy Barrett ResumeTroy Barrett Resume
Troy Barrett Resume
 
Jarque eilers construction cv
Jarque eilers construction cvJarque eilers construction cv
Jarque eilers construction cv
 
M.Panneerselvamgopi - Resume
M.Panneerselvamgopi - ResumeM.Panneerselvamgopi - Resume
M.Panneerselvamgopi - Resume
 
Domiciano Bejer - CV
Domiciano Bejer - CVDomiciano Bejer - CV
Domiciano Bejer - CV
 
resume
resumeresume
resume
 
Latest CV of MJ Welmans
Latest CV of MJ WelmansLatest CV of MJ Welmans
Latest CV of MJ Welmans
 
ResumeDavidClay090216 (1) (2)
ResumeDavidClay090216 (1) (2)ResumeDavidClay090216 (1) (2)
ResumeDavidClay090216 (1) (2)
 
Force Capability Statement
Force Capability StatementForce Capability Statement
Force Capability Statement
 
CHRISTOPHER TORRES RESUME 2015
CHRISTOPHER TORRES RESUME 2015CHRISTOPHER TORRES RESUME 2015
CHRISTOPHER TORRES RESUME 2015
 
Richard Rodriquez-Resume
Richard Rodriquez-ResumeRichard Rodriquez-Resume
Richard Rodriquez-Resume
 
K.Miskolczi 2
K.Miskolczi 2K.Miskolczi 2
K.Miskolczi 2
 
CV
CVCV
CV
 
Mechanical Section Head
Mechanical Section HeadMechanical Section Head
Mechanical Section Head
 
Muhammad Nazir updated cv
Muhammad Nazir updated cvMuhammad Nazir updated cv
Muhammad Nazir updated cv
 
Jamie Wilson
Jamie Wilson Jamie Wilson
Jamie Wilson
 
Rajvimal
RajvimalRajvimal
Rajvimal
 
RAJVIMAL
RAJVIMALRAJVIMAL
RAJVIMAL
 

Experienced Crane Operator Résumé

  • 1. REYNALDO J. UNIDA Pipindan, Binangonan, Rizal, Philippines Contact #: +639998267676 (Phil’s.) +639477141868 E-mail: rey_crane@yahoo.com ARAMCO CERTIFICATE NO.B 7653 / Badge no. 7544177 SAUDI GOVERNMENT LICENSE # 2196137844 Objectives; To obtain a positionthat will give an opportunity to demonstrate my skill and allowme to developmy full potential to become a well-roundedworker.crane operator expert,highlyskilledin riggingworks. Deadline-drivenMachine Operator with10+ years experience ina fast-pacedenvironment.Greatattentionto detail and organizational skills.. Skills:Career Highlightand Strengths Driving ComputerLiterate Clerical:MS word, Power Point,Excel Career Highlightand Strengths
  • 2. Hardworking, team player and abilityto work under pressure Extensive experience withcrane'sequipment..mobilecrawlercrane's Goodcommunication skills Equipmentproblemresolution Strong team player Strong written and verbal communicationskills Equipmentproblemresolution Troubleshoot/repairof compressionequipment ENPLOYMENT HISTORY: FILMENERA.Resources corporation/cc. ANTRAK.Logistics. Puro.Aroroy.Masbate.Philippimes Feb.2014 March.2015 JOB DESCRIPTION: •.CopperGoldmine . processingPlant. crane operator.. • work undersupervisionofengr.maintenance.forall works in processing. WORK HISTORY:  Maintainedcompliance withcompany standards to perform all maintenance activities.
  • 3.  Collaboratedwithrigging dept.to ensure smoothwork flowand efficientorganizationoperations.  Supported techniciansinequipmentmaintenance and repair.  Followedcompanyproceduresto maintain work environmentina neat and orderly condition.  Communicatedoperational issuesand changesto supervisoron regular basis.  Accuratelyread, understood,and carried out writteninstructions.  Attendedmonthlysafetymeetingsto ensure machine operation safety. TYPE OF CRANE OPERATED: • XCMG Rough Terrain (50.ton’s) • Tadano Crane – Rough Terrain Hydraulic ( Hydraulic Telescopic Ton’s 50, 25, 20,) D.M.CONSUNJI.INC.Engineer’s.Contructor’s 2x150MW.SLPGC.Powerplant.Project CALACA.Batangas.Philippine’s Aug.2013 Jan.2014 JOB DESCRIPTION:  Liftingof Structural Materialsin Erection Loading and Un-loading of Cargo Shipments
  • 4.  RelieverofBauer. Clam Shell ofJetty and pump House intake. Concrete Pilingworks. WORK HISTORY:  Maintainedcompliance withcompany standards to perform all maintenance activities.  Collaboratedwithrigging dept.to ensure smoothwork flowand efficientorganizationoperations.  Supportedtechniciansin equipmentmaintenance andrepair.  Followedcompanyproceduresto maintain work environmentina neat and orderly condition.  Communicatedoperational issuesand changesto supervisoron regular basis.  Accuratelyread, understood,and carried out writteninstructions.  Attendedmonthlysafetymeetingsto ensure machine operation safety.  TYPE OF CRANE OPERATED:  KobelcoCrane – Crawler Crane ( 7100 Hydraulic 100 Ton’s )  TerexCrane’s*(RoughTerrain)* RT100 – 90 ton’s(USton)  LIEBHERR .crawlercrane.LR1750 (750 ton’s) FIRST, QUANTUM, MINERALS LTD The Trident Project, Sentinel Mine P.O Box 230022, Zambia Road, Industrial Area.
  • 5. Ndola, Zambia Africa. November 28, 2012 – April 11, 2013 JOB DESCRIPTION:  LiftingStructural, Materials  Erection,Ball Mill,Sub mill , Parts WORK HISTORY:  Maintainedcompliance withcompany standards to perform all maintenance activities.  Collaboratedwithrigging dept.to ensure smoothwork flowand efficientorganizationoperations.  Supportedtechniciansin equipmentmaintenance andrepair.  Followedcompanyproceduresto maintain work environmentina neat and orderly condition.  Communicatedoperational issuesand changesto supervisoron regular basis.  Accuratelyread, understood,and carried out writteninstructions.  Attendedmonthlysafetymeetingsto ensure machine operation safety. TYPE OF CRANE OPERATED:  Grove by Manitowoc*(truck all terrain)*GMK, 4100 (100 Ton’s) GMK,5220 (220 Ton’s)
  • 6.  Manitowoc, Crawler Crane* 5220, (300 Ton’s) 18000 (750 tons)55A Boom with MAX-ER  Terex Crane’s*(RoughTerrain)* RT100 – 90 ton’s(USton) RT75 – 75 ton’s82.7 ton’s (USton) BIN QURAYA EST.HEAVY EQUIPMENT RENTAL DIVISION P.O Box 32058 – AL-KHOBAR 31952, Saudi Arabia July 13, 2003 – January 15, 2012 JOB DESCRIOTION:  Rig MovingRig Upping.RefineryPlant Shut Down. Civil construction BuildingRefineryplant.Oil well Services. Coil Tubing .Wire line.Fracturing services. WORK HISTORY:  Maintainedcompliance withcompany standards to perform all maintenance activities.  Collaboratedwithrigging dept.to ensure smoothwork flowand efficientorganizationoperations.  Supportedtechniciansin equipmentmaintenance andrepair.  Followedcompanyproceduresto maintain work environmentina neat and orderly condition.  Communicatedoperational issuesand changesto supervisoron regular basis.  Accuratelyread, understood,and carried out writteninstructions.
  • 7.  Attendedmonthlysafetymeetingsto ensure machine operation safety.  Usedschematicdiagrams to plan work. TYPE OF CRANE OPERATED:  TADANO Faun ATF 110G-5,ATF 220G-5(100- 220.ton’s)*ALL TERRAIN  LIEBHERR LTM 1100, 1160, 1220.1300(100 up 300.ton’s)*ALL TERRAIN  LIEBHERR .crawlercrane.LR1750 (750 ton’s) RAYTHEON – EBASCO OVERSEAS LTD. San Roque Multi Purpose Project San Roque, San Manuel Pangasinan March 07 – September 15, 2002 JOB DESCRIPTION:  Erectionof Parts Material’sof Turbine Motor  Erection ofSlab Girdersfor Spill way WORK HISTORY:  Maintainedcompliance withcompany standards to perform all maintenance activities.  Collaboratedwithrigging dept.to ensure smoothwork flowand efficientorganization operations.  Supportedtechniciansin equipmentmaintenance andrepair.
  • 8.  Followedcompanyproceduresto maintain work environmentina neat and orderly condition.  Communicatedoperational issuesand changesto supervisoron regular basis.  Accuratelyread, understood,and carried out writteninstructions.  Attendedmonthlysafetymeetingsto ensure machine operation safety. TYPE OF CRANE OPERATED:  Manitowoc Crane – Truck Mountain ( 3900 Series#140 tons )Mechanical cranes.  Manitowoc Crane – Crawler Crane ( 888 Hydraulic 240 Ton’s )Mechanical cranes.  KobelcoCrane – Crawler Crane ( 7100 Hydraulic 100 Ton’s )  Tadano Crane – Rough Terrain ( Hydraulic Telescopic Ton 50, 25, 20 )  KobelcoCrane – Rough Terrain ( Hydraulic Telescopic Ton 45 )  Link BeltCrane’s– (Rough Terrain) RTC-890 (90 tons) RTC-8065 Series II (65 Tons) MAXWELL HEAVY EQUIPMENT CORPORATION # 198 Gregorio Araneta Avenue.Sta Mesa Quezon City October 17, 1998 – March 01, 2001 JOB DESCRIPTION:
  • 9.  Erection and Support Material In ConstructionWork. WORK HISTORY:  Maintainedcompliance withcompany standards to perform all maintenance activities.  Collaboratedwithrigging dept.to ensure smoothwork flowand efficientorganizationoperations.  Supportedtechniciansin equipmentmaintenance andrepair.  Followedcompanyproceduresto maintain work environmentina neat and orderly condition.  Communicatedoperational issuesand changesto supervisoron regular basis.  Accuratelyread, understood,and carried out writteninstructions.  Attendedmonthlysafetymeetingsto ensure machine operation safety. TYPE OF CRANE OPERATED:  Tadano Crane – Rough Terrain Hydraulic ( Hydraulic Telescopic Ton’s 50, 25, 20,) SUAL CONSTRUCTION CORPORATION 1200 MW Coal Generated Power System Under the Sought Energy Corporation Sual Pangasinan. January 02, 1997 – January 02, 1998 JOB DESCRIPTION:
  • 10.  Liftingof Structural Materials inErection Loading and Un-loading of Cargo Shipments  RelieverofBauer. Clam Shell ofJetty and pump House intake. Concrete Pilingworks. WORK HISTORY:  Maintainedcompliance withcompany standards to perform all maintenance activities.  Collaboratedwithrigging dept.to ensure smoothwork flowand efficientorganizationoperations.  Supportedtechniciansin equipmentmaintenance andrepair.  Followedcompanyproceduresto maintain work environmentina neat and orderly condition.  Communicatedoperational issuesand changesto supervisoron regular basis.  Accuratelyread, understood,and carried out writteninstructions.  Attendedmonthlysafetymeetingsto ensure machine operation safety. TYPE OF CRANE OPERATED:  ManitowocCrane -( Hydraulic and Mechanical 3900 / 100 Ton’s )  ManitowocCrane -( Hydraulic and Mechanical 4000 / 150 Ton’s )  ManitowocCrane -( Hydraulic and Mechanical 4100 / 200 Ton’s )  LiebherrCrane -( Hydraulic Model 870 / 852 / 882 )
  • 11. • KobelcoCrane - ( Hydraulic BM 800 / 90 Ton’s ) • Anthony P / H - ( TelescopicHydraulic75 Ton’s ) CEPA SLIP FROM POWER SYSTEM LIMITED ( 750 MW Coal Generated Power System ) Isla Grande Pagbilao Quezon JOB DESCRIPTION:  Liftingof Structural Materials inErection Loading and Un-loading of Cargo Shipments  RelieverofBauer. Clam Shell ofJetty and pump House intake. Concrete Pilingworks. WORK HISTORY:  Maintainedcompliance withcompany standards to perform all maintenance activities.  Collaboratedwithrigging dept.to ensure smoothwork flowand efficientorganizationoperations.  Supportedtechniciansin equipmentmaintenance andrepair.  Followedcompanyproceduresto maintain work environmentina neat and orderly condition.  Communicatedoperational issuesand changesto supervisoron regular basis.  Accuratelyread, understood,and carried out writteninstructions.
  • 12.  Attendedmonthlysafetymeetings to ensure machine operation safety. TYPE OF CRANE OPERATED:  ManitowocCrane -( Hydraulic and Mechanical 3900 / 100 Ton’s )  ManitowocCrane -( Hydraulic and Mechanical 4000 / 150 Ton’s )  ManitowocCrane -( Hydraulic and Mechanical 4100 / 200 Ton’s )  LiebherrCrane -( Hydraulic Model 870 / 852 / 882 )  KobelcoCrane - ( Hydraulic BM 800 / 90 Ton’s )  AnthonyP / H -( TelescopicHydraulic75 Ton’s ) EDUCATION: College : Technological Institute of the Philippines Course - Marine Engineering (Undergraduate) Secondary : Tomas ClaudioMemorial High School Year - April 1991 Primary: PipindanElementarySchool Year – March 1983 Date of Birth : March 15, 1970 Nationality : Filipino Height : 5’9’’
  • 13. Philippine License : D19-99-000788 Code 238 I herebycertify that all informationand skillsare true and correct to the best ofmy knowledge. ReynaldoJ. Unida