1. Curriculum Vitae
Name: Ronald Zolina Amban
Instrument/Analyzer and Electrical Technician
Email:amban_ronald@yahoo.com
ronald.saipem@yahoo.com
Contact no: +639298258919
/+639484895848/+639125899772
Career Summary:
Five years, experience in different Electrical & Instrument pre commissioning
& commissioning jobs Experience oil and gas like. Refinery, fertilizer and
chemical plant in depth knowledge in the classification, construction, electrical
equipment’s in hazardous area health safety and environment oriented.
Working Experiences
SAIPEM Co., Ltd.
Shah GasDevelopment (SGD)
P.O Box# 47117 Abu Dhabi,U.A.E
Tel.:+971 2 698 9898 Fax.: +971 2 698 9893
June. 30,2014 to May 28, 2015
Project:SHAH GAS Package2&3
Position: Instrument/Analyzer Technician
Project Completed:
Job Description:
TELEDYNE( 6400E)(6400EH)(6400EU) with 4060 GC,S2s& cos
Cems, Moisture3050-SLR Analyzer.
To power up and warm up analyzer.
To perform sample line leak check through analyzer.
To verify analyzer sample flowmeter setting.
To verify sample pressure setting.
To verify switching valve function and flow path by instrument air.
Check flow restricted function for toxic and flammable gas/liquid
entering into house.
To perform response check.
2. To perform leaktest UV fluorecence So2 analyzer 6400EU unit.
To perform calibration/validation with known reference.
To verify analyzer purge controller fucntion.
To simulate and measure proportionality of analogue 4-20 output.
To simulate and measure status of each digital output as indicated.
To verify analyzer network communacation.
Cylinder regulator purging and flusshing.
To perform leak test on 6400E, So2 analyzer UV unit.
To perform zero and span calibration on 6400TSG, TS unit.
Check the power supply input and replace if broken.
Check the pump, kicker, soleniod, filter gauge replace if broken.
Check the UV lamp adjust correct setpoint and replace if broken.
To perform calibration of analog output 4-20mA.
Check flow swicth low and common fault alarm.
To perform flame signal adjustment electronic module.
To perform trouble shooting 6400E and 6400UE So2 flourecence and
Cems Analyzer.
Familiarize GC, Moisture, Co, O2, and Cems Analyzer.
To perform Calibration of Cems Analyzer.
To perform of Calibration of Ametek Moisture Analyzer.
Close all WORK ORDER.
PTW Preparation (Hot,Cold,Entry)
Able to work safety by following plant HSE rules and regulations.
Descon Engineering Co., Ltd.
Shah GasDevelopment (SGD) Package2&3 Project.
Shah GasDevelopment Abu Dhabi UAE
Man power supply to Descon to Saipem.
July 22, 2013 to April 22,2014
Position: Electrical& Instrument Technician
Job Description:
Glanding and termination of lighting foil.
Remove the old cable and also cable fulling of primary and secondary
cable and cable dressing.
Installed and termination of cathodic corrosion system.
Cud weld of earth grounding.
Testing and loop checking of power &control cable using insulator
tester (megger) multi tester.
Installation bus bar and safety breaker in substation.
3. Lay-out and fixing of conduit pipe support.
Installation of cable tray cable ladder and tranking.
Executing and reading of P&ID and location plan.
Glanding and termination of instruments junction box (JB) and
Marshalling Cabinet (MC).
Installation of panel board and control.
Glanding and termination of electrical & instrument cable.
Wire checking and trouble shooting.
Preparation of materials needed at the site
Function test, calibration and installations of instruments
Servicing of control valves (PV,TV,LV,FV):
Pulling out
Cleaning
Stroke testing and calibration using Beamex MC5
Hydro test for leak testing
Installation
Inspection, function check, calibration and troubleshoot of the
following instruments:
transmitters (pressure/flow/level/temperature)
switches (hand switch/pressure/level/temperature)
Proximity sensors
Pull-out/install transmitter, pressure switch, vortex flow meter &
positioner
Install swage lock tubings and fittings for hook up the transmitter
impulse line
Install process instruments based on P&ID/hook up and location
Drawing both electric and pneumatic such as transmitter( for level,
pressure, flow, temperature, pressure gauges and thermocouples.
Loop check wire of instrument.
Pull-out/ install/calibrate safeguarding instruments
Install/pull-out polyflow tubing fire detection system of the process.
Terminate from junction boxes to bfar and pfar to instruments
Cable termination, glanding line checking of instruments
Calibrate/stroke testing of control valves, on/off valves and relief
valves
Calibrate of different type of transmitter (Level , Flow, Pressure,
Temperature and Analyzer)
Pressure test and leak testing
Pull-out/install accelerometer, vibration probe, rtd, thermocouple,
flame detector and switches
4. Familiarize using instrument calibration test equipment: HART 375
Communicator, loop calibrator, temperature calibrator and Fluke
Multitester.
PTW Preparation (Hot,Cold,Entry)
Able to work safety by following plant HSE rules and regulations.
XERVON LLC
Powering Plant Performance
PO Box# 47616 Abu Dhabi UAE
Nov.11, 2012-May.08,2013
Project Completed:
Fertil 2 Ammonia & Urea Expansion Project.
Al RuwaisAbu Dhabi UAE
Man Power Supply toSamsung Engineering
Position: Instrument & Electrical Technician
Glanding and termination of panel board and control.
Cable pulling, conduiting and trunking installation.
Removal of old cable and also cable pulling of primary and secondary
cable and cable dressing.
Glancing and termination of lighting foil and instrument cable.
Testing/loop checking of power & control cable using insulation
tester (megger) multitester and functional test.
Wire checking, loop checking, tubing and troubleshooting if needed.
Glanding and termination of instruments junction box (JB) and
Marshalling Cabinet (MC)
Executing and reading of P&ID and location plan.
Installed and termination of Cathodic corrosion system.
PTW Preparation (Hot,Cold,Entry)
BOROUGE FOR INNOVATION
Abu Dhabi UAE
Nov.12, 2011 to Oct.01, 2012
Project Completed:
Position: ElectricalTechnician
5. Cable pulling, conducting and trucking installation.
Cud weld and installation of earth grounding.
Lay-out and fixing of conduit pipe support.
Installation of cable tray and cable ladder.
Glanding and termination of electrical cable.
Installed and termination Cathodic corrosion system.
Installation and termination of lighting foil.
Installation of panel board and control.
Testing and loop checking of power and control cable using
insulation tester (meger) multi tester.
Able to work safety by following plant HSE rules and regulations.
Jonghap Elec.& Mech. Construction Co. Ltd.
Hyundai Qafco (QATAR)
April 15, 2007-May 01, 2010
Position: Electrical Technician
Glanding and termination of panel board and control.
Cable pulling, conduiting and trunking installation.
Wire checking and trouble shooting.
Lay-out and fixing of conduit pipe support.
Testing and loop checking of power & control cable using insulator
tester (megger) multi tester.
Installed and termination of cathodic corrosion system.
Cud weld and installation of earth grounding.
Installation of junction box, cable tray and cable ladder.
Preparation of materials needed at the site.
PTW Preparation (Hot,Cold,Entry)
Able to work safety by following plant HSE rules and regulations.
Personal data
Date of birth : February 28, 1986
Placeof birth : Brgy, Bololmala, TupiSouth Cotabato
Age : 29 yearsold
6. Civil Status : Married
Citizenship : Filipino
Religion : Catholic
Height : 5’6”
Weight : 125 lbs.
Passport # : EB3940145
Issue : 26, Oct. 11 at DFA Manila
Language :English / Filipino
Educational Attainment
NC-II NATIONAL CERTIFICATE-II
Building WiringInstallation
Issue: March 28,2009
Certificateno. 091201024349
Tertiary:
College Southern PhilippinesTechnical Institute,Inc.
School Address:Gensan drive,Koronaldal City,South Cotabato
Year Graduated:2006
Course : Industrial Electricity
Secondary:
School : Cebuano National High School ANNEX
School Address: Cebuano Tupi, South Cotabato
Year Graduated :2004
Primary:
School :Bololmala Elementary School