Nasrul Irfan is an electrical and instrumentation inspector from Indonesia with over 5 years of experience in oil and gas, marine, and power plant projects. He has worked on projects for Siemens Energy and PT. Citra Shipyard. His responsibilities include material inspection, cable testing, equipment installation verification, and ensuring compliance with inspection test plans. He is proficient in Microsoft Office, electrical drawings, and has experience calibrating instruments and commissioning control systems. Nasrul holds an E&I inspector certification and certificates in PLCs and TOEFL English.
1. Nasrul Irfan
(+62)81320486821
bajegpicung@gmail.com
1
,
CURRICULLUM VITAE
Nasrul Irfan
Place & date of birth : Pandelang 03 Januari 1984
Address : Kav. Bidakabil Blok Kembang sari 2 no 4
Rt.002. Rw.018 (Batam)
Marital Status : Merried
Religion : Moslem
Nationality : Indonesian
Email : bajegpicung@gmail.com
Hp No. : +62 81320486821
+62 81320486821 (Whatsapp)
BANDUNG ISLAMIC UNIVERSITY OF INDUSTRIAL ENGINEERING Not Graduate
Senior high school of Electrical Industries, SMK PGRI 1 SERANG
E & I Inspector : Certificate No. 0TI.EIXVIII.06.13.359
BASIC PROGRAMMABLE LOGIC CONTROLLER (PLC) : Certificate No. OTI/WPLC/I.15/011
TOEFL : Certificate No. 143/Test-Toefl/UPT-BHS/II/2007
More than 5 years Include in Oil & Gas, Marine, Power Plant and Building. I Have
experience about Inspection, Document, Installation, Commissioning. I have ever been Work under
High Pressure. I like team work & have never leave a project under bad condition. it gives a good
sense of achievement and job satisfaction to have been a part of team that gets the job done.
EDUCATION
CERTIFICATED TRAINING
SUMMARY JOB
2. Nasrul Irfan
(+62)81320486821
bajegpicung@gmail.com
2
CURRICULLUM VITAE
Contruction
● Cable Ladder/Tray Installation SS316, galvanize
● Installation Device Equipment like as F&G, JB, Lighting etc.
● Pulling Cable for Control, Electric, Instrument IS and ISE
● Install Glanding HAWK, CMP, and CAPRI product of Gland all Size
● Wiring Termination Control, Instrument, Lighting & small Power
● Inspection Equipment Installation, Cable Routing & Termination
Pre-Comm and Commissioning
● Familiar with Multi Tester and Insulation Test for Line Check
● Calibration for Transmitter (flow, Level, Pressure & temperature)
● Calibration for Valve (safety valve, control valve, & Etc.)
● Familiar with Hart Communicator and Loop calibrator
● DCS, PLC, IAS or Other System control I/O System list function test
● Hydraulic, Electrical pneumatic function test
● F & G, Instrument Device, HVAC, and Sensor I/O function test
● Lighting System, Internal Communication system
● Cause and Effect general system testing
Computer
● Microsoft Excel & Word (All Ver.)
Understanding :
Ensure Contractor compliance with requirements of Inspection Test Plant & work
procedures.
Monitor field construction activities to ensure requirements are meet in compliance
with drawings, specifications, and applicable codes.
Issue Observation Report, Occurrence Report & NCR on Non-complying products.
Identify quality deficiencies and root causes at infancy to avoid substantial
repetition prior to discovery and minimize rework.
Inspection equipment of Hazardous Area-ensure equipment is suitable for the area
in which it is installed.
Inspection all frame/support equipment electrical include installation for power
transformer, Main Switchboard, Emergency switchboard, Fixation Panels, Engine
Generators, Thrusters, etc.
SKILL & ABILITY
3. Nasrul Irfan
(+62)81320486821
bajegpicung@gmail.com
3
CURRICULLUM VITAE
Prepared Check List & Datasheet of Electrical & Instrument Equipment.
Witness and verify cable continuity test and insulation test or Insulation test
including the correct use and installation of cable glands.
Check Earthing (proper electrical grounding) checks for continuity and resistance
during installation.
Preparation of test records and reports.
Completion of check sheet requirement and Planning of process to completion.
Prepared Final Document dossier as Inspection Test Record include with incoming
material summary according ITP & requirement.
Electrical Drawing, Symbol, Legend, Single Line Diagram, Layout Drawing, Cable
Schedule, and Detail Drawing.
Electrical lighting, block diagram, PAGA (Public Address General Alarm).
Learn about Hazardous Area Drawing.
Material Specification, Standard Project / Specification.
Electrical Fabrication about kind of support material such as Angle, Channel, Pipe,
Beam, Hollow.
Function of support such as Cable Ladder, Cable Tray perforated and Material
support.
Electrical Cabling, Cable Marking, Cable Glanding, Connection and termination.
Inspection Cable, Cable Marker Grounding Cable, Cable Glanding, Termination
Cable, and Pulling Cable.
Electrical Equipment such as Panel Box, Junction Box, Marshalling Cabinet, Circuit
Breaker.
Inspection of specification Installation Equipment.
Cable Ladder and Cable Tray Installation and Inspection of Installation.
Learn about Inspection, As built drawing, ITR, ITP, RFI, FIN, FIR, Material Control.
Troubleshooting.
Drawing Hazardous and symbol hazardous area, Zone Classification, Temperature
Classification, Dust, Gas Group, and Ingress Protection Rating.
4. Nasrul Irfan
(+62)81320486821
bajegpicung@gmail.com
4
WORK EXPERIENCE
CURRICULLUM VITAE
1. Siemens Energy (Oil & Gas)
Designation : E & I Inspector ( TPEI Services Pte. Ltd )
Duration : January 2016 – Present
Location : SMOE Indonesia, Kabil, Batam, Kepri, Indonesia
Project In-Charge :
Bog Compressor Substation PAB-032 (Batch 3 Construction YAMAL Project)
Client : YAMGAZ
Main Client : YAMAL LNG
Job Description
Material Receiving Inspection
Continuity & Insulation Test on Drum Cable
Inspection of Hotwork Installation (Support, MCT frame)
Inspection of Cable Ladder/tray & unistrut support Installation
Inspection of E & I Equipment Installation
Inspection of Cable Continuity & Insulation test
Prepared RFI (Request For Inspection) by Doc. Controller and MC team will be
Present system inspection, such as installation, cable test and energizer.
Monitoring Punch list Closed activities by MC Team and Record by Document Controller
Responsible of Heater, lighting, and F&G Function test / energize
Perform the equipment test according to manufacturer recommendation.
Report Daily Activities, Man power, and Progress to Project Controller.
Inspection Cable, Cable Marker, Grounding Cable, Cable Glanding, Termination, Pulling
Cable, transmitter, solenoid valve.
Inspection of specification Installation Equipment Electrical and Instrument.
Inspection material coming, insulation test, countinity test.
Inspection all frame/support equipment electrical and Instrument, include installation
for power transformer, Main Switchboard, Emergency switchboard, Fixation Panels,
Engine Generators, etc.
Check installation for equipment CB, CT, DSE, DS, CVT, SA, LA, CH.
Check installation for single tension, single suspension, flying busbar, earthing ground.
Make report FIN/RFI, FIR/ITR for Inspection.
2. PT. CITRA SHIPYARD
Designation : Electrician Facility ( PT. Citra Shipyard )
Duration : September 2011- September 2015
5. Nasrul Irfan
(+62)81320486821
bajegpicung@gmail.com
5
Location : - Tanjung Uncang, Batam, Kepri, Indonesia
Kabil Batam, Kepri, Indonesia
Project In-Charge :
Installed cable and termination Transformer room
Installed and termination cable power yard
Check motor 3 fhase.
Instalation panel lighting, Motor control panel, remote control panel.
Troubleshooting electrical Generator System
Repair & Service maintenance for Engine Power Generating Set, motor winch, control
panel winch, electric crane, instrument control electric crane.
Connection shore power supply for vessel, crane barge, tanker, Tug Boat.