SlideShare a Scribd company logo
1 of 8
Download to read offline
1
TECH NOTE
ROCK COVERED GEOTUBE®®®®
PROJECT
CONSTRUCTION METHODOLOGY
Miratech Division
Ten Cate Nicolon
PROJECT OVERVIEW
2
STELLA MARIS MARINA
CASABLANCA, ECUADOR
13.7M CIR. GC1000 GEOTUBES
3
SLURRY PIT FOR PUMPING SAND TO THE GEOTUBE
AND
HYDRAULIC DRIVE
FOR
4”H&H PUMP
(Note, pump suspended into slurry pit)
4” H & H Submersible Slurry Pump Note, Water Jetting Ring At Base of Pump Used
To Slurry The Sand For Pumping
4
GEOTUBE INSTALLATION FRAME
Position Frame In WaterConnect Flexible 4” Discharge Hose From
Pump To Fill Port Of Geotube
Secure Geotube Within Steel Positioning
Frame
Move Positioning Frame To Location For
Placement
5
FILLING GEOTUBE
PROTECTIVE GEOTUBE COVER
Fill Geotube By Pumping Sand From Slurry
Pit Into Geotube. Slurry Pump Rate At 20 to
30 m3
hr. And At 4 to 6 PSI Line Pressure
Continue filling Geotube Until It Reaches The
Design Height
Placing Geotextile Protective Cover Over
Geotube Before Placement of Rock
Placing Geotextile Protective Cover Over
Geotube Before Placement of Rock
6
PLACING ROCK COVER
Working From Shore Dump Rock On Top
Of Constructed Structure
Use Excavator To Place Rock Cover On
Surface Of Geotube To Complete Structure
Covering Surface of Geotube With Rock
7
PLACING AND FILLING GEOTUBES UNDER THE WATER
Secure Unfilled Geotube Within Positioning
Frame and Lower Underwater Into Position
Attach Discharge Line From Pump To Fill Port
Of Geotube
Divers Will Be Necessary To Inspect Geotube
During Underwater Filling Process
8
PLACING AND FILLING GEOTUBES UNDERWATER
CONTINUED
Alignment Piles May Be Necessary To
Position Unfilled Geotube On Surface
Before Filling
Working Off Of A Barge In Deeper Water May Be
Necessary. Note, As Filling Begins, Geotube Will Fall
Into Place Underwater Between Positioning Piles
Geotube Pyramid Structure Filled Underwater Emerges
Above Surface
MIRATECH™ division of Ten Cate Nicolon will assume no liability for the accuracy or completeness of this information. No warranty or guarantee, expressed or
implied, is made regarding the performance of any product, since the manner of use and handling are beyond our control. This document should not be construed as final
engineering advice and the final design will be the responsibility of the project engineer and/or registered engineer.
05/26/04
Version 4.0
Geotube®
Geobag®
Geocontainer®
3680 Mount Olive Road / Commerce, Georgia 30529 / 706 335 3400 / 1 888 795 0808 / Fax 706 335 3405
A division of Ten Cate Nicolon USA

More Related Content

What's hot

Segmental Lining Design Presentation
Segmental Lining Design PresentationSegmental Lining Design Presentation
Segmental Lining Design Presentation
Keith Kong
 

What's hot (20)

Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnels
 
Bore hole
Bore holeBore hole
Bore hole
 
Study of MORT_&_H
Study of MORT_&_HStudy of MORT_&_H
Study of MORT_&_H
 
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
2.2 HIGHWAY TRANSPORTATION : HIGHWAY GEOMETRIC DESIGN (TRE) 3150611 GTU
 
Tunnel Engineering Report (VJTI MUMBAI)
Tunnel Engineering Report (VJTI MUMBAI)Tunnel Engineering Report (VJTI MUMBAI)
Tunnel Engineering Report (VJTI MUMBAI)
 
Introduction to engineering geology
Introduction to engineering geologyIntroduction to engineering geology
Introduction to engineering geology
 
Tunnelling & underground design (Topic6-sequential excavation & squeezing)
Tunnelling & underground design (Topic6-sequential excavation & squeezing)Tunnelling & underground design (Topic6-sequential excavation & squeezing)
Tunnelling & underground design (Topic6-sequential excavation & squeezing)
 
Tunnels concepts
Tunnels conceptsTunnels concepts
Tunnels concepts
 
Tata Cara Konstruksi Sistem Drainase Perkotaan - Bagian 1
Tata Cara Konstruksi Sistem Drainase Perkotaan - Bagian 1Tata Cara Konstruksi Sistem Drainase Perkotaan - Bagian 1
Tata Cara Konstruksi Sistem Drainase Perkotaan - Bagian 1
 
Slope stability analysis methods
Slope stability analysis methodsSlope stability analysis methods
Slope stability analysis methods
 
Hill road
Hill roadHill road
Hill road
 
Location survey for the Rural and urban areas
Location survey for the Rural and urban areasLocation survey for the Rural and urban areas
Location survey for the Rural and urban areas
 
Design and construction procedure of otta seal
Design and construction procedure of otta sealDesign and construction procedure of otta seal
Design and construction procedure of otta seal
 
SAP 2000 PROJEKTI
SAP 2000 PROJEKTISAP 2000 PROJEKTI
SAP 2000 PROJEKTI
 
Slope stability
Slope stabilitySlope stability
Slope stability
 
Soldier pile retaining wall design جدران ساندة للتربة اوتاد معدنية.2 pdf
Soldier pile retaining wall design   جدران ساندة  للتربة اوتاد معدنية.2 pdfSoldier pile retaining wall design   جدران ساندة  للتربة اوتاد معدنية.2 pdf
Soldier pile retaining wall design جدران ساندة للتربة اوتاد معدنية.2 pdf
 
The role of site investigation
The role of site investigationThe role of site investigation
The role of site investigation
 
Elements of road x-section
Elements of road x-section Elements of road x-section
Elements of road x-section
 
planning, design and estimation of road side drainage system
planning, design and estimation of road side drainage systemplanning, design and estimation of road side drainage system
planning, design and estimation of road side drainage system
 
Segmental Lining Design Presentation
Segmental Lining Design PresentationSegmental Lining Design Presentation
Segmental Lining Design Presentation
 

Similar to Geotube marinas-rock covered

Bored cast insitu
Bored cast insituBored cast insitu
Bored cast insitu
LingWei11
 
Technical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptorsTechnical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptors
Laith Abdel Nabi
 
Presentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptxPresentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptx
olaboughannam1
 
Presentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptxPresentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptx
olaboughannam1
 
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme [IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
IJET - International Journal of Engineering and Techniques
 

Similar to Geotube marinas-rock covered (20)

Blind Backfilling of Goaf and Coal Extraction below Built-up Areas / Surface ...
Blind Backfilling of Goaf and Coal Extraction below Built-up Areas / Surface ...Blind Backfilling of Goaf and Coal Extraction below Built-up Areas / Surface ...
Blind Backfilling of Goaf and Coal Extraction below Built-up Areas / Surface ...
 
Blind Backfilling.pptx
Blind Backfilling.pptxBlind Backfilling.pptx
Blind Backfilling.pptx
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90
 
IJSRED-V2I3P90
IJSRED-V2I3P90IJSRED-V2I3P90
IJSRED-V2I3P90
 
Exploitation.pptx
Exploitation.pptxExploitation.pptx
Exploitation.pptx
 
Polavaram internship
Polavaram internshipPolavaram internship
Polavaram internship
 
Analysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case studyAnalysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case study
 
Bored cast insitu
Bored cast insituBored cast insitu
Bored cast insitu
 
Drilling imp
Drilling impDrilling imp
Drilling imp
 
2007 0709 Ca
2007 0709 Ca2007 0709 Ca
2007 0709 Ca
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Technical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptorsTechnical specifications for Phase 1 Wastewater Network tank interceptors
Technical specifications for Phase 1 Wastewater Network tank interceptors
 
Presentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptxPresentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptx
 
Presentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptxPresentation - Case Study on Site Investigation Plan at Chek.pptx
Presentation - Case Study on Site Investigation Plan at Chek.pptx
 
Sne closure turf presentation combined
Sne closure turf presentation combinedSne closure turf presentation combined
Sne closure turf presentation combined
 
Level crossings tech note august 2017
Level crossings tech note august 2017Level crossings tech note august 2017
Level crossings tech note august 2017
 
Jom 06 02_001
Jom 06 02_001Jom 06 02_001
Jom 06 02_001
 
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme [IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)
 
Jet-grouting Technology
Jet-grouting TechnologyJet-grouting Technology
Jet-grouting Technology
 

More from pjgomezd

Guía constructv construcc def ribereñs sist muro enroc.pdf
Guía constructv construcc def ribereñs sist muro enroc.pdfGuía constructv construcc def ribereñs sist muro enroc.pdf
Guía constructv construcc def ribereñs sist muro enroc.pdf
pjgomezd
 
Tailings lagoon dewatering el mochito honduras
Tailings lagoon dewatering   el mochito hondurasTailings lagoon dewatering   el mochito honduras
Tailings lagoon dewatering el mochito honduras
pjgomezd
 
Benefit from geotube stacking technology & analysis
Benefit from geotube stacking technology & analysisBenefit from geotube stacking technology & analysis
Benefit from geotube stacking technology & analysis
pjgomezd
 
Arizona chemical tight space solution
Arizona chemical tight space solutionArizona chemical tight space solution
Arizona chemical tight space solution
pjgomezd
 
Bro mining minerals_tcm29-33179
Bro mining minerals_tcm29-33179Bro mining minerals_tcm29-33179
Bro mining minerals_tcm29-33179
pjgomezd
 
Brochure geotube ten cate dewatering(español)
Brochure geotube ten cate dewatering(español)Brochure geotube ten cate dewatering(español)
Brochure geotube ten cate dewatering(español)
pjgomezd
 

More from pjgomezd (12)

Guía constructv construcc def ribereñs sist muro enroc.pdf
Guía constructv construcc def ribereñs sist muro enroc.pdfGuía constructv construcc def ribereñs sist muro enroc.pdf
Guía constructv construcc def ribereñs sist muro enroc.pdf
 
Guía identif-formul-eval proys invers pub protecc inundcs.pdf
Guía identif-formul-eval proys invers pub protecc inundcs.pdfGuía identif-formul-eval proys invers pub protecc inundcs.pdf
Guía identif-formul-eval proys invers pub protecc inundcs.pdf
 
DEFENSA RIBEREÑA CON ESPIGONES.pdf
DEFENSA RIBEREÑA CON ESPIGONES.pdfDEFENSA RIBEREÑA CON ESPIGONES.pdf
DEFENSA RIBEREÑA CON ESPIGONES.pdf
 
Perspectivas gest actual sedimentos 9 países de las Américas.pdf
Perspectivas gest actual sedimentos 9 países de las Américas.pdfPerspectivas gest actual sedimentos 9 países de las Américas.pdf
Perspectivas gest actual sedimentos 9 países de las Américas.pdf
 
FRONT-Dec-2018.pdf
FRONT-Dec-2018.pdfFRONT-Dec-2018.pdf
FRONT-Dec-2018.pdf
 
Andrés Roca Rey conquistó Sevilla, la única plaza importante del mundo que aú...
Andrés Roca Rey conquistó Sevilla, la única plaza importante del mundo que aú...Andrés Roca Rey conquistó Sevilla, la única plaza importante del mundo que aú...
Andrés Roca Rey conquistó Sevilla, la única plaza importante del mundo que aú...
 
El Comercio (Lima-Peru) Pag Toros Lun 24 abr 2023 (Pag A17).pdf
El Comercio (Lima-Peru) Pag Toros Lun 24 abr 2023 (Pag A17).pdfEl Comercio (Lima-Peru) Pag Toros Lun 24 abr 2023 (Pag A17).pdf
El Comercio (Lima-Peru) Pag Toros Lun 24 abr 2023 (Pag A17).pdf
 
Tailings lagoon dewatering el mochito honduras
Tailings lagoon dewatering   el mochito hondurasTailings lagoon dewatering   el mochito honduras
Tailings lagoon dewatering el mochito honduras
 
Benefit from geotube stacking technology & analysis
Benefit from geotube stacking technology & analysisBenefit from geotube stacking technology & analysis
Benefit from geotube stacking technology & analysis
 
Arizona chemical tight space solution
Arizona chemical tight space solutionArizona chemical tight space solution
Arizona chemical tight space solution
 
Bro mining minerals_tcm29-33179
Bro mining minerals_tcm29-33179Bro mining minerals_tcm29-33179
Bro mining minerals_tcm29-33179
 
Brochure geotube ten cate dewatering(español)
Brochure geotube ten cate dewatering(español)Brochure geotube ten cate dewatering(español)
Brochure geotube ten cate dewatering(español)
 

Geotube marinas-rock covered

  • 1. 1 TECH NOTE ROCK COVERED GEOTUBE®®®® PROJECT CONSTRUCTION METHODOLOGY Miratech Division Ten Cate Nicolon PROJECT OVERVIEW
  • 2. 2 STELLA MARIS MARINA CASABLANCA, ECUADOR 13.7M CIR. GC1000 GEOTUBES
  • 3. 3 SLURRY PIT FOR PUMPING SAND TO THE GEOTUBE AND HYDRAULIC DRIVE FOR 4”H&H PUMP (Note, pump suspended into slurry pit) 4” H & H Submersible Slurry Pump Note, Water Jetting Ring At Base of Pump Used To Slurry The Sand For Pumping
  • 4. 4 GEOTUBE INSTALLATION FRAME Position Frame In WaterConnect Flexible 4” Discharge Hose From Pump To Fill Port Of Geotube Secure Geotube Within Steel Positioning Frame Move Positioning Frame To Location For Placement
  • 5. 5 FILLING GEOTUBE PROTECTIVE GEOTUBE COVER Fill Geotube By Pumping Sand From Slurry Pit Into Geotube. Slurry Pump Rate At 20 to 30 m3 hr. And At 4 to 6 PSI Line Pressure Continue filling Geotube Until It Reaches The Design Height Placing Geotextile Protective Cover Over Geotube Before Placement of Rock Placing Geotextile Protective Cover Over Geotube Before Placement of Rock
  • 6. 6 PLACING ROCK COVER Working From Shore Dump Rock On Top Of Constructed Structure Use Excavator To Place Rock Cover On Surface Of Geotube To Complete Structure Covering Surface of Geotube With Rock
  • 7. 7 PLACING AND FILLING GEOTUBES UNDER THE WATER Secure Unfilled Geotube Within Positioning Frame and Lower Underwater Into Position Attach Discharge Line From Pump To Fill Port Of Geotube Divers Will Be Necessary To Inspect Geotube During Underwater Filling Process
  • 8. 8 PLACING AND FILLING GEOTUBES UNDERWATER CONTINUED Alignment Piles May Be Necessary To Position Unfilled Geotube On Surface Before Filling Working Off Of A Barge In Deeper Water May Be Necessary. Note, As Filling Begins, Geotube Will Fall Into Place Underwater Between Positioning Piles Geotube Pyramid Structure Filled Underwater Emerges Above Surface MIRATECH™ division of Ten Cate Nicolon will assume no liability for the accuracy or completeness of this information. No warranty or guarantee, expressed or implied, is made regarding the performance of any product, since the manner of use and handling are beyond our control. This document should not be construed as final engineering advice and the final design will be the responsibility of the project engineer and/or registered engineer. 05/26/04 Version 4.0 Geotube® Geobag® Geocontainer® 3680 Mount Olive Road / Commerce, Georgia 30529 / 706 335 3400 / 1 888 795 0808 / Fax 706 335 3405 A division of Ten Cate Nicolon USA