1. CURRICULUM VITAE
PEEYUSH KUMAR C-74, Millennium Apartment
Sector-18, Rohini, Delhi-89
Mobile: +91-9250907233
peeyush44@yahoo.co.in
peeyush88@rediffmail.com
OBJECTIVE
Aim to be associated with a Progressive organization that gives me scope to share my Knowledge
And skills in accordance with the latest trends and be a part of the team that dynamically works
Towards the growth of organization and gives the satisfaction thereof.
TECHNICAL QUALIFICATION
B.Tech Electronics & Telecommunication Engineering
From Vishwasaraiya College of Engineering & Technology by
(Distance Education from Rajasthan vidyapeeth University Udaipur with 1st
division 68.92% in 2011)
Three year Diploma in Electronics & Communication Engineering
From C.R.R.I.T. Kanjhawala College Delhi-81 in 2001 with 2nd
Division (58.92%)
JOB EXPERIENCE
PRESENT EXPERIENCE TOTAL EXPERIENCE (14 Years)
COMPANY
7. CEC INDIA PVT.LTD
9th
Floor DLF Tower 9A, DLF Ph-III
Gurgaon-122002
Project - DMRC CC04
Design and Construction of Tunnel by Shield TBM, Tunnel by Cut and Cover, Underground
station at Azadpur by Cut & Cover method & Ramps at Mukundpur and Shalimar Bagh for
underground works on Mukund Pur-Yamuna Vihar Corridor of Delhi MRTS project of Phase-III
Working as an Asst.Manager (From April 2016 to till now)
Working as a Sr. Engg.Instrumentation (From Nov 2012 to March 16)
JOB RESPONSIBILITY-
The scope of works includes managing, planning, lead and supervision of the project team for the
instrumentation, monitoring and related geo technical works that includes site visits.
Coordination with clients, consultants, authorities and sub-contractors and to attend meetings
pertinent to the project to resolve technical, progress and other issues
Preparation and submission of method statements, proposals and review all monitoring Reports
before submission as per the contract requirements
Carry out checks on the data processing, monitoring and compilation of reports
Under Ground Station, Lunching Shaft, Cut & Cover, TBM Tunnel and Cross Passage: and
Structure instrumentation & Monitoring by using inclinometer, Magnetic Extensometer, MPBX,
Settlement Marker, Tilt Meter, Bi-Reflex Target, Building Settlement Marker, Crack Meter, Piezometer
and Strain gauge for struts, work shafts, D-walls and Bore tunnels.
Monitoring plan during cutter intervention
Special Monitoring Scheme for Railway Track and Under Ground Chemical Tank during TBM driving.
2. Hourly monitoring during TBM driving
Monitoring: Submission of Weekly/daily Monitoring Report to client.
PREVIOUS EXPERIENCE
6. PRATIBHA INDUSTRIES LTD.
Universal Majestic 13&14 Floor Govandi
Mumbai-400043
Project- DMRC CC-01
Design and Construction of Tunnel by Shield TBM and Janpath and Mandi House Stations by
Cut and Cover method between Central Secretariat and Mandi House for Underground works
under Delhi MRTS Project.
Working as a Sr. Engg. Instrumentation (From November 2011 October 2012 )
JOB RESPONSIBILITY
Monitoring of Under Ground Station, Lunching Shaft, Cut & Cover and TBM Tunnel–
Supervision of sub Contactor works
Commissioning of geotechnical Instruments
Testing of every instrument
Compatibility of instrument
Load cell Installation and monitoring
Strain Gauge Installation and monitoring
Tilt Meter Installation and monitoring
Settlement Points Installation and monitoring
Real Time Monitoring and OSV Monitoring (Mondi House Metro Station)
Manage all site work and Client Satisfaction
Submission of Weekly/daily Monitoring Report
Monitoring : Overall responsibility to Execute Monitoring Plan
Building/ Structure Condition Survey- Cracks in building /Tube well/ Hand pumps/ Bore well along
Tunnel Alignment and condition of buildings.
5. COMPANY
CEC-SOMA-CICI JV
Bangalore Metro Rail Project UG-2 OFFICE
Near M.Chinnaswamy Stadium, opp.Gate No.20
M.G.Road, Bengaluru-560001
Project – BMRCL UG-2
Bangalore Metro Rail Project (UG-2)
Working as an Instrumentation Engg. (From January 2011 to October 2011 )
JOB RESPONSIBILITY
Monitoring of Under Ground Station, Lunching Shaft, Cut & Cover and TBM Tunnel–
Inclinometer – Inclinometer installed behind braced excavation walls of station and tunnel access
shaft excavations to monitor potential ground movement. Locations of inclinometer were compatible
with instrumented bracing members to correlative soil movement with load changes in bracing
members.
Standpipe Piezometer – Piezometer installed to monitoring the water level during dewatering.
Strain Gauge – Strain gauge was installed on bracing members for station and tunnel access shaft
excavations.
Crack Meter – Crack Meter installed on structure for crack monitoring during deep excavations.
Surface Settlement Points – Surface Settlement point was installed on the roads and foot path for
ground and utility settlement monitoring.
Building Monitoring Point – Building monitoring point installed in the structure for Settlement
monitoring.
3. Bi-Reflex Target-Bi-reflex target installed on the structure for deformation monitoring.
Building/ Structure Condition Survey- Cracks in building along tunnel alignment and Conditions of
the buildings according to pre-building condition survey report.
Report preparing and manage all site work
4. COMPANY
Silica InfoTech Pvt. Ltd
Northern Railway Project
142 Ground Floor Sant Nagar East of Kailas
New Delhi 110065
Working as a Project Engg. (From November 2009 to December 2010)
JOB RESPONSIBILITY
Executing OFC & 6-quiad cable laying project
Analyzing the requirements of the project and preparing the estimations accordingly.
Inviting quotations from vendors for materials and services and suggesting the management team
about the most cost-effective option.
3. COMPANY
ALPINE-SAMSUNG-HCC JV
2, Jain mandir Marg opposite Shivaji Stadium
Near shivaji bus terminal,
Connaught place, New Delhi-110001
Project- DMRC AMEL C-1
Airport Metro Express Line Project, C-1
Working as an Instrumentation Engg. (From September 2008 to October 2009 )
JOB RESPONSIBILITY
Monitoring of Under Ground Station, Lunching Shaft, Cut & Cover, TBM Tunnel and Cross
Passage –
Inclinometer – Inclinometer installed behind braced excavation walls of station and tunnel access
shaft excavations to monitor potential ground movement. Locations of inclinometer were compatible
with instrumented bracing members to correlative soil movement with load changes in bracing
members.
Multi-Point Borehole Extensometer (MPBX) – MPBX installed along tunnel centerline alignment to
monitor soil settlement above tunnel crown at multiple depths.
Standpipe Piezometer – Piezometer installed to monitoring the water level during dewatering.
Strain Gauge/Load cell – Strain gauge and load cell were installed on bracing members for station
and tunnel access shaft excavations.
Tilt Meter – Tilt Meter installed on structure for tilting the structure during deep excavations.
Settlement Reference Points – Settlement point were installed on buildings, bridge structure,
streets, roads and side walls along the tunnel alignments and deep. Excavations.
Bi-Reflex Target-Bi-reflex target installed on the structure for deformation monitoring.
Report preparing
Manage all site work
2. COMPANY
Encardio-Rite Electronics Private Limited
A-7, Industrial Estate
Talkatora Road
Lucknow, U.P.-226 011
Working as an Instrumentation Engg. (From September 2006 to August 2008)
4. JOB RESPONSIBILITY
Inclinometer Installation and monitoring of lateral movement
Standpipe Installation and monitoring
Load cell Installation and monitoring
Strain Gauge Installation and monitoring
Tilt Meter Installation and monitoring
Settlement Marker Installation and monitoring
1. COMPANY
ScalesTronics Private Limited
301 & 302 Aggarwal Plaza, Sector-14, Rohini Prasant vihar Delhi-85
Working as a System Engineer (From July 2001 to June 2006)
JOB RESPONSIBILITY
Installation of electronic weighing Instrument
Installation of Tank weighing systems measurement of Tank weight
Troubleshooting of all Type weighing Instrument
PERSONAL PROFILE
Father’s Name : Shri Dev Kara
Date of Birth : 1st
Feb, 1979
Languages Known : Hindi, English
Marital Status : Married
Nationality : Indian
Passport No : N 1145100
Deceleration
I hereby declare that the information furnished above is true and correct to the best of my Knowledge
Date:
Place: Delhi PEEYUSH KUMAR