SlideShare a Scribd company logo
1 of 4
CURRICULUM VITAE
PEEYUSH KUMAR C-74, Millennium Apartment
Sector-18, Rohini, Delhi-89
Mobile: +91-9250907233
peeyush44@yahoo.co.in
peeyush88@rediffmail.com
OBJECTIVE
Aim to be associated with a Progressive organization that gives me scope to share my Knowledge
And skills in accordance with the latest trends and be a part of the team that dynamically works
Towards the growth of organization and gives the satisfaction thereof.
TECHNICAL QUALIFICATION
 B.Tech Electronics & Telecommunication Engineering
From Vishwasaraiya College of Engineering & Technology by
(Distance Education from Rajasthan vidyapeeth University Udaipur with 1st
division 68.92% in 2011)
 Three year Diploma in Electronics & Communication Engineering
From C.R.R.I.T. Kanjhawala College Delhi-81 in 2001 with 2nd
Division (58.92%)
JOB EXPERIENCE
PRESENT EXPERIENCE TOTAL EXPERIENCE (14 Years)
COMPANY
7. CEC INDIA PVT.LTD
9th
Floor DLF Tower 9A, DLF Ph-III
Gurgaon-122002
 Project - DMRC CC04
Design and Construction of Tunnel by Shield TBM, Tunnel by Cut and Cover, Underground
station at Azadpur by Cut & Cover method & Ramps at Mukundpur and Shalimar Bagh for
underground works on Mukund Pur-Yamuna Vihar Corridor of Delhi MRTS project of Phase-III
 Working as an Asst.Manager (From April 2016 to till now)
 Working as a Sr. Engg.Instrumentation (From Nov 2012 to March 16)
JOB RESPONSIBILITY-
The scope of works includes managing, planning, lead and supervision of the project team for the
instrumentation, monitoring and related geo technical works that includes site visits.
Coordination with clients, consultants, authorities and sub-contractors and to attend meetings
pertinent to the project to resolve technical, progress and other issues
Preparation and submission of method statements, proposals and review all monitoring Reports
before submission as per the contract requirements
Carry out checks on the data processing, monitoring and compilation of reports
 Under Ground Station, Lunching Shaft, Cut & Cover, TBM Tunnel and Cross Passage: and
Structure instrumentation & Monitoring by using inclinometer, Magnetic Extensometer, MPBX,
Settlement Marker, Tilt Meter, Bi-Reflex Target, Building Settlement Marker, Crack Meter, Piezometer
and Strain gauge for struts, work shafts, D-walls and Bore tunnels.
 Monitoring plan during cutter intervention
 Special Monitoring Scheme for Railway Track and Under Ground Chemical Tank during TBM driving.
 Hourly monitoring during TBM driving
 Monitoring: Submission of Weekly/daily Monitoring Report to client.
PREVIOUS EXPERIENCE
6. PRATIBHA INDUSTRIES LTD.
Universal Majestic 13&14 Floor Govandi
Mumbai-400043
 Project- DMRC CC-01
Design and Construction of Tunnel by Shield TBM and Janpath and Mandi House Stations by
Cut and Cover method between Central Secretariat and Mandi House for Underground works
under Delhi MRTS Project.
 Working as a Sr. Engg. Instrumentation (From November 2011 October 2012 )
JOB RESPONSIBILITY
Monitoring of Under Ground Station, Lunching Shaft, Cut & Cover and TBM Tunnel–
 Supervision of sub Contactor works
 Commissioning of geotechnical Instruments
 Testing of every instrument
 Compatibility of instrument
 Load cell Installation and monitoring
 Strain Gauge Installation and monitoring
 Tilt Meter Installation and monitoring
 Settlement Points Installation and monitoring
 Real Time Monitoring and OSV Monitoring (Mondi House Metro Station)
 Manage all site work and Client Satisfaction
 Submission of Weekly/daily Monitoring Report
 Monitoring : Overall responsibility to Execute Monitoring Plan
 Building/ Structure Condition Survey- Cracks in building /Tube well/ Hand pumps/ Bore well along
Tunnel Alignment and condition of buildings.
5. COMPANY
CEC-SOMA-CICI JV
Bangalore Metro Rail Project UG-2 OFFICE
Near M.Chinnaswamy Stadium, opp.Gate No.20
M.G.Road, Bengaluru-560001
 Project – BMRCL UG-2
Bangalore Metro Rail Project (UG-2)
 Working as an Instrumentation Engg. (From January 2011 to October 2011 )
JOB RESPONSIBILITY
Monitoring of Under Ground Station, Lunching Shaft, Cut & Cover and TBM Tunnel–
 Inclinometer – Inclinometer installed behind braced excavation walls of station and tunnel access
shaft excavations to monitor potential ground movement. Locations of inclinometer were compatible
with instrumented bracing members to correlative soil movement with load changes in bracing
members.
 Standpipe Piezometer – Piezometer installed to monitoring the water level during dewatering.
 Strain Gauge – Strain gauge was installed on bracing members for station and tunnel access shaft
excavations.
 Crack Meter – Crack Meter installed on structure for crack monitoring during deep excavations.
 Surface Settlement Points – Surface Settlement point was installed on the roads and foot path for
ground and utility settlement monitoring.
 Building Monitoring Point – Building monitoring point installed in the structure for Settlement
monitoring.
 Bi-Reflex Target-Bi-reflex target installed on the structure for deformation monitoring.
 Building/ Structure Condition Survey- Cracks in building along tunnel alignment and Conditions of
the buildings according to pre-building condition survey report.
 Report preparing and manage all site work
4. COMPANY
Silica InfoTech Pvt. Ltd
Northern Railway Project
142 Ground Floor Sant Nagar East of Kailas
New Delhi 110065
 Working as a Project Engg. (From November 2009 to December 2010)
JOB RESPONSIBILITY
 Executing OFC & 6-quiad cable laying project
 Analyzing the requirements of the project and preparing the estimations accordingly.
 Inviting quotations from vendors for materials and services and suggesting the management team
about the most cost-effective option.
3. COMPANY
ALPINE-SAMSUNG-HCC JV
2, Jain mandir Marg opposite Shivaji Stadium
Near shivaji bus terminal,
Connaught place, New Delhi-110001
 Project- DMRC AMEL C-1
Airport Metro Express Line Project, C-1
 Working as an Instrumentation Engg. (From September 2008 to October 2009 )
JOB RESPONSIBILITY
Monitoring of Under Ground Station, Lunching Shaft, Cut & Cover, TBM Tunnel and Cross
Passage –
 Inclinometer – Inclinometer installed behind braced excavation walls of station and tunnel access
shaft excavations to monitor potential ground movement. Locations of inclinometer were compatible
with instrumented bracing members to correlative soil movement with load changes in bracing
members.
 Multi-Point Borehole Extensometer (MPBX) – MPBX installed along tunnel centerline alignment to
monitor soil settlement above tunnel crown at multiple depths.
 Standpipe Piezometer – Piezometer installed to monitoring the water level during dewatering.
 Strain Gauge/Load cell – Strain gauge and load cell were installed on bracing members for station
and tunnel access shaft excavations.
 Tilt Meter – Tilt Meter installed on structure for tilting the structure during deep excavations.
 Settlement Reference Points – Settlement point were installed on buildings, bridge structure,
streets, roads and side walls along the tunnel alignments and deep. Excavations.
 Bi-Reflex Target-Bi-reflex target installed on the structure for deformation monitoring.
 Report preparing
 Manage all site work
2. COMPANY
Encardio-Rite Electronics Private Limited
A-7, Industrial Estate
Talkatora Road
Lucknow, U.P.-226 011
 Working as an Instrumentation Engg. (From September 2006 to August 2008)
JOB RESPONSIBILITY
 Inclinometer Installation and monitoring of lateral movement
 Standpipe Installation and monitoring
 Load cell Installation and monitoring
 Strain Gauge Installation and monitoring
 Tilt Meter Installation and monitoring
 Settlement Marker Installation and monitoring
1. COMPANY
ScalesTronics Private Limited
301 & 302 Aggarwal Plaza, Sector-14, Rohini Prasant vihar Delhi-85
 Working as a System Engineer (From July 2001 to June 2006)
JOB RESPONSIBILITY
 Installation of electronic weighing Instrument
 Installation of Tank weighing systems measurement of Tank weight
 Troubleshooting of all Type weighing Instrument
PERSONAL PROFILE
Father’s Name : Shri Dev Kara
Date of Birth : 1st
Feb, 1979
Languages Known : Hindi, English
Marital Status : Married
Nationality : Indian
Passport No : N 1145100
Deceleration
I hereby declare that the information furnished above is true and correct to the best of my Knowledge
Date:
Place: Delhi PEEYUSH KUMAR

More Related Content

What's hot (20)

Leandro CV
Leandro CVLeandro CV
Leandro CV
 
Cv 2015
Cv 2015Cv 2015
Cv 2015
 
PRANESH GHOSH CV AS ON dt 01.06.2015
PRANESH GHOSH CV AS ON dt 01.06.2015PRANESH GHOSH CV AS ON dt 01.06.2015
PRANESH GHOSH CV AS ON dt 01.06.2015
 
CV
CVCV
CV
 
Summer Training Report (GAMMON INDIA)
Summer Training Report (GAMMON INDIA)Summer Training Report (GAMMON INDIA)
Summer Training Report (GAMMON INDIA)
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1
 
CV_Emanuil Videnov
CV_Emanuil VidenovCV_Emanuil Videnov
CV_Emanuil Videnov
 
cv nour
cv nourcv nour
cv nour
 
Amended CV of Eng. Ibrahim A.A. march 2015
Amended CV of Eng. Ibrahim A.A.   march 2015Amended CV of Eng. Ibrahim A.A.   march 2015
Amended CV of Eng. Ibrahim A.A. march 2015
 
Ko Ko Naing Thein (update 2015)
Ko Ko Naing Thein (update 2015)Ko Ko Naing Thein (update 2015)
Ko Ko Naing Thein (update 2015)
 
CV Sada
CV SadaCV Sada
CV Sada
 
ENGLISH
ENGLISH ENGLISH
ENGLISH
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
DETAILED CV - Aug 16 v3
DETAILED CV - Aug 16 v3DETAILED CV - Aug 16 v3
DETAILED CV - Aug 16 v3
 
Cv inglese it
Cv inglese itCv inglese it
Cv inglese it
 
Resume
ResumeResume
Resume
 
CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15CV-SAJAN LAND SURVEYOR 15-07-15
CV-SAJAN LAND SURVEYOR 15-07-15
 
Covering Letter
Covering LetterCovering Letter
Covering Letter
 
CVHAlbertoGarcia2016English_C
CVHAlbertoGarcia2016English_CCVHAlbertoGarcia2016English_C
CVHAlbertoGarcia2016English_C
 

Viewers also liked

Clase n°4 organizacion y estructura sistema de salud de chile 01 09_16
Clase n°4 organizacion y estructura sistema de salud de chile 01 09_16Clase n°4 organizacion y estructura sistema de salud de chile 01 09_16
Clase n°4 organizacion y estructura sistema de salud de chile 01 09_16Cristobal Navarro
 
Grafica D..[1] De Primero[1]
Grafica D..[1] De Primero[1]Grafica D..[1] De Primero[1]
Grafica D..[1] De Primero[1]mari v.g
 
New Tech for Business Analysts
New Tech for Business AnalystsNew Tech for Business Analysts
New Tech for Business AnalystsPratip Mallik
 
Movie Maker
Movie MakerMovie Maker
Movie Makerritha22
 
Unified Communications(UC) Trend
Unified Communications(UC) Trend Unified Communications(UC) Trend
Unified Communications(UC) Trend REVE Systems
 
NIVELES DE ATENCIÓN EN SALUD I
NIVELES DE ATENCIÓN EN SALUD INIVELES DE ATENCIÓN EN SALUD I
NIVELES DE ATENCIÓN EN SALUD IPia Hurtado Burgos
 

Viewers also liked (14)

Clase n°4 organizacion y estructura sistema de salud de chile 01 09_16
Clase n°4 organizacion y estructura sistema de salud de chile 01 09_16Clase n°4 organizacion y estructura sistema de salud de chile 01 09_16
Clase n°4 organizacion y estructura sistema de salud de chile 01 09_16
 
Moviemakerescrito
MoviemakerescritoMoviemakerescrito
Moviemakerescrito
 
By Compartir A
By Compartir ABy Compartir A
By Compartir A
 
Prezi
PreziPrezi
Prezi
 
Edad media
Edad mediaEdad media
Edad media
 
Grafica D..[1] De Primero[1]
Grafica D..[1] De Primero[1]Grafica D..[1] De Primero[1]
Grafica D..[1] De Primero[1]
 
Light ball
Light ballLight ball
Light ball
 
New Tech for Business Analysts
New Tech for Business AnalystsNew Tech for Business Analysts
New Tech for Business Analysts
 
Movie Maker
Movie MakerMovie Maker
Movie Maker
 
DermotQuigley_CV 2016
DermotQuigley_CV 2016DermotQuigley_CV 2016
DermotQuigley_CV 2016
 
505 Media Plan
505 Media Plan505 Media Plan
505 Media Plan
 
CGS_Other
CGS_OtherCGS_Other
CGS_Other
 
Unified Communications(UC) Trend
Unified Communications(UC) Trend Unified Communications(UC) Trend
Unified Communications(UC) Trend
 
NIVELES DE ATENCIÓN EN SALUD I
NIVELES DE ATENCIÓN EN SALUD INIVELES DE ATENCIÓN EN SALUD I
NIVELES DE ATENCIÓN EN SALUD I
 

Similar to Peeyush Resume (20)

Resume
ResumeResume
Resume
 
CV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEERCV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEER
 
Arul_CV
Arul_CVArul_CV
Arul_CV
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
 
Tirlok Sharma CV (1)
Tirlok Sharma CV (1)Tirlok Sharma CV (1)
Tirlok Sharma CV (1)
 
My Resume.1
My Resume.1My Resume.1
My Resume.1
 
updated cv of indrasen
updated cv of indrasenupdated cv of indrasen
updated cv of indrasen
 
Resume vinoth kumar
Resume   vinoth kumarResume   vinoth kumar
Resume vinoth kumar
 
JOVIN RESUME
JOVIN RESUMEJOVIN RESUME
JOVIN RESUME
 
Tirlok
TirlokTirlok
Tirlok
 
Tirlok
TirlokTirlok
Tirlok
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
Mahmoud Al Khouli_CV2015
Mahmoud Al Khouli_CV2015Mahmoud Al Khouli_CV2015
Mahmoud Al Khouli_CV2015
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
 
Shiraz nawaz cv.
Shiraz nawaz cv.Shiraz nawaz cv.
Shiraz nawaz cv.
 
Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15Updated_Work_Profile_29-09-15
Updated_Work_Profile_29-09-15
 
Resume
ResumeResume
Resume
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 

Peeyush Resume

  • 1. CURRICULUM VITAE PEEYUSH KUMAR C-74, Millennium Apartment Sector-18, Rohini, Delhi-89 Mobile: +91-9250907233 peeyush44@yahoo.co.in peeyush88@rediffmail.com OBJECTIVE Aim to be associated with a Progressive organization that gives me scope to share my Knowledge And skills in accordance with the latest trends and be a part of the team that dynamically works Towards the growth of organization and gives the satisfaction thereof. TECHNICAL QUALIFICATION  B.Tech Electronics & Telecommunication Engineering From Vishwasaraiya College of Engineering & Technology by (Distance Education from Rajasthan vidyapeeth University Udaipur with 1st division 68.92% in 2011)  Three year Diploma in Electronics & Communication Engineering From C.R.R.I.T. Kanjhawala College Delhi-81 in 2001 with 2nd Division (58.92%) JOB EXPERIENCE PRESENT EXPERIENCE TOTAL EXPERIENCE (14 Years) COMPANY 7. CEC INDIA PVT.LTD 9th Floor DLF Tower 9A, DLF Ph-III Gurgaon-122002  Project - DMRC CC04 Design and Construction of Tunnel by Shield TBM, Tunnel by Cut and Cover, Underground station at Azadpur by Cut & Cover method & Ramps at Mukundpur and Shalimar Bagh for underground works on Mukund Pur-Yamuna Vihar Corridor of Delhi MRTS project of Phase-III  Working as an Asst.Manager (From April 2016 to till now)  Working as a Sr. Engg.Instrumentation (From Nov 2012 to March 16) JOB RESPONSIBILITY- The scope of works includes managing, planning, lead and supervision of the project team for the instrumentation, monitoring and related geo technical works that includes site visits. Coordination with clients, consultants, authorities and sub-contractors and to attend meetings pertinent to the project to resolve technical, progress and other issues Preparation and submission of method statements, proposals and review all monitoring Reports before submission as per the contract requirements Carry out checks on the data processing, monitoring and compilation of reports  Under Ground Station, Lunching Shaft, Cut & Cover, TBM Tunnel and Cross Passage: and Structure instrumentation & Monitoring by using inclinometer, Magnetic Extensometer, MPBX, Settlement Marker, Tilt Meter, Bi-Reflex Target, Building Settlement Marker, Crack Meter, Piezometer and Strain gauge for struts, work shafts, D-walls and Bore tunnels.  Monitoring plan during cutter intervention  Special Monitoring Scheme for Railway Track and Under Ground Chemical Tank during TBM driving.
  • 2.  Hourly monitoring during TBM driving  Monitoring: Submission of Weekly/daily Monitoring Report to client. PREVIOUS EXPERIENCE 6. PRATIBHA INDUSTRIES LTD. Universal Majestic 13&14 Floor Govandi Mumbai-400043  Project- DMRC CC-01 Design and Construction of Tunnel by Shield TBM and Janpath and Mandi House Stations by Cut and Cover method between Central Secretariat and Mandi House for Underground works under Delhi MRTS Project.  Working as a Sr. Engg. Instrumentation (From November 2011 October 2012 ) JOB RESPONSIBILITY Monitoring of Under Ground Station, Lunching Shaft, Cut & Cover and TBM Tunnel–  Supervision of sub Contactor works  Commissioning of geotechnical Instruments  Testing of every instrument  Compatibility of instrument  Load cell Installation and monitoring  Strain Gauge Installation and monitoring  Tilt Meter Installation and monitoring  Settlement Points Installation and monitoring  Real Time Monitoring and OSV Monitoring (Mondi House Metro Station)  Manage all site work and Client Satisfaction  Submission of Weekly/daily Monitoring Report  Monitoring : Overall responsibility to Execute Monitoring Plan  Building/ Structure Condition Survey- Cracks in building /Tube well/ Hand pumps/ Bore well along Tunnel Alignment and condition of buildings. 5. COMPANY CEC-SOMA-CICI JV Bangalore Metro Rail Project UG-2 OFFICE Near M.Chinnaswamy Stadium, opp.Gate No.20 M.G.Road, Bengaluru-560001  Project – BMRCL UG-2 Bangalore Metro Rail Project (UG-2)  Working as an Instrumentation Engg. (From January 2011 to October 2011 ) JOB RESPONSIBILITY Monitoring of Under Ground Station, Lunching Shaft, Cut & Cover and TBM Tunnel–  Inclinometer – Inclinometer installed behind braced excavation walls of station and tunnel access shaft excavations to monitor potential ground movement. Locations of inclinometer were compatible with instrumented bracing members to correlative soil movement with load changes in bracing members.  Standpipe Piezometer – Piezometer installed to monitoring the water level during dewatering.  Strain Gauge – Strain gauge was installed on bracing members for station and tunnel access shaft excavations.  Crack Meter – Crack Meter installed on structure for crack monitoring during deep excavations.  Surface Settlement Points – Surface Settlement point was installed on the roads and foot path for ground and utility settlement monitoring.  Building Monitoring Point – Building monitoring point installed in the structure for Settlement monitoring.
  • 3.  Bi-Reflex Target-Bi-reflex target installed on the structure for deformation monitoring.  Building/ Structure Condition Survey- Cracks in building along tunnel alignment and Conditions of the buildings according to pre-building condition survey report.  Report preparing and manage all site work 4. COMPANY Silica InfoTech Pvt. Ltd Northern Railway Project 142 Ground Floor Sant Nagar East of Kailas New Delhi 110065  Working as a Project Engg. (From November 2009 to December 2010) JOB RESPONSIBILITY  Executing OFC & 6-quiad cable laying project  Analyzing the requirements of the project and preparing the estimations accordingly.  Inviting quotations from vendors for materials and services and suggesting the management team about the most cost-effective option. 3. COMPANY ALPINE-SAMSUNG-HCC JV 2, Jain mandir Marg opposite Shivaji Stadium Near shivaji bus terminal, Connaught place, New Delhi-110001  Project- DMRC AMEL C-1 Airport Metro Express Line Project, C-1  Working as an Instrumentation Engg. (From September 2008 to October 2009 ) JOB RESPONSIBILITY Monitoring of Under Ground Station, Lunching Shaft, Cut & Cover, TBM Tunnel and Cross Passage –  Inclinometer – Inclinometer installed behind braced excavation walls of station and tunnel access shaft excavations to monitor potential ground movement. Locations of inclinometer were compatible with instrumented bracing members to correlative soil movement with load changes in bracing members.  Multi-Point Borehole Extensometer (MPBX) – MPBX installed along tunnel centerline alignment to monitor soil settlement above tunnel crown at multiple depths.  Standpipe Piezometer – Piezometer installed to monitoring the water level during dewatering.  Strain Gauge/Load cell – Strain gauge and load cell were installed on bracing members for station and tunnel access shaft excavations.  Tilt Meter – Tilt Meter installed on structure for tilting the structure during deep excavations.  Settlement Reference Points – Settlement point were installed on buildings, bridge structure, streets, roads and side walls along the tunnel alignments and deep. Excavations.  Bi-Reflex Target-Bi-reflex target installed on the structure for deformation monitoring.  Report preparing  Manage all site work 2. COMPANY Encardio-Rite Electronics Private Limited A-7, Industrial Estate Talkatora Road Lucknow, U.P.-226 011  Working as an Instrumentation Engg. (From September 2006 to August 2008)
  • 4. JOB RESPONSIBILITY  Inclinometer Installation and monitoring of lateral movement  Standpipe Installation and monitoring  Load cell Installation and monitoring  Strain Gauge Installation and monitoring  Tilt Meter Installation and monitoring  Settlement Marker Installation and monitoring 1. COMPANY ScalesTronics Private Limited 301 & 302 Aggarwal Plaza, Sector-14, Rohini Prasant vihar Delhi-85  Working as a System Engineer (From July 2001 to June 2006) JOB RESPONSIBILITY  Installation of electronic weighing Instrument  Installation of Tank weighing systems measurement of Tank weight  Troubleshooting of all Type weighing Instrument PERSONAL PROFILE Father’s Name : Shri Dev Kara Date of Birth : 1st Feb, 1979 Languages Known : Hindi, English Marital Status : Married Nationality : Indian Passport No : N 1145100 Deceleration I hereby declare that the information furnished above is true and correct to the best of my Knowledge Date: Place: Delhi PEEYUSH KUMAR