Héctor “ALBERTO” GARCIA López
Civil Engineer
Mr. Garcia has 35 years of experience in Roads and
Airports Infrastructure under a variety of
environments around the world. His experience
includes; planning, feasibility, design, site
supervision, construction, maintenance and
performance of airports, low volume roads, urban
roads, haul roads, highways and tunnels.
Most part of his experienced has been developed at the Louis Berger Group Inc (USA-19
years) and in the Ministry of Transport and Communications (Peru).
• As Soils, Materials and Pavement Engineer, Mr. Garcia has extensive technical and
experience background in geotechnical investigations, drilling, laboratory tests, pavement
design, pavement materials, field evaluation, nondestructive testing, forensic pavement
engineering and highway management systems.
• As Project Manager, Mr. Garcia is familiar with project management procedures. He is
familiar with variety of contract delivery methods, contract monitoring, construction
procedures, labor based works, variations, cost-time control (Gain Value), dispute
resolutions, communications, quality control and quality assurance.
• As Vice President and Country Manager, Mr. Garcia was in charge of resources control
and technical monitoring of the projects in Latin America. This included also business
development activities; contact with clients and partners, project evaluation, proposals
development, negotiations and contract monitoring for private and public organizations.
Also has supported several projects around the world.
Mr. Garcia have worked also as QC/QA for Wilbur Smith Associates Inc (USA) in a Millenium
Challenge Corporation project in El Salvador.
Mr. Garcia was the General Director for engineer design company TNM Limited - Peru
(Technology and Management Ltd – Israel) that is involved in Highway Management
Systems, Non Destructive Testing’s, and Concessionaire advisor among other related to
marketing and administrative issues.
Also is owner of Powermatic SA, an engineering Peruvian firm involved in the design-
construction of equipments, drilling and wells services for the construction, mining, and
agriculture industries. He introduced several engineering devices for pavement monitoring
like LWD from Germany.
Mr. Garcia received his degree in Civil Engineering from the National University of
Engineering in Peru in 1978. He completed post-graduate studies in Soils and Foundations
Engineering in Japan in 1986. He is also actively involved in new transportation and
pavement technologies around the world. Mr. Garcia is experienced in using numerous
software applications for airport and road engineering. He also has produced several manuals
and technical papers. Mr. Garcia is fluent in Spanish and English. Actually is an Independent
Consultant.
He is involved in the development and training programs of transport infrastructure for
engineers and technicians, providing courses to Concessionaires and Universities (for Master
Degree) like Highway-Pavement Evaluation, Delivery Methods, Highway Systems-
Maintenance & Operations, HDM IV-V2.
January 2016
Hector Alberto Garcia Lopez 1
HECTOR ALBERTO GARCIA LOPEZ
EDUCATION:
1980 Civil Engineer – Bachellor, Universidad Nacional de Ingeniería, Lima, Perú.
1983 Civil Engineer, Universidad Nacional de Ingeniería, Lima, Perú.
1986 Soils and Foundation Engineering, Japan International Cooperation Agency, Tokyo,
Japan.
Continuing Education - Reading several publications; Transportation Infrastructure and Project
Management (PMBOK-PMI and the manual published by Dr. H. Kerzner among others).
KEY SKILL
35 years of Experinece in Roads and Airports Infrastructure under a variety of environments
around the world.
Development of several technical publications
Feasibility, Final Design, Construction, Site Supervision and Maintenance of Roads (Urban,
Rural, Haul, Highways) and Airports for Private and Public organizations.
Soils, Materials and Pavements Specialist
Forensic Pavement Engineering
Quality Control and Quality Assurance
Project Management
Procurement
Business Development of Consulting Services
Trainning of special courses at Universities (Master Degree), Concessionaries and Engineers.
Water Well and Drilling
LANGUAGES
Speaking Reading Writing
English Good Good Good
Spanish Excellent Excellent Excellent
POSITIONS:
2011 → Individual Consultant - Profesor - Pavements- APAV -Peru
2013 2014 General Director– Peru, TNM Limited (Technology and Management Ltd)
2010 → Project Engineer/Pavements/Drilling/Owner – Peru, Powermatic SA.
2009 Project Engineer/QCQA, Wilbur Smith Associates, Inc.
2000 2008 Vice President (Operations/Technical – Project Engineer), The Louis Berger Group,
Inc.
1996 2003 Country Manager – Peru, The Louis Berger Group, Inc.
1994 2001 Country Manager - El Salvador, The Louis Berger Group, Inc.
1989 1994 Project Engineer, The Louis Berger Group, Inc.
1988 1998 Project Engineer. Corporacion Peruana de Aeropuertos (CORPAC), Peru.
1981 1987 Chief of the Soil Mechanics and Testing Materials´s Division, Bureau of Special
Studies, Ministry of Transport and Communications, Peru.
Hector Alberto Garcia Lopez 2
SPECIFIC PROJECT EXPERIENCE:
Powermatic SA and Civil Engineer Consultant
2010 - 2016 PERU. Project Engineer. Training. Technical advisor in water wells and
geotechnical drilling for the mining, agriculture, and civil work industries. Set up
nondestructive tests for pavement evaluation. Individual Consultant. Until now.
TNM Limited (Technology and Management Ltd)
2013 2014 PERU. General Director - Engineering Consulting Services. Technical,
Administrative and Business Developmen, Pavement Management Systems, Non
Destructive Testing, Pavement Monitoring, Concessionaire Work Plan and
Advisor for Concessionaire Proposals. September 2013 to February 2014.
JSA Recycling Group SAC
2012 PERU. Technical Manager. Advisor on transportation infrastructure projects.
Training courses for engineers and technicians (Roads and Airports). Project
Management Advisor for a new plastic bottles recycling plant. Until September
2013.
Powermatic SA
2010 PERU. Project Engineer. Technical advisor in water wells and geotechnical
drilling for the mining, agriculture, and civil work industries. Set up nondestructive
tests for pavement evaluation. Until now.
Wilbur Smith Associates Inc.
2009 EL SALVADOR. Quality Assurance / Quality Control Specialist. Northern
Transnational Highway Project – Connectivity Project Management - Project
Management, Final Design and Construction Supervision. Development of the
Quality Assurance Guidelines for the Connectivity Project Management and
approval of the Contractor’s Quality Control Plans. Other duties include Project
Plan Implementation, Risk-Mitigation Analysis, Bid evaluations and others related
to pavements. The project considers approximately 175km of Asphalt Roads and
1,500m of Bridges. FOMILENIO/MCC. January to November 2009.
The Louis Berger Group, Inc.
2007 to 2008 HAITI. Pavement and Materials Specialist. Runway Rehabilitation Study –
Toussaint Louverture International Airport, Port ou Prince. 3,040m runway with a
pavement of asphalt layer that overlaid PCC slabs. HWD, Georadar and
Roughness non destructive tests were conducted for pavement evaluation.
(AAN/IDB). September 2007 to October 2008.
2006 to 2008 ECUADOR. Project Director and Pavement Engineer. Design Review and Site
Supervisión of the EPC for Concession of the New Quito International Airport
Project. Main Contractor Aecon and Andrade Gutierrez. For Corpaq. From April
2006 up to June 2008.
Hector Alberto Garcia Lopez 3
2008 AFGHANISTAN. Chief Pavement Design Engineer. Pavement Specialist for the
Gardez – Khost Road Rehabilitation Project, 101 km, financed by USAID. From
October 2007 to January 2008.
2007 SUDAN. Pavement and Materials Specialist. Evaluation of pavement Alternatives
for Feasability Study of Juba – Nimile Road Rehabilitation, 192 km. Sudan
Infrastructure Program – General Contract Management (USAID). Marzo del
2007
2004 - 2007 PERU. Project Coordinator and Pavement Engineer. Independent Engineer
Concession for the Expansion and Remodeling of the Jorge Chavez International
Airport Project, in Lima Peru. Main Contractor was Overseas Bechtel, Inc (USA)
under a EPC contract and Cosapi under EPCM contract. For OPIC and KFW
Bank. From February 2004 to March 2007.
2006 AFGHANISTAN. Chief Pavement Design Engineer. Pavement Specialist for the
Survey and Design Services for Keshim – Falzabad Road, 103 km, financed by
United Nations Office for Project Services (UNOPS). From June 2006 to
December 2006.
2005 - 2006 ECUADOR. Cost Estimator Engineer. Audit of the EPC Construction Cost for
Concession of the New Quito International Airport Project. For Corpaq. From
November 2005 to February 2006.
2004 - 2006 AFGHANISTAN. Materials, Pavement and Quality Control Specialist in the
Kabul-Kandahar Roadway Rehabilitation Project. Facilities and Services
Rehabilitation Program, financed by USAID.
Rehabilitation of Kabul – Kandahar Road:
Final Design of 389 km of asphalt pavement 25 cm thick using large stone mixes
and uncrussed aggregates. Mayor challenge was to finalize the first 10 cm
asphalt layer before December 2003. This achievement had deserved recognition
of the President of USA and USAID.
Development of the QC/QA program. Implementation of the Materials Laboratory.
Technical support on construction matters.
Pavement structural evaluation (340 km) with FWD for the first 10 cm asphalt
layer in order to verify the pavement design.
Rehabilitation of Kandahar – Herat Road:
Final Design of 442 km for PCC pavement rehabilitation. Rubblization of PCC and
25 cm asphalt overlay has been adopted for the rehabilitation. Several pavement
design methods including the new AASHTO Guide 2002 have been used.
Extensive analysis of asphalt and modifiers has been conducted to analyze low
temperature cracks and rutting. Pavement and Materials advisor during
construction. From February 2004 up to 2006. LBG and Antigo Construction won
the 2006 IRF award in the Construction Methodology category for our
rubbilization on the Kandahar Herat road.
The REFS Program has been awarded with “2007 Most Outstanding Civil
Engineering Achievement Award” by the American Society of Civil Engineers
(ASCE) and Kandahar-Herat Highway has been awarded with “2006 Global Road
Achievement Award” for Construction Methodology by the International Roads
Federation (IRF)
Hector Alberto Garcia Lopez 4
Rehabilitation of the Secondary Road System Rehabilitation (665 km) and
Kabul`s Urban Roads (4.1 km).
Includes presentation at Waterways Experiment Station Vicksburg, Missisipi for
US Army Corps of Engineers.
From January 2004 to December 2006.
2003 AFGHANISTAN. Materials, Pavement and Quality Control Specialist in the
Kabul-Kandahar Roadway Rehabilitation Project. This project is included in the
Facilities and Services Rehabilitation Program, financed by USAID. Solutions for
Asphaltic Pavements of 25 cm thickness. Also evaluation of rehabilitation
alternatives for hydraulic concrete pavements of the Kandahar-Herat Roadway.
The asignment included asphalt source search in the region; Pakistan, Arab
Emirates, Egipt and Iran. The construction was in charge to The Louis Berger
Group. From May 2003 to December 2003.
2003 PERU. Project Manager. Final Design Study. Trujillo – Alto Chicama Road.
Mining Company Barrick. February to May 2003.
2002 PERU. Project Manager and Pavement Engineer. Pre-Feasability Study. Trujillo –
Alto Chicama Road. Mining Company Barrick. September 2002.
2002 EL SALVADOR. Project Coordinator and Pavement Engineer of Rio Chiquito –
Las Pilas Roadway Improvement Project. Analysis of several paving alternatives
that included hydraulic concrete pavements. BID/MOPTVDU. (US$ 150,000)
2001 - 2002 PERU. Project Coordinator in the Lima-Callao Traffic Improvement Project.
BID/CTAR CALLAO.
2001 - 2002 PERU. Project Coordinator. Definitive Study for the construction of Tunnels and
Bridges at the Oroya’s beltway 4,000 masl. BID/PERT.
2000 - 2001 PERU. Project Coordinator and Pavement Engineer. Feasibility Study and
Environmental Assessment of the Urco’s betlway. BID/PERT.
1999 - 2003 PERU. Project Coordinator and Pavement Engineer. Site Supervision of Tarapoto
– Rioja Roadway Project. CAF/PERT.
1999 - 2002 PERU. Project Coordinator and Pavement Engineer. Site Supervision of the
Huancayo – Imperial Roadway. BID/PERT.
1999 - 2000 PERU. Project Coordinator and Pavement Engineer. Definitive Engineering
Studies for the Rehabilitation of Pacasmayo – Cajamarca Roadway. BID/PERT.
1999 - 2000 EL SALVADOR. Project Coordinator. Supervision of Rural Roads Rehabilitation
in District 4 of Usulatán department for damages caused by Mitch Hurricane (67
Km). BID/MOPTVDU. Project developed from October 1999 to May 2000 (US$
650,000).
Hector Alberto Garcia Lopez 5
1999 - 2000 PERU. Project Coordinator. Supervision of Construction for Slope Stabilization in
South Panamerican Highway. “Cerro de Arena” Sector, approximately 60 Km.
BID/PERT. Project developed from May 1999 to March 2000. (US$ 500,000)
1999 PERU. Project Coordinator and Pavement Engineer. Definitive Studies for the
Canchaque – Huancabamba Roadway Rehabilitation. WORLD BANK/MTC-DGC.
1998 CROACIA. Highway Infrastructure Specialist. Zagreb – Gorican Freeway
Consession.
1998 - 1999 EL SALVADOR. Project Coordinator. Supervision for Design and Construction of
By-Passes: Boulevard Los Héroes – Avenida Juan Pablo II, 49ª Avenida Sur – 6ª,
10ª Calle Poniente, 49ª Avenida Sur – Avenida Roosevelt y 49ª Avenida Norte –
1ª Calle Poniente. Turnkey Project with solutions of hydraulic concrete
pavements. BID/MOPTVDU. Project developed from June 1998 to April 1999.
(US$ 820,000)
1998 BRASIL. Soils Mechanics Specialist. Site Supervision of the BR-381 Highway
Improvement - Second Stage Works, Belo Horizonte.
1997 - 2000 PERÚ. Project Coordinator and Pavement Specialist. South Interoceanic
Corridor, Ilo-Desaguadero Highway. CAF/PCVS, 1997. Project Coordinator for
Construction/Supervision of Sections I to V, 240 kms.
1997 - 1998 PERU. Project Coordinator. Technical Assistance in Planning and management
of the Rehabilitation and maintenance of Rural Roads Project. Eng. García
supervised a foreing consultants team for the Technical Assistans in Planning
and Management of Projects, Institutional Development of Rural Municipalities,
Development of small companies, Development of the Community Participation
and Trainning Programs in the most poor areas of the country. BID/BIRF/PCR.
1998 COSTA RICA. Soils and Pavement Specialist. Evaluation of alternatives of
asphaltic and hydraulic concrete pavements for concession of semi urban
roadway that runs from International Airport to San Jose City.
1998 - 1999 EL SALVADOR. Project Coordinator. Site Supervision for the Design and
Constrution of two overpasses in the city of San Salvador: 1 (49 Avenida Sur y
Alameda Roosvelt) and 2 (Boulevard de los Héroes y Alameda Juan Pablo II).
BID/MOPTVDU.
1997 BOLIVIA. General Coordinator – Soils and Pavement Advisor. Feasibility Study
and Final Design of Potosi – Tarija Roadway Project. (320 Km). BID/SNC.
1996 - 1999 PERU. Project Coordinator. Supervision of the Pucara - Santa Rosa - Sicuani
Road Construction works. BID/PERT. Eng. García supervised a foreing
consultants team for the rehabilitation of approximately 150 km of road in the
peruvian plateau located between 3,600 to 4,400 masl. The basic tasks were the
construction of terrace, granulate base and asphaltic mixes to minimize tires
thermal problems. The SHRP system was implemented to the control of cement
asphaltic and asphaltic mixes.
Hector Alberto Garcia Lopez 6
1996 - 1997 EL SALVADOR. Project Coordinator. Consultancy for Elaboration of a Study and
Action Plan for Modernization of Public Works, Transportation, Housing and
Urban Development Ministry. BID/MOPTVDU. Consultanship in privatization,
decentralization, legal and institutional sectors of the Ministry. Project developed
from July 1996 to December 1996 (US$ 560,000)
1996 - 2003 EL SALVADOR. Project Coordinator. Final Engineering Design, Tender
Documents and Site Supervision for the Reconstruction of Major Transportation
Infrastructure. OECF/MOTVDU. The project involved: design and site supervision
of two major bridges on CA-1 and CA-2 roads across the Lempa River, design
and supervision of 3.8Km of a new, six-lane expressway in the East Side of the
approximately 22 Km of the existing (A-1) highway.
1995 - 1996 MÉXICO. Project Coordinator and Pavement Management Specialist. Technical
Assistance to the Junta de Caminos del Estado de Mexico in the Pavement
Administration Sector. BIRF/JLC.
1994 - 1995 EL SALVADOR. Project Manager. Site Supervision of the San Rafael Cedros
(CA-1) - Sensuntepeque Highway, approximately 45 Km. BID/MOPTVDU.
1993 - 1994 EL SALVADOR. Project Director. Technical Assistance for Maintenance of the
Highway Network. Mr. Garcia directed a group of foreign consultants in
developing a training program for personnel from the Direccion General de
Caminos (Ministry of Highways); implementing a highway management system
for the preservation of pavements; development of a system of prioritization and
inventory for bridge maintenance; and the development of a management system
for sources of construction materials. MOP/DGC/BID.
1994 EL SALVADOR. Road Inventory Specialist. Public Services Improvement
Project/Inventory of Local Roads in Ex-Conflict Zones. MOP/USAID. As the
specialist in the maintenance and planning of road inventories, Mr. Garcia
directed the planning of the visual inventory of the low traffic volume roads; the
conceptual design for the development of schematics of local roads in each of the
121 municipalities located in Ex-Conflict Zones throughout the country
(approximately 600 km); the development of a computerized data management
system that allows processing of information resulting from the inventories to
summarize the road characteristics as well as the preliminary cost estimation of
construction alternatives to allow almost permanent passableness in each of the
subject roads. In this manner, the Highway Management System was developed
to allow easy access to the information by the municipal authorities. Mr. Garcia
conducted the training of local engineers in techniques of inventory of roads of
low-traffic volume as well as in the development of the instructive necessary to
carry out the inventory.
1994 PARAGUAY. Plan for the Preservation of the National Road Network. As a
short-term expert in Highway Maintenance, Mr. Garcia was in charge of the
preparation of the road inventory system for a network of approximately 25,000
km, comprised of asphalt, rigid gravel, cobblestone, and earth pavements. He
developed inventory instructive for the characteristics of the road network as well
as training the engineers responsible for carry out the inventories. BID/DNV.
Hector Alberto Garcia Lopez 7
1993 EL SALVADOR. Project Manager. Construction Supervision of Rehabilitation
Works of the International Airport of El Salvador. Mr. Garcia was in charge of the
direction of a group of local and expatriate professionals. The works consisted of
the laying of a hot asphalt mix overlay in the system of taxiways and aprons.
Problems with instability in the hot mix asphalt due to the hot weather and
existing conditions of the existing aprons paralyzed the works on other aprons
and the main runway.
1993 NICARAGUA. Technical and Economic Feasibility Study and Preliminary Design
of the Izapa-Leon-Chinandega-Guasaule Highway, BIRF/MCT. Mr. Garcia was in
charge of the revision of the final aspects of basic engineering and construction
and maintenance costs. Aspects such as the rehabilitation and improvement of
pavements and bridges were also considered.
1992 EL SALVADOR. Soils and Pavement Engineer. Feasibility Study and Preliminary
Design of Highway CA:4/Quitasol-El Poy. MOPT-DGC/FOSEP. Mr. Garcia was
responsible for the evaluation of soils, pavements, and construction materials as
well as the unit costs for the end of the rehabilitation and established
improvements. Additionally, within the technology transfer program of this
project, delivered a conference on the Structural Design of Pavements.
1992 COSTA RICA. Infrastructure Engineer. Study of the Provincial Highway System.
MOPT/BID. Mr. Garcia directed the development of the basic engineering aspects
and the construction and maintenance costs for the evaluation of 2,300 km of
roads for feasibility studies and 950 km of schematic designs for construction
including bid documents. The low traffic volumes in the subject roads required
the application of special concepts for these types of roads.
1992 NICARAGUA. Highway Engineer. Rehabilitation and Improvements of Rural
Roads. MCT/BID. Mr. Garcia was responsible for assisting a group of local
consultants in developing feasibility studies and construction bids for 250 km of
rural roads.
1992 BOLIVIA. Technical Advisor for Construction Materials and Pavements.
Reconstruction of the Confital-Calhuasi Roadway. SNC/BID. Mr. Garcia provided
the guide for the use of marginal materials and the design of asphalt concrete
mixes in cold climates. He also evaluated the structural characteristics of the
projected pavements and recommended guidelines for their monitoring.
1992 EL SALVADOR. Public Services Improvement Project. Mr. Garcia developed a
training manual for construction supervisors of gravel roads. Mr. Garcia delivered
various training conferences on this material to DGC personnel. Mr. Garcia also
produced teaching guides for future DGC trainers. Training of Construction
Supervisors of Unpaved Roads. MOP/USAID.
1991 EL SALVADOR. Soils and Pavement Engineer. Public Services Improvement
Project. Feasibility Study of Littoral Highway CA2: Acajutla-Usulutan.
MOPT/USAID. Mr. Garcia developed basic engineering aspects and construction
costs for the study.
1991 EL SALVADOR. Road Inverntory Engineer. Public Services Improvement
Project. MOPT/USAID. Mr. Garcia was responsible for the direction of the Road
Inventory of the National Road Network for its use within the Highway
Hector Alberto Garcia Lopez 8
Management System. The inventory system consisted of the visual and
structural evaluation of paved roads. Mr. Garcia participated in the training of
local consultants and personnel from the Direccion General de Caminos (Ministry
of Highways) on inventory techniques. In this way he developed guidelines
allowing the personnel to conduct the inventories themselves.
1990 - 1991 PHILLIPINES. Soils and Pavment Engineer. Rural Roads Infrastructure Project.
USAID/Public Works and Highways Department. Participated in the soils and
construction materials study for the final pavement designs, bridge foundations,
slopes' stability analysis and drainage. The project analyzed approximately 1,000
km of roads for feasibility studies and 500 km of roads for final designs.
1990 GRENADA. Construction Supervision of the Principal Highway. MOP/CDB.
Engineer in charge of the final evaluation of the construction works. The works
consisted of the evaluation of the materials and their quality after their use. Also
designed systems to correct the stability of slopes.
1989 EL SALVADOR. Transportation Engineer. Infrastructure Sector Assessment.
MOP/USAID. In charge of the basic engineering, technical specifications, and
costs for the technical-economic evaluation of the national system of highways,
airports, ports and railroads.
1989 MEXICO. Pavement Engineer. Urban Roads Maintenance Project. In charge of
the definition of maintenance and rehabilitation works for planning purposes, as
well as costs and quality control for construction proceedings on urban roads. Mr.
Garcia developed the manuals related to the structural evaluation of pavements
using non-destructive methods for use in the Highway Management System
developed by LBII.
1989 EL SALVADOR. Soils and Pavement Engineer. Final Design for the Rehabilitation
of the San Salvador - Comalapa Freeway. MOPT-DGR/DGC/USAID. In charge of
soils and pavements studies with non-destructive devices, also development of
specifications and cost estimation for the overall project.
1989 MEXICO. Study of the Rehabilitation of the Central Avenue in the State of
Mexico. Carried out superficial and structural evaluations. Studied the soil
properties of the extremely soft soil in the Texoco Valley and analyzed diverse
rehabilitation alternatives.
1988 PERU. Project Engineer. Study for the Rehabilitation and Maintenance of the
Airports of Cuzco and Tarapoto. Peru. CORPAC/DIA. In charge of the basic
engineering works. The works consisted of soils studies, structural evaluations of
pavement with non-destructive methods, studies of construction materials,
rehabilitation plans, specifications, construction costs, construction procedures,
and works scheduling.
1985 - 1987 PERU. Chief of Project. Final Design for the Rehabilitation of Roads in the
National Network of Asphalt and Concrete Roads, Peru/MTC. Head of the
rehabilitation studies that consisted of field work and preparation of contracts for
the works. Evaluated diverse types of pavements using destructive and non-
destructive methods.
Hector Alberto Garcia Lopez 9
1985 SUDAN. Soils and Pavement Engineer. Evaluation of the Ed-Dueim-Raback
Highway. In charge of developing a program of studies to evaluate the final
quality of the work. The evaluation consisted of studies of quality of the materials
used during construction, as well as the structural evaluation of the finished
pavement. A series of destructive and non-destructive methods was used for the
studies of sub-grade soils and top pavement layers.
1981 - 1987 PERU. Chief of the Soil Mechanics and Testing Materials Division, Bureau of
Special Studies, Ministry of Transport and Communications.
1980 - 1981 PERU. SECIGRA-MTC (Ministry of Transportation and Communications)
ORDEPUNO.
1978 - 1980 PERU. Corporacion de Ingenieria Civil, S.A. As Assistance Engineer in charge of
the designs and costs analysis for a variety of projects (water, drainage, highway,
ports, prefabricated dwellings, special moldings). Also in charge of studies of
soils and construction materials (ferrocrete).
1977 - 1978 PERU. CIEMSA Contratistas Generales, S.A. As the assistant to the Department
of Engineering for the Phase III Assembly of Metallic Structures of the Milpo
Mining Complex, duties included design of engineering specifications,
topography, constructive controls and soils foundations studies.
Héctor Alberto García López
January 2016
Hector Alberto Garcia Lopez 10
DEVELOPMENT AND LECTURES OF TRAINNING COURSES:
Location Hours Persons Year
Elastic Deflection with Benkelman Beam Powermatic 13 22 2011
Pavement Evaluation Powermatic 5 12 2011
Technics for the Rehabilitation of Airport
Pavements
Powermatic 6 10 2012
Pavement Evaluation and Rehavilitacion UPAO*
-Trujillo 10.5 20 2012
Roads Evaluation and Rehabilitacion UPAO*
-Trujillo 10.5 20 2012
Technics for the Rehabilitation and
Maintenance of Airport Pavements
CEPA
El Salvador
8 23 2012
Pavement Evaluation and Rehabilitacion UPAO*-Trujillo 20.5 20 2012
Pavement Evaluation, Maintenance and
Rehabilitation
Powermatic 18 8 2012
Road and Transport Engineering UCP*-Tarapoto 25 19 2013
Elastic Deflection with Benkelman Beam Powermatic 10 26 2013
Elastic Deflection with Benkelman Beam Powermatic 10 9 2013
Elastic Deflection with Benkelman Beam Contractor JJC 9 23 2013
Deflections of Pavements ABC-Bolivia 12 38 2013
Road and Transport Engineering UCP*-Iquitos 18 19 2013
Road Maintenance Management UPAO*-Trujillo 28 19 2015
Road Maintenance Management – HDM IV UPAO*-Trujillo 28 19 2015
UPAO and UCP: Courses as part of the University Master Degree in Transportation
ASSOCIATIONS:
• Miembro del Comité Técnico de la Norma CE.10 Pavimentos Urbanos (1era Revisión),
Gerencia de Investigación y Normalización SENCICO, 2013, Lima – PERU.
• President – Technical. Peruvian Roads Association (APC), Peru.
• School of Engineers - PERU, PERU
• Comitte of Soils Mechanis, Foundations and Rock Mechanics, Perú
• American Association of Civil Engineers (ASCE Associate Member 390345)
• Asphalt Recycling & Reclaiming Association (ARRA)
• Transportation Research Board, USA
• Developed APAV at Linkedit.com for Hispanic interchange of knowledge. 150 members
PUBLICATIONS:
• “Nuevas Tecnicas de Estabilizacion de Suelos”, APC Asociación Peruana de Carreteras,
Marzo 2015. (Speaker)
• “Los Asfaltos para Uso Vial”, APAP, Enero 2015. (Speaker)
• “Equipos de Bajo Costo para la Evaluación de Pavimentos In Situ”, Congreso Nacional del
Asfalto y Congreso Nacional de Concreto” APC Asociación Peruana de Carreteras,
Noviembre 2014. (Speaker)
• “Deflectometro de Carga Ligero HMP LFGpro – Light Weight Deflectometer (LWD)”,
Abengoa Perú SA – Cuajone, Julio 2014. (Speaker)
• “Diseño de Pavimentos Asfalticos – Guía AASHTO 1993 – Criterios Prácticos”, Vigésimo
Segundo Curso de Pavimentos”. APC Asociación Peruana de Carreteras, Julio 2014.
(Speaker)
Hector Alberto Garcia Lopez 11
• “Viga Benkelman AGL: Equipo para la Medida Simplificada de la Curva de Deflexione del
Pavimento”, Congreso Nacional del Asfalto y Congreso Nacional de Concreto” APC
Asociación Peruana de Carreteras, Octubre 2013. (Speaker)
• “Deflexiones Elásticas con Viga Benkelman”, Programa de Capacitación en Infraestructura
de Transportes, JSA Recycling Group SAC – Powermatic SA, Perú, Julio 2013.
• “Comentarios al Proyecto: Sección de Suelos y Pavimentos del Manual de Suelos,
Geología, Geotecnia y Pavimentos del Ministerio de Transportes y Comunicaciones del
PERU – 2011”, Congreso Nacional del Asfalto y Congreso Nacional del Concreto, APC
Comte del Asfalto, PERU, Noviembre 2012.
• “Visión de la Ingeniería respecto a las Asociaciones Publico-Privadas””, VI Fórum de
Concesiones Viales y Asociación Publico-Privada, APC Comte del Asfalto, PERU, Octubre
2012. (Speaker)
• “Técnicas de Mantenimiento y Rehabilitación de Pavimentos Aeroportuarios”, Comisión
Ejecutiva Portuaria Autónoma (CEPA), Instituto Salvadoreño del Asfalto (ISA), INSAFORP,
El Salvador, Junio 2012. (Speaker)
• “Evaluación y Rehabilitación de Vías”, Maestría en Transportes y Conservación y
Mantenimiento Vial, Universidad Privada Antenor Orrego Perú (UPAO), Abril 2012.
• “Resistencia y Compactación de Suelos empleando Módulos In-Situ del LWD (Light Weight
Deflectometer)”, XV Curso Internacional de Pavimentos: Asfaltos y Concreto, APC Comité
del Asfalto, Lima, Perú, Febrero del 2012. (Speaker)
• “Técnicas de Mantenimiento y Rehabilitación de Pavimentos Aeroportuarios”, Programa de
Capacitación en Infraestructura de Transportes, JSA Consulting Group SAC – Powermatic
SA, Perú, Enero 2012. (Speaker)
• “Evaluación de Pavimentos”, Programa de Capacitación en Infraestructura de Transportes,
JSA Consulting Group SAC – Powermatic SA, Perú, Diciembre 2011.
• “Deflexiones Elásticas con Viga Benkelman”, Programa de Capacitación en Infraestructura
de Transportes, JSA Consulting Group SAC – Powermatic SA, Perú, Noviembre 2011.
• “Rehabilitación de Pavimentos Aeroportuarios”, 1er Seminario de Infraestructura
Aeroportuaria, Asociación de Ingenieros Aeroportuarios, Lima, Junio del 2011. (Speaker)
• “Evaluación de Pavimentos: Procedimientos y Tendencias”, XIII CURSO DE
PAVIMENTOS: Asfaltos y Concreto, Asociación Peruana de Caminos, Lima, Perú, Mayo del
2011.
• “Quality Assurance Plan – Volume I a V”, WSA-TYPSA-FOMILENIO, El Salvador, November
2009.
• “Application of Perpetual Asphalt Pavement Principles for The Design and Construction of
the Kandahar to Herat Highway in Afghanistan”, 2006 International Conference on Perpetual
Pavements, Columbus, Ohio, September 2006.
• “Fragmentación de Losas de Concreto y Capas Asfálticas para la Rehabilitación de
Pavimentos”. 8vo.
CONGRESO NACIONAL DEL ASFALTO, Perú, Septiembre 2005.
Lecturer. (Speaker)
• “La Nueva Guía AASHTO para el Diseño de Pavimentos. 1er Curso de Actualización de de
Conocimientos en Pavimentos-Aspectos Básicos-Caracterización de Datos de Materiales
No Ligados y de Suelos de Subrasante”, Instituto para el Desarrollo de los Pavimentos en el
Perú, CIP, Perú, Mayo 2005. (Speaker)
• “La Nueva Guía AASHTO para el Diseño de Pavimentos. 1er Curso de Actualización de de
Conocimientos en Pavimentos-Aspectos Básicos-Del Enfoque a la Confiabilidad del
Diseño”, Instituto para el Desarollo de los Pavimentos en el Perú, CIP, Perú, Mayo 2005.
(Speaker)
• “Experiencias en la Reconstrucción de Pavimentos en Afghanistan”. 7to.
CONGRESO
NACIONAL DEL ASFALTO, Perú, Septiembre 2004. (Speaker)
• “Pavimentos Asfálticos Perpetuos”. 5to.
CONGRESO NACIONAL DEL ASFALTO, Perú,
2002. (Speaker).
Hector Alberto Garcia Lopez 12
• “Comentarios sobre la relacion Estabilidad/Flujo de las Mezclas Asfálticas en Caliente”. 5to.
CONGRESO NACIONAL DEL ASFALTO, Perú, 2002. (Speaker)
• Sistema de Gestion de Vias No pavimentadas, 1er Congreso Internacional de la
Construccion, Instituto de la Construccion y Gerencia, Peru, Noviembre del 2002. (Speaker)
• Gestion y Mantenimiento de Carreteras, 1er Congreso Nacional de Obras de Infraestructura
Vial: Carreteras y Puentes, Instituto de la Construccion y Gerencia, Peru, Junio del 2002.
(Speaker)
• “Comentarios sobre la relacion Estabilidad/Flujo de las Mezclas Asfálticas en Caliente”,
Revista Tecnica Caminos del Peru, Edicion No 11 Enero – Junio 2002, Asociacion Peruana
de Caminos, Peru, 2002.
• “Evaluacion Estructural de Pavimentos Flexibles con el Falling Weight Deflectometer y la
Guia de Diseño de Pavimentos AASHTO”. 4to.
CONGRESO NACIONAL DEL ASFALTO,
Perú, 2000.
• “Principios Básicos para el Diseño de Pavimentos”,9no.
CONGRESO IBERO
LATINOAMERICANO DEL ASFALTO, Paraguay,1997.
• “Caso Practico de la Aplicación de Tecnologías en Frío con Emulsiones Asfálticas para la
Rehabilitación de Pavimentos”, 9no.
CONGRESO IBERO LATINOAMERICANO DEL
ASFALTO, Paraguay,1997.
• “Conceptos Generales de los Sistemas de Administración de Pavimentos”, III Seminario
PROVIAL. Perú, 1997. Lecturer.
• “Principios Básicos para el Diseño de Pavimentos”,1er.
CONGRESO NACIONAL DEL
ASFALTO, Perú,1997
• “Caso Practico de la Aplicación de Tecnologías en Frío con Emulsiones Asfálticas para la
Rehabilitación de Pavimentos”,1er.
CONGRESO NACIONAL DEL ASFALTO, Peru,1997
• "Supervisión de Obras de Infraestructura Vial - Colocación de las Mezclas: Colocación,
Compactación y Acabado, ASIA-MOPTVDU, El Salvador 1996
• "Caso Practico de la Aplicación de Emulsiones Asfálticas en El Salvador", ASIA, El Salvador
1996.
• "Caso Practico de la Aplicación de Mezclas en Frío en El Salvador", ASIA-ACODES, El
Salvador 1996.
• "Principios Básicos para el Diseño de Pavimentos", DGC-BID-LBII, El Salvador 1995.
• "Definición del CBR de los Suelos de Subrasante", DGC-BID-LBII, El Salvador 1995.
• "Guía AASHTO para el Diseño de Estructuras de Pavimentos Flexibles", DGC-BID-LBII, El
Salvador, 1995.
• "Sistema Elástico Multicapa (ELSYM5)" DGC-BID-LBII, El Salvador 1995.
• "Diseño y Prácticas Constructivas de Mezclas Asfálticas en Caliente-NAPA-AI-USACE-
SHRP", DGC-BID-LBII, El Salvador 1995.
• "Diseño de Pavimentos Asfálticos para Carreteras y Calles-Asphalt Institute", DGC-BID-LBII,
El Salvador 1995.
• "Técnicas en Frío para la Construcción y el Mantenimiento de Pavimentos", DGC-BID-LBII,
El Salvador 1994.
• "Deterioro de los Pavimentos", DGC-BID-LBII, El Salvador 1994."Manual de Supervisión de
Vías No Pavimentadas", El Salvador, 1992.
• "Monitoring Asphalt Concrete Performance at High Altitudes in the Peruvian Andes",
TRB1269, 1990.
• "Nuevas Tecnologías para la Preservación de Pavimentos, Mantenimiento y Rehabilitación
de Pavimentos", El Salvador, 1989.
• "Recomendaciones de Exploración de Suelos para el Diseño de Pavimentos, V-CNMSIC",
Perú, 1987.
• "Reflexiones sobre la Determinación del CBR de los suelos, VI-CNMSIC", Perú, 1988.
Hector Alberto Garcia Lopez 13
• "El Penetrómetro Dinámico de Cono y su Aplicación en la Ingeniería Vial, V-CNMSIC", Perú,
1987.
• "Manual de Modos Operativos de Ensayo de Suelos y Materiales de Construcción", MTC,
Perú, 1986.
• "Recomendaciones para estudios de Suelos, Canteras y Diseño del Pavimento", a ser
introducidas en las Normas Peruanas para Diseño de Carreteras, MTC, Perú, 1986
• "Recomendaciones para el Estudio de Suelos, Canteras y Diseño del Pavimento", MTC,
Perú, 1986.
• "Análisis y Evaluación del Comportamiento Estructural de los Pavimentos Flexibles", UNI,
Perú, 1982.
• "Comportamiento de Mezclas Asfálticas en Caliente en Zonas de Altura IICLA", Argentina,
1983.
• "Evaluación y Comportamiento Estructural de Pavimentos Flexibles". Tesis de Grado para
optar el Título Profesional. UNI, Perú.
Hector Alberto Garcia Lopez 14
CONGRESS AND WORKSHOPS:
• “Congreso Nacional del Asfalto y Congreso Nacional de Concreto” APC Asociación Peruana
de Carreteras, Octubre 2014. Presidente Técnico.
• “Congreso Nacional del Asfalto y Congreso Nacional de Concreto” APC Asociación
Peruana de Carreteras, Octubre 2013. Presidente Técnico.
• “Segundo Congreso Nacional de Seguridad Vial: Un Compromiso de Todos”, APC
Asociación Peruana de Carreteras, Junio 2013. Presidente Técnico.
• Congreso Nacional del Asfalto y Congreso Nacional del Concreto, APC Comte del Asfalto,
PERU, Noviembre 2012.Presidente Técnico.
• “Ingeniería Vial y de Transportes”, Pre-Grado, Titulación 2013-I, Universidad Científica del
Perú (UCP) Mayo 2013.
• “Evaluación y Rehabilitación de Vías”, Maestría en Transportes y Conservación y
Mantenimiento Vial, Universidad Privada Antenor Orrego Perú (UPAO), Octubre 2012.
• VI Fórum de Concesiones Viales y Asociación Público-Privada, APC Comte del Asfalto,
PERU, Octubre 2012.
• “Evaluación y Rehabilitación de Vías”, Maestría en Transportes y Conservación y
Mantenimiento Vial, Universidad Privada Antenor Orrego Perú (UPAO), Abril 2012.
• XV Curso Internacional de Pavimentos: Asfaltos y Concreto, APC Comité del Asfalto, Lima,
Perú, Febrero del 2012.
• Geographical Information Systems ArcGis Basic-Intermediate, Universidad Nacional Agraria
la Molina, Peru, January-February 2011.
• XII Congreso Nacional del Asfalto y III Congreso Nacional de Concreto, APC, Peru, 2010.
• Primer Seminario Peruano de Geoingeniería, Instituto de Ingenieros de Minas del Perú -
Sociedad Peruana de Geoingeniería, Lima, Perú, Febrero del 2010
• Pavimentos Asfalticos Perpetuos, VIII CURSO DE PAVIMENTOS, Asociacion Peruana de
Caminos, Lima, Perú, Diciembre del 2008.
• PCASE – PAVER Workshop, US Army Corps of Engineers, Tampa, Florida, November
2008.
• 2006 International Conference on Perpetual Pavements, Columbus, Ohio, September 2006.
• Quinto Congreso Nacional del Asfalto, APC, Peru,2002.
• Primer Congreso Internacional de la Construccion, Instituto de la Construccion y Gerencia,
Peru, Noviembre del 2002.
• Gestion y Mantenimiento de Carreteras, I Congreso Nacional de Obras de Infraestructura
Vial: Carreteras y Puentes, Instituto de la Construccion y Gerencia, Peru, Junio del 2002.
• 11º Congreso Ibero-Latinoamericano del Asfalto, Peru,2001.
• “Diseño de Pavimentos, Mezclas y Especificaciones” y “Asfaltos en Altura”. 4to.
CONGRESO
NACIONAL DEL ASFALTO, Perú, 2000.
• Normas y Técnicas Aplicables a los Procesos de Contratación Financiados con Préstamos de
Organismos Financieros Internacionales. Universidad de Lima, Perú, 1999.
• 10º Congreso Ibero-Latinoamericano del Asfalto, España,1999.
• Segundo PROVIAL de las Americas, APC-MTCVC-IPC, Peru,1999.
• Tercer Congreso Nacional del Asfalto, IPC, Peru,1999
• Programas y Proyectos de Vialidad Urbana, Capeco, Peru, 1999.
• XIII Simposio sobre Prevencion de Desastres, Sismos y Sistemas no Convencionales en la
Construccion, UNI-CISMID, Peru, 1999.
• Gestión de Proyectos EXCEL – PROJECT. Julio – Noviembre de 1999.
• Segundo Congreso Nacional del Asfalto, APC-MTCVC-IPC, Peru,1998
• PROVIAL DEL NIÑO, APC-MTCVC-IPC, Peru, 1998.
• 4TH
International Conference on Managing Pavements, Durban, South Africa, 1998.
• III Seminario PROVIAL “Sentando las Bases del Desarrollo Vial del Perú”. Perú, 1997.
Hector Alberto Garcia Lopez 15
• Primer Congreso Nacional del Asfalto, APC-MTCVC-IPC, Peru,1997
• Estabilización de Suelos Utilizando Emulsión Asfáltica, RECOPAV, El Salvador, 1996.
• Supervisión de Obras de Infraestructura Vial, ASIA, El Salvador 1996.
• La Ingeniería, la Arquitectura y el Medio Ambiente en El , ASIA, El Salvador 1996.
• Caso Practico de la Aplicación de Mezclas en Frío, ASIA-ACODES, El Salvador 1996.
• Administracion Financiera de Empresas Constructoras, ASIA, El Salvador, 1996.
• Primer Congreso Panamericano de Consultoria, APC-FEPAC, Peru, 1996.
• Direccion Ejecutiva, Liderazco y Productividad, FEPADE, El Salvador, 1996.
• La Negociacion como Elemento de Actitud Humana, ASI-INSAFORP-CE, El Salvador, 1996.
• Curso de Ingeniería de Carreteras, ASIA-FEPADE, El Salvador, 1994.
• 3º Congreso Iberoamericano de Emulsiones Asfalticas, ALEA, Mexico, 1994.
• Aplicaciones de Emulsiones Asfálticas en Calles, Caminos y Carreteras, Tratamientos
Superficiales, ASIA-FEPADE-ASFALCA, El Salvador, 1993.
• Conceptos para el Diseño Estructural de Pavimentos, DGC, El Salvador, 1992.
• 6º Congreso Ibero-Latinoamericano del Asfalto, Chile,1991.
• Nuevas Tecnologías para la Preservación de Pavimentos, El Salvador, 1989.
• El Enfoque de Sistemas en el Sector Transporte, México, 1989
• VI Congreso Nacional de Mecánica de Suelos, Fundaciones y Mecánica de Rocas, Perú,
1988
• V Congreso Nacional de Mecánica de Suelos, Fundaciones y Mecánica de Rocas, Perú,
1987
• VI Seminario Internacional de Mecánica de Suelos, Lima, 1987
• El Suelo Cemento como Alternativa de Construcción, ASOCEM, Perú, 1986
• II Congreso Latinoamericano del Asfalto, CPA, Argentina, 1982
Mr Garcia has accumulated a large library of technical books and reports on roads, airports,
project management and procurement. Mr. Garcia is familiarized with several engineering
software; MSProject, Primavera, AASHTO Guide 2002, JULEA, PERROAD3.1, DARWIN,
BIN2.1, AASHTO, MEPDG, PAS, ELSYM 5, BACKFAA, LEDFAA, FAAIRFIELD, CONFAA,
PCASE, WINJULEA, MICROPAVER, KENLAYER, HWYCON, ILLIPAVE, PCA Pavement
Design, EXPEAR, CAAMA, MODULUS, PASELS, CP-4 HWY, CP-3 AIRPORTS, LCCOST,
SBSLOPE, LOGDRAFT III, VOC, HDM-IV-V2 and SIAMV.
Hector Alberto Garcia Lopez 16
OTHER EXPERIENCES:
• Louis Berger International Inc/ The Louis Berger Group Inc. - Legal Representative and
General Manager in El Salvador branch (1994-2000) and Peru branch (1997-2003).
• Louis Berger International, Inc. - Business Development – Technical and Economical
proposals for several transport projects (Untill 2003).
• Technical assistance of construction and consulting firms.
• Technical visit to PRI - Asphalt Technologist Inc. – Asphalt and Asphalt Mix tests in
accordance to Strategic Highway Research Program (SHRP), Tampa, Florida, USA.
• Technical inspections of micro surfacing techniques - Texas and de Arkansas - BASS.
• Condition survey and pavement evaluation of urban roads in San Salvador - ASFALCA SA
de CV de El Salvador, El Salvador.
• Foundation Design – Water Supply Tanks- F.A.P. La Molina, Lima - Peru.
• Design of Impervious asphalt layer for mining materials deposits - CENTROMIN, Lima -
Peru.
• Rehabilitation Design of Urban roads - Av. Abancay, Tramo Av. Grau - Av. La Colmena.
Lima - Peru.
• Rehabilitation Design of Panamerican Highway - Av Javier Prado - Puente Primavera, Lima -
Perú.
• Rehabilitation and Design of PCC Urban roads – City of Iquitos., Iquitos - Perú.
• Post Construction Evaluation of hot mix asphalt for the Rehabilitation of the runway of the
airport in Herat, Afghanistan Recon International Inc, November 2008.
• Evaluation of the presence of cracks in hot mix asphalt for the Rehabilitation of La Paz -
Cotapata Highway, Bolivia, Joint Venture CPS-Belmonte, June 2011.
• Technical Assistance – Final Design Pavement Rehabilitation - Piura International Airport,
Perú, CESEL SA, Mayo 2012.
• Developing service design notes for hot asphalt paving Section 2: Comments submitted by
MTC National PROVIAS to certificates Hot Mix Asphalt (MAC) placed in the road Section 2:
Urcos-Puente Inambari - IIRSA Sur, Peru, Odebrecht Engineering and Construction Peru
SAC, July 2012.
• Project Manager – Final Design Improvement - Chiclayo International Airport, Peru, June –
May 2015.
• Advisor of several Contractors and Concessionaire in Peru. Support on Proposals
Development and Technical Matters.
Hector Alberto Garcia Lopez 17
• Specific in Peru (1981-1987)
Soil Mechanics and Testing Materials Division
Bureau of Special Studies
Ministry of Transport and Communications
1981 - 1987 PERU. Chief of the Soil Mechanics and Testing Materials Division, Bureau of
Special Studies, Ministry of Transport and Communications. Was responsible for
the following activities:
 Investigations of soils and construction materials for bridge foundation projects
and projects for rehabilitation of urban roads, roads with low traffic roads,
highways and airports. These projects were located in diverse geographical
locations (desert, high mountains, and jungle), climactic conditions (dry, humid,
frigid, wide daily variation), and a wide range of soil types (conglomerate, Aeolic,
expansive). Implemented non-destructive methods of structural evaluation of
pavements, as well as proceedings for soils and construction materials testing.
 Development of bidding documents of public works. The projects included:
 Rehabilitation: 9 first category airports, 100 km of urban roads.
 Construction of new roads: 400 km of second category roads, 200 km of
low traffic volume roads, 2 airports, 15 bridges.
 Responsible for investigations of soils and new construction materials, some of
which are indicated below:
 Hot, cold and emulsified asphalt mixes for cold and hot weather.
 Chemical stabilization with Portland cement, hydrated lime, pozzolan,
sulfonated oil, and slag.
 Use of marginal materials for pavement works.
 Dry compaction of desert sands.
 Reology of asphaltic products (Asphalt, Cutback, Emulsions)
 Effective expansion of salty soils.
 Introduction of new highway engineering technologies, among which are:
 Destructive and non-destructive methods of structural pavement
evaluation for highways and airports (Benkelman beam, CBR, In situ,
Charge Plate, Dynamic Cone Penetrometer, exploratory shaft).
Introduced structural evaluation methods employed in France, U.S.A.,
Argentina, Brazil and South Africa.
 New methods of pavement design for urban roads, low traffic volume
roads, highways and airports. Introduced diverse methods accepted
around the world, such as AASHTO, TRRL, SHELL, ASPHALT
INSTITUTE, FAA.
 Application of geotextiles and stabilized columns of soil/lime.
 Supervision and approval of projects awarded to local consultants by the
government.
Hector Alberto Garcia Lopez 18
 Responsible for quality control of those field supervision projects executed by the
government, which includes the following:
 Chanchay-Huacho Road. Rehabilitation and improvements for a coastal
road. (Asphalt pavement)
 Huayre-Cerro de Pasco Highway. Rehabilitation and improvements on
this road, located in hilly terrain. (Asphalt pavement)
 Santa Anita-Chosica Highway. Overlay of concrete pavement with
asphalt concrete mixes for a coastal road.
 Pucusana-Canete Highway. Road rehabilitation and improvements for a
coastal road. (Asphalt pavement)
 Tumbes-Ecuadorian Border Road. Overlay of pavements with sandwich-
type structures for a coastal road.
 Torres Street, San Borja. Construction of concrete pavements for a
coastal road.
 Talara-Cancas Road. Road rehabilitation and improvements for a coastal
road. (Asphalt pavement)
 Pomata-Yunguyo Road. Pavement improvements with double superficial
treatment for a road located in high mountain terrain.
 Jaen Airport. Gravel improvements in jungle terrain.
 Evaluation of final construction works carried out by contractors, among which are
the following:
 Cupiche-Matucana Road; 53,880 km to 64,760 km. Rehabilitation and
improvements for a road in hilly terrain. (Asphalt pavement)
 Oroya-La Cima Road; 40 km. Rehabilitation and improvements for a road
in hilly terrain. (Asphalt pavement)
 La Cima-Huayre Road; 40 km. Rehabilitation and improvement for a road
in hilly terrain. (Asphalt pavement)
 Cerro de Pasca-Huariaca Road; 56 km. Rehabilitation and improvements
for a road in hilly terrain. (Asphalt pavement)
 Huariaca-Independencia Road; 17 km. Rehabilitation and improvements
for a road in hilly terrain. (Asphalt pavement)
 Poroy-Inquilapata Road; 18 km. Rehabilitation and improvements for a
road in hilly terrain. (Asphalt pavement)
 Runway at the Piura Airport. Reinforcement of a runway in a coastal area
with an asphalt concrete.
 San Felix and San Carlos Bridge Road; 21 km. Rehabilitation and
improvements for two bridges in a jungle climate. (Asphalt pavement)
 Piura-Sullana Road; 17 km. Rehabilitation and improvements for a road in
a coastal area. (Asphalt pavement)
 Olmos-Corral Quemado, Tramo I and II; approx. 60 km. Rehabilitation and
improvements for a road through coastal-hill terrain. (Asphalt pavement)
 Juliaca Airport. Rehabilitation and improvements for an airport runway at
4,200 m in hilly terrain. (Asphalt and concrete pavement)
 Pomata-Yunguyo Road; 21 km. Rehabilitation and treatment
improvements for a road located in hilly terrain. (Double surface
pavement)
 Talara-Cancas, Tramos I and II; approx. 50 km. Rehabilitation and
improvements for a coastal road. (Asphalt pavement)
 Heavy Traffic Ring of Pucallpa. Rigid pavement for a road located in a
jungle region.
Hector Alberto Garcia Lopez 19
 Cruce-Catacanos Road. Asphalt concrete pavement for a road in a
coastal region.
 Sector Ticlio. Flexible and rigid pavement for a road in a hilly area.
 Huayre-Cerro de Pasco Road. Asphalt pavement for a road in a hilly
region.
 In charge of the evaluation of airports at the request of the Direccion General de
Transporte Aereo (Ministry of Air Transportation) and other government agencies:
 Pucallpa Airport, 2.50 km. Jungle, Asphalt Pavement.
 Tarapoto Airport , 2.50 km. Jungle, Asphalt Pavement.
 Rioja Airport, 1.80 km Jungle, Asphalt Pavement.
 Piura Airport, 2.60 km, Arid Zone, Asphalt Pavement & PCC.
 Talara Airport, 2.50 km Arid Zone, Asphalt Pavement & PCC.
 Yurimaguas Airport, 1.80 km. Jungle, HMA & Soil-Cement.
 Andoas Airport, Jungle, Sand-Cement
 Caballocolla Airport, Jungle, Sand-Cement.
 Juanjui Airport, Jungle, Gravel.
 Iquitos Airport, Jungle, PCC.
 Contamana Airport, Jungle, Sand-Cement
 Las Palmas Airport, Arid Zone, Asphalt Pavement.
 Madre de Dios Airport, Jungle, PCC.
 Jorge Chavez Airport, Arid Zone, PCC.
.

More Related Content

What's hot (17)

Mark_Rowland_CV_2016
Mark_Rowland_CV_2016Mark_Rowland_CV_2016
Mark_Rowland_CV_2016
 
Career Portfolio
Career PortfolioCareer Portfolio
Career Portfolio
 
Siemens_CV1
Siemens_CV1Siemens_CV1
Siemens_CV1
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
UPDATE CV 2015
UPDATE CV 2015UPDATE CV 2015
UPDATE CV 2015
 
Maher Abuelteen Highways July 2016.
Maher Abuelteen Highways July 2016.Maher Abuelteen Highways July 2016.
Maher Abuelteen Highways July 2016.
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
CV 2018 Series
CV 2018 SeriesCV 2018 Series
CV 2018 Series
 
CV
CVCV
CV
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
Mirasol Resume 10-14-14
Mirasol Resume 10-14-14Mirasol Resume 10-14-14
Mirasol Resume 10-14-14
 
Civil Consultant Resume
Civil Consultant ResumeCivil Consultant Resume
Civil Consultant Resume
 
Md._Habibur_Rahman_CV
Md._Habibur_Rahman_CVMd._Habibur_Rahman_CV
Md._Habibur_Rahman_CV
 
CV.Eng Ashraf Abdulsalam(2016)
CV.Eng Ashraf Abdulsalam(2016)CV.Eng Ashraf Abdulsalam(2016)
CV.Eng Ashraf Abdulsalam(2016)
 

Similar to CVHAlbertoGarcia2016English_C

Similar to CVHAlbertoGarcia2016English_C (20)

Cv Mohamed Gaber eng.
Cv Mohamed Gaber eng.Cv Mohamed Gaber eng.
Cv Mohamed Gaber eng.
 
Resume201503230249
Resume201503230249Resume201503230249
Resume201503230249
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
Paul details 2014today
Paul details 2014todayPaul details 2014today
Paul details 2014today
 
Esteban Raganit_2016
Esteban Raganit_2016Esteban Raganit_2016
Esteban Raganit_2016
 
Omar Alani CV 20160410
Omar Alani CV 20160410Omar Alani CV 20160410
Omar Alani CV 20160410
 
Mechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdf
Mechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdfMechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdf
Mechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdf
 
CURICULUM VITAE
CURICULUM VITAECURICULUM VITAE
CURICULUM VITAE
 
Adonis Curriculum Vitae
Adonis Curriculum VitaeAdonis Curriculum Vitae
Adonis Curriculum Vitae
 
Hesham CV - Senior Road Eng 2023.pdf
Hesham CV - Senior Road Eng  2023.pdfHesham CV - Senior Road Eng  2023.pdf
Hesham CV - Senior Road Eng 2023.pdf
 
Cv @Ali maruoof
Cv @Ali maruoofCv @Ali maruoof
Cv @Ali maruoof
 
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oilMohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oil
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
Rafatahmed resume 2013
Rafatahmed resume 2013Rafatahmed resume 2013
Rafatahmed resume 2013
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
DCG_CV
DCG_CVDCG_CV
DCG_CV
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
Muhammad Khadim2013
Muhammad Khadim2013Muhammad Khadim2013
Muhammad Khadim2013
 
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey ServicesPramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
Pramitee Engineering & Surveys Private Limited, Navi Mumbai, Survey Services
 
Resume Dwyer 9-16
Resume Dwyer 9-16Resume Dwyer 9-16
Resume Dwyer 9-16
 

CVHAlbertoGarcia2016English_C

  • 1. Héctor “ALBERTO” GARCIA López Civil Engineer Mr. Garcia has 35 years of experience in Roads and Airports Infrastructure under a variety of environments around the world. His experience includes; planning, feasibility, design, site supervision, construction, maintenance and performance of airports, low volume roads, urban roads, haul roads, highways and tunnels. Most part of his experienced has been developed at the Louis Berger Group Inc (USA-19 years) and in the Ministry of Transport and Communications (Peru). • As Soils, Materials and Pavement Engineer, Mr. Garcia has extensive technical and experience background in geotechnical investigations, drilling, laboratory tests, pavement design, pavement materials, field evaluation, nondestructive testing, forensic pavement engineering and highway management systems. • As Project Manager, Mr. Garcia is familiar with project management procedures. He is familiar with variety of contract delivery methods, contract monitoring, construction procedures, labor based works, variations, cost-time control (Gain Value), dispute resolutions, communications, quality control and quality assurance. • As Vice President and Country Manager, Mr. Garcia was in charge of resources control and technical monitoring of the projects in Latin America. This included also business development activities; contact with clients and partners, project evaluation, proposals development, negotiations and contract monitoring for private and public organizations. Also has supported several projects around the world. Mr. Garcia have worked also as QC/QA for Wilbur Smith Associates Inc (USA) in a Millenium Challenge Corporation project in El Salvador. Mr. Garcia was the General Director for engineer design company TNM Limited - Peru (Technology and Management Ltd – Israel) that is involved in Highway Management Systems, Non Destructive Testing’s, and Concessionaire advisor among other related to marketing and administrative issues. Also is owner of Powermatic SA, an engineering Peruvian firm involved in the design- construction of equipments, drilling and wells services for the construction, mining, and agriculture industries. He introduced several engineering devices for pavement monitoring like LWD from Germany. Mr. Garcia received his degree in Civil Engineering from the National University of Engineering in Peru in 1978. He completed post-graduate studies in Soils and Foundations Engineering in Japan in 1986. He is also actively involved in new transportation and pavement technologies around the world. Mr. Garcia is experienced in using numerous software applications for airport and road engineering. He also has produced several manuals and technical papers. Mr. Garcia is fluent in Spanish and English. Actually is an Independent Consultant. He is involved in the development and training programs of transport infrastructure for engineers and technicians, providing courses to Concessionaires and Universities (for Master Degree) like Highway-Pavement Evaluation, Delivery Methods, Highway Systems- Maintenance & Operations, HDM IV-V2. January 2016
  • 2. Hector Alberto Garcia Lopez 1 HECTOR ALBERTO GARCIA LOPEZ EDUCATION: 1980 Civil Engineer – Bachellor, Universidad Nacional de Ingeniería, Lima, Perú. 1983 Civil Engineer, Universidad Nacional de Ingeniería, Lima, Perú. 1986 Soils and Foundation Engineering, Japan International Cooperation Agency, Tokyo, Japan. Continuing Education - Reading several publications; Transportation Infrastructure and Project Management (PMBOK-PMI and the manual published by Dr. H. Kerzner among others). KEY SKILL 35 years of Experinece in Roads and Airports Infrastructure under a variety of environments around the world. Development of several technical publications Feasibility, Final Design, Construction, Site Supervision and Maintenance of Roads (Urban, Rural, Haul, Highways) and Airports for Private and Public organizations. Soils, Materials and Pavements Specialist Forensic Pavement Engineering Quality Control and Quality Assurance Project Management Procurement Business Development of Consulting Services Trainning of special courses at Universities (Master Degree), Concessionaries and Engineers. Water Well and Drilling LANGUAGES Speaking Reading Writing English Good Good Good Spanish Excellent Excellent Excellent POSITIONS: 2011 → Individual Consultant - Profesor - Pavements- APAV -Peru 2013 2014 General Director– Peru, TNM Limited (Technology and Management Ltd) 2010 → Project Engineer/Pavements/Drilling/Owner – Peru, Powermatic SA. 2009 Project Engineer/QCQA, Wilbur Smith Associates, Inc. 2000 2008 Vice President (Operations/Technical – Project Engineer), The Louis Berger Group, Inc. 1996 2003 Country Manager – Peru, The Louis Berger Group, Inc. 1994 2001 Country Manager - El Salvador, The Louis Berger Group, Inc. 1989 1994 Project Engineer, The Louis Berger Group, Inc. 1988 1998 Project Engineer. Corporacion Peruana de Aeropuertos (CORPAC), Peru. 1981 1987 Chief of the Soil Mechanics and Testing Materials´s Division, Bureau of Special Studies, Ministry of Transport and Communications, Peru.
  • 3. Hector Alberto Garcia Lopez 2 SPECIFIC PROJECT EXPERIENCE: Powermatic SA and Civil Engineer Consultant 2010 - 2016 PERU. Project Engineer. Training. Technical advisor in water wells and geotechnical drilling for the mining, agriculture, and civil work industries. Set up nondestructive tests for pavement evaluation. Individual Consultant. Until now. TNM Limited (Technology and Management Ltd) 2013 2014 PERU. General Director - Engineering Consulting Services. Technical, Administrative and Business Developmen, Pavement Management Systems, Non Destructive Testing, Pavement Monitoring, Concessionaire Work Plan and Advisor for Concessionaire Proposals. September 2013 to February 2014. JSA Recycling Group SAC 2012 PERU. Technical Manager. Advisor on transportation infrastructure projects. Training courses for engineers and technicians (Roads and Airports). Project Management Advisor for a new plastic bottles recycling plant. Until September 2013. Powermatic SA 2010 PERU. Project Engineer. Technical advisor in water wells and geotechnical drilling for the mining, agriculture, and civil work industries. Set up nondestructive tests for pavement evaluation. Until now. Wilbur Smith Associates Inc. 2009 EL SALVADOR. Quality Assurance / Quality Control Specialist. Northern Transnational Highway Project – Connectivity Project Management - Project Management, Final Design and Construction Supervision. Development of the Quality Assurance Guidelines for the Connectivity Project Management and approval of the Contractor’s Quality Control Plans. Other duties include Project Plan Implementation, Risk-Mitigation Analysis, Bid evaluations and others related to pavements. The project considers approximately 175km of Asphalt Roads and 1,500m of Bridges. FOMILENIO/MCC. January to November 2009. The Louis Berger Group, Inc. 2007 to 2008 HAITI. Pavement and Materials Specialist. Runway Rehabilitation Study – Toussaint Louverture International Airport, Port ou Prince. 3,040m runway with a pavement of asphalt layer that overlaid PCC slabs. HWD, Georadar and Roughness non destructive tests were conducted for pavement evaluation. (AAN/IDB). September 2007 to October 2008. 2006 to 2008 ECUADOR. Project Director and Pavement Engineer. Design Review and Site Supervisión of the EPC for Concession of the New Quito International Airport Project. Main Contractor Aecon and Andrade Gutierrez. For Corpaq. From April 2006 up to June 2008.
  • 4. Hector Alberto Garcia Lopez 3 2008 AFGHANISTAN. Chief Pavement Design Engineer. Pavement Specialist for the Gardez – Khost Road Rehabilitation Project, 101 km, financed by USAID. From October 2007 to January 2008. 2007 SUDAN. Pavement and Materials Specialist. Evaluation of pavement Alternatives for Feasability Study of Juba – Nimile Road Rehabilitation, 192 km. Sudan Infrastructure Program – General Contract Management (USAID). Marzo del 2007 2004 - 2007 PERU. Project Coordinator and Pavement Engineer. Independent Engineer Concession for the Expansion and Remodeling of the Jorge Chavez International Airport Project, in Lima Peru. Main Contractor was Overseas Bechtel, Inc (USA) under a EPC contract and Cosapi under EPCM contract. For OPIC and KFW Bank. From February 2004 to March 2007. 2006 AFGHANISTAN. Chief Pavement Design Engineer. Pavement Specialist for the Survey and Design Services for Keshim – Falzabad Road, 103 km, financed by United Nations Office for Project Services (UNOPS). From June 2006 to December 2006. 2005 - 2006 ECUADOR. Cost Estimator Engineer. Audit of the EPC Construction Cost for Concession of the New Quito International Airport Project. For Corpaq. From November 2005 to February 2006. 2004 - 2006 AFGHANISTAN. Materials, Pavement and Quality Control Specialist in the Kabul-Kandahar Roadway Rehabilitation Project. Facilities and Services Rehabilitation Program, financed by USAID. Rehabilitation of Kabul – Kandahar Road: Final Design of 389 km of asphalt pavement 25 cm thick using large stone mixes and uncrussed aggregates. Mayor challenge was to finalize the first 10 cm asphalt layer before December 2003. This achievement had deserved recognition of the President of USA and USAID. Development of the QC/QA program. Implementation of the Materials Laboratory. Technical support on construction matters. Pavement structural evaluation (340 km) with FWD for the first 10 cm asphalt layer in order to verify the pavement design. Rehabilitation of Kandahar – Herat Road: Final Design of 442 km for PCC pavement rehabilitation. Rubblization of PCC and 25 cm asphalt overlay has been adopted for the rehabilitation. Several pavement design methods including the new AASHTO Guide 2002 have been used. Extensive analysis of asphalt and modifiers has been conducted to analyze low temperature cracks and rutting. Pavement and Materials advisor during construction. From February 2004 up to 2006. LBG and Antigo Construction won the 2006 IRF award in the Construction Methodology category for our rubbilization on the Kandahar Herat road. The REFS Program has been awarded with “2007 Most Outstanding Civil Engineering Achievement Award” by the American Society of Civil Engineers (ASCE) and Kandahar-Herat Highway has been awarded with “2006 Global Road Achievement Award” for Construction Methodology by the International Roads Federation (IRF)
  • 5. Hector Alberto Garcia Lopez 4 Rehabilitation of the Secondary Road System Rehabilitation (665 km) and Kabul`s Urban Roads (4.1 km). Includes presentation at Waterways Experiment Station Vicksburg, Missisipi for US Army Corps of Engineers. From January 2004 to December 2006. 2003 AFGHANISTAN. Materials, Pavement and Quality Control Specialist in the Kabul-Kandahar Roadway Rehabilitation Project. This project is included in the Facilities and Services Rehabilitation Program, financed by USAID. Solutions for Asphaltic Pavements of 25 cm thickness. Also evaluation of rehabilitation alternatives for hydraulic concrete pavements of the Kandahar-Herat Roadway. The asignment included asphalt source search in the region; Pakistan, Arab Emirates, Egipt and Iran. The construction was in charge to The Louis Berger Group. From May 2003 to December 2003. 2003 PERU. Project Manager. Final Design Study. Trujillo – Alto Chicama Road. Mining Company Barrick. February to May 2003. 2002 PERU. Project Manager and Pavement Engineer. Pre-Feasability Study. Trujillo – Alto Chicama Road. Mining Company Barrick. September 2002. 2002 EL SALVADOR. Project Coordinator and Pavement Engineer of Rio Chiquito – Las Pilas Roadway Improvement Project. Analysis of several paving alternatives that included hydraulic concrete pavements. BID/MOPTVDU. (US$ 150,000) 2001 - 2002 PERU. Project Coordinator in the Lima-Callao Traffic Improvement Project. BID/CTAR CALLAO. 2001 - 2002 PERU. Project Coordinator. Definitive Study for the construction of Tunnels and Bridges at the Oroya’s beltway 4,000 masl. BID/PERT. 2000 - 2001 PERU. Project Coordinator and Pavement Engineer. Feasibility Study and Environmental Assessment of the Urco’s betlway. BID/PERT. 1999 - 2003 PERU. Project Coordinator and Pavement Engineer. Site Supervision of Tarapoto – Rioja Roadway Project. CAF/PERT. 1999 - 2002 PERU. Project Coordinator and Pavement Engineer. Site Supervision of the Huancayo – Imperial Roadway. BID/PERT. 1999 - 2000 PERU. Project Coordinator and Pavement Engineer. Definitive Engineering Studies for the Rehabilitation of Pacasmayo – Cajamarca Roadway. BID/PERT. 1999 - 2000 EL SALVADOR. Project Coordinator. Supervision of Rural Roads Rehabilitation in District 4 of Usulatán department for damages caused by Mitch Hurricane (67 Km). BID/MOPTVDU. Project developed from October 1999 to May 2000 (US$ 650,000).
  • 6. Hector Alberto Garcia Lopez 5 1999 - 2000 PERU. Project Coordinator. Supervision of Construction for Slope Stabilization in South Panamerican Highway. “Cerro de Arena” Sector, approximately 60 Km. BID/PERT. Project developed from May 1999 to March 2000. (US$ 500,000) 1999 PERU. Project Coordinator and Pavement Engineer. Definitive Studies for the Canchaque – Huancabamba Roadway Rehabilitation. WORLD BANK/MTC-DGC. 1998 CROACIA. Highway Infrastructure Specialist. Zagreb – Gorican Freeway Consession. 1998 - 1999 EL SALVADOR. Project Coordinator. Supervision for Design and Construction of By-Passes: Boulevard Los Héroes – Avenida Juan Pablo II, 49ª Avenida Sur – 6ª, 10ª Calle Poniente, 49ª Avenida Sur – Avenida Roosevelt y 49ª Avenida Norte – 1ª Calle Poniente. Turnkey Project with solutions of hydraulic concrete pavements. BID/MOPTVDU. Project developed from June 1998 to April 1999. (US$ 820,000) 1998 BRASIL. Soils Mechanics Specialist. Site Supervision of the BR-381 Highway Improvement - Second Stage Works, Belo Horizonte. 1997 - 2000 PERÚ. Project Coordinator and Pavement Specialist. South Interoceanic Corridor, Ilo-Desaguadero Highway. CAF/PCVS, 1997. Project Coordinator for Construction/Supervision of Sections I to V, 240 kms. 1997 - 1998 PERU. Project Coordinator. Technical Assistance in Planning and management of the Rehabilitation and maintenance of Rural Roads Project. Eng. García supervised a foreing consultants team for the Technical Assistans in Planning and Management of Projects, Institutional Development of Rural Municipalities, Development of small companies, Development of the Community Participation and Trainning Programs in the most poor areas of the country. BID/BIRF/PCR. 1998 COSTA RICA. Soils and Pavement Specialist. Evaluation of alternatives of asphaltic and hydraulic concrete pavements for concession of semi urban roadway that runs from International Airport to San Jose City. 1998 - 1999 EL SALVADOR. Project Coordinator. Site Supervision for the Design and Constrution of two overpasses in the city of San Salvador: 1 (49 Avenida Sur y Alameda Roosvelt) and 2 (Boulevard de los Héroes y Alameda Juan Pablo II). BID/MOPTVDU. 1997 BOLIVIA. General Coordinator – Soils and Pavement Advisor. Feasibility Study and Final Design of Potosi – Tarija Roadway Project. (320 Km). BID/SNC. 1996 - 1999 PERU. Project Coordinator. Supervision of the Pucara - Santa Rosa - Sicuani Road Construction works. BID/PERT. Eng. García supervised a foreing consultants team for the rehabilitation of approximately 150 km of road in the peruvian plateau located between 3,600 to 4,400 masl. The basic tasks were the construction of terrace, granulate base and asphaltic mixes to minimize tires thermal problems. The SHRP system was implemented to the control of cement asphaltic and asphaltic mixes.
  • 7. Hector Alberto Garcia Lopez 6 1996 - 1997 EL SALVADOR. Project Coordinator. Consultancy for Elaboration of a Study and Action Plan for Modernization of Public Works, Transportation, Housing and Urban Development Ministry. BID/MOPTVDU. Consultanship in privatization, decentralization, legal and institutional sectors of the Ministry. Project developed from July 1996 to December 1996 (US$ 560,000) 1996 - 2003 EL SALVADOR. Project Coordinator. Final Engineering Design, Tender Documents and Site Supervision for the Reconstruction of Major Transportation Infrastructure. OECF/MOTVDU. The project involved: design and site supervision of two major bridges on CA-1 and CA-2 roads across the Lempa River, design and supervision of 3.8Km of a new, six-lane expressway in the East Side of the approximately 22 Km of the existing (A-1) highway. 1995 - 1996 MÉXICO. Project Coordinator and Pavement Management Specialist. Technical Assistance to the Junta de Caminos del Estado de Mexico in the Pavement Administration Sector. BIRF/JLC. 1994 - 1995 EL SALVADOR. Project Manager. Site Supervision of the San Rafael Cedros (CA-1) - Sensuntepeque Highway, approximately 45 Km. BID/MOPTVDU. 1993 - 1994 EL SALVADOR. Project Director. Technical Assistance for Maintenance of the Highway Network. Mr. Garcia directed a group of foreign consultants in developing a training program for personnel from the Direccion General de Caminos (Ministry of Highways); implementing a highway management system for the preservation of pavements; development of a system of prioritization and inventory for bridge maintenance; and the development of a management system for sources of construction materials. MOP/DGC/BID. 1994 EL SALVADOR. Road Inventory Specialist. Public Services Improvement Project/Inventory of Local Roads in Ex-Conflict Zones. MOP/USAID. As the specialist in the maintenance and planning of road inventories, Mr. Garcia directed the planning of the visual inventory of the low traffic volume roads; the conceptual design for the development of schematics of local roads in each of the 121 municipalities located in Ex-Conflict Zones throughout the country (approximately 600 km); the development of a computerized data management system that allows processing of information resulting from the inventories to summarize the road characteristics as well as the preliminary cost estimation of construction alternatives to allow almost permanent passableness in each of the subject roads. In this manner, the Highway Management System was developed to allow easy access to the information by the municipal authorities. Mr. Garcia conducted the training of local engineers in techniques of inventory of roads of low-traffic volume as well as in the development of the instructive necessary to carry out the inventory. 1994 PARAGUAY. Plan for the Preservation of the National Road Network. As a short-term expert in Highway Maintenance, Mr. Garcia was in charge of the preparation of the road inventory system for a network of approximately 25,000 km, comprised of asphalt, rigid gravel, cobblestone, and earth pavements. He developed inventory instructive for the characteristics of the road network as well as training the engineers responsible for carry out the inventories. BID/DNV.
  • 8. Hector Alberto Garcia Lopez 7 1993 EL SALVADOR. Project Manager. Construction Supervision of Rehabilitation Works of the International Airport of El Salvador. Mr. Garcia was in charge of the direction of a group of local and expatriate professionals. The works consisted of the laying of a hot asphalt mix overlay in the system of taxiways and aprons. Problems with instability in the hot mix asphalt due to the hot weather and existing conditions of the existing aprons paralyzed the works on other aprons and the main runway. 1993 NICARAGUA. Technical and Economic Feasibility Study and Preliminary Design of the Izapa-Leon-Chinandega-Guasaule Highway, BIRF/MCT. Mr. Garcia was in charge of the revision of the final aspects of basic engineering and construction and maintenance costs. Aspects such as the rehabilitation and improvement of pavements and bridges were also considered. 1992 EL SALVADOR. Soils and Pavement Engineer. Feasibility Study and Preliminary Design of Highway CA:4/Quitasol-El Poy. MOPT-DGC/FOSEP. Mr. Garcia was responsible for the evaluation of soils, pavements, and construction materials as well as the unit costs for the end of the rehabilitation and established improvements. Additionally, within the technology transfer program of this project, delivered a conference on the Structural Design of Pavements. 1992 COSTA RICA. Infrastructure Engineer. Study of the Provincial Highway System. MOPT/BID. Mr. Garcia directed the development of the basic engineering aspects and the construction and maintenance costs for the evaluation of 2,300 km of roads for feasibility studies and 950 km of schematic designs for construction including bid documents. The low traffic volumes in the subject roads required the application of special concepts for these types of roads. 1992 NICARAGUA. Highway Engineer. Rehabilitation and Improvements of Rural Roads. MCT/BID. Mr. Garcia was responsible for assisting a group of local consultants in developing feasibility studies and construction bids for 250 km of rural roads. 1992 BOLIVIA. Technical Advisor for Construction Materials and Pavements. Reconstruction of the Confital-Calhuasi Roadway. SNC/BID. Mr. Garcia provided the guide for the use of marginal materials and the design of asphalt concrete mixes in cold climates. He also evaluated the structural characteristics of the projected pavements and recommended guidelines for their monitoring. 1992 EL SALVADOR. Public Services Improvement Project. Mr. Garcia developed a training manual for construction supervisors of gravel roads. Mr. Garcia delivered various training conferences on this material to DGC personnel. Mr. Garcia also produced teaching guides for future DGC trainers. Training of Construction Supervisors of Unpaved Roads. MOP/USAID. 1991 EL SALVADOR. Soils and Pavement Engineer. Public Services Improvement Project. Feasibility Study of Littoral Highway CA2: Acajutla-Usulutan. MOPT/USAID. Mr. Garcia developed basic engineering aspects and construction costs for the study. 1991 EL SALVADOR. Road Inverntory Engineer. Public Services Improvement Project. MOPT/USAID. Mr. Garcia was responsible for the direction of the Road Inventory of the National Road Network for its use within the Highway
  • 9. Hector Alberto Garcia Lopez 8 Management System. The inventory system consisted of the visual and structural evaluation of paved roads. Mr. Garcia participated in the training of local consultants and personnel from the Direccion General de Caminos (Ministry of Highways) on inventory techniques. In this way he developed guidelines allowing the personnel to conduct the inventories themselves. 1990 - 1991 PHILLIPINES. Soils and Pavment Engineer. Rural Roads Infrastructure Project. USAID/Public Works and Highways Department. Participated in the soils and construction materials study for the final pavement designs, bridge foundations, slopes' stability analysis and drainage. The project analyzed approximately 1,000 km of roads for feasibility studies and 500 km of roads for final designs. 1990 GRENADA. Construction Supervision of the Principal Highway. MOP/CDB. Engineer in charge of the final evaluation of the construction works. The works consisted of the evaluation of the materials and their quality after their use. Also designed systems to correct the stability of slopes. 1989 EL SALVADOR. Transportation Engineer. Infrastructure Sector Assessment. MOP/USAID. In charge of the basic engineering, technical specifications, and costs for the technical-economic evaluation of the national system of highways, airports, ports and railroads. 1989 MEXICO. Pavement Engineer. Urban Roads Maintenance Project. In charge of the definition of maintenance and rehabilitation works for planning purposes, as well as costs and quality control for construction proceedings on urban roads. Mr. Garcia developed the manuals related to the structural evaluation of pavements using non-destructive methods for use in the Highway Management System developed by LBII. 1989 EL SALVADOR. Soils and Pavement Engineer. Final Design for the Rehabilitation of the San Salvador - Comalapa Freeway. MOPT-DGR/DGC/USAID. In charge of soils and pavements studies with non-destructive devices, also development of specifications and cost estimation for the overall project. 1989 MEXICO. Study of the Rehabilitation of the Central Avenue in the State of Mexico. Carried out superficial and structural evaluations. Studied the soil properties of the extremely soft soil in the Texoco Valley and analyzed diverse rehabilitation alternatives. 1988 PERU. Project Engineer. Study for the Rehabilitation and Maintenance of the Airports of Cuzco and Tarapoto. Peru. CORPAC/DIA. In charge of the basic engineering works. The works consisted of soils studies, structural evaluations of pavement with non-destructive methods, studies of construction materials, rehabilitation plans, specifications, construction costs, construction procedures, and works scheduling. 1985 - 1987 PERU. Chief of Project. Final Design for the Rehabilitation of Roads in the National Network of Asphalt and Concrete Roads, Peru/MTC. Head of the rehabilitation studies that consisted of field work and preparation of contracts for the works. Evaluated diverse types of pavements using destructive and non- destructive methods.
  • 10. Hector Alberto Garcia Lopez 9 1985 SUDAN. Soils and Pavement Engineer. Evaluation of the Ed-Dueim-Raback Highway. In charge of developing a program of studies to evaluate the final quality of the work. The evaluation consisted of studies of quality of the materials used during construction, as well as the structural evaluation of the finished pavement. A series of destructive and non-destructive methods was used for the studies of sub-grade soils and top pavement layers. 1981 - 1987 PERU. Chief of the Soil Mechanics and Testing Materials Division, Bureau of Special Studies, Ministry of Transport and Communications. 1980 - 1981 PERU. SECIGRA-MTC (Ministry of Transportation and Communications) ORDEPUNO. 1978 - 1980 PERU. Corporacion de Ingenieria Civil, S.A. As Assistance Engineer in charge of the designs and costs analysis for a variety of projects (water, drainage, highway, ports, prefabricated dwellings, special moldings). Also in charge of studies of soils and construction materials (ferrocrete). 1977 - 1978 PERU. CIEMSA Contratistas Generales, S.A. As the assistant to the Department of Engineering for the Phase III Assembly of Metallic Structures of the Milpo Mining Complex, duties included design of engineering specifications, topography, constructive controls and soils foundations studies. Héctor Alberto García López January 2016
  • 11. Hector Alberto Garcia Lopez 10 DEVELOPMENT AND LECTURES OF TRAINNING COURSES: Location Hours Persons Year Elastic Deflection with Benkelman Beam Powermatic 13 22 2011 Pavement Evaluation Powermatic 5 12 2011 Technics for the Rehabilitation of Airport Pavements Powermatic 6 10 2012 Pavement Evaluation and Rehavilitacion UPAO* -Trujillo 10.5 20 2012 Roads Evaluation and Rehabilitacion UPAO* -Trujillo 10.5 20 2012 Technics for the Rehabilitation and Maintenance of Airport Pavements CEPA El Salvador 8 23 2012 Pavement Evaluation and Rehabilitacion UPAO*-Trujillo 20.5 20 2012 Pavement Evaluation, Maintenance and Rehabilitation Powermatic 18 8 2012 Road and Transport Engineering UCP*-Tarapoto 25 19 2013 Elastic Deflection with Benkelman Beam Powermatic 10 26 2013 Elastic Deflection with Benkelman Beam Powermatic 10 9 2013 Elastic Deflection with Benkelman Beam Contractor JJC 9 23 2013 Deflections of Pavements ABC-Bolivia 12 38 2013 Road and Transport Engineering UCP*-Iquitos 18 19 2013 Road Maintenance Management UPAO*-Trujillo 28 19 2015 Road Maintenance Management – HDM IV UPAO*-Trujillo 28 19 2015 UPAO and UCP: Courses as part of the University Master Degree in Transportation ASSOCIATIONS: • Miembro del Comité Técnico de la Norma CE.10 Pavimentos Urbanos (1era Revisión), Gerencia de Investigación y Normalización SENCICO, 2013, Lima – PERU. • President – Technical. Peruvian Roads Association (APC), Peru. • School of Engineers - PERU, PERU • Comitte of Soils Mechanis, Foundations and Rock Mechanics, Perú • American Association of Civil Engineers (ASCE Associate Member 390345) • Asphalt Recycling & Reclaiming Association (ARRA) • Transportation Research Board, USA • Developed APAV at Linkedit.com for Hispanic interchange of knowledge. 150 members PUBLICATIONS: • “Nuevas Tecnicas de Estabilizacion de Suelos”, APC Asociación Peruana de Carreteras, Marzo 2015. (Speaker) • “Los Asfaltos para Uso Vial”, APAP, Enero 2015. (Speaker) • “Equipos de Bajo Costo para la Evaluación de Pavimentos In Situ”, Congreso Nacional del Asfalto y Congreso Nacional de Concreto” APC Asociación Peruana de Carreteras, Noviembre 2014. (Speaker) • “Deflectometro de Carga Ligero HMP LFGpro – Light Weight Deflectometer (LWD)”, Abengoa Perú SA – Cuajone, Julio 2014. (Speaker) • “Diseño de Pavimentos Asfalticos – Guía AASHTO 1993 – Criterios Prácticos”, Vigésimo Segundo Curso de Pavimentos”. APC Asociación Peruana de Carreteras, Julio 2014. (Speaker)
  • 12. Hector Alberto Garcia Lopez 11 • “Viga Benkelman AGL: Equipo para la Medida Simplificada de la Curva de Deflexione del Pavimento”, Congreso Nacional del Asfalto y Congreso Nacional de Concreto” APC Asociación Peruana de Carreteras, Octubre 2013. (Speaker) • “Deflexiones Elásticas con Viga Benkelman”, Programa de Capacitación en Infraestructura de Transportes, JSA Recycling Group SAC – Powermatic SA, Perú, Julio 2013. • “Comentarios al Proyecto: Sección de Suelos y Pavimentos del Manual de Suelos, Geología, Geotecnia y Pavimentos del Ministerio de Transportes y Comunicaciones del PERU – 2011”, Congreso Nacional del Asfalto y Congreso Nacional del Concreto, APC Comte del Asfalto, PERU, Noviembre 2012. • “Visión de la Ingeniería respecto a las Asociaciones Publico-Privadas””, VI Fórum de Concesiones Viales y Asociación Publico-Privada, APC Comte del Asfalto, PERU, Octubre 2012. (Speaker) • “Técnicas de Mantenimiento y Rehabilitación de Pavimentos Aeroportuarios”, Comisión Ejecutiva Portuaria Autónoma (CEPA), Instituto Salvadoreño del Asfalto (ISA), INSAFORP, El Salvador, Junio 2012. (Speaker) • “Evaluación y Rehabilitación de Vías”, Maestría en Transportes y Conservación y Mantenimiento Vial, Universidad Privada Antenor Orrego Perú (UPAO), Abril 2012. • “Resistencia y Compactación de Suelos empleando Módulos In-Situ del LWD (Light Weight Deflectometer)”, XV Curso Internacional de Pavimentos: Asfaltos y Concreto, APC Comité del Asfalto, Lima, Perú, Febrero del 2012. (Speaker) • “Técnicas de Mantenimiento y Rehabilitación de Pavimentos Aeroportuarios”, Programa de Capacitación en Infraestructura de Transportes, JSA Consulting Group SAC – Powermatic SA, Perú, Enero 2012. (Speaker) • “Evaluación de Pavimentos”, Programa de Capacitación en Infraestructura de Transportes, JSA Consulting Group SAC – Powermatic SA, Perú, Diciembre 2011. • “Deflexiones Elásticas con Viga Benkelman”, Programa de Capacitación en Infraestructura de Transportes, JSA Consulting Group SAC – Powermatic SA, Perú, Noviembre 2011. • “Rehabilitación de Pavimentos Aeroportuarios”, 1er Seminario de Infraestructura Aeroportuaria, Asociación de Ingenieros Aeroportuarios, Lima, Junio del 2011. (Speaker) • “Evaluación de Pavimentos: Procedimientos y Tendencias”, XIII CURSO DE PAVIMENTOS: Asfaltos y Concreto, Asociación Peruana de Caminos, Lima, Perú, Mayo del 2011. • “Quality Assurance Plan – Volume I a V”, WSA-TYPSA-FOMILENIO, El Salvador, November 2009. • “Application of Perpetual Asphalt Pavement Principles for The Design and Construction of the Kandahar to Herat Highway in Afghanistan”, 2006 International Conference on Perpetual Pavements, Columbus, Ohio, September 2006. • “Fragmentación de Losas de Concreto y Capas Asfálticas para la Rehabilitación de Pavimentos”. 8vo. CONGRESO NACIONAL DEL ASFALTO, Perú, Septiembre 2005. Lecturer. (Speaker) • “La Nueva Guía AASHTO para el Diseño de Pavimentos. 1er Curso de Actualización de de Conocimientos en Pavimentos-Aspectos Básicos-Caracterización de Datos de Materiales No Ligados y de Suelos de Subrasante”, Instituto para el Desarrollo de los Pavimentos en el Perú, CIP, Perú, Mayo 2005. (Speaker) • “La Nueva Guía AASHTO para el Diseño de Pavimentos. 1er Curso de Actualización de de Conocimientos en Pavimentos-Aspectos Básicos-Del Enfoque a la Confiabilidad del Diseño”, Instituto para el Desarollo de los Pavimentos en el Perú, CIP, Perú, Mayo 2005. (Speaker) • “Experiencias en la Reconstrucción de Pavimentos en Afghanistan”. 7to. CONGRESO NACIONAL DEL ASFALTO, Perú, Septiembre 2004. (Speaker) • “Pavimentos Asfálticos Perpetuos”. 5to. CONGRESO NACIONAL DEL ASFALTO, Perú, 2002. (Speaker).
  • 13. Hector Alberto Garcia Lopez 12 • “Comentarios sobre la relacion Estabilidad/Flujo de las Mezclas Asfálticas en Caliente”. 5to. CONGRESO NACIONAL DEL ASFALTO, Perú, 2002. (Speaker) • Sistema de Gestion de Vias No pavimentadas, 1er Congreso Internacional de la Construccion, Instituto de la Construccion y Gerencia, Peru, Noviembre del 2002. (Speaker) • Gestion y Mantenimiento de Carreteras, 1er Congreso Nacional de Obras de Infraestructura Vial: Carreteras y Puentes, Instituto de la Construccion y Gerencia, Peru, Junio del 2002. (Speaker) • “Comentarios sobre la relacion Estabilidad/Flujo de las Mezclas Asfálticas en Caliente”, Revista Tecnica Caminos del Peru, Edicion No 11 Enero – Junio 2002, Asociacion Peruana de Caminos, Peru, 2002. • “Evaluacion Estructural de Pavimentos Flexibles con el Falling Weight Deflectometer y la Guia de Diseño de Pavimentos AASHTO”. 4to. CONGRESO NACIONAL DEL ASFALTO, Perú, 2000. • “Principios Básicos para el Diseño de Pavimentos”,9no. CONGRESO IBERO LATINOAMERICANO DEL ASFALTO, Paraguay,1997. • “Caso Practico de la Aplicación de Tecnologías en Frío con Emulsiones Asfálticas para la Rehabilitación de Pavimentos”, 9no. CONGRESO IBERO LATINOAMERICANO DEL ASFALTO, Paraguay,1997. • “Conceptos Generales de los Sistemas de Administración de Pavimentos”, III Seminario PROVIAL. Perú, 1997. Lecturer. • “Principios Básicos para el Diseño de Pavimentos”,1er. CONGRESO NACIONAL DEL ASFALTO, Perú,1997 • “Caso Practico de la Aplicación de Tecnologías en Frío con Emulsiones Asfálticas para la Rehabilitación de Pavimentos”,1er. CONGRESO NACIONAL DEL ASFALTO, Peru,1997 • "Supervisión de Obras de Infraestructura Vial - Colocación de las Mezclas: Colocación, Compactación y Acabado, ASIA-MOPTVDU, El Salvador 1996 • "Caso Practico de la Aplicación de Emulsiones Asfálticas en El Salvador", ASIA, El Salvador 1996. • "Caso Practico de la Aplicación de Mezclas en Frío en El Salvador", ASIA-ACODES, El Salvador 1996. • "Principios Básicos para el Diseño de Pavimentos", DGC-BID-LBII, El Salvador 1995. • "Definición del CBR de los Suelos de Subrasante", DGC-BID-LBII, El Salvador 1995. • "Guía AASHTO para el Diseño de Estructuras de Pavimentos Flexibles", DGC-BID-LBII, El Salvador, 1995. • "Sistema Elástico Multicapa (ELSYM5)" DGC-BID-LBII, El Salvador 1995. • "Diseño y Prácticas Constructivas de Mezclas Asfálticas en Caliente-NAPA-AI-USACE- SHRP", DGC-BID-LBII, El Salvador 1995. • "Diseño de Pavimentos Asfálticos para Carreteras y Calles-Asphalt Institute", DGC-BID-LBII, El Salvador 1995. • "Técnicas en Frío para la Construcción y el Mantenimiento de Pavimentos", DGC-BID-LBII, El Salvador 1994. • "Deterioro de los Pavimentos", DGC-BID-LBII, El Salvador 1994."Manual de Supervisión de Vías No Pavimentadas", El Salvador, 1992. • "Monitoring Asphalt Concrete Performance at High Altitudes in the Peruvian Andes", TRB1269, 1990. • "Nuevas Tecnologías para la Preservación de Pavimentos, Mantenimiento y Rehabilitación de Pavimentos", El Salvador, 1989. • "Recomendaciones de Exploración de Suelos para el Diseño de Pavimentos, V-CNMSIC", Perú, 1987. • "Reflexiones sobre la Determinación del CBR de los suelos, VI-CNMSIC", Perú, 1988.
  • 14. Hector Alberto Garcia Lopez 13 • "El Penetrómetro Dinámico de Cono y su Aplicación en la Ingeniería Vial, V-CNMSIC", Perú, 1987. • "Manual de Modos Operativos de Ensayo de Suelos y Materiales de Construcción", MTC, Perú, 1986. • "Recomendaciones para estudios de Suelos, Canteras y Diseño del Pavimento", a ser introducidas en las Normas Peruanas para Diseño de Carreteras, MTC, Perú, 1986 • "Recomendaciones para el Estudio de Suelos, Canteras y Diseño del Pavimento", MTC, Perú, 1986. • "Análisis y Evaluación del Comportamiento Estructural de los Pavimentos Flexibles", UNI, Perú, 1982. • "Comportamiento de Mezclas Asfálticas en Caliente en Zonas de Altura IICLA", Argentina, 1983. • "Evaluación y Comportamiento Estructural de Pavimentos Flexibles". Tesis de Grado para optar el Título Profesional. UNI, Perú.
  • 15. Hector Alberto Garcia Lopez 14 CONGRESS AND WORKSHOPS: • “Congreso Nacional del Asfalto y Congreso Nacional de Concreto” APC Asociación Peruana de Carreteras, Octubre 2014. Presidente Técnico. • “Congreso Nacional del Asfalto y Congreso Nacional de Concreto” APC Asociación Peruana de Carreteras, Octubre 2013. Presidente Técnico. • “Segundo Congreso Nacional de Seguridad Vial: Un Compromiso de Todos”, APC Asociación Peruana de Carreteras, Junio 2013. Presidente Técnico. • Congreso Nacional del Asfalto y Congreso Nacional del Concreto, APC Comte del Asfalto, PERU, Noviembre 2012.Presidente Técnico. • “Ingeniería Vial y de Transportes”, Pre-Grado, Titulación 2013-I, Universidad Científica del Perú (UCP) Mayo 2013. • “Evaluación y Rehabilitación de Vías”, Maestría en Transportes y Conservación y Mantenimiento Vial, Universidad Privada Antenor Orrego Perú (UPAO), Octubre 2012. • VI Fórum de Concesiones Viales y Asociación Público-Privada, APC Comte del Asfalto, PERU, Octubre 2012. • “Evaluación y Rehabilitación de Vías”, Maestría en Transportes y Conservación y Mantenimiento Vial, Universidad Privada Antenor Orrego Perú (UPAO), Abril 2012. • XV Curso Internacional de Pavimentos: Asfaltos y Concreto, APC Comité del Asfalto, Lima, Perú, Febrero del 2012. • Geographical Information Systems ArcGis Basic-Intermediate, Universidad Nacional Agraria la Molina, Peru, January-February 2011. • XII Congreso Nacional del Asfalto y III Congreso Nacional de Concreto, APC, Peru, 2010. • Primer Seminario Peruano de Geoingeniería, Instituto de Ingenieros de Minas del Perú - Sociedad Peruana de Geoingeniería, Lima, Perú, Febrero del 2010 • Pavimentos Asfalticos Perpetuos, VIII CURSO DE PAVIMENTOS, Asociacion Peruana de Caminos, Lima, Perú, Diciembre del 2008. • PCASE – PAVER Workshop, US Army Corps of Engineers, Tampa, Florida, November 2008. • 2006 International Conference on Perpetual Pavements, Columbus, Ohio, September 2006. • Quinto Congreso Nacional del Asfalto, APC, Peru,2002. • Primer Congreso Internacional de la Construccion, Instituto de la Construccion y Gerencia, Peru, Noviembre del 2002. • Gestion y Mantenimiento de Carreteras, I Congreso Nacional de Obras de Infraestructura Vial: Carreteras y Puentes, Instituto de la Construccion y Gerencia, Peru, Junio del 2002. • 11º Congreso Ibero-Latinoamericano del Asfalto, Peru,2001. • “Diseño de Pavimentos, Mezclas y Especificaciones” y “Asfaltos en Altura”. 4to. CONGRESO NACIONAL DEL ASFALTO, Perú, 2000. • Normas y Técnicas Aplicables a los Procesos de Contratación Financiados con Préstamos de Organismos Financieros Internacionales. Universidad de Lima, Perú, 1999. • 10º Congreso Ibero-Latinoamericano del Asfalto, España,1999. • Segundo PROVIAL de las Americas, APC-MTCVC-IPC, Peru,1999. • Tercer Congreso Nacional del Asfalto, IPC, Peru,1999 • Programas y Proyectos de Vialidad Urbana, Capeco, Peru, 1999. • XIII Simposio sobre Prevencion de Desastres, Sismos y Sistemas no Convencionales en la Construccion, UNI-CISMID, Peru, 1999. • Gestión de Proyectos EXCEL – PROJECT. Julio – Noviembre de 1999. • Segundo Congreso Nacional del Asfalto, APC-MTCVC-IPC, Peru,1998 • PROVIAL DEL NIÑO, APC-MTCVC-IPC, Peru, 1998. • 4TH International Conference on Managing Pavements, Durban, South Africa, 1998. • III Seminario PROVIAL “Sentando las Bases del Desarrollo Vial del Perú”. Perú, 1997.
  • 16. Hector Alberto Garcia Lopez 15 • Primer Congreso Nacional del Asfalto, APC-MTCVC-IPC, Peru,1997 • Estabilización de Suelos Utilizando Emulsión Asfáltica, RECOPAV, El Salvador, 1996. • Supervisión de Obras de Infraestructura Vial, ASIA, El Salvador 1996. • La Ingeniería, la Arquitectura y el Medio Ambiente en El , ASIA, El Salvador 1996. • Caso Practico de la Aplicación de Mezclas en Frío, ASIA-ACODES, El Salvador 1996. • Administracion Financiera de Empresas Constructoras, ASIA, El Salvador, 1996. • Primer Congreso Panamericano de Consultoria, APC-FEPAC, Peru, 1996. • Direccion Ejecutiva, Liderazco y Productividad, FEPADE, El Salvador, 1996. • La Negociacion como Elemento de Actitud Humana, ASI-INSAFORP-CE, El Salvador, 1996. • Curso de Ingeniería de Carreteras, ASIA-FEPADE, El Salvador, 1994. • 3º Congreso Iberoamericano de Emulsiones Asfalticas, ALEA, Mexico, 1994. • Aplicaciones de Emulsiones Asfálticas en Calles, Caminos y Carreteras, Tratamientos Superficiales, ASIA-FEPADE-ASFALCA, El Salvador, 1993. • Conceptos para el Diseño Estructural de Pavimentos, DGC, El Salvador, 1992. • 6º Congreso Ibero-Latinoamericano del Asfalto, Chile,1991. • Nuevas Tecnologías para la Preservación de Pavimentos, El Salvador, 1989. • El Enfoque de Sistemas en el Sector Transporte, México, 1989 • VI Congreso Nacional de Mecánica de Suelos, Fundaciones y Mecánica de Rocas, Perú, 1988 • V Congreso Nacional de Mecánica de Suelos, Fundaciones y Mecánica de Rocas, Perú, 1987 • VI Seminario Internacional de Mecánica de Suelos, Lima, 1987 • El Suelo Cemento como Alternativa de Construcción, ASOCEM, Perú, 1986 • II Congreso Latinoamericano del Asfalto, CPA, Argentina, 1982 Mr Garcia has accumulated a large library of technical books and reports on roads, airports, project management and procurement. Mr. Garcia is familiarized with several engineering software; MSProject, Primavera, AASHTO Guide 2002, JULEA, PERROAD3.1, DARWIN, BIN2.1, AASHTO, MEPDG, PAS, ELSYM 5, BACKFAA, LEDFAA, FAAIRFIELD, CONFAA, PCASE, WINJULEA, MICROPAVER, KENLAYER, HWYCON, ILLIPAVE, PCA Pavement Design, EXPEAR, CAAMA, MODULUS, PASELS, CP-4 HWY, CP-3 AIRPORTS, LCCOST, SBSLOPE, LOGDRAFT III, VOC, HDM-IV-V2 and SIAMV.
  • 17. Hector Alberto Garcia Lopez 16 OTHER EXPERIENCES: • Louis Berger International Inc/ The Louis Berger Group Inc. - Legal Representative and General Manager in El Salvador branch (1994-2000) and Peru branch (1997-2003). • Louis Berger International, Inc. - Business Development – Technical and Economical proposals for several transport projects (Untill 2003). • Technical assistance of construction and consulting firms. • Technical visit to PRI - Asphalt Technologist Inc. – Asphalt and Asphalt Mix tests in accordance to Strategic Highway Research Program (SHRP), Tampa, Florida, USA. • Technical inspections of micro surfacing techniques - Texas and de Arkansas - BASS. • Condition survey and pavement evaluation of urban roads in San Salvador - ASFALCA SA de CV de El Salvador, El Salvador. • Foundation Design – Water Supply Tanks- F.A.P. La Molina, Lima - Peru. • Design of Impervious asphalt layer for mining materials deposits - CENTROMIN, Lima - Peru. • Rehabilitation Design of Urban roads - Av. Abancay, Tramo Av. Grau - Av. La Colmena. Lima - Peru. • Rehabilitation Design of Panamerican Highway - Av Javier Prado - Puente Primavera, Lima - Perú. • Rehabilitation and Design of PCC Urban roads – City of Iquitos., Iquitos - Perú. • Post Construction Evaluation of hot mix asphalt for the Rehabilitation of the runway of the airport in Herat, Afghanistan Recon International Inc, November 2008. • Evaluation of the presence of cracks in hot mix asphalt for the Rehabilitation of La Paz - Cotapata Highway, Bolivia, Joint Venture CPS-Belmonte, June 2011. • Technical Assistance – Final Design Pavement Rehabilitation - Piura International Airport, Perú, CESEL SA, Mayo 2012. • Developing service design notes for hot asphalt paving Section 2: Comments submitted by MTC National PROVIAS to certificates Hot Mix Asphalt (MAC) placed in the road Section 2: Urcos-Puente Inambari - IIRSA Sur, Peru, Odebrecht Engineering and Construction Peru SAC, July 2012. • Project Manager – Final Design Improvement - Chiclayo International Airport, Peru, June – May 2015. • Advisor of several Contractors and Concessionaire in Peru. Support on Proposals Development and Technical Matters.
  • 18. Hector Alberto Garcia Lopez 17 • Specific in Peru (1981-1987) Soil Mechanics and Testing Materials Division Bureau of Special Studies Ministry of Transport and Communications 1981 - 1987 PERU. Chief of the Soil Mechanics and Testing Materials Division, Bureau of Special Studies, Ministry of Transport and Communications. Was responsible for the following activities:  Investigations of soils and construction materials for bridge foundation projects and projects for rehabilitation of urban roads, roads with low traffic roads, highways and airports. These projects were located in diverse geographical locations (desert, high mountains, and jungle), climactic conditions (dry, humid, frigid, wide daily variation), and a wide range of soil types (conglomerate, Aeolic, expansive). Implemented non-destructive methods of structural evaluation of pavements, as well as proceedings for soils and construction materials testing.  Development of bidding documents of public works. The projects included:  Rehabilitation: 9 first category airports, 100 km of urban roads.  Construction of new roads: 400 km of second category roads, 200 km of low traffic volume roads, 2 airports, 15 bridges.  Responsible for investigations of soils and new construction materials, some of which are indicated below:  Hot, cold and emulsified asphalt mixes for cold and hot weather.  Chemical stabilization with Portland cement, hydrated lime, pozzolan, sulfonated oil, and slag.  Use of marginal materials for pavement works.  Dry compaction of desert sands.  Reology of asphaltic products (Asphalt, Cutback, Emulsions)  Effective expansion of salty soils.  Introduction of new highway engineering technologies, among which are:  Destructive and non-destructive methods of structural pavement evaluation for highways and airports (Benkelman beam, CBR, In situ, Charge Plate, Dynamic Cone Penetrometer, exploratory shaft). Introduced structural evaluation methods employed in France, U.S.A., Argentina, Brazil and South Africa.  New methods of pavement design for urban roads, low traffic volume roads, highways and airports. Introduced diverse methods accepted around the world, such as AASHTO, TRRL, SHELL, ASPHALT INSTITUTE, FAA.  Application of geotextiles and stabilized columns of soil/lime.  Supervision and approval of projects awarded to local consultants by the government.
  • 19. Hector Alberto Garcia Lopez 18  Responsible for quality control of those field supervision projects executed by the government, which includes the following:  Chanchay-Huacho Road. Rehabilitation and improvements for a coastal road. (Asphalt pavement)  Huayre-Cerro de Pasco Highway. Rehabilitation and improvements on this road, located in hilly terrain. (Asphalt pavement)  Santa Anita-Chosica Highway. Overlay of concrete pavement with asphalt concrete mixes for a coastal road.  Pucusana-Canete Highway. Road rehabilitation and improvements for a coastal road. (Asphalt pavement)  Tumbes-Ecuadorian Border Road. Overlay of pavements with sandwich- type structures for a coastal road.  Torres Street, San Borja. Construction of concrete pavements for a coastal road.  Talara-Cancas Road. Road rehabilitation and improvements for a coastal road. (Asphalt pavement)  Pomata-Yunguyo Road. Pavement improvements with double superficial treatment for a road located in high mountain terrain.  Jaen Airport. Gravel improvements in jungle terrain.  Evaluation of final construction works carried out by contractors, among which are the following:  Cupiche-Matucana Road; 53,880 km to 64,760 km. Rehabilitation and improvements for a road in hilly terrain. (Asphalt pavement)  Oroya-La Cima Road; 40 km. Rehabilitation and improvements for a road in hilly terrain. (Asphalt pavement)  La Cima-Huayre Road; 40 km. Rehabilitation and improvement for a road in hilly terrain. (Asphalt pavement)  Cerro de Pasca-Huariaca Road; 56 km. Rehabilitation and improvements for a road in hilly terrain. (Asphalt pavement)  Huariaca-Independencia Road; 17 km. Rehabilitation and improvements for a road in hilly terrain. (Asphalt pavement)  Poroy-Inquilapata Road; 18 km. Rehabilitation and improvements for a road in hilly terrain. (Asphalt pavement)  Runway at the Piura Airport. Reinforcement of a runway in a coastal area with an asphalt concrete.  San Felix and San Carlos Bridge Road; 21 km. Rehabilitation and improvements for two bridges in a jungle climate. (Asphalt pavement)  Piura-Sullana Road; 17 km. Rehabilitation and improvements for a road in a coastal area. (Asphalt pavement)  Olmos-Corral Quemado, Tramo I and II; approx. 60 km. Rehabilitation and improvements for a road through coastal-hill terrain. (Asphalt pavement)  Juliaca Airport. Rehabilitation and improvements for an airport runway at 4,200 m in hilly terrain. (Asphalt and concrete pavement)  Pomata-Yunguyo Road; 21 km. Rehabilitation and treatment improvements for a road located in hilly terrain. (Double surface pavement)  Talara-Cancas, Tramos I and II; approx. 50 km. Rehabilitation and improvements for a coastal road. (Asphalt pavement)  Heavy Traffic Ring of Pucallpa. Rigid pavement for a road located in a jungle region.
  • 20. Hector Alberto Garcia Lopez 19  Cruce-Catacanos Road. Asphalt concrete pavement for a road in a coastal region.  Sector Ticlio. Flexible and rigid pavement for a road in a hilly area.  Huayre-Cerro de Pasco Road. Asphalt pavement for a road in a hilly region.  In charge of the evaluation of airports at the request of the Direccion General de Transporte Aereo (Ministry of Air Transportation) and other government agencies:  Pucallpa Airport, 2.50 km. Jungle, Asphalt Pavement.  Tarapoto Airport , 2.50 km. Jungle, Asphalt Pavement.  Rioja Airport, 1.80 km Jungle, Asphalt Pavement.  Piura Airport, 2.60 km, Arid Zone, Asphalt Pavement & PCC.  Talara Airport, 2.50 km Arid Zone, Asphalt Pavement & PCC.  Yurimaguas Airport, 1.80 km. Jungle, HMA & Soil-Cement.  Andoas Airport, Jungle, Sand-Cement  Caballocolla Airport, Jungle, Sand-Cement.  Juanjui Airport, Jungle, Gravel.  Iquitos Airport, Jungle, PCC.  Contamana Airport, Jungle, Sand-Cement  Las Palmas Airport, Arid Zone, Asphalt Pavement.  Madre de Dios Airport, Jungle, PCC.  Jorge Chavez Airport, Arid Zone, PCC. .