Introduction 
In hydraulic systems with single-sided pistons 
we can distinguish different types of movements 
(flow of the fluid) depending on the assembled 
systems. These are slow (working) or fast, 
forward or backward.
Differential system- working principle 
[ ] 
Q F v 
tl 
active surface of the piston 2 
F m 
velocity of the piston m 
tl 
v 
- é 
volumetric efficiency 
s 
- 
ù 
úû 
êë 
- 
h 
vh 
vh 
h 
h 
=
Adjustment of velocity, 
differential system 
1,2- dividers a1,b1,b2- 
electromagnets 
Fast (forward) 
movement will be 
activated when both 
electromagnets a1 
and b2 are switched 
on 
- attained velocity 
- attained load
Adjustment of velocity, 
differential system 
Slow (forward) 
movement will be 
activated when a1 
electromagnet is 
switched on 
In this case velocity will be 
smaller than vr1 and the load will 
be higher than Sr1
Adjustment of velocity, 
differential system 
Backward 
movement will be 
activated when only 
b1 electromagnet is 
switched on
I system 
2 1 
3 
4 
5 
1- pump, 2- pressure relief 
valve, 3- 4 way 3 positions 
directional valve, 4- 
hydraulic cylinder, 5- tank 
Divider positions: 
1 position- slow (working) 
forward movement 
2 position- fast forward 
movement 
3 position- backward 
movement
II system
II system 
Divider positions: 
1 position- fast forward 
movement 
2 position- neutral 
3 position- slow backward 
movement
Wiring diagram of the I & II systems
III system 
Divider positions: 
Y1, Y2 switched on-slow 
forward 
movement 
Only Y1 switched on-fast 
forward 
movement 
Y1,Y3 switched on-slow 
backward 
movement
Wiring diagram of the III system
Application of fast movement 
hydraulic systems 
• Excavator arm control 
• Airplane flap control 
• Breaks control (in cars) 
• Transmitters in agricultural machines 
• Entrance gates mechanisms 
• Cranes
Advantages and disadvantages 
• Longevity 
• Fluent change of velocities in the system; no vibrations 
• Relatively cheap in exploitation 
• Very accurate position of the piston cannot be 
controlled 
• Energy losses 
• Leakages

More Related Content

What's hot

Variable speed drive in pumping system
Variable speed drive in pumping systemVariable speed drive in pumping system
Variable speed drive in pumping systempranav teli
 
LV Advanced Soft starter Familiarisation Presentation - SSUK
LV Advanced Soft starter Familiarisation Presentation - SSUKLV Advanced Soft starter Familiarisation Presentation - SSUK
LV Advanced Soft starter Familiarisation Presentation - SSUKStuart Harvey
 
Final presentation
Final presentationFinal presentation
Final presentationViral Shah
 
Variable Frequency Derive
Variable Frequency DeriveVariable Frequency Derive
Variable Frequency DeriveSalahuddin Khan
 
induction Motor Drive (sped control)
induction Motor Drive (sped control)induction Motor Drive (sped control)
induction Motor Drive (sped control)Muhammad Kamran
 
Switchyard final
Switchyard finalSwitchyard final
Switchyard finalHAIDER ALI
 
Power electronic converter in wind turbine
Power electronic converter in wind turbinePower electronic converter in wind turbine
Power electronic converter in wind turbineSonuKumarBairwa
 
What is variable frequency drive & how it works
What is variable frequency drive & how it works What is variable frequency drive & how it works
What is variable frequency drive & how it works Engineering Garage V=ir
 
Speed control of Three phase Induction motor using AC voltage regulator
Speed control of Three phase Induction motor using AC voltage regulatorSpeed control of Three phase Induction motor using AC voltage regulator
Speed control of Three phase Induction motor using AC voltage regulatorShivagee Raj
 
Introduction to Electric Drives
Introduction to Electric DrivesIntroduction to Electric Drives
Introduction to Electric Drivesrrsurani
 
Electric drives control
Electric drives controlElectric drives control
Electric drives controlAnandKumar2123
 
Variable Frequency Drive Vs Servo Drive System
 Variable Frequency Drive Vs Servo Drive System Variable Frequency Drive Vs Servo Drive System
Variable Frequency Drive Vs Servo Drive Systemsoftconsystem
 
Electric drives
Electric drivesElectric drives
Electric drivesraj_e2004
 

What's hot (19)

Variable speed drive in pumping system
Variable speed drive in pumping systemVariable speed drive in pumping system
Variable speed drive in pumping system
 
Vfd theory
Vfd theoryVfd theory
Vfd theory
 
LV Advanced Soft starter Familiarisation Presentation - SSUK
LV Advanced Soft starter Familiarisation Presentation - SSUKLV Advanced Soft starter Familiarisation Presentation - SSUK
LV Advanced Soft starter Familiarisation Presentation - SSUK
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Control system
Control systemControl system
Control system
 
soft starer
soft starersoft starer
soft starer
 
Variable Frequency Derive
Variable Frequency DeriveVariable Frequency Derive
Variable Frequency Derive
 
induction Motor Drive (sped control)
induction Motor Drive (sped control)induction Motor Drive (sped control)
induction Motor Drive (sped control)
 
Switchyard final
Switchyard finalSwitchyard final
Switchyard final
 
Power electronic converter in wind turbine
Power electronic converter in wind turbinePower electronic converter in wind turbine
Power electronic converter in wind turbine
 
What is variable frequency drive & how it works
What is variable frequency drive & how it works What is variable frequency drive & how it works
What is variable frequency drive & how it works
 
Speed control of Three phase Induction motor using AC voltage regulator
Speed control of Three phase Induction motor using AC voltage regulatorSpeed control of Three phase Induction motor using AC voltage regulator
Speed control of Three phase Induction motor using AC voltage regulator
 
Electrical Drives and Controls
Electrical Drives and Controls Electrical Drives and Controls
Electrical Drives and Controls
 
Introduction to Electric Drives
Introduction to Electric DrivesIntroduction to Electric Drives
Introduction to Electric Drives
 
Electric drives control
Electric drives controlElectric drives control
Electric drives control
 
Variable frequency Drive
Variable frequency DriveVariable frequency Drive
Variable frequency Drive
 
Variable Frequency Drive Vs Servo Drive System
 Variable Frequency Drive Vs Servo Drive System Variable Frequency Drive Vs Servo Drive System
Variable Frequency Drive Vs Servo Drive System
 
various types of transformers.
various types of transformers.various types of transformers.
various types of transformers.
 
Electric drives
Electric drivesElectric drives
Electric drives
 

Similar to Hydraulic Systems

Tecnam p2006 t systems
Tecnam p2006 t systemsTecnam p2006 t systems
Tecnam p2006 t systemsBrianYanowski
 
Cascade control system
Cascade control systemCascade control system
Cascade control systemVedant Patel
 
7conoksbremrkrzl9blg-signature-e0edb9008207189f96395a03ed1cf51c74f09678bf931b...
7conoksbremrkrzl9blg-signature-e0edb9008207189f96395a03ed1cf51c74f09678bf931b...7conoksbremrkrzl9blg-signature-e0edb9008207189f96395a03ed1cf51c74f09678bf931b...
7conoksbremrkrzl9blg-signature-e0edb9008207189f96395a03ed1cf51c74f09678bf931b...devmarineacademy
 
Instrumentation & control of typical material handling of FGD Plant
Instrumentation & control of typical material handling of FGD PlantInstrumentation & control of typical material handling of FGD Plant
Instrumentation & control of typical material handling of FGD PlantSANJIB KUMAR PATRA
 
Actuators and optical speed sensor and application in automatic transmission
Actuators and optical speed sensor and application in automatic transmissionActuators and optical speed sensor and application in automatic transmission
Actuators and optical speed sensor and application in automatic transmissionZIYAD AMBALANGADAN
 
18EE81_PSOC_8th Semester.pptx
18EE81_PSOC_8th Semester.pptx18EE81_PSOC_8th Semester.pptx
18EE81_PSOC_8th Semester.pptxVinayAS13
 
Operation of hydro power plants
Operation of hydro power plants Operation of hydro power plants
Operation of hydro power plants DINESHPRASAD39
 
53_36765_ME594_2014_1__2_1_Robot Actuators.pdf
53_36765_ME594_2014_1__2_1_Robot Actuators.pdf53_36765_ME594_2014_1__2_1_Robot Actuators.pdf
53_36765_ME594_2014_1__2_1_Robot Actuators.pdfcbecuk23
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing SystemSalil Vaidya
 
Transient Stability Analysis for elect.pptx
Transient Stability Analysis for elect.pptxTransient Stability Analysis for elect.pptx
Transient Stability Analysis for elect.pptxtehreemfatima435360
 

Similar to Hydraulic Systems (20)

Turning Table.pptx
Turning Table.pptxTurning Table.pptx
Turning Table.pptx
 
Tecnam p2006 t systems
Tecnam p2006 t systemsTecnam p2006 t systems
Tecnam p2006 t systems
 
Cascade control system
Cascade control systemCascade control system
Cascade control system
 
7conoksbremrkrzl9blg-signature-e0edb9008207189f96395a03ed1cf51c74f09678bf931b...
7conoksbremrkrzl9blg-signature-e0edb9008207189f96395a03ed1cf51c74f09678bf931b...7conoksbremrkrzl9blg-signature-e0edb9008207189f96395a03ed1cf51c74f09678bf931b...
7conoksbremrkrzl9blg-signature-e0edb9008207189f96395a03ed1cf51c74f09678bf931b...
 
Automatic control fundmentals
Automatic control fundmentalsAutomatic control fundmentals
Automatic control fundmentals
 
Modern control system
Modern control systemModern control system
Modern control system
 
concept of Actuators
concept of Actuatorsconcept of Actuators
concept of Actuators
 
Instrumentation & control of typical material handling of FGD Plant
Instrumentation & control of typical material handling of FGD PlantInstrumentation & control of typical material handling of FGD Plant
Instrumentation & control of typical material handling of FGD Plant
 
Auto trans
Auto transAuto trans
Auto trans
 
Control Systems
Control SystemsControl Systems
Control Systems
 
MANUAL DE CAJA AUTOMÁTICA DE TERIOS
MANUAL DE CAJA AUTOMÁTICA DE TERIOSMANUAL DE CAJA AUTOMÁTICA DE TERIOS
MANUAL DE CAJA AUTOMÁTICA DE TERIOS
 
Actuators and optical speed sensor and application in automatic transmission
Actuators and optical speed sensor and application in automatic transmissionActuators and optical speed sensor and application in automatic transmission
Actuators and optical speed sensor and application in automatic transmission
 
Drives.pdf
Drives.pdfDrives.pdf
Drives.pdf
 
18EE81_PSOC_8th Semester.pptx
18EE81_PSOC_8th Semester.pptx18EE81_PSOC_8th Semester.pptx
18EE81_PSOC_8th Semester.pptx
 
F05113439
F05113439F05113439
F05113439
 
Operation of hydro power plants
Operation of hydro power plants Operation of hydro power plants
Operation of hydro power plants
 
53_36765_ME594_2014_1__2_1_Robot Actuators.pdf
53_36765_ME594_2014_1__2_1_Robot Actuators.pdf53_36765_ME594_2014_1__2_1_Robot Actuators.pdf
53_36765_ME594_2014_1__2_1_Robot Actuators.pdf
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing System
 
HPCD Unit-1.ppt
HPCD Unit-1.pptHPCD Unit-1.ppt
HPCD Unit-1.ppt
 
Transient Stability Analysis for elect.pptx
Transient Stability Analysis for elect.pptxTransient Stability Analysis for elect.pptx
Transient Stability Analysis for elect.pptx
 

Recently uploaded

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 

Hydraulic Systems

  • 2. Introduction In hydraulic systems with single-sided pistons we can distinguish different types of movements (flow of the fluid) depending on the assembled systems. These are slow (working) or fast, forward or backward.
  • 3. Differential system- working principle [ ] Q F v tl active surface of the piston 2 F m velocity of the piston m tl v - é volumetric efficiency s - ù úû êë - h vh vh h h =
  • 4. Adjustment of velocity, differential system 1,2- dividers a1,b1,b2- electromagnets Fast (forward) movement will be activated when both electromagnets a1 and b2 are switched on - attained velocity - attained load
  • 5. Adjustment of velocity, differential system Slow (forward) movement will be activated when a1 electromagnet is switched on In this case velocity will be smaller than vr1 and the load will be higher than Sr1
  • 6. Adjustment of velocity, differential system Backward movement will be activated when only b1 electromagnet is switched on
  • 7. I system 2 1 3 4 5 1- pump, 2- pressure relief valve, 3- 4 way 3 positions directional valve, 4- hydraulic cylinder, 5- tank Divider positions: 1 position- slow (working) forward movement 2 position- fast forward movement 3 position- backward movement
  • 9. II system Divider positions: 1 position- fast forward movement 2 position- neutral 3 position- slow backward movement
  • 10. Wiring diagram of the I & II systems
  • 11. III system Divider positions: Y1, Y2 switched on-slow forward movement Only Y1 switched on-fast forward movement Y1,Y3 switched on-slow backward movement
  • 12. Wiring diagram of the III system
  • 13. Application of fast movement hydraulic systems • Excavator arm control • Airplane flap control • Breaks control (in cars) • Transmitters in agricultural machines • Entrance gates mechanisms • Cranes
  • 14. Advantages and disadvantages • Longevity • Fluent change of velocities in the system; no vibrations • Relatively cheap in exploitation • Very accurate position of the piston cannot be controlled • Energy losses • Leakages

Editor's Notes

  1. To realize the fast movement (forward direction) the right chamber of the actuator must be included in the fluid circulation-> fluid from the right chamber + fluid from the pump altogether generate more power, therefore the piston moves (to the right) with higher velocity
  2. Pressure in both actuator’s chambers is the same F- is area (not force!!) S- load
  3. To activate 1st position signal Y1 must be switched on; to activate 3rd position- Y2 signal
  4. 3 way 3 positions divider is not availible in the labs that’s why it has to be replaced as indicated in the slide above
  5. Current circuit configuration