1. Week Lesson Task/Outcome Responsibilities Other Info
Tues 2 Art skill test to work out each other’s strengths in art: copying an Drawing Image.
1 image from the board and enlarging it Questionn
Planning aires
Tues 3 Weekly plan overview/ take photos of murals around the school. Finish Weekly plan Overview.
finished
Taking photos.
for
Tues 4 Choose the responsibilities and roles for your group. Discuss as a Roles: Minutes keeper, Lead
Wednesd
group several different questions to ask students. Decide who will Organiser, Artistic
ay if not,
be doing which questionnaire. Director, Liaison.
Friday.
Tues 5 Design and make your questionnaires, ready to give to students. Designing questionnaire.
Weds 4 Individually analyse your questionnaire if completed. If not Individually analyze your
complete, finish by today. questionnaire using excel.
Fri 4 Finishing analysing questionnaires use the information to help you Discussing ideas with group.
brainstorm ideas of what to include in the mural.
Individually come up with 3 final designs for your mural. Be Making sure they are done by
2 prepared to present your ideas to your group. the end of the holidays.
Half Term
Tues 2 Bring all designs together, and start analysing each one. Individually explaining your
3 mural drawings. Presentati
Planning Tues 3 As a group start to draw a final design. Drawing the final design. on to
Tues 4 Carry on drawing final design making sure nothing is missed out Finish design using colours. Faculty
and colours are correct. Thurs 3.15
Tues 5 Start designing presentation for faculty. Help make the presentation. - 4.15
Weds 4 Practice presentation with the entire group. Know my part in the
presentation.
Fri 4 Discuss with group about what the faculty’s feedback. Starting Discussing what happened in
thinking of a group name/logo. the meeting.
Tues 2 Redraw design making any alterations, considering what the Making sure any changes that
4 faculty had discussed with us. should be made are made to
Planning the design.
Tues 3 Complete a health and safety risk assessment. Completing assessment, to
prepare us for painting.
Tues 4 Measure mural space. Measuring mural to scale.
Tues 5 Finish measuring. List all equipment needed. Listing all equipment needed.
Wed 4 Finish if final design making sure the client is happy with it and all Finish of design, add colours,
colours and everything is included. and get clients approval.
Fri 4 Make sure everything is completed to start the drawing on our Discuss and check what still
Tuesday back needs to be done.
2. Tues 2 Clean surface area, start preparing Clearing our room.
1 equipment.
Making Tues 3 Finish preparing equipment if not done Group discussion, making sure
already; discuss with group what needs everyone is on track.
to be done.
Tues 4 Start painting a base coat on the wall. Painting wall white.
Tues 5 Finish painting the base coat on the wall. Finishing painting back wall.
Weds 4 Discuss with group what needs to be Measuring sections to spilt wall up, to
done next so everyone is clear. Separate make it easier to draw,
wall into sections to make it easier to
draw design.
Fri 4 Start drawing final design on wall.
Tues 2 Draw final design onto wall. Drawing our mural.
2 Tues 3 Draw final design onto wall.
Making Tues 4 Draw final design onto wall.
Tues 5 Draw final design onto wall.
Weds 4 Draw final design onto wall.
Fri 4 Double check nothing in our drawing is Any adjustments must be made, any
left out, make any adjustments to missed out detail etc.
anything. Finish of design.
Tues 2 Prepare and clear area, ready to paint. Cover flooring, clear everything.
3
Making Tues 3 Paint your final design.
Tues 4 Paint your final design. Painting.
Tues 5 Paint your final design.
Weds 4 Paint your final design.
Fri 4 Finish up with painting your mural. Run Finishing up with the painting.
through everything to make sure
everything presentable and finished and
nothing is missed out.