OM2012


                           The Case of the Faltering Factory
An engineer with a flair for production management was the principal owner and founder of a company in
Los Angeles. He had a special talent for working with airplane manufacturers, taking their designs of
various small devices and subcontracting component parts, and producing them on a commercial basis.
He operated a small plant in which he assembled the parts which were entirely purchased from outside
and tested and shipped the completed assemblies.
Subsequently, to meet the competition that sprang up, he decided to manufacture his own parts, which
represented the greater part of the total value of his products. To have a favourable labour market and a
climate that was good for his type of manufacturing, he located his new plant in Arizona, several hundred
kms from Los Angeles. Not only did he set up the parts manufacturing there, he moved the testing and
assembly operations there as well. The owner, however, remained in Los Angeles, in his executive
headquarters, with a small group of sales engineers. This permitted him to maintain the same close
contact with his customers that had made him successful.
A qualified factory manager was put in charge of the new plant. During the start-up period, the owner
made several trips to the plant, keeping in touch with what was going on and providing leadership and
motivation to the local management. However, as time went on, these trips became less and less frequent
as the complexity of his personal activities made continuing presence in Los Angeles more compelling.
Accordingly, the time came when full responsibility for the factory operation had been shifted to the
manager, with the owner depending completely on the manager’s activities and results.
Soon, the owner began to hear from several of his customers that some of his prices were not competitive,
some deliveries were seriously late, and quality was not up to the expected high standard. The owner
began to develop a sense of disquietude. His uneasiness reached a point of where he procured the services
of a consulting industrial engineer.
On his introductory trip through the plant, the consultant got the impression that a rather slow working
tempo prevailed. This led him to review the payroll records. Here he learnt that for several months, the
workers’ productivity had been slipping. An investigation revealed that it was due to delays and slowing
down of the workers caused by an uneven flow of work. When this was explored more deeply, the cause
of uneven flow of work proved to be a combination of substandard materials and inadequate maintenance.
Working backwards, the consultant unearthed the root cause of this difficulty—poor control of materials.
Purchased materials were not up to original standards. At first this caused low productivity, which
increased labor costs. Then, to compensate for this, a drive towards overhead cost reduction ensued,
which included a cutback in maintenance personnel. The result only lowered productivity still more. All
this resulted in higher cost, lower capacity and poorer quality, which showed up later in customer
complaints.
A meeting of the owner, factory manager, and the consultant revealed that deterioration in purchased
materials and parts was because of a misguided program on the part of the factory manager to reduce
production costs by saving on purchases. The use of substitute materials created other cost increases that
overbalanced the slight savings on purchases.
Examine the case in terms of activities, functions and decision-making in a production system.




                                                                                                        1

More Related Content

Similar to The case of_the_faltering_factory

Production optimization with process fmea
Production optimization with process fmeaProduction optimization with process fmea
Production optimization with process fmea
Ngoc Dep
 
Experience by Industrial Functions
Experience by Industrial FunctionsExperience by Industrial Functions
Experience by Industrial Functions
Robert Fitzgerald
 
Production of goods and services - Copy.pptx
Production of goods and services - Copy.pptxProduction of goods and services - Copy.pptx
Production of goods and services - Copy.pptx
MuhammedFaheem19
 
Planned and Unplanned Presentation (1)
Planned and Unplanned Presentation (1)Planned and Unplanned Presentation (1)
Planned and Unplanned Presentation (1)
Dianne Johnson
 
Planned and Unplanned Presentation (1) [52859]
Planned and Unplanned Presentation (1) [52859]Planned and Unplanned Presentation (1) [52859]
Planned and Unplanned Presentation (1) [52859]
Lore Guthrie
 
Vehicle cost weight process improvement 2011
Vehicle cost weight process improvement 2011Vehicle cost weight process improvement 2011
Vehicle cost weight process improvement 2011
tmtrnr
 
POM Presentation PPT summer internship project
POM Presentation PPT summer internship projectPOM Presentation PPT summer internship project
POM Presentation PPT summer internship project
DhruvRaval40
 

Similar to The case of_the_faltering_factory (20)

Design methodology
Design methodologyDesign methodology
Design methodology
 
LEAN Digital Assignment
LEAN Digital AssignmentLEAN Digital Assignment
LEAN Digital Assignment
 
Production optimization with process fmea
Production optimization with process fmeaProduction optimization with process fmea
Production optimization with process fmea
 
ISO_8
ISO_8ISO_8
ISO_8
 
pranav presentation _markup
pranav presentation _markuppranav presentation _markup
pranav presentation _markup
 
Case aircraft assenbly
Case aircraft assenblyCase aircraft assenbly
Case aircraft assenbly
 
Experience by Industrial Functions
Experience by Industrial FunctionsExperience by Industrial Functions
Experience by Industrial Functions
 
Production of goods and services - Copy.pptx
Production of goods and services - Copy.pptxProduction of goods and services - Copy.pptx
Production of goods and services - Copy.pptx
 
Owens Illinois.pptx
Owens Illinois.pptxOwens Illinois.pptx
Owens Illinois.pptx
 
Oee part 2
Oee part  2 Oee part  2
Oee part 2
 
Cost of Poor quality
Cost of  Poor qualityCost of  Poor quality
Cost of Poor quality
 
Planned and Unplanned Presentation (1)
Planned and Unplanned Presentation (1)Planned and Unplanned Presentation (1)
Planned and Unplanned Presentation (1)
 
Planned and Unplanned Presentation (1) [52859]
Planned and Unplanned Presentation (1) [52859]Planned and Unplanned Presentation (1) [52859]
Planned and Unplanned Presentation (1) [52859]
 
DFM basics AWARENESS.pptx
DFM basics AWARENESS.pptxDFM basics AWARENESS.pptx
DFM basics AWARENESS.pptx
 
Vehicle cost weight process improvement 2011
Vehicle cost weight process improvement 2011Vehicle cost weight process improvement 2011
Vehicle cost weight process improvement 2011
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
 
M Rearick Resume
M Rearick ResumeM Rearick Resume
M Rearick Resume
 
POM Presentation PPT summer internship project
POM Presentation PPT summer internship projectPOM Presentation PPT summer internship project
POM Presentation PPT summer internship project
 
Michael hammer and james champy on Business process re-engineering video anal...
Michael hammer and james champy on Business process re-engineering video anal...Michael hammer and james champy on Business process re-engineering video anal...
Michael hammer and james champy on Business process re-engineering video anal...
 
Productivity.op mgmt.chpt 20
Productivity.op mgmt.chpt 20Productivity.op mgmt.chpt 20
Productivity.op mgmt.chpt 20
 

Recently uploaded

Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxHarnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
FIDO Alliance
 
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
Muhammad Subhan
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc
 

Recently uploaded (20)

Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe
 
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdfFrisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
Frisco Automating Purchase Orders with MuleSoft IDP- May 10th, 2024.pptx.pdf
 
Vector Search @ sw2con for slideshare.pptx
Vector Search @ sw2con for slideshare.pptxVector Search @ sw2con for slideshare.pptx
Vector Search @ sw2con for slideshare.pptx
 
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
Event-Driven Architecture Masterclass: Engineering a Robust, High-performance...
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
 
State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!
 
ADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptxADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptx
 
Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024Long journey of Ruby Standard library at RubyKaigi 2024
Long journey of Ruby Standard library at RubyKaigi 2024
 
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxHarnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
 
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
(Explainable) Data-Centric AI: what are you explaininhg, and to whom?
 
Microsoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireMicrosoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - Questionnaire
 
ERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage Intacct
 
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
 
WebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM PerformanceWebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM Performance
 
Design and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data ScienceDesign and Development of a Provenance Capture Platform for Data Science
Design and Development of a Provenance Capture Platform for Data Science
 
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
TrustArc Webinar - Unified Trust Center for Privacy, Security, Compliance, an...
 
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsContinuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
 
JavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate GuideJavaScript Usage Statistics 2024 - The Ultimate Guide
JavaScript Usage Statistics 2024 - The Ultimate Guide
 
Syngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdfSyngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdf
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
 

The case of_the_faltering_factory

  • 1. OM2012 The Case of the Faltering Factory An engineer with a flair for production management was the principal owner and founder of a company in Los Angeles. He had a special talent for working with airplane manufacturers, taking their designs of various small devices and subcontracting component parts, and producing them on a commercial basis. He operated a small plant in which he assembled the parts which were entirely purchased from outside and tested and shipped the completed assemblies. Subsequently, to meet the competition that sprang up, he decided to manufacture his own parts, which represented the greater part of the total value of his products. To have a favourable labour market and a climate that was good for his type of manufacturing, he located his new plant in Arizona, several hundred kms from Los Angeles. Not only did he set up the parts manufacturing there, he moved the testing and assembly operations there as well. The owner, however, remained in Los Angeles, in his executive headquarters, with a small group of sales engineers. This permitted him to maintain the same close contact with his customers that had made him successful. A qualified factory manager was put in charge of the new plant. During the start-up period, the owner made several trips to the plant, keeping in touch with what was going on and providing leadership and motivation to the local management. However, as time went on, these trips became less and less frequent as the complexity of his personal activities made continuing presence in Los Angeles more compelling. Accordingly, the time came when full responsibility for the factory operation had been shifted to the manager, with the owner depending completely on the manager’s activities and results. Soon, the owner began to hear from several of his customers that some of his prices were not competitive, some deliveries were seriously late, and quality was not up to the expected high standard. The owner began to develop a sense of disquietude. His uneasiness reached a point of where he procured the services of a consulting industrial engineer. On his introductory trip through the plant, the consultant got the impression that a rather slow working tempo prevailed. This led him to review the payroll records. Here he learnt that for several months, the workers’ productivity had been slipping. An investigation revealed that it was due to delays and slowing down of the workers caused by an uneven flow of work. When this was explored more deeply, the cause of uneven flow of work proved to be a combination of substandard materials and inadequate maintenance. Working backwards, the consultant unearthed the root cause of this difficulty—poor control of materials. Purchased materials were not up to original standards. At first this caused low productivity, which increased labor costs. Then, to compensate for this, a drive towards overhead cost reduction ensued, which included a cutback in maintenance personnel. The result only lowered productivity still more. All this resulted in higher cost, lower capacity and poorer quality, which showed up later in customer complaints. A meeting of the owner, factory manager, and the consultant revealed that deterioration in purchased materials and parts was because of a misguided program on the part of the factory manager to reduce production costs by saving on purchases. The use of substitute materials created other cost increases that overbalanced the slight savings on purchases. Examine the case in terms of activities, functions and decision-making in a production system. 1