How to Displease the Customer, to Engage
    the Customer



Vimal Kumar Khanna – Managing Director, mCalibre Technologies
Contents
 1. Abstract ........................................................................................................................................... 4
 2. Introduction...................................................................................................................................... 4
 3. Related Work................................................................................................................................... 4
 4. Limitations of Customer-Controlled Approach ................................................................................ 5
 5. Collaborative Approach ................................................................................................................... 5
 6. Project Bid Phase ............................................................................................................................ 7
 7. Project Initiation phase .................................................................................................................... 9
 8. Project Execution Phase ............................................................................................................... 10
 9. Conclusion..................................................................................................................................... 11
 10. References .................................................................................................................................. 11
 10. Author’s Profile ............................................................................................................................ 13




3 Page
1. Abstract
Global software product-companies are outsourcing projects to services-companies. Current trend
within services-companies is to assume that since customer knows product requirements they must
agree to customer-proposed product-features/technologies/schedule/cost and follow a “Customer-
Controlled Approach” to project execution. However, highly complex and dynamic nature of software-
sector questions these assumptions since product technologies, business-domain requirements and
end-user requirements are continuously changing. The product-company team alone cannot strike a
balance between these aspects. Hence, we suggest services-companies to adopt a “Collaborative
Approach” and continuously contribute inputs to improve product feature-set/design/technologies.
Hence, services-company team should regularly express disagreements with product-company team
to suggest product improvements. However, frequent disagreement can cause customer displeasure.
We suggest multiple means to channel these differences and win customer confidence.



2. Introduction
Global software product companies (Customers) are outsourcing projects to Indian services-
companies (Implementers). Current trend among Implementer-companies is to assume that Customer
knows end-users' requirements, has conducted market research and has studied competing products.
Since, Customer is the best judge on all the issues, the only option left for the Implementer is to agree
to Customer-defined product-features/schedule/cost.

Hence, the three mantras for Customer Satisfaction should be – agree, agree and agree.

Thus, Implementers follow a “Customer-Controlled Approach” for executing projects.

However, we argue that this approach fails to deliver successful products due to highly complex and
dynamic nature of software sector. We, instead, suggest a “Collaborative Approach” to project
execution, where Implementer proactively contributes in each phase of project.

We start the paper by discussing Related Work in this domain. We then discuss limitations of
“Customer-Controlled Approach” and then introduce our “Collaborative Approach”. We then present
techniques to be followed in our approach in various project phases– Project Bid, Initiation and
Execution phases. We also share some interesting experiences of Indian software-services
companies executing projects for customers like NEC-Japan and Hitachi-Japan.




3. Related Work
A major risk in outsourcing has been identified as schedule-overrun [1]. We suggest techniques for
the Implementer to proactively push-back the Customer on requirements changes that cause
overruns.

Most of the related works [2,4,5,6,7,8] recommend the control of the outsourced project to solely
reside with Customer-team, with the Implementer-team purely following their instructions. We,
4 Page
instead, argue that Implementer-team can add significantly value if it is given freedom over deciding
project features and execution approaches. We suggest techniques using which Implementer can
convince the Customer to make Implementer-team as peers and extension to Customer-team.

Product-companies are outsourcing not purely for cost savings but also due to availability of unique
skills in outsourced countries [3]. We also agree that highly capable talent is available in Implementer-
companies. However, Customers are not fully aware of it and, hence, are not fully utilising it. The
techniques suggested herein will allow Implementer-companies to showcase their true capabilities to
the Customer, right from the project-bid phase itself.

A number of above works [2,4,5,6,7] insist that since Implementer-teams do not have the expertise in
handling complex projects hence core/complex projects must not be outsourtced. However, we
instead argue that Implementer-teams have much broader expertise than Customer-teams. The
Implementer-teams can apply our suggested techniques to convince the Customers to offload them
more complex and large projects than they are currently handling.




4. Limitations of Customer-Controlled Approach
In “Customer-Controlled Approach”, Implementers are assuming that the Customer is the best judge
on all project aspects. However, highly complex and dynamic nature of software-sector questions
these assumptions-

         Software-sector is characterised by ever-evolving technological innovations. A vast pool of
         global knowledge is available for the business domain for which a software-product is being
         developed. This available technical and business knowledge needs to be studied and
         incorporated in the product being developed.

         End-user requirements are also continuously changing, resulting in need for implementing
         continuous improvements in ongoing product development.

         Products have a global focus and end-user requirements vary largely between different
         geographies, adding to complexity of deciding optimal features-set that can satisfy all end-
         users.

All the above complex and contradicting requirements make a centralised “Customer-Controlled
Approach” fail to deliver. Customer alone cannot strike a balance between all these aspects.




5. Collaborative Approach
We, instead, suggest a “Collaborative Approach”, where the Implementer contributes its inputs to
Customer at each stage of product development-



5 Page
Extensive global research is being conducted in various software domains, resulting in
         innovative technologies being developed. The "requirements gathering" phase of the project
         requires the Customer to conduct extensive research in such information available globally: in
         competing products, in published work in journals/conferences, etc. The Implementer can
         significantly contribute in this phase by independently conducting additional research to
         gather more information.

         Customer decides the product features by gathering end-user companies’ requirements from
         a limited number of geographies where it has major presence. The Implementer has
         extensive experience of executing services-projects for companies from a wider range of
         geographies, some of which companies are end-users of similar products. Implementer can
         gather requirements of these end-user companies and provide significant inputs to product
         features, to make the product globally more acceptable.

         Customer is usually a “Domain Specialist” and has a narrow focus since it has been
         developing products for a single business/technology domain. The Implementer, on the other
         hand, has experience of executing projects in a range of business/technology domains.
         Implementer can utilise its broad focus to improve product design, to make it more efficient
         and competitive.

         Technologies and end-user expectations are known to change frequently in software sector.
         Thus,    a    long-duration   project    may     require   multiple   changes    in    its
         requirements/features/design during the execution phase. Implementer can add value to the
         product by proactively keeping on top of such changing requirements and suggesting
         enhancements during the execution phase.

Hence, the key to successful project execution is that the Implementer must participate in, and
contribute to, each phase of the project. The Implementer needs to clearly express his disagreements
with the Customer to suggest product improvements. In case of any difference of opinions, the loyalty
of the Implementer should be with the product, and not with the Customer. The Implementer could
deprive the product of genuine improvements if it agrees to the viewpoint of Customer on all issues.

Hence the three new mantras for Customer Satisfaction need be – differ, disagree with and displease
the customer.

We suggest techniques by which Implementer can channel these differences and win Customer
confidence by–

         Generating supporting data
         Performing Cost-Benefit analysis
         Prototyping
         Using negotiation and other soft-skills.




6 Page
6. Project Bid Phase
In the project bid phase, the Customer sends project requirements/features document to multiple
prospective Implementers. The Implementer needs to prepare a project proposal suggesting technical
solution/schedule/cost, etc.

The Customer meets prospective Implementers and awards project to one of them, based on the
contents of the proposal and the ability of the Implementer to convince Customer of its delivery
capabilities.

We suggest Implementer to adopt a number of measures in this phase, to win Customer confidence-

         Suggest Enhancements to Product Features
         Implementer should study Customer-proposed product features in detail with the aim to find
         mistakes in these features and to determine any missing desirable features. The purpose of
         faultfinding mission is manifold. Firstly, by identifying mistakes in a document that has been
         comprehensively prepared/inspected by Customer-team, the Implementer can demonstrate
         that it has comprehensive command over the product domain and technology. Secondly,
         identification of these mistakes early can significantly reduce the time and effort to correct
         them during project execution phase.

         Implementer should next study competing international products. A comprehensive study of
         competition could reveal some important features required by business users from the
         product, which were not covered in the Customer-proposed feature-set.

         Finally, Implementer should suggest some other innovative features on its own, based on its
         past experience of executing projects in that business domain.

         Present Corroborative Data for Suggested Enhancements
         Customers are not very receptive to suggestions from the Implementer-teams in their very
         first meeting for a number of reasons. The Customer is an expert in the product domain and
         has been developing such products for long time. Its confidence in its own capability makes it
         difficult for it to accept that its team could have missed some features. Further, since, it would
         be its first meeting with Implementer-team, Customer-team is also unaware of the
         Implementer-team’s capabilities. Hence, Customer is unlikely to accept the fact that
         Implementer-team would be able to suggest improvements to its product features.

Hence, Implementer must present corroborative evidence to justify its suggestions. E.g., some other
clients of Implementer may be end-user companies of similar products. Implementer can gather
detailed information on their interest of its suggested features to convince the Customer of the
importance of suggested features. In the absence of such corroboration from external established
sources, Customer can even reject some good suggestions.

6.1      Case Study

I was managing teams in a services company that had been successfully following the above steps
during project-bid phases for multiple projects. We used to study the Customer’s product-

7 Page
requirements document, find mistakes/missing features, suggest feature-enhancements and convince
the Customer of our capabilities by providing supporting data during our discussions.

However, once we encountered a peculiar situation. Instead of receiving detailed requirements
document, we received only one-paragraph requirement of the project accompanied by a brief
software solution suggested by the Customer to meet the requirement. The Customer’s aim was to
have initial discussions with multiple prospective Implementers to evaluate their skills, while its team
was still formulating comprehensive product-requirements/features. The brief solution suggested was
a broad framework that had to be developed further by the Implementer to propose a comprehensive
solution to the problem.

On receipt of the document, as usual, I asked my team to find mistakes and gaps in the requirements
and the solution suggested therein. The team had a detailed brainstorming session but came back
dejectedly. Apparently with the limited information available about the requirements it was not
possible to find any mistakes in the document. Further, the solution suggested therein seemed to be
the correct solution for the limited information we had about the problem. We were disheartened.

However, the incorrigible polemic within us refused to relent.

"Fine. Agreed, that the Customer has the correct solution. We can, at least, suggest an alternative
solution to the same problem", I announced and urged our team to go back to drawing board.

Another long brainstorming session followed, resulting in our team being able to suggest a totally
different solution to the same problem. Armed with this information we decided to confront the
Customer.

Our meeting started with a presentation by the Customer on the project requirements and their
suggested brief solution. We responded by presenting our alternative solution to the problem. This
act, expectedly, stimulated a detailed discussion. Their team immediately started aggressively
defending their choice of the solution. Their team presented further details of the problem and gave
reasons for the choice of their solution. We presented detailed supporting data for our proposed
solution. Both teams went deeper in the discussions, with each presenting detailed pros-and-cons of
their solutions. At the end of the discussions, the Customer was able to convince us of the
correctness of their solution. We agreed with them and the document remained unchanged.

Although, the overall result of the discussions was a status quo on product-requirements and
Customer-suggested solution but the detailed discussions gave multiple benefits to us. Firstly, the
Customer-team got a positive impression that we had the domain knowledge to think in innovative
fashion and suggest an alternative solution. They gained faith that we could execute the project.
Secondly, the detailed discussions provoked the Customer to reveal much more details about their
product-requirements. We became privy to information that our competitors did not possess. This
information was quite valuable to us when we submitted the detailed proposal to them later. Needless
to say, we won the order.

Hence, the key learning was that it is important to stimulate a detailed discussion to create the first
positive impression on the Customer. If, instead, we had submitted a standard proposal for their
requirements, the discussion may have petered out to being a one-way talk by the Customer followed
by insipid usual technical queries by our team. There would not have been any opportunity for our
8 Page
team to display their knowledge to the Customer, to convince it of our ability to execute the project.



7. Project Initiation phase
After the project is awarded, the Customer and Implementer teams generally have a series of
meetings to initiate the project. A major concern in this phase is that the Customer team can change
the project requirements that were initially agreed upon. We suggest the Implementers to push back
on these changes.

         Refuse Changes Unless Unavoidable
Once a project bid is decided, the Implementer plans for project execution. The manpower allocation,
schedules and inter-dependencies of tasks are decided. Any change in the requirements at this stage
would require a change in this project plan. An increase in the number of features would require the
Implementer to move engineers from some other tas of the project to implement these additional
features. This action would cause that task and all its dependent tasks to suffer. The plans can go
haywire and project schedule and product quality can suffer. Hence the Implementer should take a
firm stand and refuse changes at this stage by presenting the above argument with supporting data.
An exception should be made only if both the parties are in full agreement that these changes are
unavoidable. E.g., if technology to be used in the product itself has advanced after the features were
frozen then incorporation of this improved technology can make the product more competitive in the
market.

7.1      Case Study
We won a software services project and our team went to Japan for discussions to initiate project. In
one of our meetings with the Customer team, an interesting development took place. Their Assistant
Manager suggested enhanced user interfaces to the product. We realised that the enhancements
being suggested were considerable. I immediately protested mentioning that since we had already
mutually finalised the features, any changes now would impact our project plans. I presented analysis
of impact of proposed changes on project plan and tasks inter-dependencies to show that project
schedule and quality may suffer. More arguments followed. Suddenly tempers of their team rose.
Their Assistant Manager and Manager talked to each other in Japanese. The Manager rose and
announced, "So you will not implement what we are asking for?" and walked out of the room
immediately. Their team followed him.

We were suddenly tense since the issue seemed to have taken a serious turn. Further, due to their
limitation in comprehensively understanding spoken English, we were not sure if they had clearly
understood our reasons for not agreeing to their demand. However, as they had their mutual
discussions in Japanese, which we did not understand, we still hoped that they might not have taken
the issue so seriously.

The eternal optimist within us hoped that perhaps the Manager was suddenly reminded of the time to
attend another meeting and hence left in a hurry! Perhaps...

However, one of their team members re-entered the room and reassuringly allayed any doubts we
had. He informed us, in clear and distinct English, that the Assistant Manager had said to the
9 Page
Manager in Japanese that we were refusing to agree to their demand. He further informed that it
seemed to him that their Manager was quite upset by our stand, which was the reason for their
ending the meeting abruptly.

The only thing we could now do was to wait to see what happens next.

As we were suspecting, the same evening an e-mail from their Manager was sent to our Japan
Regional Office regarding this discussion. What we were not expecting were the contents of the e-
mail. The e-mail said:

“We understand that your team has accepted ownership of the project and is equally concerned about
the success of the project, as we are. Hence your team had raised genuine concerns about schedule
of the project being impacted by our suggested modifications. This act of your team has affirmed our
faith that the project would succeed in your hands.”

We were pleasantly surprised at their deep understanding of our viewpoint. This positive response
resulted in development of a cohesive professional relationship that resulted in both teams
successfully tackling all the future project problems through mutual discussions and agreements,
resulting in success of the project.

However, we are sure that our Japan Office Head would have never been able to figure out how we
were able to extract such an appreciative response from the Customer, within only a week of our stay.
We believe that he may have guessed that our success would have been due to our hard work,
responsiveness to Customer sensitivities and personal relation building with their team. However,
even in his wildest of imaginations he could not have thought that we had, instead, been able to
devise a much easier approach to achieve this objective – by simply picking up a quarrel with their
team.


8. Project Execution Phase
We consider the case of execution phase of large software projects, which can usually take many
months to be completed. Since, technologies and business domain requirements change very fast in
software domain, we suggest the Implementer to be proactive to such global changes.

       Suggest changes to product features
Implementer should continuously keep track of improvements occurring in the technology and
business domains of the product and suggest enhancements to product features/design-
        -       Study journals/conference proceedings that discuss new improved software
                technologies being developed in that technical domain.
        -       Study new features of competing products being released in the market.
        -       Be aware of the changing needs of the business domain for which the product is
                being developed, by seeking inputs from its other clients who are end-users of
                products in this business domain.
Interestingly, at first look, the recommendation to the Implementer to suggest changes to the product
features seems to contradict the recommendation given in the last section, to refuse changes to the
product. However, the key here is the duration of the project execution. In case of small duration

10 Page
projects, such changes in features should be avoided. However, for long duration projects the
changes need to be incorporated to keep pace with the ongoing developments in the market during
the time the project is being executed.
         Present a Cost-Benefit analysis
Any feature or design additions/improvements suggested during the execution of the project would
result in increase in project schedule and cost. Hence, Customer is generally not receptive to such
suggested changes. Implementer should perform a cost-benefit analysis of each suggested feature
enhancement. The analysis should list the possible benefits to the product by the feature
enhancement, like, the expected additional monetary returns due to wider market acceptability of the
product. The cost analysis should detail the expected delay in delivery of the project, and the
additional cost to be incurred for implementing the feature. Customer can then decide on a subset of
features that are critical to the success of the project and can also be implemented without causing a
high impact on the project schedule and cost.
        Develop a Prototype
        Customer may not be fully able to appreciate the utility of suggested feature enhancements.
        Implementer should develop a “Prototype” for the product enhancements being suggested to
        convince the Customer.

A prototype is a small piece of software that models the functions of the final software product being
developed. On execution, the prototype broadly shows how the features would work in the final
product. Customer can then accept some of these features and can give a go-ahead to the
Implementer to implement them. Hence, a prototype can be developed in a short duration with
minimal cost and effort, and can still help in taking critical decisions about the project.




9. Conclusion
We have suggested software services-companies to adopt a “Collaborative Approach” to project
execution where they can collaborate with customer to add significant value in all project phases. Our
techniques can be applied by services-companies to gain customer confidence and be given freedom
and control to improve project requirements/design/execution.



10. References
1. Hunsberger, K. (2011). The Risks of Outsourcing – Know them and what to do about them, PM
   Network, November 2011.
2. Aron, R., and Singh, J. V. (2005). Getting Offshoring Right. Harvard Business Review
   (December) 135-143.
3. Bigelow, D. (2002).Will Outsourcing Relationships rule the New Millenium? PM Network (May) 22.
4. Serrador, P. (2009). Far Flung. PM Network (November) 28-29.
5. Serrador, P. (2008). Offshoring for the Project Manager: Globalization is here. Are you ready to
   take advantage of it? PMI Global Congress – Denver, USA.

11 Page
6. Serrador, P. (2010). Offshoring: How to keep your Western Clients coming back. PMI Global
   Congress – Melbourne, Australia.
7. Holden, A.D. (2005). Evolving the Paradigm: Leading Multicultural Teams. PMI Global Congress
   – Toronto, Canada.
8. Camper Bull, R. (2004). International Projects and Off-shoring: A New Paradigm. PMI Global
   Congress – Anaheim, Canada.




12 Page
10. Author’s Profile


                       Vimal Kumar Khanna is Founder and Managing
                       Director of “mCalibre Technologies”, a Knowledge
                       Processing software startup. He has over 27
                       years industry experience and has won multiple
                       international honours. He is listed in “Marquis
                       Who’s Who in the World”. He is also among 50
                       select experts in the world to be on “IEEE
                       Communications” (pub. New York) Editorial Board
                       (invited   honorary    position).  His     multiple
                       independently-written    papers     have      been
                       published       in      leading       international
                       journals/conferences, including PMI Global
                       Congress 2010 - Asia Pacific, Melbourne; PMI
                       Asia Pacific e-Link; PMI India Conferences 2010
                       and 2011. He has been interviewed in “PM
                       Network” magazine.


                       Email: vimal_k@ieee.org




13 Page

ISO_8

  • 1.
  • 2.
    How to Displeasethe Customer, to Engage the Customer Vimal Kumar Khanna – Managing Director, mCalibre Technologies
  • 3.
    Contents 1. Abstract........................................................................................................................................... 4 2. Introduction...................................................................................................................................... 4 3. Related Work................................................................................................................................... 4 4. Limitations of Customer-Controlled Approach ................................................................................ 5 5. Collaborative Approach ................................................................................................................... 5 6. Project Bid Phase ............................................................................................................................ 7 7. Project Initiation phase .................................................................................................................... 9 8. Project Execution Phase ............................................................................................................... 10 9. Conclusion..................................................................................................................................... 11 10. References .................................................................................................................................. 11 10. Author’s Profile ............................................................................................................................ 13 3 Page
  • 4.
    1. Abstract Global softwareproduct-companies are outsourcing projects to services-companies. Current trend within services-companies is to assume that since customer knows product requirements they must agree to customer-proposed product-features/technologies/schedule/cost and follow a “Customer- Controlled Approach” to project execution. However, highly complex and dynamic nature of software- sector questions these assumptions since product technologies, business-domain requirements and end-user requirements are continuously changing. The product-company team alone cannot strike a balance between these aspects. Hence, we suggest services-companies to adopt a “Collaborative Approach” and continuously contribute inputs to improve product feature-set/design/technologies. Hence, services-company team should regularly express disagreements with product-company team to suggest product improvements. However, frequent disagreement can cause customer displeasure. We suggest multiple means to channel these differences and win customer confidence. 2. Introduction Global software product companies (Customers) are outsourcing projects to Indian services- companies (Implementers). Current trend among Implementer-companies is to assume that Customer knows end-users' requirements, has conducted market research and has studied competing products. Since, Customer is the best judge on all the issues, the only option left for the Implementer is to agree to Customer-defined product-features/schedule/cost. Hence, the three mantras for Customer Satisfaction should be – agree, agree and agree. Thus, Implementers follow a “Customer-Controlled Approach” for executing projects. However, we argue that this approach fails to deliver successful products due to highly complex and dynamic nature of software sector. We, instead, suggest a “Collaborative Approach” to project execution, where Implementer proactively contributes in each phase of project. We start the paper by discussing Related Work in this domain. We then discuss limitations of “Customer-Controlled Approach” and then introduce our “Collaborative Approach”. We then present techniques to be followed in our approach in various project phases– Project Bid, Initiation and Execution phases. We also share some interesting experiences of Indian software-services companies executing projects for customers like NEC-Japan and Hitachi-Japan. 3. Related Work A major risk in outsourcing has been identified as schedule-overrun [1]. We suggest techniques for the Implementer to proactively push-back the Customer on requirements changes that cause overruns. Most of the related works [2,4,5,6,7,8] recommend the control of the outsourced project to solely reside with Customer-team, with the Implementer-team purely following their instructions. We, 4 Page
  • 5.
    instead, argue thatImplementer-team can add significantly value if it is given freedom over deciding project features and execution approaches. We suggest techniques using which Implementer can convince the Customer to make Implementer-team as peers and extension to Customer-team. Product-companies are outsourcing not purely for cost savings but also due to availability of unique skills in outsourced countries [3]. We also agree that highly capable talent is available in Implementer- companies. However, Customers are not fully aware of it and, hence, are not fully utilising it. The techniques suggested herein will allow Implementer-companies to showcase their true capabilities to the Customer, right from the project-bid phase itself. A number of above works [2,4,5,6,7] insist that since Implementer-teams do not have the expertise in handling complex projects hence core/complex projects must not be outsourtced. However, we instead argue that Implementer-teams have much broader expertise than Customer-teams. The Implementer-teams can apply our suggested techniques to convince the Customers to offload them more complex and large projects than they are currently handling. 4. Limitations of Customer-Controlled Approach In “Customer-Controlled Approach”, Implementers are assuming that the Customer is the best judge on all project aspects. However, highly complex and dynamic nature of software-sector questions these assumptions- Software-sector is characterised by ever-evolving technological innovations. A vast pool of global knowledge is available for the business domain for which a software-product is being developed. This available technical and business knowledge needs to be studied and incorporated in the product being developed. End-user requirements are also continuously changing, resulting in need for implementing continuous improvements in ongoing product development. Products have a global focus and end-user requirements vary largely between different geographies, adding to complexity of deciding optimal features-set that can satisfy all end- users. All the above complex and contradicting requirements make a centralised “Customer-Controlled Approach” fail to deliver. Customer alone cannot strike a balance between all these aspects. 5. Collaborative Approach We, instead, suggest a “Collaborative Approach”, where the Implementer contributes its inputs to Customer at each stage of product development- 5 Page
  • 6.
    Extensive global researchis being conducted in various software domains, resulting in innovative technologies being developed. The "requirements gathering" phase of the project requires the Customer to conduct extensive research in such information available globally: in competing products, in published work in journals/conferences, etc. The Implementer can significantly contribute in this phase by independently conducting additional research to gather more information. Customer decides the product features by gathering end-user companies’ requirements from a limited number of geographies where it has major presence. The Implementer has extensive experience of executing services-projects for companies from a wider range of geographies, some of which companies are end-users of similar products. Implementer can gather requirements of these end-user companies and provide significant inputs to product features, to make the product globally more acceptable. Customer is usually a “Domain Specialist” and has a narrow focus since it has been developing products for a single business/technology domain. The Implementer, on the other hand, has experience of executing projects in a range of business/technology domains. Implementer can utilise its broad focus to improve product design, to make it more efficient and competitive. Technologies and end-user expectations are known to change frequently in software sector. Thus, a long-duration project may require multiple changes in its requirements/features/design during the execution phase. Implementer can add value to the product by proactively keeping on top of such changing requirements and suggesting enhancements during the execution phase. Hence, the key to successful project execution is that the Implementer must participate in, and contribute to, each phase of the project. The Implementer needs to clearly express his disagreements with the Customer to suggest product improvements. In case of any difference of opinions, the loyalty of the Implementer should be with the product, and not with the Customer. The Implementer could deprive the product of genuine improvements if it agrees to the viewpoint of Customer on all issues. Hence the three new mantras for Customer Satisfaction need be – differ, disagree with and displease the customer. We suggest techniques by which Implementer can channel these differences and win Customer confidence by– Generating supporting data Performing Cost-Benefit analysis Prototyping Using negotiation and other soft-skills. 6 Page
  • 7.
    6. Project BidPhase In the project bid phase, the Customer sends project requirements/features document to multiple prospective Implementers. The Implementer needs to prepare a project proposal suggesting technical solution/schedule/cost, etc. The Customer meets prospective Implementers and awards project to one of them, based on the contents of the proposal and the ability of the Implementer to convince Customer of its delivery capabilities. We suggest Implementer to adopt a number of measures in this phase, to win Customer confidence- Suggest Enhancements to Product Features Implementer should study Customer-proposed product features in detail with the aim to find mistakes in these features and to determine any missing desirable features. The purpose of faultfinding mission is manifold. Firstly, by identifying mistakes in a document that has been comprehensively prepared/inspected by Customer-team, the Implementer can demonstrate that it has comprehensive command over the product domain and technology. Secondly, identification of these mistakes early can significantly reduce the time and effort to correct them during project execution phase. Implementer should next study competing international products. A comprehensive study of competition could reveal some important features required by business users from the product, which were not covered in the Customer-proposed feature-set. Finally, Implementer should suggest some other innovative features on its own, based on its past experience of executing projects in that business domain. Present Corroborative Data for Suggested Enhancements Customers are not very receptive to suggestions from the Implementer-teams in their very first meeting for a number of reasons. The Customer is an expert in the product domain and has been developing such products for long time. Its confidence in its own capability makes it difficult for it to accept that its team could have missed some features. Further, since, it would be its first meeting with Implementer-team, Customer-team is also unaware of the Implementer-team’s capabilities. Hence, Customer is unlikely to accept the fact that Implementer-team would be able to suggest improvements to its product features. Hence, Implementer must present corroborative evidence to justify its suggestions. E.g., some other clients of Implementer may be end-user companies of similar products. Implementer can gather detailed information on their interest of its suggested features to convince the Customer of the importance of suggested features. In the absence of such corroboration from external established sources, Customer can even reject some good suggestions. 6.1 Case Study I was managing teams in a services company that had been successfully following the above steps during project-bid phases for multiple projects. We used to study the Customer’s product- 7 Page
  • 8.
    requirements document, findmistakes/missing features, suggest feature-enhancements and convince the Customer of our capabilities by providing supporting data during our discussions. However, once we encountered a peculiar situation. Instead of receiving detailed requirements document, we received only one-paragraph requirement of the project accompanied by a brief software solution suggested by the Customer to meet the requirement. The Customer’s aim was to have initial discussions with multiple prospective Implementers to evaluate their skills, while its team was still formulating comprehensive product-requirements/features. The brief solution suggested was a broad framework that had to be developed further by the Implementer to propose a comprehensive solution to the problem. On receipt of the document, as usual, I asked my team to find mistakes and gaps in the requirements and the solution suggested therein. The team had a detailed brainstorming session but came back dejectedly. Apparently with the limited information available about the requirements it was not possible to find any mistakes in the document. Further, the solution suggested therein seemed to be the correct solution for the limited information we had about the problem. We were disheartened. However, the incorrigible polemic within us refused to relent. "Fine. Agreed, that the Customer has the correct solution. We can, at least, suggest an alternative solution to the same problem", I announced and urged our team to go back to drawing board. Another long brainstorming session followed, resulting in our team being able to suggest a totally different solution to the same problem. Armed with this information we decided to confront the Customer. Our meeting started with a presentation by the Customer on the project requirements and their suggested brief solution. We responded by presenting our alternative solution to the problem. This act, expectedly, stimulated a detailed discussion. Their team immediately started aggressively defending their choice of the solution. Their team presented further details of the problem and gave reasons for the choice of their solution. We presented detailed supporting data for our proposed solution. Both teams went deeper in the discussions, with each presenting detailed pros-and-cons of their solutions. At the end of the discussions, the Customer was able to convince us of the correctness of their solution. We agreed with them and the document remained unchanged. Although, the overall result of the discussions was a status quo on product-requirements and Customer-suggested solution but the detailed discussions gave multiple benefits to us. Firstly, the Customer-team got a positive impression that we had the domain knowledge to think in innovative fashion and suggest an alternative solution. They gained faith that we could execute the project. Secondly, the detailed discussions provoked the Customer to reveal much more details about their product-requirements. We became privy to information that our competitors did not possess. This information was quite valuable to us when we submitted the detailed proposal to them later. Needless to say, we won the order. Hence, the key learning was that it is important to stimulate a detailed discussion to create the first positive impression on the Customer. If, instead, we had submitted a standard proposal for their requirements, the discussion may have petered out to being a one-way talk by the Customer followed by insipid usual technical queries by our team. There would not have been any opportunity for our 8 Page
  • 9.
    team to displaytheir knowledge to the Customer, to convince it of our ability to execute the project. 7. Project Initiation phase After the project is awarded, the Customer and Implementer teams generally have a series of meetings to initiate the project. A major concern in this phase is that the Customer team can change the project requirements that were initially agreed upon. We suggest the Implementers to push back on these changes. Refuse Changes Unless Unavoidable Once a project bid is decided, the Implementer plans for project execution. The manpower allocation, schedules and inter-dependencies of tasks are decided. Any change in the requirements at this stage would require a change in this project plan. An increase in the number of features would require the Implementer to move engineers from some other tas of the project to implement these additional features. This action would cause that task and all its dependent tasks to suffer. The plans can go haywire and project schedule and product quality can suffer. Hence the Implementer should take a firm stand and refuse changes at this stage by presenting the above argument with supporting data. An exception should be made only if both the parties are in full agreement that these changes are unavoidable. E.g., if technology to be used in the product itself has advanced after the features were frozen then incorporation of this improved technology can make the product more competitive in the market. 7.1 Case Study We won a software services project and our team went to Japan for discussions to initiate project. In one of our meetings with the Customer team, an interesting development took place. Their Assistant Manager suggested enhanced user interfaces to the product. We realised that the enhancements being suggested were considerable. I immediately protested mentioning that since we had already mutually finalised the features, any changes now would impact our project plans. I presented analysis of impact of proposed changes on project plan and tasks inter-dependencies to show that project schedule and quality may suffer. More arguments followed. Suddenly tempers of their team rose. Their Assistant Manager and Manager talked to each other in Japanese. The Manager rose and announced, "So you will not implement what we are asking for?" and walked out of the room immediately. Their team followed him. We were suddenly tense since the issue seemed to have taken a serious turn. Further, due to their limitation in comprehensively understanding spoken English, we were not sure if they had clearly understood our reasons for not agreeing to their demand. However, as they had their mutual discussions in Japanese, which we did not understand, we still hoped that they might not have taken the issue so seriously. The eternal optimist within us hoped that perhaps the Manager was suddenly reminded of the time to attend another meeting and hence left in a hurry! Perhaps... However, one of their team members re-entered the room and reassuringly allayed any doubts we had. He informed us, in clear and distinct English, that the Assistant Manager had said to the 9 Page
  • 10.
    Manager in Japanesethat we were refusing to agree to their demand. He further informed that it seemed to him that their Manager was quite upset by our stand, which was the reason for their ending the meeting abruptly. The only thing we could now do was to wait to see what happens next. As we were suspecting, the same evening an e-mail from their Manager was sent to our Japan Regional Office regarding this discussion. What we were not expecting were the contents of the e- mail. The e-mail said: “We understand that your team has accepted ownership of the project and is equally concerned about the success of the project, as we are. Hence your team had raised genuine concerns about schedule of the project being impacted by our suggested modifications. This act of your team has affirmed our faith that the project would succeed in your hands.” We were pleasantly surprised at their deep understanding of our viewpoint. This positive response resulted in development of a cohesive professional relationship that resulted in both teams successfully tackling all the future project problems through mutual discussions and agreements, resulting in success of the project. However, we are sure that our Japan Office Head would have never been able to figure out how we were able to extract such an appreciative response from the Customer, within only a week of our stay. We believe that he may have guessed that our success would have been due to our hard work, responsiveness to Customer sensitivities and personal relation building with their team. However, even in his wildest of imaginations he could not have thought that we had, instead, been able to devise a much easier approach to achieve this objective – by simply picking up a quarrel with their team. 8. Project Execution Phase We consider the case of execution phase of large software projects, which can usually take many months to be completed. Since, technologies and business domain requirements change very fast in software domain, we suggest the Implementer to be proactive to such global changes. Suggest changes to product features Implementer should continuously keep track of improvements occurring in the technology and business domains of the product and suggest enhancements to product features/design- - Study journals/conference proceedings that discuss new improved software technologies being developed in that technical domain. - Study new features of competing products being released in the market. - Be aware of the changing needs of the business domain for which the product is being developed, by seeking inputs from its other clients who are end-users of products in this business domain. Interestingly, at first look, the recommendation to the Implementer to suggest changes to the product features seems to contradict the recommendation given in the last section, to refuse changes to the product. However, the key here is the duration of the project execution. In case of small duration 10 Page
  • 11.
    projects, such changesin features should be avoided. However, for long duration projects the changes need to be incorporated to keep pace with the ongoing developments in the market during the time the project is being executed. Present a Cost-Benefit analysis Any feature or design additions/improvements suggested during the execution of the project would result in increase in project schedule and cost. Hence, Customer is generally not receptive to such suggested changes. Implementer should perform a cost-benefit analysis of each suggested feature enhancement. The analysis should list the possible benefits to the product by the feature enhancement, like, the expected additional monetary returns due to wider market acceptability of the product. The cost analysis should detail the expected delay in delivery of the project, and the additional cost to be incurred for implementing the feature. Customer can then decide on a subset of features that are critical to the success of the project and can also be implemented without causing a high impact on the project schedule and cost. Develop a Prototype Customer may not be fully able to appreciate the utility of suggested feature enhancements. Implementer should develop a “Prototype” for the product enhancements being suggested to convince the Customer. A prototype is a small piece of software that models the functions of the final software product being developed. On execution, the prototype broadly shows how the features would work in the final product. Customer can then accept some of these features and can give a go-ahead to the Implementer to implement them. Hence, a prototype can be developed in a short duration with minimal cost and effort, and can still help in taking critical decisions about the project. 9. Conclusion We have suggested software services-companies to adopt a “Collaborative Approach” to project execution where they can collaborate with customer to add significant value in all project phases. Our techniques can be applied by services-companies to gain customer confidence and be given freedom and control to improve project requirements/design/execution. 10. References 1. Hunsberger, K. (2011). The Risks of Outsourcing – Know them and what to do about them, PM Network, November 2011. 2. Aron, R., and Singh, J. V. (2005). Getting Offshoring Right. Harvard Business Review (December) 135-143. 3. Bigelow, D. (2002).Will Outsourcing Relationships rule the New Millenium? PM Network (May) 22. 4. Serrador, P. (2009). Far Flung. PM Network (November) 28-29. 5. Serrador, P. (2008). Offshoring for the Project Manager: Globalization is here. Are you ready to take advantage of it? PMI Global Congress – Denver, USA. 11 Page
  • 12.
    6. Serrador, P.(2010). Offshoring: How to keep your Western Clients coming back. PMI Global Congress – Melbourne, Australia. 7. Holden, A.D. (2005). Evolving the Paradigm: Leading Multicultural Teams. PMI Global Congress – Toronto, Canada. 8. Camper Bull, R. (2004). International Projects and Off-shoring: A New Paradigm. PMI Global Congress – Anaheim, Canada. 12 Page
  • 13.
    10. Author’s Profile Vimal Kumar Khanna is Founder and Managing Director of “mCalibre Technologies”, a Knowledge Processing software startup. He has over 27 years industry experience and has won multiple international honours. He is listed in “Marquis Who’s Who in the World”. He is also among 50 select experts in the world to be on “IEEE Communications” (pub. New York) Editorial Board (invited honorary position). His multiple independently-written papers have been published in leading international journals/conferences, including PMI Global Congress 2010 - Asia Pacific, Melbourne; PMI Asia Pacific e-Link; PMI India Conferences 2010 and 2011. He has been interviewed in “PM Network” magazine. Email: vimal_k@ieee.org 13 Page