Sub-station Maintenance
WEL- Maintained
Main Equipments in 33 KV Sub-Station
1) Power transformer
2) Circuit breaker
3) Isolator
4) Earthing switch
5) lightning arrestor
6) Busbar
7) Current transformer
8) Potential transformer
9) Protective relay
10) DC battery set
11)Capacitor bank
12)Fire fighting system
Power Transformer
Transformer is used to step down the voltage from 33 kV
voltage to 11kv voltage .
Maintenance of Transformers
.
Check Earth resistance
Check Oil level in main tank & OLTC tank.
Check the color of silica gel in breather ;it must be blue in
color .if it is turned pink then recondition it or replace it
Check On load Tap Changer Lower/Raise trail by Local & Remote.
Trip trail by draining oil in Buchholz relay
Tight all connections.
Check breakdown voltage of oil.
Clean the bushings.
Attend the oil leakages
Note Temperature of Oil & leakage
Current Transformer
Direct measurement of current in high voltage
system is not possible because of insulation problem
of measuring instruments. It is also not possible to
use current flowing through the system directly for
protection purpose due to its high value and high
insulation problem.
Basic functions of current transformers are:
 To reduce the line current to a value which is suitable for
standard measuring instruments, relays, etc.
 To isolate the measuring instruments namely meters, relays,
etc. from high voltage side of an installation.
 To protect measuring instruments against short circuit
currents.
 To sense abnormalities in current and to give current signals
to protective relays to isolate the defective system.
CT Earthing
Check the oil level
Oil leakages
Primary injection
Potential Transformer
Check the N earthing
Basic functions of potential
transformers are:
• To reduce the line voltage to a value
which is suitable for standard measuring
instruments, relays, etc.
• To isolate the measuring instruments,
meters, relays, etc. from high voltage side of
an installation.
• To sense abnormalities in voltage and
give voltage signals to protective relays to
isolate the defective system.
Single phase electromagnetic PT is
manufactured in two types:
1. Single Pole ( between lines & earth)
2. Double Pole (between line-to-line)
Energypac ensure quality test facility as to
IEC-76, VDE 0537, ANSI C 57.12 and BS 171
and every transformer are dispatched from the
factory after being tested properly and passing
quality requirements.
Potential Transformer consists of
 Primary and Secondary Windings
 Electromagnetic Core
 Bottom Tank and Oil Expansion Chamber
 Porcelain Bushing
Breaker
SUBSTATION EARTHING
Easy but most Important!!!!!!!!
Grounding-provided a low impedance path to earth.
Grounding Conductor- A conductor used to connect
equipment or the grounded circuit of a wiring system to a
grounding electrode that normally carry current.
Normally green colour conductor are used for
grounding
Substation Grounding-A Great Start !
All metallic components are bonded to earth-
-Breakers
-Transformer
-Structure
-Panels
-lighting shielding
-Relays
-metering equipment
Connect the control room earthing system
with grid
Grounding Multi panel
1. Total number of DTs(Distribution Transformer) in the
Division/Sub-division.
2. Monthly DT failure report in each sub-division. A separate
report in a uniformly prescribed format for each DT failure
3. Weekly/Monthly interruption report in a sub-division
4. Monthly record of consumer complaints and records of failure
against each DT.
5. Weekly
leakage of transformer oil.
6. Fortnightly
Oil Level in Transformer.
Operation of cooling fan in
manually and auto mode.
MAINTAINANCE SCHEDULE OF
TRANSFORMER
7. Monthly
Connections (HT & LT terminals)
Explosion vent
Pressure relief device
Watering to earthing Montly
8. Half yearly
Cable boxes, gasket joints .
Bushings .
9. Yearly
Oil in transformer.
Earth resistance.
Oil BDV(Break Down Voltage) test Yearly .
Transformer Input &Out put terminal
tightening Yearly.
Cleaning of transformer.
MAINTAINENCE SCHEDULE OF
33KV OUTDOOR BREAKER
 Inspection of the external condition
 checking correct function of position indicators and
interlocks
 Be sure the circuit breaker and its mechanism are
disconnected from all electric power, both high voltage
and control voltage, before it is inspected or repaired.
 After the circuit breaker has been disconnected from the
electrical power, attach the grounding leads properly
before touching any of the circuit breaker parts.
 Clean the insulating parts including the bushings.
 See that bolts, nuts, washers, cotter pins, and all
terminal connections are in place and tight.
 After maintenance of circuit breaker must operate the
breaker from local and remote position .
MAINTENANCE OF 11KV
SWITCHGEAR
 Proper condition of the switchgear should
be monitored by regular inspections.
 Inspection is primarily to constitute a
visual check for corrosion and moisture.
 Proper mechanical/electrical function of
the following facilities:
switching devices,
interlocking,
protection and signaling facilities

More Related Content

What's hot

Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsSumeet Ratnawat
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substationsvishalgohel12195
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.Hemendra Kumar Rajput
 
Under ground cables presention
Under ground cables presentionUnder ground cables presention
Under ground cables presentionRazu Khan
 
Design of substation
Design of substationDesign of substation
Design of substationSayanSarkar55
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSPartha Parida
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relaysPremanandDesai
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance Molla Morshad
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformerssiddharam kantoli
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONRavi Phadtare
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
substation internship report
substation internship report substation internship report
substation internship report Arun Thapa
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guideSlides Hub
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substationAshutosh Srivastava
 

What's hot (20)

Electrical SUBSTATION ppt
Electrical SUBSTATION pptElectrical SUBSTATION ppt
Electrical SUBSTATION ppt
 
Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substations
 
33kv substation
33kv substation33kv substation
33kv substation
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
 
Under ground cables presention
Under ground cables presentionUnder ground cables presention
Under ground cables presention
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
Design of substation
Design of substationDesign of substation
Design of substation
 
33/11 KV SUBSTATION
33/11 KV SUBSTATION33/11 KV SUBSTATION
33/11 KV SUBSTATION
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATION
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
Panel designing
Panel designingPanel designing
Panel designing
 
substation internship report
substation internship report substation internship report
substation internship report
 
Switchgear - complete guide
Switchgear - complete guideSwitchgear - complete guide
Switchgear - complete guide
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 

Similar to Maintenance schedule of Substation.

switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxDrNiveditaSingh3
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentationNadir Baloch
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rAshish Patel
 
Switchgear & Rectifier ppt
Switchgear & Rectifier pptSwitchgear & Rectifier ppt
Switchgear & Rectifier pptvikas kumar
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protectionRakesh Joshi
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khojaASHOK KHOJA
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankurAnkur Mishra
 
Presentation training
Presentation trainingPresentation training
Presentation trainingSrajan Raj
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Nik Sharma
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppclSunny Daksh
 
PROTECTIVE DEVICES & MAINTENANCE.ppt
PROTECTIVE DEVICES & MAINTENANCE.pptPROTECTIVE DEVICES & MAINTENANCE.ppt
PROTECTIVE DEVICES & MAINTENANCE.pptQwer401863
 

Similar to Maintenance schedule of Substation. (20)

transformers.ppt
transformers.ppttransformers.ppt
transformers.ppt
 
POWER GRID
POWER GRIDPOWER GRID
POWER GRID
 
switchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptxswitchgearpresentation-151030171028-lva1-app6892.pptx
switchgearpresentation-151030171028-lva1-app6892.pptx
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines r
 
Switchgear & Rectifier ppt
Switchgear & Rectifier pptSwitchgear & Rectifier ppt
Switchgear & Rectifier ppt
 
Testing,maintenance&protection
Testing,maintenance&protectionTesting,maintenance&protection
Testing,maintenance&protection
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
Heavy maintenance
Heavy maintenanceHeavy maintenance
Heavy maintenance
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
 
Presentation training
Presentation trainingPresentation training
Presentation training
 
Voltage Regulation
Voltage RegulationVoltage Regulation
Voltage Regulation
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE] Transformer Repair Workshop Report [EEE]
Transformer Repair Workshop Report [EEE]
 
Transformer
TransformerTransformer
Transformer
 
MV Switchgear from IEEE
MV Switchgear from IEEEMV Switchgear from IEEE
MV Switchgear from IEEE
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
PROTECTIVE DEVICES & MAINTENANCE.ppt
PROTECTIVE DEVICES & MAINTENANCE.pptPROTECTIVE DEVICES & MAINTENANCE.ppt
PROTECTIVE DEVICES & MAINTENANCE.ppt
 
132 kV uppcl
132 kV uppcl132 kV uppcl
132 kV uppcl
 

Recently uploaded

Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 

Recently uploaded (20)

🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 

Maintenance schedule of Substation.

  • 3.
  • 4. Main Equipments in 33 KV Sub-Station 1) Power transformer 2) Circuit breaker 3) Isolator 4) Earthing switch 5) lightning arrestor 6) Busbar 7) Current transformer 8) Potential transformer 9) Protective relay 10) DC battery set 11)Capacitor bank 12)Fire fighting system
  • 5. Power Transformer Transformer is used to step down the voltage from 33 kV voltage to 11kv voltage .
  • 7. Check Oil level in main tank & OLTC tank.
  • 8. Check the color of silica gel in breather ;it must be blue in color .if it is turned pink then recondition it or replace it
  • 9. Check On load Tap Changer Lower/Raise trail by Local & Remote.
  • 10. Trip trail by draining oil in Buchholz relay
  • 11. Tight all connections. Check breakdown voltage of oil. Clean the bushings. Attend the oil leakages Note Temperature of Oil & leakage
  • 13. Direct measurement of current in high voltage system is not possible because of insulation problem of measuring instruments. It is also not possible to use current flowing through the system directly for protection purpose due to its high value and high insulation problem. Basic functions of current transformers are:  To reduce the line current to a value which is suitable for standard measuring instruments, relays, etc.  To isolate the measuring instruments namely meters, relays, etc. from high voltage side of an installation.  To protect measuring instruments against short circuit currents.  To sense abnormalities in current and to give current signals to protective relays to isolate the defective system.
  • 14. CT Earthing Check the oil level Oil leakages Primary injection
  • 16. Basic functions of potential transformers are: • To reduce the line voltage to a value which is suitable for standard measuring instruments, relays, etc. • To isolate the measuring instruments, meters, relays, etc. from high voltage side of an installation. • To sense abnormalities in voltage and give voltage signals to protective relays to isolate the defective system.
  • 17. Single phase electromagnetic PT is manufactured in two types: 1. Single Pole ( between lines & earth) 2. Double Pole (between line-to-line) Energypac ensure quality test facility as to IEC-76, VDE 0537, ANSI C 57.12 and BS 171 and every transformer are dispatched from the factory after being tested properly and passing quality requirements. Potential Transformer consists of  Primary and Secondary Windings  Electromagnetic Core  Bottom Tank and Oil Expansion Chamber  Porcelain Bushing
  • 18.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24. SUBSTATION EARTHING Easy but most Important!!!!!!!! Grounding-provided a low impedance path to earth. Grounding Conductor- A conductor used to connect equipment or the grounded circuit of a wiring system to a grounding electrode that normally carry current. Normally green colour conductor are used for grounding
  • 25. Substation Grounding-A Great Start ! All metallic components are bonded to earth- -Breakers -Transformer -Structure -Panels -lighting shielding -Relays -metering equipment Connect the control room earthing system with grid
  • 27. 1. Total number of DTs(Distribution Transformer) in the Division/Sub-division. 2. Monthly DT failure report in each sub-division. A separate report in a uniformly prescribed format for each DT failure 3. Weekly/Monthly interruption report in a sub-division 4. Monthly record of consumer complaints and records of failure against each DT. 5. Weekly leakage of transformer oil. 6. Fortnightly Oil Level in Transformer. Operation of cooling fan in manually and auto mode. MAINTAINANCE SCHEDULE OF TRANSFORMER
  • 28. 7. Monthly Connections (HT & LT terminals) Explosion vent Pressure relief device Watering to earthing Montly 8. Half yearly Cable boxes, gasket joints . Bushings . 9. Yearly Oil in transformer. Earth resistance. Oil BDV(Break Down Voltage) test Yearly . Transformer Input &Out put terminal tightening Yearly. Cleaning of transformer.
  • 29. MAINTAINENCE SCHEDULE OF 33KV OUTDOOR BREAKER  Inspection of the external condition  checking correct function of position indicators and interlocks  Be sure the circuit breaker and its mechanism are disconnected from all electric power, both high voltage and control voltage, before it is inspected or repaired.  After the circuit breaker has been disconnected from the electrical power, attach the grounding leads properly before touching any of the circuit breaker parts.
  • 30.  Clean the insulating parts including the bushings.  See that bolts, nuts, washers, cotter pins, and all terminal connections are in place and tight.  After maintenance of circuit breaker must operate the breaker from local and remote position .
  • 31. MAINTENANCE OF 11KV SWITCHGEAR  Proper condition of the switchgear should be monitored by regular inspections.  Inspection is primarily to constitute a visual check for corrosion and moisture.  Proper mechanical/electrical function of the following facilities: switching devices, interlocking, protection and signaling facilities