INFRASTRUCTURE PROJECTS
OCTOBER 2009
Prepared By: Sura Al Shami
WET UTILITIES DESIGN WORK
STAGES
HIP – Sharjah / Water & Power
Business Group
Infrastructure Project – Wet Utilities Work
CONTENTS
• Brief Introduction
• Stages of the Design Work
• Open Discussion and Questions
Infrastructure Project – Wet Utilities Work
INTRODUCTION
• Infrastructure development projects refer to development
of new or upgrading the existing development projects
comprising of one or more of the land use types like
residential, commercial, recreational and industrial etc.
Infrastructure Project – Wet Utilities Work
Airport Plot Development – Abu Dhabi
Infrastructure Project – Wet Utilities Work
Land Development
Survey & Investigation
Master Planning
Grading Plans &
Earth Work Design
Roads Design
Design of Utilities
Dry Utilities
Wet Utilities
Power Telecom Street Lighting
Water Supply Foul Drainage Storm Water Irrigation Fire Fighting
Infrastructure Project – Wet Utilities Work
Master Planning Support & Data Collection
Concept Design
Preliminary Design
Detail Design
Tender
Construction, Supervision, Commissioning
and Handing over (not covered)
Review & Approval from
Client and related
Authorities
Infrastructure development project comprise of the following stages
Infrastructure Project – Wet Utilities Work
STAGE 1: Master Planning Support and Data Collection
• Collection and review of all the available data including topographic
maps, geological maps, existing land use, climatic data and existing
utilities etc.
• Preparation of existing utilities inventory including (data collection,
review and site appraisal, utility authority liaison - RFI’s)
• Assessment for the condition and loads on the existing facilities and
identify requirements for upgrade, diversion, protection…etc
• Demands assessment for the new development under consideration.
• Preparation and submission of an Inception Report for client review
and approval
Infrastructure Project – Wet Utilities Work
Survey Data
Land Use Layout
Infrastructure Project – Wet Utilities Work
Infrastructure Project – Wet Utilities Work
Land Use Summery Tables
Infrastructure Project – Wet Utilities Work
Existing Irrigation System from Agriculture Dept
Infrastructure Project – Wet Utilities Work
STAGE 2: Concept Design
• Development of design strategy and options.
• Evaluation of alternatives and cost estimate analysis.
• Setting up the Utilities Design Standards and Criteria.
• Fixing of the utility corridors for different ROWs of roads as per the
services authorities requirements.
• Preparation of utilities concept design drawings including the
preliminary size and locations of the primary infrastructure
(reservoirs, pumping stations, RO and STP plants, sub stations etc)
and concept network layouts
• Preparation and submission of Concept Design Report
Infrastructure Project – Wet Utilities Work
Utilities Corridors
Infrastructure Project – Wet Utilities Work
Concept Layout for SW Network
Infrastructure Project – Wet Utilities Work
STAGE 3: Preliminary Design
• Firming up the systems layout plans.
• Hydraulic design and sizing of systems (usually by means computer
programs for hydraulic design and analysis).
• Preliminary civil, M&E and structural design of primary structures like
reservoirs, pumping stations etc and setting up the design parameters
for RO plants and STP.
• Preparation of preliminary drawings (Layouts and Details)
• Quantity survey and preliminary cost estimates.
• Preparation of Preliminary Design Report
Infrastructure Project – Wet Utilities Work
Preliminary Layout for Foul Network
Infrastructure Project – Wet Utilities Work
STAGE 4: Detail Design
• Finalization of the layout in exact corridor
• Conflict resolution with other services
• Final hydraulic design and systems sizing
• Preparation of manhole schedules and profiles
• Detailed civil, M&E and structural designs for LS, PS, tanks and
Reservoir.
• Preparation of final detailed drawings
• Preparation of a Detailed Design Report
Infrastructure Project – Wet Utilities Work
Manhole Schedule
Infrastructure Project – Wet Utilities Work
Longitude Profile
Infrastructure Project – Wet Utilities Work
STAGE 5: Tender
• Quantity surveys and preparation of Bill of Quantities.
• Preparation of technical specifications.
• Specialty equipments or items, such as packaged STP or RO plants
• Preparation of Tender Documents.
• Invitation for Tenders
Infrastructure Project – Wet Utilities Work
BOQs Example
Infrastructure Project – Wet Utilities Work
Invitation to Tenderers Example
Infrastructure Project – Wet Utilities Work
Open Discussion and Questions

More Related Content

What's hot

Frederick Gonzales Resume 2014
Frederick Gonzales Resume 2014Frederick Gonzales Resume 2014
Frederick Gonzales Resume 2014Freddy Gonzales
 
150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-CargoDouglas Tobin
 
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014San Diego County Water Authority
 
March 09 Planning Commission
March 09 Planning CommissionMarch 09 Planning Commission
March 09 Planning CommissionRobert Voigt
 
Development Plan Review Process
Development Plan Review ProcessDevelopment Plan Review Process
Development Plan Review Processgscplanning
 
Building plan approval for b khata ,bda,bbmp in Bangalore
Building plan approval for b khata ,bda,bbmp in BangaloreBuilding plan approval for b khata ,bda,bbmp in Bangalore
Building plan approval for b khata ,bda,bbmp in Bangalorecitadilconstruction
 
Summary of previous projects
Summary of previous projectsSummary of previous projects
Summary of previous projectsHarun Hodžić
 
North Street Capital Project Request 18 January 2011
North Street Capital Project Request 18 January 2011North Street Capital Project Request 18 January 2011
North Street Capital Project Request 18 January 2011Adam Cohen
 

What's hot (15)

Frederick Gonzales Resume 2014
Frederick Gonzales Resume 2014Frederick Gonzales Resume 2014
Frederick Gonzales Resume 2014
 
Maaden Exp.
Maaden Exp.Maaden Exp.
Maaden Exp.
 
TTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC StreetcarTTG Luncheon 4.6.2016 - OC Streetcar
TTG Luncheon 4.6.2016 - OC Streetcar
 
150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo150804-DTAE-Brochure-Master Plan-Cargo
150804-DTAE-Brochure-Master Plan-Cargo
 
Session 10
Session 10Session 10
Session 10
 
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
Bay Delta Conservation Plan - Infrastructure Review - Feb. 13, 2014
 
March 09 Planning Commission
March 09 Planning CommissionMarch 09 Planning Commission
March 09 Planning Commission
 
ART Resume
ART Resume ART Resume
ART Resume
 
Development Plan Review Process
Development Plan Review ProcessDevelopment Plan Review Process
Development Plan Review Process
 
Te assignment by hemant
Te assignment by hemantTe assignment by hemant
Te assignment by hemant
 
City Council November 20, 2012 Finance
City Council November 20, 2012 FinanceCity Council November 20, 2012 Finance
City Council November 20, 2012 Finance
 
Building plan approval for b khata ,bda,bbmp in Bangalore
Building plan approval for b khata ,bda,bbmp in BangaloreBuilding plan approval for b khata ,bda,bbmp in Bangalore
Building plan approval for b khata ,bda,bbmp in Bangalore
 
Byron CV 2016v5
Byron CV 2016v5Byron CV 2016v5
Byron CV 2016v5
 
Summary of previous projects
Summary of previous projectsSummary of previous projects
Summary of previous projects
 
North Street Capital Project Request 18 January 2011
North Street Capital Project Request 18 January 2011North Street Capital Project Request 18 January 2011
North Street Capital Project Request 18 January 2011
 

Similar to Infrastructure projects

hamed_barakat_CV_New
hamed_barakat_CV_Newhamed_barakat_CV_New
hamed_barakat_CV_NewHamed Elawady
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project managementDr Bhavana Deshpande
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process EngineerJuber Loharia
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project managementDr. Pramod Deshpande
 
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014San Diego County Water Authority
 
17 mse003 pv plant devlopement
17 mse003 pv plant devlopement17 mse003 pv plant devlopement
17 mse003 pv plant devlopementpaneliya sagar
 
Hydraulic services tables_8_2004
Hydraulic services tables_8_2004Hydraulic services tables_8_2004
Hydraulic services tables_8_2004Nghia Huynh Ngoc
 
Peter Etim-CV.
Peter Etim-CV. Peter Etim-CV.
Peter Etim-CV. Peter Etim
 
agile constructsim overview
agile constructsim overviewagile constructsim overview
agile constructsim overviewsaeed zarif
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul A'mal Mohd Hanafiah
 
Baraa Mohd Al Sotari CV
Baraa  Mohd Al Sotari CVBaraa  Mohd Al Sotari CV
Baraa Mohd Al Sotari CVbaraa Mohammad
 
Nady Boktor Resume
Nady Boktor ResumeNady Boktor Resume
Nady Boktor ResumeNADY BOKTOR
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEHSAN ASGHAR, RE
 

Similar to Infrastructure projects (20)

Saeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer UtilitiesSaeed Ahmad Infrastucture Engineer Utilities
Saeed Ahmad Infrastucture Engineer Utilities
 
Masterplan.pptx
Masterplan.pptxMasterplan.pptx
Masterplan.pptx
 
hamed_barakat_CV_New
hamed_barakat_CV_Newhamed_barakat_CV_New
hamed_barakat_CV_New
 
ramCV
ramCVramCV
ramCV
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
Sagar_cv
Sagar_cv Sagar_cv
Sagar_cv
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
Bay-Delta Conservation Plan -- Infrastructure Review, Jan. 9, 2014
 
Yasser Wahba CV
Yasser Wahba CVYasser Wahba CV
Yasser Wahba CV
 
17 mse003 pv plant devlopement
17 mse003 pv plant devlopement17 mse003 pv plant devlopement
17 mse003 pv plant devlopement
 
Hydraulic services tables_8_2004
Hydraulic services tables_8_2004Hydraulic services tables_8_2004
Hydraulic services tables_8_2004
 
Peter Etim-CV.
Peter Etim-CV. Peter Etim-CV.
Peter Etim-CV.
 
agile constructsim overview
agile constructsim overviewagile constructsim overview
agile constructsim overview
 
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
 
Baraa Mohd Al Sotari CV
Baraa  Mohd Al Sotari CVBaraa  Mohd Al Sotari CV
Baraa Mohd Al Sotari CV
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
Nady Boktor Resume
Nady Boktor ResumeNady Boktor Resume
Nady Boktor Resume
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
Process & power plants
Process & power plantsProcess & power plants
Process & power plants
 

More from AHMED NADIM JILANI

More from AHMED NADIM JILANI (20)

Scaffolding by vn prabhu source facebook group survey & engineering de...
Scaffolding  by  vn prabhu source facebook group survey  & engineering de...Scaffolding  by  vn prabhu source facebook group survey  & engineering de...
Scaffolding by vn prabhu source facebook group survey & engineering de...
 
Nanotechnology in civil engineering0
Nanotechnology in civil engineering0Nanotechnology in civil engineering0
Nanotechnology in civil engineering0
 
Staadpresentation1 159
Staadpresentation1 159Staadpresentation1 159
Staadpresentation1 159
 
Pres staadpro
Pres staadproPres staadpro
Pres staadpro
 
Corenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materialsCorenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materials
 
DESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTUREDESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTURE
 
Ccna day5
Ccna day5Ccna day5
Ccna day5
 
Ccna day4
Ccna day4Ccna day4
Ccna day4
 
Ccna day3
Ccna day3Ccna day3
Ccna day3
 
Ccna day2
Ccna day2Ccna day2
Ccna day2
 
Ccna day1
Ccna day1Ccna day1
Ccna day1
 
What is nanotechnology
What is nanotechnologyWhat is nanotechnology
What is nanotechnology
 
Nanotechnology in civil engineering by shahid
Nanotechnology in  civil engineering by shahidNanotechnology in  civil engineering by shahid
Nanotechnology in civil engineering by shahid
 
What is nanotechnology
What is nanotechnologyWhat is nanotechnology
What is nanotechnology
 
Nanotechnology in civil engineering by shahid
Nanotechnology in  civil engineering by shahidNanotechnology in  civil engineering by shahid
Nanotechnology in civil engineering by shahid
 
Corenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materialsCorenet montreal 2_13_08_nanotech_materials
Corenet montreal 2_13_08_nanotech_materials
 
Carbon nanotubes
Carbon nanotubesCarbon nanotubes
Carbon nanotubes
 
Nanotechnology in civil engineering
Nanotechnology in civil engineeringNanotechnology in civil engineering
Nanotechnology in civil engineering
 
electrical engineering
electrical engineeringelectrical engineering
electrical engineering
 
Water balance & management
Water balance & managementWater balance & management
Water balance & management
 

Recently uploaded

💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...ppkakm
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...gragchanchal546
 

Recently uploaded (20)

💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 

Infrastructure projects

  • 1. INFRASTRUCTURE PROJECTS OCTOBER 2009 Prepared By: Sura Al Shami WET UTILITIES DESIGN WORK STAGES HIP – Sharjah / Water & Power Business Group
  • 2. Infrastructure Project – Wet Utilities Work CONTENTS • Brief Introduction • Stages of the Design Work • Open Discussion and Questions
  • 3. Infrastructure Project – Wet Utilities Work INTRODUCTION • Infrastructure development projects refer to development of new or upgrading the existing development projects comprising of one or more of the land use types like residential, commercial, recreational and industrial etc.
  • 4. Infrastructure Project – Wet Utilities Work Airport Plot Development – Abu Dhabi
  • 5. Infrastructure Project – Wet Utilities Work Land Development Survey & Investigation Master Planning Grading Plans & Earth Work Design Roads Design Design of Utilities Dry Utilities Wet Utilities Power Telecom Street Lighting Water Supply Foul Drainage Storm Water Irrigation Fire Fighting
  • 6. Infrastructure Project – Wet Utilities Work Master Planning Support & Data Collection Concept Design Preliminary Design Detail Design Tender Construction, Supervision, Commissioning and Handing over (not covered) Review & Approval from Client and related Authorities Infrastructure development project comprise of the following stages
  • 7. Infrastructure Project – Wet Utilities Work STAGE 1: Master Planning Support and Data Collection • Collection and review of all the available data including topographic maps, geological maps, existing land use, climatic data and existing utilities etc. • Preparation of existing utilities inventory including (data collection, review and site appraisal, utility authority liaison - RFI’s) • Assessment for the condition and loads on the existing facilities and identify requirements for upgrade, diversion, protection…etc • Demands assessment for the new development under consideration. • Preparation and submission of an Inception Report for client review and approval
  • 8. Infrastructure Project – Wet Utilities Work Survey Data
  • 9. Land Use Layout Infrastructure Project – Wet Utilities Work
  • 10. Infrastructure Project – Wet Utilities Work Land Use Summery Tables
  • 11. Infrastructure Project – Wet Utilities Work Existing Irrigation System from Agriculture Dept
  • 12. Infrastructure Project – Wet Utilities Work STAGE 2: Concept Design • Development of design strategy and options. • Evaluation of alternatives and cost estimate analysis. • Setting up the Utilities Design Standards and Criteria. • Fixing of the utility corridors for different ROWs of roads as per the services authorities requirements. • Preparation of utilities concept design drawings including the preliminary size and locations of the primary infrastructure (reservoirs, pumping stations, RO and STP plants, sub stations etc) and concept network layouts • Preparation and submission of Concept Design Report
  • 13. Infrastructure Project – Wet Utilities Work Utilities Corridors
  • 14. Infrastructure Project – Wet Utilities Work Concept Layout for SW Network
  • 15. Infrastructure Project – Wet Utilities Work STAGE 3: Preliminary Design • Firming up the systems layout plans. • Hydraulic design and sizing of systems (usually by means computer programs for hydraulic design and analysis). • Preliminary civil, M&E and structural design of primary structures like reservoirs, pumping stations etc and setting up the design parameters for RO plants and STP. • Preparation of preliminary drawings (Layouts and Details) • Quantity survey and preliminary cost estimates. • Preparation of Preliminary Design Report
  • 16. Infrastructure Project – Wet Utilities Work Preliminary Layout for Foul Network
  • 17. Infrastructure Project – Wet Utilities Work STAGE 4: Detail Design • Finalization of the layout in exact corridor • Conflict resolution with other services • Final hydraulic design and systems sizing • Preparation of manhole schedules and profiles • Detailed civil, M&E and structural designs for LS, PS, tanks and Reservoir. • Preparation of final detailed drawings • Preparation of a Detailed Design Report
  • 18. Infrastructure Project – Wet Utilities Work Manhole Schedule
  • 19. Infrastructure Project – Wet Utilities Work Longitude Profile
  • 20. Infrastructure Project – Wet Utilities Work STAGE 5: Tender • Quantity surveys and preparation of Bill of Quantities. • Preparation of technical specifications. • Specialty equipments or items, such as packaged STP or RO plants • Preparation of Tender Documents. • Invitation for Tenders
  • 21. Infrastructure Project – Wet Utilities Work BOQs Example
  • 22. Infrastructure Project – Wet Utilities Work Invitation to Tenderers Example
  • 23. Infrastructure Project – Wet Utilities Work Open Discussion and Questions