PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan Sisingamangaraja Lorong BKKBN - Meulaboh
GAMBAR RENCANA
NAMA PEKERJAAN : PEMBANGUNAN JALAN JAWI - SIPOT
LOKASI PEKERJAAN : KABUPATEN ACEH BARAT
TAHUN ANGGARAN : 2022
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan Sisingamangaraja Lorong BKKBN - Meulaboh
LEMBAR PENGESAHAN
NAMA PEKERJAAN : PEMBANGUNAN JALAN JAWI - SIPOT
LOKASI PEKERJAAN : KABUPATEN ACEH BARAT
TAHUN ANGGARAN : 2022
DIBUAT OLEH :
KONSULTAN PERENCANA
CV. UTAMA KARYA DESIGN
MUTAQIN
Direktur
DISETUJUI OLEH :
PEJABAT PEMBUAT KOMITMEN (PPK)
BIDANG JALAN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN ACEH BARAT
BENI HARDI, ST., MT
NIP. 19790211 200504 1 001
MENYETUJUI OLEH :
KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN ACEH BARAT
DR. KURDI, ST.MT
NIP. 19760612 200504 1 001
Lokasi Quarry
KOTAMADYA
BANDAR UDARA
IBUKOTA KECAMATAN
IBUKOTA KABUPATEN
JALAN PROVINSI
IBUKOTA PROPINSI
PELABUHAN
BATAS KABUPATEN
BATAS PROPINSI
JALAN NASIONAL
B
A
P
A
053
P. SIMEULUE
Lasikin
SINABANG
Inor
Nasreheu
Sibigo
Lewak
054
055
P. BABI P. TUANKU
TL. Nibong
P.Bale
P. UJUNGBATU
050
DARUSSALAM
P.WEH
P.BREUH
P.NASI
SP.Krueng Raya
BANDA ACEH
Ulele
Sp. Rima
Mata Ie
Lambaro
Krueng raya
Laweung
Blang Bintang
Alue Glong
Seulimeum
Kota Jantho
Km. 63.400 Keumala Km.87
Batee
SIGLI Km.112
LHOKSEUMAWE
LANGSA
Km.440
BLANG KEJREN
Km.475
KUTA CANE
Km.579
TAPAK TUAN
Ke Binjai
Ke Kota Buluh
Ke Sibolga
MEULABOH
CALANG
TAKENGON
Tibang
Pk. Pidie
Beureunun
Teupin Raya
Sp. Pangwa
MEUREUDU
Samalanga
Jabal gafur
Babah jurong
Sp. samalanga
BIREUEN
Sp. Kr. Geukeuh
Km. 253
Pel. Lhokseumawe
Kreung Mane
Cunda
Bukit rata
Geudong
MK. malikul saleh
Mancang
Panton Labu
LK. SUKON
Km.328
Idi
Cot Girek
Peureulak
Penaron
Sp. Langsa Lama
Sp. Aluedua
Kuala Langsa
Km.449.350
Lokop
Km.458
Bts. Prop. Km.491.60
Sp. Lawedeski
Lawepakam
Km.611
Ma.Situlan
Laweuanan
Pinding
Bakongan
G.Kapur
Krueng Luas
Km.560
Peunanggalan Km.611
Ke Sidikalang
Bts. Prop
Lawe paris
Bts. Prop
Singkil
Km.644
Lipatkajang
Subulussalam
Rundeng
Ka.Keupeung
Trumon Geulombang
P.Paya
Babah Rat
BLANG PIDIE
Susoh
Km.337
lamie
kuala Tuha
Jeuram
SP. Peut
B.Talu
Lhok Seumod
Km.306
Tutut Km.313
Km.180
Km.125
Lamno Sp. Turu
Lutueng
Geumpang
Pameu Gt. Gerbang D.L.TAWAR
Kebayakan
Sp. Kebayakan
Bintang
Gelelungi
Celala
Bt.Lintang Isaq
Sp. Teritit
Pd. Baru
Samar Kilang
Sp. Kraft
Uwak Km.379
Jagung Jeget
Trangon
001
051
052
002 040
002
026
K
026
027
028
029
030
030
046
046
032
033
034
035
036
037
038
039
025
024
023
022
021
020
019
044
018
017
016
015
014
013
003
004
005
006
042
041
007
008
043
009
010
011
047
012
PROPINSI SUMATRA UTARA
U
LOKASI PROYEK
PEMBANGUNAN JALAN LAWI - SIPOT
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
PETA PROVINSI ACEH
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
LAY OUT
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan Sisingamangaraja Lorong BKKBN - Meulaboh
TYPICAL
BADAN JALAN
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
Timbunan Pilihan t= 20 cm
50
50
500
Agg.Kelas S t = 15 cm
Timbunan Pilihan Bahu T = 40 cm
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
TYPICAL PENANGANAN
L
C
L
2% 2%
4000
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
500
5000
500
STA 0+950 S.D 1+055
RENCANA PENANGANAN GALIAN
Agg.Kelas S t = 15 cm
Timbunan Pilihan t = 20 cm
STA 0+000 S.D 0+950
RENCANA PENANGANAN
L
C
L
2% 2%
Urpil t= 20 cm
500
STA 1+055 S.D 1+325
RENCANA PENANGANAN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan Sisingamangaraja Lorong BKKBN - Meulaboh
POTONGAN MEMANJANG
LONG SECTION
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
38.00 m
ELEVASI RENCANA PADA AS
PATOK HEKTOMETER
NOMOR PROFIL
JARAK LANGSUNG
JARAK PROFIL/DISTANCE
bidang persamaan/reference level
ELEVASI TANAH ASLI PADA AS
46.0
47.0
48.0
49.0
50.0
51.0
52.0
53.0
45.00 m
ELEVASI RENCANA PADA AS
PATOK HEKTOMETER
NOMOR PROFIL
JARAK LANGSUNG
JARAK PROFIL/DISTANCE
bidang persamaan/reference level
ELEVASI TANAH ASLI PADA AS
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
LONG SECTION / POTONGAN MEMANJANG
37.0
38.0
39.0
40.0
41.0
42.0
43.0
44.0
45.0
46.0
47.0
48.0
13.00 m
ELEVASI RENCANA PADA AS
PATOK HEKTOMETER
NOMOR PROFIL
JARAK LANGSUNG
JARAK PROFIL/DISTANCE
bidang persamaan/reference level
ELEVASI TANAH ASLI PADA AS
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
LONG SECTION / POTONGAN MEMANJANG
27.0
28.0
29.0
30.0
31.0
32.0
33.0
34.0
35.0
36.0
37.0
38.0
39.0
26.00 m
ELEVASI RENCANA PADA AS
PATOK HEKTOMETER
NOMOR PROFIL
JARAK LANGSUNG
JARAK PROFIL/DISTANCE
bidang persamaan/reference level
ELEVASI TANAH ASLI PADA AS
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
LONG SECTION / POTONGAN MEMANJANG
27.0
28.0
20.0
21.0
22.0
23.0
24.0
25.0
26.0
19.00 m
ELEVASI RENCANA PADA AS
PATOK HEKTOMETER
NOMOR PROFIL
JARAK LANGSUNG
JARAK PROFIL/DISTANCE
bidang persamaan/reference level
ELEVASI TANAH ASLI PADA AS
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
LONG SECTION / POTONGAN MEMANJANG
27.0
28.0
29.0
30.0
31.0
32.0
22.0
23.0
24.0
25.0
26.0
21.00 m
ELEVASI RENCANA PADA AS
PATOK HEKTOMETER
NOMOR PROFIL
JARAK LANGSUNG
JARAK PROFIL/DISTANCE
bidang persamaan/reference level
ELEVASI TANAH ASLI PADA AS
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
LONG SECTION / POTONGAN MEMANJANG
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan Sisingamangaraja Lorong BKKBN - Meulaboh
POTONGAN MELINTANG
CROSS SECTION
38.688
38.413
37.356
37.882
38.138
38.178
37.968
38.000
36.974
35.152
31.701
2.00 2.50 3.80
0.50
0.50
3.40
0.30
2.00 1.00 2.00
39
35
C
L
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
Agg.Kelas S t = 15 cm
Pas. Batu
38.378
38.418
38.378
2.00
2.00
0.50 0.50
50
Pas. Batu
38.298
38.298
Timbunan Pilihan t = 20 cm
38.413
41.084
40.684
39.684
39.734
40.234
40.524
40.634
40.584
40.506
40.006
39.964
40.664
40.584
36.884
36.584
3.50 1.10
0.50
0.40
0.50
1.00 2.25 2.25 1.00
0.50
0.40
0.50
1.10 1.00 2.50
42
40
40.956
40.996
40.956
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
0.50 0.50
40.918
40.918
Timbunan Pilihan t = 20 cm
37.356
46.076
43.576
43.526
44.036
44.101
44.146
44.096
44.197
43.696
43.626
44.326
44.226
40.626
40.516
4.10 1.50
0.40
0.50
1.00 2.25 2.25 1.00
0.50
0.40
0.50
1.10 1.00 2.50
47
45
40
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
44.506
44.546
44.506
2.00
2.00
50
Agg.Kelas S t = 15 cm
0.50 0.50
44.426
44.426
Timbunan Pilihan t = 20 cm
37.882
46.976
47.676
45.676
45.726
46.326
46.396
46.476
46.426
46.353
45.751
45.781
46.476
46.616
43.676
42.796
4.00 4.70 1.50
0.40
0.50
0.90
2.25 2.35
0.90
0.70
0.40
0.60
1.00 2.00 4.00
48
45
46.803
46.843
46.803
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
0.50 0.50
46.764
46.764
Timbunan Pilihan t = 20 cm
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
CROSS SECTION / POTONGAN MELINTANG
38.138
46.418
46.954
47.298
47.459
47.413
47.190
46.298
43.773
2.00 5.00 3.00 2.50 2.50 1.50 1.50 4.00
48
45
47.741
47.781
47.741
2.00
2.00
Pas. Batu
L
C
L
2% 2%
400
50
500
50
Pas. Batu
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
0.50 0.50
47.739
47.739
Timbunan Pilihan t = 20 cm
Agg.Kelas S t = 15 cm
38.178
50.412
51.512
49.512
49.572
50.172
50.192
50.162
50.108
49.472
48.412
46.932
5.00 3.10 1.00
0.50
0.90
2.25 2.25 1.00 2.00 2.00 4.00
52
50
2.00
2.00
50.068
50.028
50.028
Pas. Batu
L
C
L
2% 2%
400
50
500
50
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
0.50 0.50
49.943
49.572
49.472
49.943
Timbunan Pilihan t = 20 cm
Agg.Kelas S t = 15 cm
37.968
52.546
53.546
51.046
51.156
51.632
51.677
51.712
51.672
51.633
51.487
52.377
52.247
52.044
4.00 3.00 2.00
0.40
0.50
1.00 2.25 2.25
0.85
1.10 1.20 3.00 5.00
54
2.00
2.00
50.733
50.693
50.693
50.194
1.10
50.212
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
0.50 0.50
50.611
50.611
Timbunan Pilihan t = 20 cm
38.000
53.349
53.149
50.149
50.229
50.814
50.934
50.954
50.929
50.891
50.804
51.504
4.00 3.00 2.50
0.40
0.50
1.00 2.30 2.30
0.90
1.00 1.20
54
50
2.00
2.00
50.221
50.181
50.181
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
0.50 0.50
50.101
49.690
49.730
0.60
50.101
Timbunan Pilihan t = 20 cm
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
CROSS SECTION / POTONGAN MELINTANG
36.974
52.994
52.844
48.344
48.395
48.605
48.559
48.538
48.345
47.153
46.849
45.931
4.50 3.00 2.50
0.40
1.20 2.30 2.10 1.00
0.50
4.00 1.50
54
50
45
48.929
48.969
48.929
2.00
2.00
Pipa PVC Ø 3
4 inch
Pas. Batu Kali
Pas. Batu
L
C
L
2%
2%
400 50
500
50
0.50 0.50
48.849
48.849
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
Agg.Kelas S t = 15 cm
Timbunan Pilihan t = 20 cm
35.152
46.157
46.512
45.472
45.512
46.012
46.036
46.056
46.078
46.028
45.962
45.847
45.687
4.00 3.00
0.70
0.50
0.50
1.00 2.30 2.30 1.20 2.00 4.00 3.00
47
45
46.431
46.471
46.431
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
0.50 0.50
46.350
46.350
Timbunan Pilihan t = 20 cm
31.701
44.512
44.862
43.662
43.512
44.012
44.092
44.132
44.112
44.075
44.017
43.706
42.974
4.00 3.00
0.70
0.50
0.50
1.10 2.25 2.25 1.00 2.20 3.40 4.40
45
45
44.501
44.541
44.501
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
0.50 0.50
44.419
44.419
Timbunan Pilihan t = 20 cm
39.834
40.789
39.789
39.809
40.334
40.401
40.467
40.501
40.477
39.921
39.509
38.926
4.00 3.00
0.70
0.50
0.50
1.00 2.30 2.30
0.90
1.50 2.50 4.00
41
40
40.831
40.871
40.831
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
0.50 0.50
40.772
40.772
Timbunan Pilihan t = 20 cm
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
CROSS SECTION / POTONGAN MELINTANG
38.314
38.617
38.692
38.712
38.702
38.663
38.182
38.172
41.172
41.462
41.682
1.00 3.00 3.10 1.50
0.30
1.30
0.60
0.60
1.50 2.00 3.00
42
40
39.062
39.102
39.062
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
39.882
40.182
39.182
39.082
39.582
39.626
39.662
39.642
39.591
39.262
39.282
41.782
42.282
42.982
40.222
40.662
40.832
40.882
40.862
40.805
40.375
40.402
42.902
43.147
43.348
3.00 3.00
0.70
0.50
0.50
1.00 2.25 2.25 1.10
0.60
0.75
1.50 2.00 3.00 4.00 3.00 1.00 2.30 2.30 1.50
0.70
0.50
1.50 1.50 3.00
43
40
44
40
40.032
40.072
40.032
41.252
41.292
41.252
2.00
2.00 2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
0.50
0.50
0.50
0.50 0.50
0.50
38.983
39.952
41.172
41.172
39.952
38.983
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
39
35
36.220
36.802
37.381
37.962
38.250
38.351
37.885
35.782
35.182
4.00
2.40
2.00
3.00
0.60
3.50
3.50
2.50
1.50
38.689
38.729
38.689
2.00
2.00 0.50
Pas. Batu
L
C
L
2% 2%
400
50
500
50
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
38.626
0.50
38.626 Agg.Kelas S t = 15 cm
Timbunan Pilihan t = 20 cm
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
CROSS SECTION / POTONGAN MELINTANG
42.608
42.974
43.014
43.034
43.019
42.967
42.614
42.664
45.164
46.164
46.764
3.50 2.50 1.10 2.25 2.25 1.50
0.90
0.40
1.50 2.00 4.00
47
45
43.404
43.444
43.404
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
42.264
41.364
40.564
40.544
40.904
40.939
40.984
40.964
40.905
40.564
40.544
40.864
40.708
40.296
40.742
39.952
39.153
39.059
39.652
39.744
39.801
39.782
39.732
39.364
39.264
39.964
40.214
40.064
3.00 3.00
0.80
0.50
0.60
1.00 2.40 2.40 1.00 1.00
0.80
0.70
3.00 5.00
3.00 3.00
0.80
0.60
0.60
1.10 2.40 2.40
0.80
1.00
0.70
0.70
3.00 5.00
44
40
41
40
41.354
41.394
41.354
40.140
40.180
40.140
2.00
2.00
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
0.50
0.50
0.50
0.50
0.50
0.50
43.324
41.274
40.091
40.091
41.274
43.324
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
42.878
44.634
44.661
43.164
43.186
43.375
43.508
43.384
44.194
46.694
47.694
48.194
4.00 1.80 1.00
0.20
0.40
1.60 3.00 3.00 1.00
0.50
3.00 4.00
49
45
43.825
43.865
43.825
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
0.50
0.50
43.798
43.798 Timbunan Pilihan t = 20 cm
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
CROSS SECTION / POTONGAN MELINTANG
38.643
37.430
37.795
37.931
37.822
37.697
38.405
38.126
36.353
36.112
35.453
35.442
35.794
35.816
35.894
35.874
35.810
35.352
35.361
36.063
36.142
35.908
4.50 1.30 1.20 3.50 3.50 1.80 1.00 1.20
4.00 3.00
0.80
0.60
0.70
1.10 2.40 2.40
0.70
1.00
0.70
0.70
3.00 5.00
40
40
37
35
34.466
34.652
33.862
33.796
34.325
34.365
34.395
34.380
34.350
33.856
33.995
34.576
34.795
34.698
34.665
34.365
33.798
33.098
33.518
33.568
33.605
33.635
33.577
33.177
33.198
33.552
33.663
33.455
4.00 3.00 1.00
0.60
0.70
1.10 2.30 2.30 1.00 1.00
0.60
0.60
3.00 5.00
4.00 3.00 2.00
0.60
0.70
1.50 2.25 2.25 1.10 1.00
0.60
0.60
3.00 4.00
35
35
35
35
38.265
38.305
38.265
36.256
36.296
36.256
34.765
34.805
34.765
33.975
34.015
33.975
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
38.221
36.184
34.685
33.895
33.895
34.685
36.184
38.221
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
CROSS SECTION / POTONGAN MELINTANG
35.414
33.252
33.250
33.752
33.962
33.786
33.810
33.558
32.589
32.830
31.833
31.770
32.208
32.242
32.290
32.273
32.235
32.178
32.030
5.00 1.00
0.50
0.90
3.60 4.00 4.00 6.00
0.50
4.00 3.00
0.60
0.60
1.00 2.00 2.00 2.70 3.00 5.00
36
35 33
33.993
33.631
31.120
31.078
31.669
31.743
31.800
31.867
31.766
31.630
31.389
31.190
32.720
31.922
30.945
30.933
31.502
31.539
31.573
31.553
31.501
31.330
31.120
31.389
4.00 3.00
0.60
0.40
0.50
1.00 2.00 2.00 2.40 3.00 3.00 4.00 3.00 2.00
0.70
0.40
0.50
1.00 2.00 2.00 2.00 3.00 3.00 4.00
35
35 34
30
34.196
34.236
34.196
32.643
32.683
32.643
32.189
32.229
32.189
31.911
31.951
31.911
2.00
2.00 2.00
2.00
2.00
2.00 2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
0.50
0.50 0.50
0.50
0.50
0.50 0.50
0.50
34.164
31.843
31.843
32.563
32.563
34.164
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
CROSS SECTION / POTONGAN MELINTANG
32.528
31.275
31.296
31.822
31.877
31.624
32.097
32.008
32.163
2.40 1.35
0.50
0.50
3.65 3.60 3.00 2.00 5.00
37
35
32.299
32.259
2.00
2.00 0.50
0.50
32.179
32.179
32.259
L
C
L
2%
2%
400 50
500
50
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
Pas. Batu
Agg.Kelas S t = 15 cm
Timbunan Pilihan t = 20 cm
30.019
30.060
29.283
29.260
29.873
29.917
29.964
29.940
29.863
29.717
29.530
29.333
3.00 3.00
0.60
0.40
0.60
1.00 2.00 2.00 3.00 3.00 3.00 4.00
31
30
30.284
30.324
30.284
2.00
2.00
34.563
31.063
31.030
31.590
31.622
31.663
31.643
31.604
31.663
31.720
31.690
3.00 2.00
0.40
0.50
1.00 2.00 2.00 1.00 3.00 3.00 4.00
36
35
32.014
32.054
32.014
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
31.934
30.204
0.50
0.50 0.50
0.50
31.934
30.204
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
33.887
30.887
30.900
31.463
31.479
31.487
31.470
31.418
31.332
31.373
31.339
3.00 2.00
0.40
0.50
1.00 2.00 2.00 2.00 3.00 3.00 4.00
35
35
30
31.828
31.868
31.828
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
0.50
0.50
31.748
31.748
Timbunan Pilihan t = 20 cm
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
CROSS SECTION / POTONGAN MELINTANG
26.449
27.120
27.345
27.673
27.769
27.613
27.149
27.970
28.318
28.229
4.00 3.00 2.50 1.50 3.00 3.00 1.50 1.00 2.50 5.00
29
24.486
24.876
25.187
25.241
25.229
25.548
25.139
25.716
26.317
26.800
27.573
25.078
25.293
25.313
25.385
25.356
25.328
24.743
24.756
25.646
26.296
27.296
4.00 4.00 2.00 2.00 2.00 1.50 3.00
0.70
0.30
2.20 2.10
4.00 4.00 2.00 2.00 2.00 1.80
0.60
0.50
1.00 3.00 4.00
28
25
28
25
28.071
28.111
28.071
25.597
25.637
25.597
25.723
25.763
25.723
2.00
2.00
2.00
2.00
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
27.991
25.517
25.643
0.50
0.50
0.50
0.50
0.50
0.50
27.991
25.517
25.643
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
25.156
25.586
25.995
26.056
26.040
25.991
25.819
26.476
26.814
27.019
4.00 4.00 1.50 2.00 2.00 1.20 1.50 1.00 4.00 4.00
28
25
26.424
26.464
26.424
2.00
2.00
26.344
0.50
0.50
26.344
L
C
L
2% 2%
400
50
500
50
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
Pas. Batu
Agg.Kelas S t = 15 cm
Timbunan Pilihan t = 20 cm
Timbunan Pilihan t = 20 cm
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
CROSS SECTION / POTONGAN MELINTANG
22.825
23.095
23.182
23.248
23.298
23.255
22.792
22.692
22.275
3.00 2.00 1.00 2.50 2.50 1.50 4.00 4.00
24
23.658
23.698
23.658
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
Agg.Kelas S t = 15 cm
0.50
0.50
23.578
23.578
20.294
20.497
20.785
20.828
20.864
20.893
20.860
20.878
20.694
4.00 3.00 2.00 2.00 1.00 2.00 3.00 4.00
22
20
21.198
21.238
21.198
2.00
2.00
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
50
500
50
0.50
0.50
21.118
21.118
Timbunan Pilihan t = 20 cm
Agg.Kelas S t = 15 cm
Timb. Pilihan t = 20 cm
21.603
21.923
22.111
22.144
22.129
22.109
22.593
21.795
21.819
22.335
22.193
22.003
5.00 4.00 2.00 2.00 2.00 1.00
0.60
0.50
0.60
2.00 4.00 4.00
23
20
22.714
22.754
22.714
2.00
2.00
0.50 0.50
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
Urpil t= 20 cm
50
50
500
Agg.Kelas S t = 15 cm
Timb. Pilihan t = 40 cm
22.634
22.634
22.200
22.427
22.804
22.825
22.857
22.791
22.634
23.010
23.494
23.362
23.205
5.00 4.00 2.00 2.00 2.00 1.20 1.50 1.00
0.50
5.00 5.00
24
23.395
23.435
23.395
2.00
2.00
0.50 0.50
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
Urpil t= 20 cm
50
50
500
Agg.Kelas S t = 15 cm
Timb. Pilihan t = 40 cm
23.315
23.315
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
CROSS SECTION / POTONGAN MELINTANG
20.315
20.691
21.471
21.471
21.503
21.544
21.528
21.501
21.487
21.487
20.684
20.405
20.304
20.134
3.00 3.00
0.40
0.30
1.30 1.50 1.50 1.00
0.30
0.30
0.40
3.00 3.00 4.00
22
20
22.114
22.154
22.114
2.00
2.00
21.193
21.307
21.471
21.557
21.603
21.663
21.654
21.626
21.094
21.089
22.097
22.437
22.404
4.00 4.00 3.00 1.50 2.00 2.00 1.00
0.80
0.60
0.40
1.00 4.00 4.00
23
20
22.167
22.207
22.167
2.00
2.00
0.50 0.50
0.50 0.50
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
Urpil t= 20 cm
50
50
500
Agg.Kelas S t = 15 cm
Timb. Pilihan t = 40 cm
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
Urpil t= 20 cm
50
50
500
Agg.Kelas S t = 15 cm
Timb. Pilihan t = 40 cm
22.034
22.087
22.034
22.087
4.00 2.00 1.00 2.00 2.00
0.80
0.80
0.70
0.50
1.20 3.00
24
20
2.00
2.00
0.50 0.50
L
C
L
2% 2%
400
Aspal AC-BC 6 cm
Agg.Kelas B t= 20 cm
Agg. Kelas A t= 15 cm
Urpil t= 20 cm
50
50
500
Agg.Kelas S t = 15 cm
Timb. Pilihan t = 40 cm
23.216
23.080
22.116
22.095
22.416
22.406
22.416
22.412
22.331
22.248
21.841
21.534
23.022
22.982
22.902
22.982
22.902
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
CROSS SECTION / POTONGAN MELINTANG
22.945
22.857
23.365
23.448
23.479
23.460
23.462
23.460
23.245
23.124
23.223
23.146
4.00 4.00 3.00 1.50 2.00 2.00
0.80
0.80
1.00 3.00 3.00 3.00
24
2.50
L
C
L
2% 2%
500
23.627
23.679
2.50
23.627
24.697
25.102
25.571
25.772
25.842
25.879
25.846
25.569
25.591
25.733
25.903
4.00 4.00 2.00 1.00 1.50 1.50
0.80
1.00 3.00 3.00 3.00
26
25
2.50
2.50
L
C
L
2% 2%
Urpil t= 20 cm
500
Pas. Batu
25.990
25.990
26.042
21.346
21.587
21.975
22.033
22.075
22.125
22.099
21.675
21.689
22.476
22.511
22.525
4.00 3.00 1.50 2.00 2.00 1.00
0.90
0.60
0.40
1.00 4.00 4.00
23
20
21.456
21.857
22.296
22.379
22.410
22.428
22.439
22.479
22.078
22.099
23.089
23.245
23.189
4.00 4.00 2.00 1.00 2.00 2.00
0.80
0.80
0.70
0.50
1.20 3.00 4.00
24
20
L
C
L
2% 2%
Urpil t= 20 cm
500
Pas. Batu
L
C
L
2% 2%
Urpil t= 20 cm
500
2.50 2.50
22.181
22.233
22.181
2.50 2.50
22.558
22.610
22.558
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
CROSS SECTION / POTONGAN MELINTANG
29.007
29.094
29.357
29.454
29.536
29.503
29.465
29.304
29.347
29.493
29.726
29.593
4.00 4.00 2.00 1.00 2.00 2.00 1.00
0.80
1.00 3.00 3.00 3.00
30
30
2.50
2.50
L
C
L
2% 2%
Urpil t= 20 cm
500
Pas. Batu
29.736
29.684
29.684
30.282
30.395
30.774
30.794
30.813
30.844
30.791
30.905
30.871
30.897
30.914
4.00 2.00 1.50 2.00 2.00 1.50 1.00 1.00 3.00 3.00 3.00
31
30
2.50
2.50
L
C
L
2% 2%
Urpil t= 20 cm
500
Pas. Batu
30.961
31.013
30.961
28.834
28.937
29.494
29.584
29.597
29.614
29.629
29.577
29.327
29.193
29.093
29.234
31.723
29.504
29.393
29.674
29.691
29.733
29.711
29.709
29.393
30.007
30.193
30.337
30.204
4.00 4.00 2.00 1.00 2.00 2.00
0.50
1.00 1.00 3.00 3.00 3.00
3.00 2.00 2.50 1.00 2.00 2.00 1.00
0.50
1.50 1.00 3.00 3.00 4.00
30
30
32
30
L
C
L
2% 2%
Urpil t= 20 cm
500
Pas. Batu
2.50
2.50
29.760
29.812
29.760
L
C
L
2% 2%
Urpil t= 20 cm
500
Pas. Batu
2.50
2.50
29.854
29.906
29.854
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
CROSS SECTION / POTONGAN MELINTANG
29.708
29.119
28.286
28.382
28.432
28.487
28.570
28.663
28.639
28.669
25.971
24.742
25.128
24.972
23.289
23.159
22.907
3.00 3.00 1.00 1.00 2.00 2.00 2.00 3.00 3.00 3.00
4.00 1.50 4.00 4.00 3.00 2.00 5.00
31
30
27
25
L
C
L
2% 2%
Urpil t= 20 cm
500
Pas. Batu
2.50
2.50
28.595
28.647
28.595
L
C
L
2% 2%
Urpil t= 20 cm
500
Pas. Batu
2.50
2.50
25.343
25.291
25.291
23.629
24.552
24.650
24.685
23.396
23.274
23.140
3.00 3.50 2.00 1.50 2.00 3.00 3.00
25
25
L
C
L
2% 2%
Urpil t= 20 cm
500
Pas. Batu
2.50
2.50
24.798
24.850
24.798
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
CROSS SECTION / POTONGAN MELINTANG
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan Sisingamangaraja Lorong BKKBN - Meulaboh
TYPICAL
PASANGAN BATU
TYPICAL PAS. BATU II
SKALA 1 : 20
TYPICAL PAS. BATU I
SKALA 1 : 20
PAKET :
PEMBANGUNAN JALAN JAWI - SIPOT
GAMBAR RENCANA
JUDUL :
CV. UTAMA KARYA DESIGN
PEMERINTAH KABUPATEN ACEH BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
JALAN SISINGAMANGARAJA LR. BKKBN
Telp. (0655) 7006105 - MEULABOH
LOKASI
HALAMAN
SKALA
NO. GAMBAR
TANGGAL
TYPICAL PASANGAN BATU

More Related Content

Similar to GAMBAR RENCANA JL. JAWI-SIPOT.pdf

Project Portfolio | A9 architects Ltd
Project Portfolio | A9 architects LtdProject Portfolio | A9 architects Ltd
Project Portfolio | A9 architects LtdA9 Architects
 
Basement wall design
Basement wall designBasement wall design
Basement wall designCETCBIM
 
presupuesto agua potable
presupuesto agua potablepresupuesto agua potable
presupuesto agua potableCarlos Sare
 
land Development
land Developmentland Development
land DevelopmentIan Wave
 
A164543 projek akhir asas sains data dalam pengangkutan
A164543 projek akhir asas sains data dalam pengangkutanA164543 projek akhir asas sains data dalam pengangkutan
A164543 projek akhir asas sains data dalam pengangkutanaida zahirah
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study sessionE'ville Eye
 
IRJET-Estimating the Vehicle Operating Cost through Railway Over Bridge
IRJET-Estimating the Vehicle Operating Cost through Railway Over BridgeIRJET-Estimating the Vehicle Operating Cost through Railway Over Bridge
IRJET-Estimating the Vehicle Operating Cost through Railway Over BridgeIRJET Journal
 
LS Price list_15/4/2015
LS Price list_15/4/2015LS Price list_15/4/2015
LS Price list_15/4/2015hairxoawn
 
Bang gia thiet bi dong cat ls 15.4.2015
Bang gia thiet bi dong cat ls 15.4.2015Bang gia thiet bi dong cat ls 15.4.2015
Bang gia thiet bi dong cat ls 15.4.2015hairxoawn
 
LS Circuit Breaker Price List_15.4.2015
LS Circuit Breaker Price List_15.4.2015LS Circuit Breaker Price List_15.4.2015
LS Circuit Breaker Price List_15.4.2015hairxoawn
 
| Plots in Ramganga nagar Yojana bareilly | Real Estate Agent in Bareilly |
| Plots in Ramganga nagar Yojana bareilly | Real Estate Agent in Bareilly || Plots in Ramganga nagar Yojana bareilly | Real Estate Agent in Bareilly |
| Plots in Ramganga nagar Yojana bareilly | Real Estate Agent in Bareilly |Anup Singh Khelal
 
B.3. RESISTANCE C3
B.3. RESISTANCE C3B.3. RESISTANCE C3
B.3. RESISTANCE C3Andrei Loata
 
Bang gia ls_2014
Bang gia ls_2014Bang gia ls_2014
Bang gia ls_2014Lãng Quên
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignKathleenFaithMamuad
 
Thebe River Safaris Room Addition 2014
Thebe River Safaris Room Addition 2014Thebe River Safaris Room Addition 2014
Thebe River Safaris Room Addition 2014Grant Hepburn
 

Similar to GAMBAR RENCANA JL. JAWI-SIPOT.pdf (20)

Project Portfolio | A9 architects Ltd
Project Portfolio | A9 architects LtdProject Portfolio | A9 architects Ltd
Project Portfolio | A9 architects Ltd
 
Basement wall design
Basement wall designBasement wall design
Basement wall design
 
Connecting Bridge
Connecting BridgeConnecting Bridge
Connecting Bridge
 
2205 cat juguete-2-roj
2205 cat juguete-2-roj2205 cat juguete-2-roj
2205 cat juguete-2-roj
 
Tohana fdp 2031
Tohana fdp 2031Tohana fdp 2031
Tohana fdp 2031
 
presupuesto agua potable
presupuesto agua potablepresupuesto agua potable
presupuesto agua potable
 
land Development
land Developmentland Development
land Development
 
A164543 projek akhir asas sains data dalam pengangkutan
A164543 projek akhir asas sains data dalam pengangkutanA164543 projek akhir asas sains data dalam pengangkutan
A164543 projek akhir asas sains data dalam pengangkutan
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study session
 
Drawing1
Drawing1Drawing1
Drawing1
 
IRJET-Estimating the Vehicle Operating Cost through Railway Over Bridge
IRJET-Estimating the Vehicle Operating Cost through Railway Over BridgeIRJET-Estimating the Vehicle Operating Cost through Railway Over Bridge
IRJET-Estimating the Vehicle Operating Cost through Railway Over Bridge
 
Aldi Inala
Aldi InalaAldi Inala
Aldi Inala
 
LS Price list_15/4/2015
LS Price list_15/4/2015LS Price list_15/4/2015
LS Price list_15/4/2015
 
Bang gia thiet bi dong cat ls 15.4.2015
Bang gia thiet bi dong cat ls 15.4.2015Bang gia thiet bi dong cat ls 15.4.2015
Bang gia thiet bi dong cat ls 15.4.2015
 
LS Circuit Breaker Price List_15.4.2015
LS Circuit Breaker Price List_15.4.2015LS Circuit Breaker Price List_15.4.2015
LS Circuit Breaker Price List_15.4.2015
 
| Plots in Ramganga nagar Yojana bareilly | Real Estate Agent in Bareilly |
| Plots in Ramganga nagar Yojana bareilly | Real Estate Agent in Bareilly || Plots in Ramganga nagar Yojana bareilly | Real Estate Agent in Bareilly |
| Plots in Ramganga nagar Yojana bareilly | Real Estate Agent in Bareilly |
 
B.3. RESISTANCE C3
B.3. RESISTANCE C3B.3. RESISTANCE C3
B.3. RESISTANCE C3
 
Bang gia ls_2014
Bang gia ls_2014Bang gia ls_2014
Bang gia ls_2014
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan Design
 
Thebe River Safaris Room Addition 2014
Thebe River Safaris Room Addition 2014Thebe River Safaris Room Addition 2014
Thebe River Safaris Room Addition 2014
 

Recently uploaded

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxchumtiyababu
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 

Recently uploaded (20)

Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 

GAMBAR RENCANA JL. JAWI-SIPOT.pdf

  • 1. PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG Jalan Sisingamangaraja Lorong BKKBN - Meulaboh GAMBAR RENCANA NAMA PEKERJAAN : PEMBANGUNAN JALAN JAWI - SIPOT LOKASI PEKERJAAN : KABUPATEN ACEH BARAT TAHUN ANGGARAN : 2022
  • 2. PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG Jalan Sisingamangaraja Lorong BKKBN - Meulaboh LEMBAR PENGESAHAN NAMA PEKERJAAN : PEMBANGUNAN JALAN JAWI - SIPOT LOKASI PEKERJAAN : KABUPATEN ACEH BARAT TAHUN ANGGARAN : 2022 DIBUAT OLEH : KONSULTAN PERENCANA CV. UTAMA KARYA DESIGN MUTAQIN Direktur DISETUJUI OLEH : PEJABAT PEMBUAT KOMITMEN (PPK) BIDANG JALAN DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN ACEH BARAT BENI HARDI, ST., MT NIP. 19790211 200504 1 001 MENYETUJUI OLEH : KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN ACEH BARAT DR. KURDI, ST.MT NIP. 19760612 200504 1 001
  • 3. Lokasi Quarry KOTAMADYA BANDAR UDARA IBUKOTA KECAMATAN IBUKOTA KABUPATEN JALAN PROVINSI IBUKOTA PROPINSI PELABUHAN BATAS KABUPATEN BATAS PROPINSI JALAN NASIONAL B A P A 053 P. SIMEULUE Lasikin SINABANG Inor Nasreheu Sibigo Lewak 054 055 P. BABI P. TUANKU TL. Nibong P.Bale P. UJUNGBATU 050 DARUSSALAM P.WEH P.BREUH P.NASI SP.Krueng Raya BANDA ACEH Ulele Sp. Rima Mata Ie Lambaro Krueng raya Laweung Blang Bintang Alue Glong Seulimeum Kota Jantho Km. 63.400 Keumala Km.87 Batee SIGLI Km.112 LHOKSEUMAWE LANGSA Km.440 BLANG KEJREN Km.475 KUTA CANE Km.579 TAPAK TUAN Ke Binjai Ke Kota Buluh Ke Sibolga MEULABOH CALANG TAKENGON Tibang Pk. Pidie Beureunun Teupin Raya Sp. Pangwa MEUREUDU Samalanga Jabal gafur Babah jurong Sp. samalanga BIREUEN Sp. Kr. Geukeuh Km. 253 Pel. Lhokseumawe Kreung Mane Cunda Bukit rata Geudong MK. malikul saleh Mancang Panton Labu LK. SUKON Km.328 Idi Cot Girek Peureulak Penaron Sp. Langsa Lama Sp. Aluedua Kuala Langsa Km.449.350 Lokop Km.458 Bts. Prop. Km.491.60 Sp. Lawedeski Lawepakam Km.611 Ma.Situlan Laweuanan Pinding Bakongan G.Kapur Krueng Luas Km.560 Peunanggalan Km.611 Ke Sidikalang Bts. Prop Lawe paris Bts. Prop Singkil Km.644 Lipatkajang Subulussalam Rundeng Ka.Keupeung Trumon Geulombang P.Paya Babah Rat BLANG PIDIE Susoh Km.337 lamie kuala Tuha Jeuram SP. Peut B.Talu Lhok Seumod Km.306 Tutut Km.313 Km.180 Km.125 Lamno Sp. Turu Lutueng Geumpang Pameu Gt. Gerbang D.L.TAWAR Kebayakan Sp. Kebayakan Bintang Gelelungi Celala Bt.Lintang Isaq Sp. Teritit Pd. Baru Samar Kilang Sp. Kraft Uwak Km.379 Jagung Jeget Trangon 001 051 052 002 040 002 026 K 026 027 028 029 030 030 046 046 032 033 034 035 036 037 038 039 025 024 023 022 021 020 019 044 018 017 016 015 014 013 003 004 005 006 042 041 007 008 043 009 010 011 047 012 PROPINSI SUMATRA UTARA U LOKASI PROYEK PEMBANGUNAN JALAN LAWI - SIPOT PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL PETA PROVINSI ACEH
  • 4. PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL LAY OUT
  • 5. PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG Jalan Sisingamangaraja Lorong BKKBN - Meulaboh TYPICAL BADAN JALAN
  • 6. L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm Timbunan Pilihan t= 20 cm 50 50 500 Agg.Kelas S t = 15 cm Timbunan Pilihan Bahu T = 40 cm PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL TYPICAL PENANGANAN L C L 2% 2% 4000 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 500 5000 500 STA 0+950 S.D 1+055 RENCANA PENANGANAN GALIAN Agg.Kelas S t = 15 cm Timbunan Pilihan t = 20 cm STA 0+000 S.D 0+950 RENCANA PENANGANAN L C L 2% 2% Urpil t= 20 cm 500 STA 1+055 S.D 1+325 RENCANA PENANGANAN
  • 7. PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG Jalan Sisingamangaraja Lorong BKKBN - Meulaboh POTONGAN MEMANJANG LONG SECTION
  • 8. 39.0 40.0 41.0 42.0 43.0 44.0 45.0 46.0 47.0 48.0 38.00 m ELEVASI RENCANA PADA AS PATOK HEKTOMETER NOMOR PROFIL JARAK LANGSUNG JARAK PROFIL/DISTANCE bidang persamaan/reference level ELEVASI TANAH ASLI PADA AS 46.0 47.0 48.0 49.0 50.0 51.0 52.0 53.0 45.00 m ELEVASI RENCANA PADA AS PATOK HEKTOMETER NOMOR PROFIL JARAK LANGSUNG JARAK PROFIL/DISTANCE bidang persamaan/reference level ELEVASI TANAH ASLI PADA AS PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL LONG SECTION / POTONGAN MEMANJANG
  • 9. 37.0 38.0 39.0 40.0 41.0 42.0 43.0 44.0 45.0 46.0 47.0 48.0 13.00 m ELEVASI RENCANA PADA AS PATOK HEKTOMETER NOMOR PROFIL JARAK LANGSUNG JARAK PROFIL/DISTANCE bidang persamaan/reference level ELEVASI TANAH ASLI PADA AS PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL LONG SECTION / POTONGAN MEMANJANG
  • 10. 27.0 28.0 29.0 30.0 31.0 32.0 33.0 34.0 35.0 36.0 37.0 38.0 39.0 26.00 m ELEVASI RENCANA PADA AS PATOK HEKTOMETER NOMOR PROFIL JARAK LANGSUNG JARAK PROFIL/DISTANCE bidang persamaan/reference level ELEVASI TANAH ASLI PADA AS PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL LONG SECTION / POTONGAN MEMANJANG
  • 11. 27.0 28.0 20.0 21.0 22.0 23.0 24.0 25.0 26.0 19.00 m ELEVASI RENCANA PADA AS PATOK HEKTOMETER NOMOR PROFIL JARAK LANGSUNG JARAK PROFIL/DISTANCE bidang persamaan/reference level ELEVASI TANAH ASLI PADA AS PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL LONG SECTION / POTONGAN MEMANJANG
  • 12. 27.0 28.0 29.0 30.0 31.0 32.0 22.0 23.0 24.0 25.0 26.0 21.00 m ELEVASI RENCANA PADA AS PATOK HEKTOMETER NOMOR PROFIL JARAK LANGSUNG JARAK PROFIL/DISTANCE bidang persamaan/reference level ELEVASI TANAH ASLI PADA AS PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL LONG SECTION / POTONGAN MEMANJANG
  • 13. PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG Jalan Sisingamangaraja Lorong BKKBN - Meulaboh POTONGAN MELINTANG CROSS SECTION
  • 14. 38.688 38.413 37.356 37.882 38.138 38.178 37.968 38.000 36.974 35.152 31.701 2.00 2.50 3.80 0.50 0.50 3.40 0.30 2.00 1.00 2.00 39 35 C L L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 Agg.Kelas S t = 15 cm Pas. Batu 38.378 38.418 38.378 2.00 2.00 0.50 0.50 50 Pas. Batu 38.298 38.298 Timbunan Pilihan t = 20 cm 38.413 41.084 40.684 39.684 39.734 40.234 40.524 40.634 40.584 40.506 40.006 39.964 40.664 40.584 36.884 36.584 3.50 1.10 0.50 0.40 0.50 1.00 2.25 2.25 1.00 0.50 0.40 0.50 1.10 1.00 2.50 42 40 40.956 40.996 40.956 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 0.50 0.50 40.918 40.918 Timbunan Pilihan t = 20 cm 37.356 46.076 43.576 43.526 44.036 44.101 44.146 44.096 44.197 43.696 43.626 44.326 44.226 40.626 40.516 4.10 1.50 0.40 0.50 1.00 2.25 2.25 1.00 0.50 0.40 0.50 1.10 1.00 2.50 47 45 40 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 44.506 44.546 44.506 2.00 2.00 50 Agg.Kelas S t = 15 cm 0.50 0.50 44.426 44.426 Timbunan Pilihan t = 20 cm 37.882 46.976 47.676 45.676 45.726 46.326 46.396 46.476 46.426 46.353 45.751 45.781 46.476 46.616 43.676 42.796 4.00 4.70 1.50 0.40 0.50 0.90 2.25 2.35 0.90 0.70 0.40 0.60 1.00 2.00 4.00 48 45 46.803 46.843 46.803 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 0.50 0.50 46.764 46.764 Timbunan Pilihan t = 20 cm PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL CROSS SECTION / POTONGAN MELINTANG
  • 15. 38.138 46.418 46.954 47.298 47.459 47.413 47.190 46.298 43.773 2.00 5.00 3.00 2.50 2.50 1.50 1.50 4.00 48 45 47.741 47.781 47.741 2.00 2.00 Pas. Batu L C L 2% 2% 400 50 500 50 Pas. Batu Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 0.50 0.50 47.739 47.739 Timbunan Pilihan t = 20 cm Agg.Kelas S t = 15 cm 38.178 50.412 51.512 49.512 49.572 50.172 50.192 50.162 50.108 49.472 48.412 46.932 5.00 3.10 1.00 0.50 0.90 2.25 2.25 1.00 2.00 2.00 4.00 52 50 2.00 2.00 50.068 50.028 50.028 Pas. Batu L C L 2% 2% 400 50 500 50 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 0.50 0.50 49.943 49.572 49.472 49.943 Timbunan Pilihan t = 20 cm Agg.Kelas S t = 15 cm 37.968 52.546 53.546 51.046 51.156 51.632 51.677 51.712 51.672 51.633 51.487 52.377 52.247 52.044 4.00 3.00 2.00 0.40 0.50 1.00 2.25 2.25 0.85 1.10 1.20 3.00 5.00 54 2.00 2.00 50.733 50.693 50.693 50.194 1.10 50.212 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 0.50 0.50 50.611 50.611 Timbunan Pilihan t = 20 cm 38.000 53.349 53.149 50.149 50.229 50.814 50.934 50.954 50.929 50.891 50.804 51.504 4.00 3.00 2.50 0.40 0.50 1.00 2.30 2.30 0.90 1.00 1.20 54 50 2.00 2.00 50.221 50.181 50.181 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 0.50 0.50 50.101 49.690 49.730 0.60 50.101 Timbunan Pilihan t = 20 cm PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL CROSS SECTION / POTONGAN MELINTANG
  • 16. 36.974 52.994 52.844 48.344 48.395 48.605 48.559 48.538 48.345 47.153 46.849 45.931 4.50 3.00 2.50 0.40 1.20 2.30 2.10 1.00 0.50 4.00 1.50 54 50 45 48.929 48.969 48.929 2.00 2.00 Pipa PVC Ø 3 4 inch Pas. Batu Kali Pas. Batu L C L 2% 2% 400 50 500 50 0.50 0.50 48.849 48.849 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm Agg.Kelas S t = 15 cm Timbunan Pilihan t = 20 cm 35.152 46.157 46.512 45.472 45.512 46.012 46.036 46.056 46.078 46.028 45.962 45.847 45.687 4.00 3.00 0.70 0.50 0.50 1.00 2.30 2.30 1.20 2.00 4.00 3.00 47 45 46.431 46.471 46.431 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 0.50 0.50 46.350 46.350 Timbunan Pilihan t = 20 cm 31.701 44.512 44.862 43.662 43.512 44.012 44.092 44.132 44.112 44.075 44.017 43.706 42.974 4.00 3.00 0.70 0.50 0.50 1.10 2.25 2.25 1.00 2.20 3.40 4.40 45 45 44.501 44.541 44.501 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 0.50 0.50 44.419 44.419 Timbunan Pilihan t = 20 cm 39.834 40.789 39.789 39.809 40.334 40.401 40.467 40.501 40.477 39.921 39.509 38.926 4.00 3.00 0.70 0.50 0.50 1.00 2.30 2.30 0.90 1.50 2.50 4.00 41 40 40.831 40.871 40.831 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 0.50 0.50 40.772 40.772 Timbunan Pilihan t = 20 cm PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL CROSS SECTION / POTONGAN MELINTANG
  • 17. 38.314 38.617 38.692 38.712 38.702 38.663 38.182 38.172 41.172 41.462 41.682 1.00 3.00 3.10 1.50 0.30 1.30 0.60 0.60 1.50 2.00 3.00 42 40 39.062 39.102 39.062 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 39.882 40.182 39.182 39.082 39.582 39.626 39.662 39.642 39.591 39.262 39.282 41.782 42.282 42.982 40.222 40.662 40.832 40.882 40.862 40.805 40.375 40.402 42.902 43.147 43.348 3.00 3.00 0.70 0.50 0.50 1.00 2.25 2.25 1.10 0.60 0.75 1.50 2.00 3.00 4.00 3.00 1.00 2.30 2.30 1.50 0.70 0.50 1.50 1.50 3.00 43 40 44 40 40.032 40.072 40.032 41.252 41.292 41.252 2.00 2.00 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 0.50 0.50 0.50 0.50 0.50 0.50 38.983 39.952 41.172 41.172 39.952 38.983 Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm 39 35 36.220 36.802 37.381 37.962 38.250 38.351 37.885 35.782 35.182 4.00 2.40 2.00 3.00 0.60 3.50 3.50 2.50 1.50 38.689 38.729 38.689 2.00 2.00 0.50 Pas. Batu L C L 2% 2% 400 50 500 50 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 38.626 0.50 38.626 Agg.Kelas S t = 15 cm Timbunan Pilihan t = 20 cm PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL CROSS SECTION / POTONGAN MELINTANG
  • 18. 42.608 42.974 43.014 43.034 43.019 42.967 42.614 42.664 45.164 46.164 46.764 3.50 2.50 1.10 2.25 2.25 1.50 0.90 0.40 1.50 2.00 4.00 47 45 43.404 43.444 43.404 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 42.264 41.364 40.564 40.544 40.904 40.939 40.984 40.964 40.905 40.564 40.544 40.864 40.708 40.296 40.742 39.952 39.153 39.059 39.652 39.744 39.801 39.782 39.732 39.364 39.264 39.964 40.214 40.064 3.00 3.00 0.80 0.50 0.60 1.00 2.40 2.40 1.00 1.00 0.80 0.70 3.00 5.00 3.00 3.00 0.80 0.60 0.60 1.10 2.40 2.40 0.80 1.00 0.70 0.70 3.00 5.00 44 40 41 40 41.354 41.394 41.354 40.140 40.180 40.140 2.00 2.00 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 0.50 0.50 0.50 0.50 0.50 0.50 43.324 41.274 40.091 40.091 41.274 43.324 Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm 42.878 44.634 44.661 43.164 43.186 43.375 43.508 43.384 44.194 46.694 47.694 48.194 4.00 1.80 1.00 0.20 0.40 1.60 3.00 3.00 1.00 0.50 3.00 4.00 49 45 43.825 43.865 43.825 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 0.50 0.50 43.798 43.798 Timbunan Pilihan t = 20 cm PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL CROSS SECTION / POTONGAN MELINTANG
  • 19. 38.643 37.430 37.795 37.931 37.822 37.697 38.405 38.126 36.353 36.112 35.453 35.442 35.794 35.816 35.894 35.874 35.810 35.352 35.361 36.063 36.142 35.908 4.50 1.30 1.20 3.50 3.50 1.80 1.00 1.20 4.00 3.00 0.80 0.60 0.70 1.10 2.40 2.40 0.70 1.00 0.70 0.70 3.00 5.00 40 40 37 35 34.466 34.652 33.862 33.796 34.325 34.365 34.395 34.380 34.350 33.856 33.995 34.576 34.795 34.698 34.665 34.365 33.798 33.098 33.518 33.568 33.605 33.635 33.577 33.177 33.198 33.552 33.663 33.455 4.00 3.00 1.00 0.60 0.70 1.10 2.30 2.30 1.00 1.00 0.60 0.60 3.00 5.00 4.00 3.00 2.00 0.60 0.70 1.50 2.25 2.25 1.10 1.00 0.60 0.60 3.00 4.00 35 35 35 35 38.265 38.305 38.265 36.256 36.296 36.256 34.765 34.805 34.765 33.975 34.015 33.975 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 38.221 36.184 34.685 33.895 33.895 34.685 36.184 38.221 Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL CROSS SECTION / POTONGAN MELINTANG
  • 20. 35.414 33.252 33.250 33.752 33.962 33.786 33.810 33.558 32.589 32.830 31.833 31.770 32.208 32.242 32.290 32.273 32.235 32.178 32.030 5.00 1.00 0.50 0.90 3.60 4.00 4.00 6.00 0.50 4.00 3.00 0.60 0.60 1.00 2.00 2.00 2.70 3.00 5.00 36 35 33 33.993 33.631 31.120 31.078 31.669 31.743 31.800 31.867 31.766 31.630 31.389 31.190 32.720 31.922 30.945 30.933 31.502 31.539 31.573 31.553 31.501 31.330 31.120 31.389 4.00 3.00 0.60 0.40 0.50 1.00 2.00 2.00 2.40 3.00 3.00 4.00 3.00 2.00 0.70 0.40 0.50 1.00 2.00 2.00 2.00 3.00 3.00 4.00 35 35 34 30 34.196 34.236 34.196 32.643 32.683 32.643 32.189 32.229 32.189 31.911 31.951 31.911 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 34.164 31.843 31.843 32.563 32.563 34.164 Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL CROSS SECTION / POTONGAN MELINTANG
  • 21. 32.528 31.275 31.296 31.822 31.877 31.624 32.097 32.008 32.163 2.40 1.35 0.50 0.50 3.65 3.60 3.00 2.00 5.00 37 35 32.299 32.259 2.00 2.00 0.50 0.50 32.179 32.179 32.259 L C L 2% 2% 400 50 500 50 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm Pas. Batu Agg.Kelas S t = 15 cm Timbunan Pilihan t = 20 cm 30.019 30.060 29.283 29.260 29.873 29.917 29.964 29.940 29.863 29.717 29.530 29.333 3.00 3.00 0.60 0.40 0.60 1.00 2.00 2.00 3.00 3.00 3.00 4.00 31 30 30.284 30.324 30.284 2.00 2.00 34.563 31.063 31.030 31.590 31.622 31.663 31.643 31.604 31.663 31.720 31.690 3.00 2.00 0.40 0.50 1.00 2.00 2.00 1.00 3.00 3.00 4.00 36 35 32.014 32.054 32.014 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 31.934 30.204 0.50 0.50 0.50 0.50 31.934 30.204 Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm 33.887 30.887 30.900 31.463 31.479 31.487 31.470 31.418 31.332 31.373 31.339 3.00 2.00 0.40 0.50 1.00 2.00 2.00 2.00 3.00 3.00 4.00 35 35 30 31.828 31.868 31.828 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 0.50 0.50 31.748 31.748 Timbunan Pilihan t = 20 cm PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL CROSS SECTION / POTONGAN MELINTANG
  • 22. 26.449 27.120 27.345 27.673 27.769 27.613 27.149 27.970 28.318 28.229 4.00 3.00 2.50 1.50 3.00 3.00 1.50 1.00 2.50 5.00 29 24.486 24.876 25.187 25.241 25.229 25.548 25.139 25.716 26.317 26.800 27.573 25.078 25.293 25.313 25.385 25.356 25.328 24.743 24.756 25.646 26.296 27.296 4.00 4.00 2.00 2.00 2.00 1.50 3.00 0.70 0.30 2.20 2.10 4.00 4.00 2.00 2.00 2.00 1.80 0.60 0.50 1.00 3.00 4.00 28 25 28 25 28.071 28.111 28.071 25.597 25.637 25.597 25.723 25.763 25.723 2.00 2.00 2.00 2.00 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 27.991 25.517 25.643 0.50 0.50 0.50 0.50 0.50 0.50 27.991 25.517 25.643 Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm 25.156 25.586 25.995 26.056 26.040 25.991 25.819 26.476 26.814 27.019 4.00 4.00 1.50 2.00 2.00 1.20 1.50 1.00 4.00 4.00 28 25 26.424 26.464 26.424 2.00 2.00 26.344 0.50 0.50 26.344 L C L 2% 2% 400 50 500 50 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm Pas. Batu Agg.Kelas S t = 15 cm Timbunan Pilihan t = 20 cm Timbunan Pilihan t = 20 cm PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL CROSS SECTION / POTONGAN MELINTANG
  • 23. 22.825 23.095 23.182 23.248 23.298 23.255 22.792 22.692 22.275 3.00 2.00 1.00 2.50 2.50 1.50 4.00 4.00 24 23.658 23.698 23.658 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 Agg.Kelas S t = 15 cm 0.50 0.50 23.578 23.578 20.294 20.497 20.785 20.828 20.864 20.893 20.860 20.878 20.694 4.00 3.00 2.00 2.00 1.00 2.00 3.00 4.00 22 20 21.198 21.238 21.198 2.00 2.00 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm 50 500 50 0.50 0.50 21.118 21.118 Timbunan Pilihan t = 20 cm Agg.Kelas S t = 15 cm Timb. Pilihan t = 20 cm 21.603 21.923 22.111 22.144 22.129 22.109 22.593 21.795 21.819 22.335 22.193 22.003 5.00 4.00 2.00 2.00 2.00 1.00 0.60 0.50 0.60 2.00 4.00 4.00 23 20 22.714 22.754 22.714 2.00 2.00 0.50 0.50 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm Urpil t= 20 cm 50 50 500 Agg.Kelas S t = 15 cm Timb. Pilihan t = 40 cm 22.634 22.634 22.200 22.427 22.804 22.825 22.857 22.791 22.634 23.010 23.494 23.362 23.205 5.00 4.00 2.00 2.00 2.00 1.20 1.50 1.00 0.50 5.00 5.00 24 23.395 23.435 23.395 2.00 2.00 0.50 0.50 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm Urpil t= 20 cm 50 50 500 Agg.Kelas S t = 15 cm Timb. Pilihan t = 40 cm 23.315 23.315 PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL CROSS SECTION / POTONGAN MELINTANG
  • 24. 20.315 20.691 21.471 21.471 21.503 21.544 21.528 21.501 21.487 21.487 20.684 20.405 20.304 20.134 3.00 3.00 0.40 0.30 1.30 1.50 1.50 1.00 0.30 0.30 0.40 3.00 3.00 4.00 22 20 22.114 22.154 22.114 2.00 2.00 21.193 21.307 21.471 21.557 21.603 21.663 21.654 21.626 21.094 21.089 22.097 22.437 22.404 4.00 4.00 3.00 1.50 2.00 2.00 1.00 0.80 0.60 0.40 1.00 4.00 4.00 23 20 22.167 22.207 22.167 2.00 2.00 0.50 0.50 0.50 0.50 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm Urpil t= 20 cm 50 50 500 Agg.Kelas S t = 15 cm Timb. Pilihan t = 40 cm L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm Urpil t= 20 cm 50 50 500 Agg.Kelas S t = 15 cm Timb. Pilihan t = 40 cm 22.034 22.087 22.034 22.087 4.00 2.00 1.00 2.00 2.00 0.80 0.80 0.70 0.50 1.20 3.00 24 20 2.00 2.00 0.50 0.50 L C L 2% 2% 400 Aspal AC-BC 6 cm Agg.Kelas B t= 20 cm Agg. Kelas A t= 15 cm Urpil t= 20 cm 50 50 500 Agg.Kelas S t = 15 cm Timb. Pilihan t = 40 cm 23.216 23.080 22.116 22.095 22.416 22.406 22.416 22.412 22.331 22.248 21.841 21.534 23.022 22.982 22.902 22.982 22.902 PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL CROSS SECTION / POTONGAN MELINTANG
  • 25. 22.945 22.857 23.365 23.448 23.479 23.460 23.462 23.460 23.245 23.124 23.223 23.146 4.00 4.00 3.00 1.50 2.00 2.00 0.80 0.80 1.00 3.00 3.00 3.00 24 2.50 L C L 2% 2% 500 23.627 23.679 2.50 23.627 24.697 25.102 25.571 25.772 25.842 25.879 25.846 25.569 25.591 25.733 25.903 4.00 4.00 2.00 1.00 1.50 1.50 0.80 1.00 3.00 3.00 3.00 26 25 2.50 2.50 L C L 2% 2% Urpil t= 20 cm 500 Pas. Batu 25.990 25.990 26.042 21.346 21.587 21.975 22.033 22.075 22.125 22.099 21.675 21.689 22.476 22.511 22.525 4.00 3.00 1.50 2.00 2.00 1.00 0.90 0.60 0.40 1.00 4.00 4.00 23 20 21.456 21.857 22.296 22.379 22.410 22.428 22.439 22.479 22.078 22.099 23.089 23.245 23.189 4.00 4.00 2.00 1.00 2.00 2.00 0.80 0.80 0.70 0.50 1.20 3.00 4.00 24 20 L C L 2% 2% Urpil t= 20 cm 500 Pas. Batu L C L 2% 2% Urpil t= 20 cm 500 2.50 2.50 22.181 22.233 22.181 2.50 2.50 22.558 22.610 22.558 PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL CROSS SECTION / POTONGAN MELINTANG
  • 26. 29.007 29.094 29.357 29.454 29.536 29.503 29.465 29.304 29.347 29.493 29.726 29.593 4.00 4.00 2.00 1.00 2.00 2.00 1.00 0.80 1.00 3.00 3.00 3.00 30 30 2.50 2.50 L C L 2% 2% Urpil t= 20 cm 500 Pas. Batu 29.736 29.684 29.684 30.282 30.395 30.774 30.794 30.813 30.844 30.791 30.905 30.871 30.897 30.914 4.00 2.00 1.50 2.00 2.00 1.50 1.00 1.00 3.00 3.00 3.00 31 30 2.50 2.50 L C L 2% 2% Urpil t= 20 cm 500 Pas. Batu 30.961 31.013 30.961 28.834 28.937 29.494 29.584 29.597 29.614 29.629 29.577 29.327 29.193 29.093 29.234 31.723 29.504 29.393 29.674 29.691 29.733 29.711 29.709 29.393 30.007 30.193 30.337 30.204 4.00 4.00 2.00 1.00 2.00 2.00 0.50 1.00 1.00 3.00 3.00 3.00 3.00 2.00 2.50 1.00 2.00 2.00 1.00 0.50 1.50 1.00 3.00 3.00 4.00 30 30 32 30 L C L 2% 2% Urpil t= 20 cm 500 Pas. Batu 2.50 2.50 29.760 29.812 29.760 L C L 2% 2% Urpil t= 20 cm 500 Pas. Batu 2.50 2.50 29.854 29.906 29.854 PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL CROSS SECTION / POTONGAN MELINTANG
  • 27. 29.708 29.119 28.286 28.382 28.432 28.487 28.570 28.663 28.639 28.669 25.971 24.742 25.128 24.972 23.289 23.159 22.907 3.00 3.00 1.00 1.00 2.00 2.00 2.00 3.00 3.00 3.00 4.00 1.50 4.00 4.00 3.00 2.00 5.00 31 30 27 25 L C L 2% 2% Urpil t= 20 cm 500 Pas. Batu 2.50 2.50 28.595 28.647 28.595 L C L 2% 2% Urpil t= 20 cm 500 Pas. Batu 2.50 2.50 25.343 25.291 25.291 23.629 24.552 24.650 24.685 23.396 23.274 23.140 3.00 3.50 2.00 1.50 2.00 3.00 3.00 25 25 L C L 2% 2% Urpil t= 20 cm 500 Pas. Batu 2.50 2.50 24.798 24.850 24.798 PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL CROSS SECTION / POTONGAN MELINTANG
  • 28. PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG Jalan Sisingamangaraja Lorong BKKBN - Meulaboh TYPICAL PASANGAN BATU
  • 29. TYPICAL PAS. BATU II SKALA 1 : 20 TYPICAL PAS. BATU I SKALA 1 : 20 PAKET : PEMBANGUNAN JALAN JAWI - SIPOT GAMBAR RENCANA JUDUL : CV. UTAMA KARYA DESIGN PEMERINTAH KABUPATEN ACEH BARAT DINAS PEKERJAAN UMUM DAN PENATAAN RUANG JALAN SISINGAMANGARAJA LR. BKKBN Telp. (0655) 7006105 - MEULABOH LOKASI HALAMAN SKALA NO. GAMBAR TANGGAL TYPICAL PASANGAN BATU