SlideShare a Scribd company logo
1 of 2
Download to read offline
EXISTING
ENTRANCE
15
PARKINGS
CAMPSITE
CAMPSITE
CAMPSITE
CAMPSITE
CAMPSITE
CAMPSITE
CAMPSITE
ABLUTIONS
CAMPSITE
ABLUTIONS
MAIN
BUILDING
TOILETS
ROOMS
AND
RECEPTION
OFFICES, STAFF TOILETS
+
WORKSHOP
OWNERS
HOUSE
OWNERS
HOUSE
16
PARKINGS
25 STANDARD
+ 2 DISABLED
PARKINGS
5 TRUCK
PARKINGS + 4
STANDARD
PARKINGS
13
PARKINGS
2M
PAVED
PATHWAY
6M
SEALED ROAD
6M
SEALED ROAD
CAMPSITE
141887
225038
218569
216432
128882
4238
8947
48675
27278
69491
31423
35901
57091
84427
5000
2500
2500
2500
6000
2500
3800
3800
2500
2500
2500
2500
5000
5000
5000
2500
2500
2500
2500
7000
3250
3250
5000
9000
LOADING
WASTE
AREA
CHOBE
RIVER
S E A S O N A L F L O O D A R E A
POOL
N E W
PROPOSED
R O O M S
EXISTING
ENTRANCE
15
PARKINGS
CAMPSITE
CAMPSITE
CAMPSITE
CAMPSITE
CAMPSITE
CAMPSITE
CAMPSITE
ABLUTIONS
CAMPSITE
ABLUTIONS
MAIN
BUILDING
TOILETS
ROOMS
AND
RECEPTION
OFFICES, STAFF TOILETS
+
WORKSHOP
OWNERS
HOUSE
OWNERS
HOUSE
16
PARKINGS
25 STANDARD
+ 2 DISABLED
PARKINGS
5 TRUCK
PARKINGS + 4
STANDARD
PARKINGS
13
PARKINGS
2M
PAVED
PATHWAY
6M
SEALED ROAD
6M
SEALED ROAD
CAMPSITE
CAMPSITE
CAMPSITE
CAMPSITE
CAMPSITE
141887
46911
47390
225038
218569
216432
214275
119223
145664
208131
128882
46918
47388
Bartlett
Combretum
MAIN
ROAD
TO
KASANE
TO
KAZUNGULA
CHOBE
RIVER
PRISON
FIELDS
PRISON
Bartlett
MAGISTRATES
COURT
4238
8947
48675
27278
69491
31423
35901
57091
84427
5000
2500
2500
2500
6000
2500
3800
3800
2500
2500
2500
2500
5000
5000
5000
2500
2500
2500
2500
7000
3250
3250
5000
9000
LOADING
WASTE
AREA
CHOBE
RIVER
S E A S O N A L F L O O D A R E A
POOL
N E W
PROPOSED
R O O M S
DATE: PROJECT: DRAWING: SCALE:
DRAWN BY:CLIENT:
PLOT: SIGNED:
LOCATION PLAN
MASTER SITE PLAN
SITE PLAN
1:500 1:2000 1:10000
G HTHEBE RIVER SAFARIS
CLIENT ADDRESS:
NOV 2014
PROPOSED NEW 25
ROOM BLOCK
SUBMITTED:REVISIONS
PAGE #:
TRS/NR14/001/01
A1L
DRAWING NUMBER:
/
PLOT 76-RO OF 706, KASANEP.O. BOX 5
KASANE
MASTER SITE PLAN 1:2000
LOCATION PLAN 1:10000
SITE PLAN 1:500
TO
EXISTING
COUNCIL
SEWER
CONNECT.
PRISONS
BPC
SUBSTATION
CHOBE
FARMS
CHOBE
FARMS
PRISON
FARMS
SEBOBA
CJSS
CHOBE RIVER
*SITE SHOWN IN RED
PROPOSED BUILDING SHOWN IN RED
ON SITE PLAN AND MASTER SITE PLAN
SITE AREA = 30000 sqm
EXISTING BUILDING AREA = ±1340 sqm
PROPOSED BUILDING AREA = 938 sqm
TOTAL = ±2278 sqm
TO EXISTING
COUNCIL SEWER
CONNECTION
PARKING
(25 X 0.75 = 18.75=> 19 PARKINGS
OR
2278 sqm X 0.02 =45.6 => 47 PARKINGS)
49 PARKINGS PROVIDED (2 DISABLED)
1 LOADING BAY
PLOT77-RO
PLOT78-RO
PLOT76-RO
PLOT75-RO
P
L
O
T
7
0
6
WASTE WATER LINES
SHOWN IN BLUE
19813
16204
SECTION A-A 1:100
MASTER FLOOR PLAN 1:100
412241224122412241224122412242404240
37333
6760 2000 4240 4122 4122 4122 4122 4240
33727
6760 2000 4240 4122 4122 4122 4122 4240
33728
6760
37333
3545424041224122424035456760
4290 4122 4122 3774
1713
2000
41224122412241221713
4290 4122 4122 3774
37744122412241223774
A
B B
A
C O U R T Y A R D
ENTRANCE
fire
escape
fire
escape
ENTRANCE
EXPANSION JOINTS TO
B E I N S T A L L E D @
E V E R Y R O O M
J U N C T I O N ( 4 1 2 2
c e n t e r s )
EXPANSION JOINT TO
BE INSTALLED @ THIS
POINT @ INTERNAL
WALL JUNCTION IF
N E C E S S A R Y
47392021
W A L K W A Y
W A L K W A Y
WALKWAY
WALKWAY
5290900
2909
4281
2898
2767
SIDE ELEVATION 1:200 REAR ELEVATION 1:200
SIDE ELEVATION 1:200 FRONT ELEVATION 1:200
ROOM FLOOR PLAN 1:50
SECTION B-B 1:50
10001881881
4000
180
180
119119119
1781 119 4500 180
6760
4145335381511419533586
180119
87064910811400
1000781
48087066015111082
659660300
234234185234
1781 119 4500
533
1000
2000
1950
867
300
ROOM
TOILET
BASIN + VANITY
AREA
SHOWER
TOILET
ROOM
ETIC/STANDARD PLASTERED MESH
FINISH AS TO MANUFACTURERS
SPECS FIXED TO 89X40 LIGHT STEEL
STUDS @ MAX 600 CS FIXED TO
89x40 LIGHT STEEL FLOOR PLATE
B O L T E D I N T O S L A B .
(see attached technical documents for
e x a c t s p e c s + d e t a i l s )
IBR CHROMADEK ROOF SHEETING
SCREWED TO 89X40 LIGHT STEEL
PURLOINS @ FIXED MAX 800CS
TO 89X40 LIGHT STEEL TRUSSES
@ 1 4 0 0 C S M A X O R T O
M A N U F A C T U R E R S S P E C
(see attached technical document
f o r e x a c t s p e c s + d e t a i l s )
30 SM OOT H P OLISHED
CEMENT SCREED ON 100
SMOOTH FLOATED R.C.
FLOORSLAB ON HARDCORE
COMPACTED FILL TO SUIT
500
390
2 0 0 C O N C B L O C K
P LI N T H R E T A I N I N G
WALLS ON 390x500
R.C. STRIP FOUNDATION
O N C O M P A C T E D
TRENCH BASE TO SUIT
GYPSUM CEILING FIXED TO
LIGHT STEEL TOPHAT PROFILES
FIXED @ MAX 400 CS TO U/SIDE
O F T R U S S E S
AS PER MANUFACTURERS SPEC
1 0 0 Ø S T E E L
C O L U M N
IN CONC FOOTING
T O S U I T
GYPSUM BARGE
BOARD TO SUIT
B B
20°
FFL1 0000
-0170
NGL -0400
-0640
-1300
900
+2100
+2400
+2757
+3449
+4281
MAX +4890
400
568
700
350
DATE: PROJECT: DRAWING: SCALE:
DRAWN BY:CLIENT:
PLOT: SIGNED:
1:50 1:100
G H
CLIENT ADDRESS:
SUBMITTED:REVISIONS
PAGE #:
A1L
DRAWING NUMBER:
/
FLOOR PLAN
SECTIONS
ELEVATIONS
THEBE RIVER SAFARIS
NOV 2014
P.O. BOX 5
KASANE
PROPOSED NEW 25
ROOM BLOCK
TRS/NR14/002/01
NOTES+ SPECIFICATIONS
ALL WALL AND ROOF DETAILS AND SPECS
TO BE TAKEN FROM SILVER LINE GROUP
LIGHT STEEL CONSTRUCTION TECHNICAL
DOCUMENT SUBMITTED WITH THESE
DRAWINGS.
ALL PLUMBING TO MEET SABS
STANDARDS.
USE DIMENSIONED DISTANCES ONLY.
EXPANSION JOINTS TO BE LEFT BETWEEN
EVERY ROOM MODULE @ 4122 CENTERS
AND WHERE NECESSARY BUT NEVER
EXCEEDING 7000 CENTERS BETWEEN
EXPANSION JOINTS
(see expansion joint details in technical
documents attached)
BUILDING AREA = 938 sqm
PLOT 76-RO OF 706, KASANE

More Related Content

What's hot (14)

Istana Bandar Jugrah Sections
Istana Bandar Jugrah SectionsIstana Bandar Jugrah Sections
Istana Bandar Jugrah Sections
 
Guía piezas de recambio s class linked rotutech español
Guía piezas de recambio s class linked rotutech españolGuía piezas de recambio s class linked rotutech español
Guía piezas de recambio s class linked rotutech español
 
PN_reflist_verallia_Jul15
PN_reflist_verallia_Jul15PN_reflist_verallia_Jul15
PN_reflist_verallia_Jul15
 
Actionline presentation aug 07 amended rl 140907
Actionline presentation aug 07   amended rl 140907Actionline presentation aug 07   amended rl 140907
Actionline presentation aug 07 amended rl 140907
 
Mf 7415
Mf 7415Mf 7415
Mf 7415
 
GROUND FLOOR-Model
GROUND FLOOR-ModelGROUND FLOOR-Model
GROUND FLOOR-Model
 
1011 oversiktrs kart boder pr 011110
1011 oversiktrs kart boder  pr 0111101011 oversiktrs kart boder  pr 011110
1011 oversiktrs kart boder pr 011110
 
Projek akhir a165585_zuriani
Projek akhir a165585_zurianiProjek akhir a165585_zuriani
Projek akhir a165585_zuriani
 
SAMPLE DRAWINGS
SAMPLE DRAWINGSSAMPLE DRAWINGS
SAMPLE DRAWINGS
 
Catalogue 265-270-spéculums
Catalogue 265-270-spéculumsCatalogue 265-270-spéculums
Catalogue 265-270-spéculums
 
LINK NICO ME
LINK NICO MELINK NICO ME
LINK NICO ME
 
Sk 069 - ga working drawings
Sk 069 - ga working drawingsSk 069 - ga working drawings
Sk 069 - ga working drawings
 
Drawing12 model
Drawing12 modelDrawing12 model
Drawing12 model
 
Fiat Fullback: i prezzi per l'Italia
Fiat Fullback: i prezzi per l'ItaliaFiat Fullback: i prezzi per l'Italia
Fiat Fullback: i prezzi per l'Italia
 

Viewers also liked (11)

JD - Pricing Officer
JD - Pricing OfficerJD - Pricing Officer
JD - Pricing Officer
 
Unit plan wednesday
Unit plan wednesdayUnit plan wednesday
Unit plan wednesday
 
Action planning for production schedule
Action planning for production scheduleAction planning for production schedule
Action planning for production schedule
 
La Consejería de educación de Lucia Figar evalúa los conocimientos de más de ...
La Consejería de educación de Lucia Figar evalúa los conocimientos de más de ...La Consejería de educación de Lucia Figar evalúa los conocimientos de más de ...
La Consejería de educación de Lucia Figar evalúa los conocimientos de más de ...
 
La musica
La musicaLa musica
La musica
 
Presentation4
Presentation4Presentation4
Presentation4
 
Recommendation Letter
Recommendation LetterRecommendation Letter
Recommendation Letter
 
EXP ROBIN CP0001.PDF
EXP ROBIN CP0001.PDFEXP ROBIN CP0001.PDF
EXP ROBIN CP0001.PDF
 
HGI's Ball Room Diagram
HGI's Ball Room DiagramHGI's Ball Room Diagram
HGI's Ball Room Diagram
 
Test
TestTest
Test
 
Introduction to project management (pm101) final exam
Introduction to project management (pm101)   final examIntroduction to project management (pm101)   final exam
Introduction to project management (pm101) final exam
 

Similar to Thebe River Safaris Room Addition 2014

Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush Lodge
Grant Hepburn
 
Kalahari Safaris Operations Base
Kalahari Safaris Operations BaseKalahari Safaris Operations Base
Kalahari Safaris Operations Base
Grant Hepburn
 
Frayne House Extension
Frayne House ExtensionFrayne House Extension
Frayne House Extension
Grant Hepburn
 
COS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENT
COS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENTCOS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENT
COS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENT
Atang Maphela
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
Grant Hepburn
 
African Crossroads Missions Residential Extension
African Crossroads Missions Residential ExtensionAfrican Crossroads Missions Residential Extension
African Crossroads Missions Residential Extension
Grant Hepburn
 
Caracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + SiteCaracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + Site
Grant Hepburn
 
Kwanokeng Oxman Fuel Depot Expansion
Kwanokeng Oxman Fuel Depot ExpansionKwanokeng Oxman Fuel Depot Expansion
Kwanokeng Oxman Fuel Depot Expansion
Grant Hepburn
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit project
Mark Thornton
 
1-9 WONIORA AVENUE WAHROONGA s
1-9 WONIORA AVENUE WAHROONGA s1-9 WONIORA AVENUE WAHROONGA s
1-9 WONIORA AVENUE WAHROONGA s
Mike Darwich
 
Residence addition _ Structural plans and details
Residence addition _ Structural plans and detailsResidence addition _ Structural plans and details
Residence addition _ Structural plans and details
Teresa Seasons
 

Similar to Thebe River Safaris Room Addition 2014 (20)

Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush Lodge
 
House Dhanilal Submission
House Dhanilal SubmissionHouse Dhanilal Submission
House Dhanilal Submission
 
Kalahari Safaris Operations Base
Kalahari Safaris Operations BaseKalahari Safaris Operations Base
Kalahari Safaris Operations Base
 
Khupe River Lodge
Khupe River LodgeKhupe River Lodge
Khupe River Lodge
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan Design
 
Lesoma Farm Houses
Lesoma Farm HousesLesoma Farm Houses
Lesoma Farm Houses
 
Frayne House Extension
Frayne House ExtensionFrayne House Extension
Frayne House Extension
 
COS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENT
COS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENTCOS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENT
COS-EE-LIGHTING LAYOUT-LEVEL-2,-1,0 (ARCH REV 5)-LEVEL -2 BASEMENT
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
 
African Crossroads Missions Residential Extension
African Crossroads Missions Residential ExtensionAfrican Crossroads Missions Residential Extension
African Crossroads Missions Residential Extension
 
Caracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + SiteCaracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + Site
 
Kwanokeng Oxman Fuel Depot Expansion
Kwanokeng Oxman Fuel Depot ExpansionKwanokeng Oxman Fuel Depot Expansion
Kwanokeng Oxman Fuel Depot Expansion
 
Adva
AdvaAdva
Adva
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit project
 
1-9 WONIORA AVENUE WAHROONGA s
1-9 WONIORA AVENUE WAHROONGA s1-9 WONIORA AVENUE WAHROONGA s
1-9 WONIORA AVENUE WAHROONGA s
 
Residence addition _ Structural plans and details
Residence addition _ Structural plans and detailsResidence addition _ Structural plans and details
Residence addition _ Structural plans and details
 
Build Something That Lasts
Build Something That LastsBuild Something That Lasts
Build Something That Lasts
 
Apartment_Red
Apartment_RedApartment_Red
Apartment_Red
 
Aldi Inala
Aldi InalaAldi Inala
Aldi Inala
 
502 north market
502 north market502 north market
502 north market
 

Thebe River Safaris Room Addition 2014

  • 1. EXISTING ENTRANCE 15 PARKINGS CAMPSITE CAMPSITE CAMPSITE CAMPSITE CAMPSITE CAMPSITE CAMPSITE ABLUTIONS CAMPSITE ABLUTIONS MAIN BUILDING TOILETS ROOMS AND RECEPTION OFFICES, STAFF TOILETS + WORKSHOP OWNERS HOUSE OWNERS HOUSE 16 PARKINGS 25 STANDARD + 2 DISABLED PARKINGS 5 TRUCK PARKINGS + 4 STANDARD PARKINGS 13 PARKINGS 2M PAVED PATHWAY 6M SEALED ROAD 6M SEALED ROAD CAMPSITE 141887 225038 218569 216432 128882 4238 8947 48675 27278 69491 31423 35901 57091 84427 5000 2500 2500 2500 6000 2500 3800 3800 2500 2500 2500 2500 5000 5000 5000 2500 2500 2500 2500 7000 3250 3250 5000 9000 LOADING WASTE AREA CHOBE RIVER S E A S O N A L F L O O D A R E A POOL N E W PROPOSED R O O M S EXISTING ENTRANCE 15 PARKINGS CAMPSITE CAMPSITE CAMPSITE CAMPSITE CAMPSITE CAMPSITE CAMPSITE ABLUTIONS CAMPSITE ABLUTIONS MAIN BUILDING TOILETS ROOMS AND RECEPTION OFFICES, STAFF TOILETS + WORKSHOP OWNERS HOUSE OWNERS HOUSE 16 PARKINGS 25 STANDARD + 2 DISABLED PARKINGS 5 TRUCK PARKINGS + 4 STANDARD PARKINGS 13 PARKINGS 2M PAVED PATHWAY 6M SEALED ROAD 6M SEALED ROAD CAMPSITE CAMPSITE CAMPSITE CAMPSITE CAMPSITE 141887 46911 47390 225038 218569 216432 214275 119223 145664 208131 128882 46918 47388 Bartlett Combretum MAIN ROAD TO KASANE TO KAZUNGULA CHOBE RIVER PRISON FIELDS PRISON Bartlett MAGISTRATES COURT 4238 8947 48675 27278 69491 31423 35901 57091 84427 5000 2500 2500 2500 6000 2500 3800 3800 2500 2500 2500 2500 5000 5000 5000 2500 2500 2500 2500 7000 3250 3250 5000 9000 LOADING WASTE AREA CHOBE RIVER S E A S O N A L F L O O D A R E A POOL N E W PROPOSED R O O M S DATE: PROJECT: DRAWING: SCALE: DRAWN BY:CLIENT: PLOT: SIGNED: LOCATION PLAN MASTER SITE PLAN SITE PLAN 1:500 1:2000 1:10000 G HTHEBE RIVER SAFARIS CLIENT ADDRESS: NOV 2014 PROPOSED NEW 25 ROOM BLOCK SUBMITTED:REVISIONS PAGE #: TRS/NR14/001/01 A1L DRAWING NUMBER: / PLOT 76-RO OF 706, KASANEP.O. BOX 5 KASANE MASTER SITE PLAN 1:2000 LOCATION PLAN 1:10000 SITE PLAN 1:500 TO EXISTING COUNCIL SEWER CONNECT. PRISONS BPC SUBSTATION CHOBE FARMS CHOBE FARMS PRISON FARMS SEBOBA CJSS CHOBE RIVER *SITE SHOWN IN RED PROPOSED BUILDING SHOWN IN RED ON SITE PLAN AND MASTER SITE PLAN SITE AREA = 30000 sqm EXISTING BUILDING AREA = ±1340 sqm PROPOSED BUILDING AREA = 938 sqm TOTAL = ±2278 sqm TO EXISTING COUNCIL SEWER CONNECTION PARKING (25 X 0.75 = 18.75=> 19 PARKINGS OR 2278 sqm X 0.02 =45.6 => 47 PARKINGS) 49 PARKINGS PROVIDED (2 DISABLED) 1 LOADING BAY PLOT77-RO PLOT78-RO PLOT76-RO PLOT75-RO P L O T 7 0 6 WASTE WATER LINES SHOWN IN BLUE
  • 2. 19813 16204 SECTION A-A 1:100 MASTER FLOOR PLAN 1:100 412241224122412241224122412242404240 37333 6760 2000 4240 4122 4122 4122 4122 4240 33727 6760 2000 4240 4122 4122 4122 4122 4240 33728 6760 37333 3545424041224122424035456760 4290 4122 4122 3774 1713 2000 41224122412241221713 4290 4122 4122 3774 37744122412241223774 A B B A C O U R T Y A R D ENTRANCE fire escape fire escape ENTRANCE EXPANSION JOINTS TO B E I N S T A L L E D @ E V E R Y R O O M J U N C T I O N ( 4 1 2 2 c e n t e r s ) EXPANSION JOINT TO BE INSTALLED @ THIS POINT @ INTERNAL WALL JUNCTION IF N E C E S S A R Y 47392021 W A L K W A Y W A L K W A Y WALKWAY WALKWAY 5290900 2909 4281 2898 2767 SIDE ELEVATION 1:200 REAR ELEVATION 1:200 SIDE ELEVATION 1:200 FRONT ELEVATION 1:200 ROOM FLOOR PLAN 1:50 SECTION B-B 1:50 10001881881 4000 180 180 119119119 1781 119 4500 180 6760 4145335381511419533586 180119 87064910811400 1000781 48087066015111082 659660300 234234185234 1781 119 4500 533 1000 2000 1950 867 300 ROOM TOILET BASIN + VANITY AREA SHOWER TOILET ROOM ETIC/STANDARD PLASTERED MESH FINISH AS TO MANUFACTURERS SPECS FIXED TO 89X40 LIGHT STEEL STUDS @ MAX 600 CS FIXED TO 89x40 LIGHT STEEL FLOOR PLATE B O L T E D I N T O S L A B . (see attached technical documents for e x a c t s p e c s + d e t a i l s ) IBR CHROMADEK ROOF SHEETING SCREWED TO 89X40 LIGHT STEEL PURLOINS @ FIXED MAX 800CS TO 89X40 LIGHT STEEL TRUSSES @ 1 4 0 0 C S M A X O R T O M A N U F A C T U R E R S S P E C (see attached technical document f o r e x a c t s p e c s + d e t a i l s ) 30 SM OOT H P OLISHED CEMENT SCREED ON 100 SMOOTH FLOATED R.C. FLOORSLAB ON HARDCORE COMPACTED FILL TO SUIT 500 390 2 0 0 C O N C B L O C K P LI N T H R E T A I N I N G WALLS ON 390x500 R.C. STRIP FOUNDATION O N C O M P A C T E D TRENCH BASE TO SUIT GYPSUM CEILING FIXED TO LIGHT STEEL TOPHAT PROFILES FIXED @ MAX 400 CS TO U/SIDE O F T R U S S E S AS PER MANUFACTURERS SPEC 1 0 0 Ø S T E E L C O L U M N IN CONC FOOTING T O S U I T GYPSUM BARGE BOARD TO SUIT B B 20° FFL1 0000 -0170 NGL -0400 -0640 -1300 900 +2100 +2400 +2757 +3449 +4281 MAX +4890 400 568 700 350 DATE: PROJECT: DRAWING: SCALE: DRAWN BY:CLIENT: PLOT: SIGNED: 1:50 1:100 G H CLIENT ADDRESS: SUBMITTED:REVISIONS PAGE #: A1L DRAWING NUMBER: / FLOOR PLAN SECTIONS ELEVATIONS THEBE RIVER SAFARIS NOV 2014 P.O. BOX 5 KASANE PROPOSED NEW 25 ROOM BLOCK TRS/NR14/002/01 NOTES+ SPECIFICATIONS ALL WALL AND ROOF DETAILS AND SPECS TO BE TAKEN FROM SILVER LINE GROUP LIGHT STEEL CONSTRUCTION TECHNICAL DOCUMENT SUBMITTED WITH THESE DRAWINGS. ALL PLUMBING TO MEET SABS STANDARDS. USE DIMENSIONED DISTANCES ONLY. EXPANSION JOINTS TO BE LEFT BETWEEN EVERY ROOM MODULE @ 4122 CENTERS AND WHERE NECESSARY BUT NEVER EXCEEDING 7000 CENTERS BETWEEN EXPANSION JOINTS (see expansion joint details in technical documents attached) BUILDING AREA = 938 sqm PLOT 76-RO OF 706, KASANE