KEGIATAN : PEMBANGUNAN TEMPAT PEMBUANGAN BENDA PADAT/CAIR YANG MENIMBULKAN POLUSI
PEKERJAAN : PEMBANGUNAN DAN PENGADAAN ALAT INSTALASI PENGOLAHAN AIR LIMBAH (IPAL)
PUSKESMAS LANGSAT, KAPASITAS 6 M3/HARI
LOKASI : JL. MELUR, KOTA PEKANBARU
TAMBAH KURANG TAMBAH KURANG
1 2 3 4 5.00 6 = 4x5 7 8 = 4x7 9 = 7-5 10 = 5-7 11 = 8-6 12 = 6-8
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lapangan dan pengukuran / Uitzet M2 6,000.00 170.00 1,020,000.00 170.00 1,020,000.00
2 Pek. Pasang Bowplank M' 40,520.00 85.00 3,444,200.00 85.00 3,444,200.00
3 Pek. Pembongkaran lantai beton M' 15,040.00 25.00 376,000.00 25.00 376,000.00
4 Pek, Pembongkaran Lantai keramik M2 15,040.00 2.00 30,080.00 2.00 30,080.00
5 Pek. Pembongkaran septictank Ls 1,500,000.00 1.00 1,500,000.00 - - 1.00 1,500,000.00
II PEKERJAAN SIPIL
A. Pekerjaan Fondasi
1 Pek. Galian tanah M3 15,040.00 67.65 1,017,456.00 14.85 223,344.00 52.80 794,112.00
2 Pek. Urugan Pasir M3 221,360.00 2.00 442,720.00 0.34 74,709.00 1.66 368,011.00
3 Pek. Pasang Lantai kerja 1:3:6 M3 658,048.00 4.00 2,632,192.00 0.34 222,091.20 3.66 2,410,100.80
4 Pek. Pondasi setempat beton bertulang M3 1,000,000.00 0.27 270,000.00 1.35 1,350,000.00 1.08 1,080,000.00
5 Pek. Fondasi batu-bata 1:3 M2 148,532.80 2.60 386,185.28 - - 2.60 386,185.28
6 Pek. Raben Fondasi 1:3 M2 50,000.00 36.00 1,800,000.00 - - 36.00 1,800,000.00
7 Pek. Urugan Tanah bekas galian M2 72,840.00 25.00 1,821,000.00 4.46 324,502.20 20.55 1,496,497.80
B. Pekerjaan Struktur
1 Pek. Cor Sloof Beton Bertulang 20 x 25 cm M3 5,964,720.00 1.30 7,754,136.00 - - 1.30 7,754,136.00
2 Pek. Cor kolom Beton Bertulang 20 x 20 cm M3 6,174,936.00 0.72 4,445,953.92 0.43 2,667,572.35 0.29 1,778,381.57
3 Pek. Cor reng Balok Beton Bertulang 20 x 20 cm M3 5,801,776.00 1.04 6,033,847.04 0.63 3,655,118.88 0.41 2,378,728.16
4 Pek. Dak Beton bertulang T = 20 cm M3 5,380,840.00 4.00 21,523,360.00 1.35 7,264,134.00 2.65 14,259,226.00
C. Pekerjaan Plasteran
1 Pek. Plasteran dinding 1: 4 M2 25,020.80 156.00 3,903,244.80 18.90 472,893.12 137.10 3,430,351.68
Pek. Pas Batu Bata 1:4 M2 66,184.00 18.90 1,250,877.60 18.90 1,250,877.60
D. Pekerjaan Lantai
1 Pek. Urugan Tanah Bawah Lantai M3 7,208.00 3.23 23,281.84 - - 3.23 23,281.84
2 Pek. Urugan Pasir Bawah Lantai M3 221,360.00 2.15 475,924.00 - - 2.15 475,924.00
3 Pek. Cor Lantai Beton Tumbuk 1:3:5 M3 658,048.00 2.15 1,414,803.20 - - 2.15 1,414,803.20
VOLUME
JUMLAH HARGA
(Rp)
PEKERJAAN TAMBAH KURANG
NO URAIAN PEKERJAAN SAT
HARGA SATUAN
(Rp)
KONTRAK REALISASI SELISIH HARGA
VOLUME
JUMLAH HARGA
(Rp)
VOLUME JUMLAH HARGA
TAMBAH KURANG TAMBAH KURANG
1 2 3 4 5.00 6 = 4x5 7 8 = 4x7 9 = 7-5 10 = 5-7 11 = 8-6 12 = 6-8
VOLUME
JUMLAH HARGA
(Rp)
NO URAIAN PEKERJAAN SAT
HARGA SATUAN
(Rp)
KONTRAK REALISASI SELISIH HARGA
VOLUME
JUMLAH HARGA
(Rp)
VOLUME JUMLAH HARGA
T O T A L
III PEKERJAAN PENGADAAN UNIT SEWAGE TRATMENT PLANT
(STP) 4 M3/hari, Merek Bestindo type BMS-4.4 Set 94,000,000.00 1.00 94,000,000.00 1.00 94,000,000.00
- -
IV. Pekerjaan Pemasangan Intalasi Pemipaan & Electrical M' 100,050.00 55.00 5,502,750.00 69.00 6,903,450.00 14.00 1,400,700.00
V. Pekerjaan Electrical M' 33,800.00 65.00 2,197,000.00 10.00 338,000.00
- -
VI. PEKERJAAN LAIN-LAIN - -
1. Pek. Pembuangan bekas pembongkaran Ls 1,000,000.00 1.00 1,000,000.00 1.00 1,000,000.00
2. Pek. Kerangkeng + Gembok Ls 1,000,000.00 1.00 1,000,000.00 1.00 1,000,000.00
163,014,134.08 125,616,972.35 4,731,577.60 40,269,739.33
16,301,413.41 12,561,697.24
179,315,547.49 138,178,669.59
179,315,000.00 138,178,000.00
NIP. 196408121990071001 NIP. 196009211983301001 NIP. 197406132005011001 Direktur
Ir. H. DEDI GUSRIADI, MT ARMAN YEDI, ST JOENAFRIKO, ST Drs. ISHARUDIN
KEPALA BADAN LINGKUNGAN HIDUP PEJABAT PELAKSANA TEKNIS KEGIATAN PENGAWAS LAPANGAN KONTRAKTOR PELAKSANA
KOTA PEKANBARU BADAN LINGKUNGAN HIDUP KOT PEKANBARU DINAS PEKERJAAN UMUM KOT PEKANBARU CV. RIZKI JAYA
Disetujui Oleh Disetujui Oleh Diperiksa Oleh: Dibuat Oleh:
JUMLAH TOTAL
DIBULATKAN
Pekanbaru, November 2009
JUMLAH
PPN 10 %

More Related Content

Similar to Adendum blh 2009 diperbaiki

3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunanSyahrul Najmi
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahSekertariat_Akmaliah
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahReguti
 
Scheduling SLEX (FS)-InitialCPM
Scheduling SLEX (FS)-InitialCPMScheduling SLEX (FS)-InitialCPM
Scheduling SLEX (FS)-InitialCPMAllan Leyte
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal ashleyyeap
 
PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE AGGREGA...
PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE  AGGREGA...PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE  AGGREGA...
PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE AGGREGA...pakkurathikailashpav
 
128249253 deped-estimate
128249253 deped-estimate128249253 deped-estimate
128249253 deped-estimateimaduddin91
 
01 cronograma valorizado
01 cronograma valorizado01 cronograma valorizado
01 cronograma valorizadoJIMMY PANDURO
 
GAMBAR RENCANA JL. JAWI-SIPOT.pdf
GAMBAR RENCANA JL. JAWI-SIPOT.pdfGAMBAR RENCANA JL. JAWI-SIPOT.pdf
GAMBAR RENCANA JL. JAWI-SIPOT.pdfmutaqinqin
 
Footing-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfFooting-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfANANDA DS
 
materi kuliah it pln perhitungan plat balok
materi kuliah it pln perhitungan plat balokmateri kuliah it pln perhitungan plat balok
materi kuliah it pln perhitungan plat balokIlhamPutera2
 
PP2 final account assignment calculations
PP2 final account assignment calculationsPP2 final account assignment calculations
PP2 final account assignment calculationsashleyyeap
 
Pp2 final account assignment excel
Pp2 final account assignment excelPp2 final account assignment excel
Pp2 final account assignment excelashleyyeap
 
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)eisa chegini
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-laborimaduddin91
 

Similar to Adendum blh 2009 diperbaiki (20)

3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan3. pekerjaan sipil dan bangunan
3. pekerjaan sipil dan bangunan
 
Rab final bata
Rab final bataRab final bata
Rab final bata
 
Gg melati
Gg melatiGg melati
Gg melati
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliah
 
Planing pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliahPlaning pembangunan masjid_akmaliah
Planing pembangunan masjid_akmaliah
 
Scheduling SLEX (FS)-InitialCPM
Scheduling SLEX (FS)-InitialCPMScheduling SLEX (FS)-InitialCPM
Scheduling SLEX (FS)-InitialCPM
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE AGGREGA...
PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE  AGGREGA...PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE  AGGREGA...
PRESENTATION.pptxA EXPERIMENTAL STUDY ON PARTIAL REPLACEMENT OF FINE AGGREGA...
 
128249253 deped-estimate
128249253 deped-estimate128249253 deped-estimate
128249253 deped-estimate
 
01 cronograma valorizado
01 cronograma valorizado01 cronograma valorizado
01 cronograma valorizado
 
GAMBAR RENCANA JL. JAWI-SIPOT.pdf
GAMBAR RENCANA JL. JAWI-SIPOT.pdfGAMBAR RENCANA JL. JAWI-SIPOT.pdf
GAMBAR RENCANA JL. JAWI-SIPOT.pdf
 
Footing-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfFooting-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdf
 
Daftarbahanbangunan
Daftarbahanbangunan Daftarbahanbangunan
Daftarbahanbangunan
 
Labul
LabulLabul
Labul
 
materi kuliah it pln perhitungan plat balok
materi kuliah it pln perhitungan plat balokmateri kuliah it pln perhitungan plat balok
materi kuliah it pln perhitungan plat balok
 
BQ
BQBQ
BQ
 
PP2 final account assignment calculations
PP2 final account assignment calculationsPP2 final account assignment calculations
PP2 final account assignment calculations
 
Pp2 final account assignment excel
Pp2 final account assignment excelPp2 final account assignment excel
Pp2 final account assignment excel
 
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
 
97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor97170708 estimate-of-material-and-labor
97170708 estimate-of-material-and-labor
 

More from kurniawan yusril (8)

Rojali
RojaliRojali
Rojali
 
Hj salamah
Hj salamahHj salamah
Hj salamah
 
Gg melati
Gg melatiGg melati
Gg melati
 
Dsn timur ok
Dsn timur okDsn timur ok
Dsn timur ok
 
Dsn timur klp pt
Dsn timur klp ptDsn timur klp pt
Dsn timur klp pt
 
Bobot
BobotBobot
Bobot
 
Dsn timur klp pt
Dsn timur klp ptDsn timur klp pt
Dsn timur klp pt
 
Bobot
BobotBobot
Bobot
 

Recently uploaded

Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIkoyaldeepu123
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 

Recently uploaded (20)

9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
EduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AIEduAI - E learning Platform integrated with AI
EduAI - E learning Platform integrated with AI
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 

Adendum blh 2009 diperbaiki

  • 1. KEGIATAN : PEMBANGUNAN TEMPAT PEMBUANGAN BENDA PADAT/CAIR YANG MENIMBULKAN POLUSI PEKERJAAN : PEMBANGUNAN DAN PENGADAAN ALAT INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) PUSKESMAS LANGSAT, KAPASITAS 6 M3/HARI LOKASI : JL. MELUR, KOTA PEKANBARU TAMBAH KURANG TAMBAH KURANG 1 2 3 4 5.00 6 = 4x5 7 8 = 4x7 9 = 7-5 10 = 5-7 11 = 8-6 12 = 6-8 I PEKERJAAN PERSIAPAN 1 Pek. Pembersihan lapangan dan pengukuran / Uitzet M2 6,000.00 170.00 1,020,000.00 170.00 1,020,000.00 2 Pek. Pasang Bowplank M' 40,520.00 85.00 3,444,200.00 85.00 3,444,200.00 3 Pek. Pembongkaran lantai beton M' 15,040.00 25.00 376,000.00 25.00 376,000.00 4 Pek, Pembongkaran Lantai keramik M2 15,040.00 2.00 30,080.00 2.00 30,080.00 5 Pek. Pembongkaran septictank Ls 1,500,000.00 1.00 1,500,000.00 - - 1.00 1,500,000.00 II PEKERJAAN SIPIL A. Pekerjaan Fondasi 1 Pek. Galian tanah M3 15,040.00 67.65 1,017,456.00 14.85 223,344.00 52.80 794,112.00 2 Pek. Urugan Pasir M3 221,360.00 2.00 442,720.00 0.34 74,709.00 1.66 368,011.00 3 Pek. Pasang Lantai kerja 1:3:6 M3 658,048.00 4.00 2,632,192.00 0.34 222,091.20 3.66 2,410,100.80 4 Pek. Pondasi setempat beton bertulang M3 1,000,000.00 0.27 270,000.00 1.35 1,350,000.00 1.08 1,080,000.00 5 Pek. Fondasi batu-bata 1:3 M2 148,532.80 2.60 386,185.28 - - 2.60 386,185.28 6 Pek. Raben Fondasi 1:3 M2 50,000.00 36.00 1,800,000.00 - - 36.00 1,800,000.00 7 Pek. Urugan Tanah bekas galian M2 72,840.00 25.00 1,821,000.00 4.46 324,502.20 20.55 1,496,497.80 B. Pekerjaan Struktur 1 Pek. Cor Sloof Beton Bertulang 20 x 25 cm M3 5,964,720.00 1.30 7,754,136.00 - - 1.30 7,754,136.00 2 Pek. Cor kolom Beton Bertulang 20 x 20 cm M3 6,174,936.00 0.72 4,445,953.92 0.43 2,667,572.35 0.29 1,778,381.57 3 Pek. Cor reng Balok Beton Bertulang 20 x 20 cm M3 5,801,776.00 1.04 6,033,847.04 0.63 3,655,118.88 0.41 2,378,728.16 4 Pek. Dak Beton bertulang T = 20 cm M3 5,380,840.00 4.00 21,523,360.00 1.35 7,264,134.00 2.65 14,259,226.00 C. Pekerjaan Plasteran 1 Pek. Plasteran dinding 1: 4 M2 25,020.80 156.00 3,903,244.80 18.90 472,893.12 137.10 3,430,351.68 Pek. Pas Batu Bata 1:4 M2 66,184.00 18.90 1,250,877.60 18.90 1,250,877.60 D. Pekerjaan Lantai 1 Pek. Urugan Tanah Bawah Lantai M3 7,208.00 3.23 23,281.84 - - 3.23 23,281.84 2 Pek. Urugan Pasir Bawah Lantai M3 221,360.00 2.15 475,924.00 - - 2.15 475,924.00 3 Pek. Cor Lantai Beton Tumbuk 1:3:5 M3 658,048.00 2.15 1,414,803.20 - - 2.15 1,414,803.20 VOLUME JUMLAH HARGA (Rp) PEKERJAAN TAMBAH KURANG NO URAIAN PEKERJAAN SAT HARGA SATUAN (Rp) KONTRAK REALISASI SELISIH HARGA VOLUME JUMLAH HARGA (Rp) VOLUME JUMLAH HARGA
  • 2. TAMBAH KURANG TAMBAH KURANG 1 2 3 4 5.00 6 = 4x5 7 8 = 4x7 9 = 7-5 10 = 5-7 11 = 8-6 12 = 6-8 VOLUME JUMLAH HARGA (Rp) NO URAIAN PEKERJAAN SAT HARGA SATUAN (Rp) KONTRAK REALISASI SELISIH HARGA VOLUME JUMLAH HARGA (Rp) VOLUME JUMLAH HARGA T O T A L III PEKERJAAN PENGADAAN UNIT SEWAGE TRATMENT PLANT (STP) 4 M3/hari, Merek Bestindo type BMS-4.4 Set 94,000,000.00 1.00 94,000,000.00 1.00 94,000,000.00 - - IV. Pekerjaan Pemasangan Intalasi Pemipaan & Electrical M' 100,050.00 55.00 5,502,750.00 69.00 6,903,450.00 14.00 1,400,700.00 V. Pekerjaan Electrical M' 33,800.00 65.00 2,197,000.00 10.00 338,000.00 - - VI. PEKERJAAN LAIN-LAIN - - 1. Pek. Pembuangan bekas pembongkaran Ls 1,000,000.00 1.00 1,000,000.00 1.00 1,000,000.00 2. Pek. Kerangkeng + Gembok Ls 1,000,000.00 1.00 1,000,000.00 1.00 1,000,000.00 163,014,134.08 125,616,972.35 4,731,577.60 40,269,739.33 16,301,413.41 12,561,697.24 179,315,547.49 138,178,669.59 179,315,000.00 138,178,000.00 NIP. 196408121990071001 NIP. 196009211983301001 NIP. 197406132005011001 Direktur Ir. H. DEDI GUSRIADI, MT ARMAN YEDI, ST JOENAFRIKO, ST Drs. ISHARUDIN KEPALA BADAN LINGKUNGAN HIDUP PEJABAT PELAKSANA TEKNIS KEGIATAN PENGAWAS LAPANGAN KONTRAKTOR PELAKSANA KOTA PEKANBARU BADAN LINGKUNGAN HIDUP KOT PEKANBARU DINAS PEKERJAAN UMUM KOT PEKANBARU CV. RIZKI JAYA Disetujui Oleh Disetujui Oleh Diperiksa Oleh: Dibuat Oleh: JUMLAH TOTAL DIBULATKAN Pekanbaru, November 2009 JUMLAH PPN 10 %