2. CONTENTS
INTRODUCTION
NUCLEAR REACTION
NUCLEAR REACTOR
NUCLEAR REACTOR COMPONENTS
TYPES OF NUCLEAR REACTORS
GENERATIONS OF NUCLEAR REACTORS
NUCLEAR REACTORS IN INDIA
3. NUCLEAR REACTION
A process in which the
structure and energy
content of an atomic
nucleus is changed by
interaction with
another nucleus or
particle .
23. REACTOR GENERATIONS
Gen I
Prototypes in 50’s & 60’s
Gen II
70’s & 80’s
Today’s Operational
Reactors
BWR, PWR, CANDU, …
Gen III
ABWR, APWR
Approved 90’s
Some Built around the World
Gen III+
Current Advanced Designs in
the Approval Process
Pebble Bed Reactor
Gen IV
Deploy in 2030
Economical
Safe
Minimize Waste
Reduce Proliferation
24. NUCLEAR PROGRAM: PRESENT STATUS IN INDIA
18 PHWR & 2 BWR now under operation
4 PHWR and 2 LWR under commission
6730 MW generation & 4300 MW under
commission
Successful experiments with Fast Breeder Test
Reactor (FBTR)
Prototype Fast Breeder Reactor (PFBR) for
500MWe under construction
Advanced Heavy Water Reactor (AHWR) using
(Pu-Th) for 300MWe: advanced stage of design
approval; construction soon to begin.
25. RESEARCH REACTORS IN INDIA
Bhabha Atomic Research Center (BARC) – Trombay
Apsara reactor – 1 MWT, pool type, light water moderated, enriched
uranium fuel supplied by France
CIRUS reactor – 40 MWT, supplied by Canada, heavy water
moderated, uses natural uranium fuel
Dhruva reactor – 100 MWT, heavy water moderated, uses natural
uranium fuel
Indira Gandhi for Atomic Research Center (IGCAR)–
Kalpakkam
PFBR – 500MWe Sodium cooled fast breeder nuclear reactor under
construction. Expected completion 2013.
FBTR – 40 MWT Fast Breeder Test Reactor, uses mixed (plutonium
and uranium) carbide fuel
KAMINI –30 kWT, uses U-233 fuel