3. INTRODUCTION
Time Line
1st Week
• Induction programme.
• 4H High Voltage Awereness Programne (include test).
• Department segregation (Production Engineering
Dept./Comercial Vehicle).
• Line Visit
4. 2nd Week
• Visit Light Duty Line
• Make stopper for Oil Drum (task)
-CUTI HARI RAYA-
3rd Week
• Stopper Oil Drum
5. 4th Week
• Starting making of ‘Standard Working
Instruction’ (SWI)- start from CH2( axle)
• Complete CH3(piping)
• Update signage (Pre Leveling)
5th Week
• Truck engine noise (Vehicle Problem)
• Complete SWI on CH4 (wiring)
Signage PPE
6. 5th Week (cont’d)
• Product Levelling (Auditor From Japan- Mr.
Kumamoto).
• Process Levelling (Auditor From India- Mrs.
Shanti).
• Report Recheck, Redo, Redone.
Audit in progress
Remind Operator On
SOP and AOS
7. 6th Week
• Documentation on SWI CH4(wiring)
• Completing SWI CH5(Fuel Tank)
7th Week- Present
• Torque wrench Registration and Recalibration for
new Fuso Model Medium Duty (05TA)
Marking torque wrench