1. CareerHighlights:
Develop Weld Procedures to repair FPF while at Operational Draught without interruption to Oil
Production and Export.
Carry Out UWILD survey while on location carrying out ACFM inspection of welds
Northern Producer Hybrid mooring system design & installation
Installed the first offshore installation in the German Sector. HVDC transformer platform.
Increased Thistle Alpha Production by 1000bbls per day though choke management
Increased Thistle Alpha productive time 45% to 87% over an 18 month period.
Provided idea to Enquest to increase the Thistle life of field. Enquest have just received an engineering
award for implementing the idea.
Changed Thistle Alpha DFPV procedure to release work fronts within 48hrs of commencing shutdown.
From 7 days
SIMOPS organisation of both Thistle Alpha & Heather Alpha
Management re-organisation of Montrose & Arbroath platforms
Produced drilling readiness audit