WELDING PROCEDURES and
WELDERS QUALIFICATION
1
SOLID HDS2-9048
ASME Sec IX code deals withā€¦
ā€¢ Part QW for welding
ā€¢ Part QB for brazing -:
ā€¢ Each part is divided into further 4 articles
ā€“ 1. General requirements
ā€“ 2. Procedure Qualification
ā€“ 3. Performance Qualification
ā€“ 4. Data
3
WHY PROCEDURE
QUALIFICATION IS REQUIRED
ā€¢ The purpose of welding procedure specification (WPS)
and Procedure Qualification Record (PQR) is to determine
that the welding operation proposed for fabrication are
capable of producing welds with required properties for
intended application. (Assuming that the welder
performing the welding procedure qualification test is a
skilled workman).
ā€¢ Procedure Qualification test is to establish the properties of
the weldment and not the skill of the welders. .
4
WELDING PROCEDURE
SPECIFICA TION (WPS) QW-482
ā€¢ A WPS is a written document to provide direction for
making production welds which will meet code
requirements.
ā€¢ i. ESSENTIAL VARIABLE: These are variables which
have a marked and significant effect on the weld properties
if changed
ā€¢ ii. NON-ESSENTIAL VARIABLE: these will not, have
any significant effect on weld properties if changed. These
variables are listed for each welding process in QW-252
through QW-265 in ASME Sec. IX.
5
WELDING PROCEDURE
SPECIFICA TION (WPS) QW-482
ā€¢ iii. SUPPLEMENTARY ESSENTIAL
VARIABLE.
ā€¢ A WPS should be made available for
reference and review by the inspector. It
should also be made available with welding
supervisors, welders actually involved in
production of the weld.
6
CONTENTS OF WPS :
ā€¢ A completed WPS shall describe all essential and non-
essential variables for each welding process used in WPS.
ā€¢ The WPS shall also mention the supporting procedure
qualification records.
ā€¢ FORMAT OF WPS :
ā€¢ A WPS may be written in any format suitable to the
manufacturer. It should ensure that all essential and
supplementary essential variables are listed in the WPS.
7
PREPARATION OF A WPS
Step by step procedure of preparing a WPS
ā€¢ Review of job requirements
ā€¢ Selection of a suitable welding process
ā€¢ Fill in the suggested format of PQR
ā€¢ Ensure that all the welding variables are covered
ā€¢ Make a preliminary WPS based on the above PQR
ā€¢ Weld a coupon as per the above WPS
ā€¢ Carry out the examinations
ā€¢ Make final WPS & PQR if the results are satisfactory
8
PROCEDURE QUALIFICA TION
RECORD (PQR) (FORMAT QW- 483)
ā€¢ The record of welding data used during welding of Test-
coupon and of Test results is Procedure Qualification
Record.
ā€¢ A PQR should contain. .
ā€¢ -Actual values/range of all essential and supplementary
essential(whenever required) variables observed during the
welding of test coupon.
ā€¢ -Actual values/range of non-essential variable may be
recorded at manufacture's option.
9
PROCEDURE QUALIFICA TION
RECORD (PQR) (FORMAT QW- 483)
ā€¢ Types of test conducted.
ā€¢ Number of test conducted. Results of tests.
ā€¢ A PQR should be certified by the Manufacturer.
ā€¢ Changes to PQR are not permitted. However, correction
can be made for example, if P No. or F No. or any other
information is wrong then the same can be corrected.
ā€¢ Additional information can be incorporated at a later date
provided it can be substantiated as having been part of
original qualification condition by some lab :-Record or
similar document.
10
FORMAT FOR PQR:
ā€¢ Form QW 483 of section IX can be used as a guide to
prepare PQR.
ā€¢ PQR used for supporting WPS should be available for
review by the inspector. PQR need not be available to
welding operator or welder.
11
TYPE OF TEST REQUIRED :
ā€¢ It should be kept in mind while deciding the test
requirements that the weld metal should also have the
essential properties of the base metal.
ā€¢ A new test coupon shall be welded. Qualification on
grooves weld also qualifies for fillet welds. Procedure
Qualification in any position qualify for all position,
provided welding, process and welding rods electrodes
etc are suitable for use in a specific position.
ā€¢ Where notch-toughness is a requirement of
construction code the PROCEDURE
QUALIFICATION should be carried out in 3G or 6G
only. 12
ACCEPTANCE CRITERIA -
PROCEDURE TENSION TEST -QW 153:
In order to pass the tension test, the specimen shall have a tensile
strength that is not less than :
ā€¢ the minimum specified T.S. of base metal
ā€¢ the minimum specified T.S. of the weaker of the two, if the
metals of different T.S are welded
ā€¢ the minimum specified T.S of weld metal when the applicable
section provides for the use of weld metal having lower room
temp strength than base metal(Applicable for Eutectic alloys)
ā€¢ If the specimen breaks in the base metal outside of the weld
or weld interface, the test shall be accepted as meeting the
requirements,provided the strength is not more than 5 %
below the minimum specified T.S of the base metal
13
ACCEPTANCE CRITERIA -
PROCEDURE AND PERFORMANCE
BEND TEST -QW 163:
ā€¢ The guided bend test shall have no open discontinuities in
the weld or HAZ exceeding 1/8 in or 3.2 mm, measured in
any direction on the convex surface of the specimen after
bending.
ā€¢ Open discontinuities occurring on the corners of the
specimen during testing shall not be considered unless
there is a definite evidence that they result from lack of
fusion, slag inclusion or any other discontinuities.
14
ACCEPTANCE CRITERIA -
PROCEDURE MACRO
EXAMINATION QW-183
ā€¢ Visual examination of the cross sections of the weld metal
and HAZ shall show complete fusion and freedom form
cracks and there shall not be more than 1/8 in difference in
the legs of the fillet weld.
15
ACCEPTANCE CRITERIA -
PERFORMANCE - FRACTURE TEST-
QW-182
ā€¢ The stem of 4 in. fracture test specimen centre shall be
loaded laterally in such a way that the root of the weld is in
tension.The load shall be steadily increased until the
specimen fractures or bends flat upon itself.The stem shall
not peel off from the base surface, which happens when the
fusion is only skin deep
If the specimen fractures, the fractured surface shall show
no evidence of cracks or incomplete root fusion, and the
sum of the lengths of the inclusions and porosity visible on
the fractured surface shall not exceed 3/8 in.
16
ACCEPTANCE CRITERIA -
PERFORMANCE -
MACROEXAMINATION QW-184
The smoothened and etched surface of the specimen
should give a clear definition of the weld metal and HAZ.
In order to pass the test:
ā€¢ Visual examination of the cross section of the weld metal
and HAZ shall show complete fusion and freedom from
cracks, except that linear indications at the root not
exceeding 1/32 in. shall be acceptable
ā€¢ The weld shall not have a concavity or convexity greater
than 1/16 in.
ā€¢ There shall not be more than 1/8 in. difference in the
lengths of the legs of the fillet.
17
ACCEPTANCE CRITERIA -
PERFORMANCE -RADIOGRAPHY-QW-
191.2
Welders and welding operators performance tests by
radiography in test assemblies conducted as per
stipulations of Article 2 of ASME Section V, shall be
judged unacceptable when the radiograph exhibits any of
the linear or rounded indications as given in this article.
GENERAL NOTE: For Tensile tests, failure in HAZ is
considered as ā€˜base metal failureā€™ whereas for bend tests,
the failure in HAZ is considered as a ā€˜weld metal failureā€™.
18
WELDING PERFORMANCE
QUALIFICA TION (FORMAT QW 484)
ā€¢ Welding performance qualification test are intended to
determine (the ability of the welder to deposit sound welds
using qualified welding procedure specification.
ā€¢ RECORD OF TESTS :
ā€¢ The record of welder's performance qualification (WPQ),
shall contain besides personal details of the welders,
essential variable, type of tests, and test results and range
qualified and reference of WPS.
ā€¢ A welder may be qualified as under.
ā€¢ i) A welder may weld a test coupon using previously
qualified WPS.
19
WELDING PERFORMANCE QUALIFICA TION
(FORMAT QW 484) Contd...
ā€¢ However, pre-heating or post-heating required by WPS
may be omitted while preparing performance test coupon.
ā€¢ Specimens required for mechanical test shall be removed
from test coupon and will be tested. All the results should
meet the requirements as mentioned earlier.
ā€¢ ii) A test coupon, minimum length of which should be 6" in
case of plate and entire circumference of pipe (min 6ā€)
shall be radiographed.
20
WELDING PERFORMANCE QUALIFICA TION
(FORMAT QW 484) Contd...
ā€¢ iii) Alternatively, at the manufacturer's option a welder
may be qualified on the job by Radiography examination
of his first 6" of production weld (for SAW 3 feet).
ā€¢ A welding supervisor/engineer may terminate the
performance test at any stage if it becomes apparent that
the welder/welding operator does not have the requisite
skill.
ā€¢ If a welding operator /welder fails in performance test
immediate re-test can be taken.
21
WELDING PERFORMANCE QUALIFICATION
(FORMAT QW 484) Contd...
ā€¢ If the mechanical test have failed then the welder will
make two consecutive sample and all mechanical tests
from both samples shall meet test requirements.
ā€¢ If the qualification test have failed radiography
examination then 2 additional 6" long plate coupon or 2
pipe coupons total circumstance of weld of which will 12"
long shall be made and all shall meet the requirements of
radiography.
ā€¢ In case of radiography of first 6" failure of production weld
then at the manufactures option further 12" of weld shall
be radiographed and shall meet the radiography
requirement. 22
WELDING PERFORMANCE QUALIFICA
TION (FORMAT QW 484) Contd...
ā€¢ If on radiography re-test a welder meets the requirement
then the area on which the welder failed to meet the
requirement shall be repaired by him or other qualified
welder.
ā€¢ In case the welder fails in re-test or the manufacturer does
not wish to offer for re-test then the entire weld made by
this welder shall be radiographed and all defective areas
shall be repaired by other qualified welder.
23
RENEWAL OF
QUALIFICATION:
ā€¢ The performance qualification of welder/welding operator
shall expire when he has not welded with a process for a
period of 3 months or more. However when he has welded
with another process, the period may be extended to six
months.
ā€¢ Renewal of qualification can be made for any process by
welding a single coupon of either plate or pipe, of any
material and by testing of that coupon.
ā€¢ When there is a specific reason to doubt the ability of the
welder to make welds that meet specification,
requirements, his qualification which support the welding
which he is doing shall be revoked. 24
RENEWAL OF QUALIFICATION:
Contd...
ā€¢ In such case the welder or welding operator will have to
weld a test coupon for re-qualification which will be tested
as required by the code before he is put on the job.
ā€¢ Performance qualification-position and diameter
limitations are mentioned in QW- 461-9 and QW-454(see
Annexures). Performance Qualification, tests can be
carried out by using a combination of welding process on
single test coupon limits of thickness for which he will be
qualified will depend upon the amount of weldment
thickness deposited by each process.
25
RENEWAL OF QUALIFICATION:
ā€¢ Two or more welders can be qualified on a single test
coupon using same or different welding processes limits of
qualification for each welder will be related to weld metal
deposited by him with his specific welding process.
ā€¢ The requirements for welding Procedure Specification
(WPS), Procedure Qualification Record (PQR) and
welders performance Qualification (WPQ) are given in
ASME Sec. IX Article I, II and III respectively.
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
THANK YOU
41
ā€¢ QW-482 .doc
42

More Related Content

What's hot

Procedure qualification
Procedure qualificationProcedure qualification
Procedure qualificationvaasuBandaru
Ā 
How to produce PQR
How to produce PQRHow to produce PQR
How to produce PQRMohamed Farouk
Ā 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix Nuri Cesur
Ā 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)Mohamed Farouk
Ā 
Weld Defects
Weld DefectsWeld Defects
Weld Defectsadminn2
Ā 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 sJithu John
Ā 
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...DixitJoshi5
Ā 
CSWIP 3.2 New BOOK.pdf
CSWIP 3.2  New BOOK.pdfCSWIP 3.2  New BOOK.pdf
CSWIP 3.2 New BOOK.pdfVENKATESAN S
Ā 
Latest cswip 3.1 book
Latest cswip 3.1 bookLatest cswip 3.1 book
Latest cswip 3.1 bookRehan khan
Ā 
Documents Governing Welding Inspection and Qualification
Documents Governing Welding Inspection and QualificationDocuments Governing Welding Inspection and Qualification
Documents Governing Welding Inspection and QualificationRandall Stremmel
Ā 
Welding Inspection Cswip
Welding Inspection CswipWelding Inspection Cswip
Welding Inspection Cswipguest831c1e
Ā 
cswip-3-1-new-book
cswip-3-1-new-bookcswip-3-1-new-book
cswip-3-1-new-bookankit sachan
Ā 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixmayank0738
Ā 
Asme b31,pressure piping code
Asme b31,pressure piping codeAsme b31,pressure piping code
Asme b31,pressure piping codeSayed Salah Elsawey
Ā 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questionsKarthik Banari
Ā 
86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.pptpeter770054
Ā 
Api 570 course material
Api 570 course materialApi 570 course material
Api 570 course materialTASSIO DOURADO
Ā 
Welders qualification
Welders qualificationWelders qualification
Welders qualificationLalu Rajendran
Ā 

What's hot (20)

Procedure qualification
Procedure qualificationProcedure qualification
Procedure qualification
Ā 
How to produce PQR
How to produce PQRHow to produce PQR
How to produce PQR
Ā 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix
Ā 
Welder qualification
Welder qualificationWelder qualification
Welder qualification
Ā 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)
Ā 
Weld Defects
Weld DefectsWeld Defects
Weld Defects
Ā 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 s
Ā 
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
Ā 
CSWIP 3.2 New BOOK.pdf
CSWIP 3.2  New BOOK.pdfCSWIP 3.2  New BOOK.pdf
CSWIP 3.2 New BOOK.pdf
Ā 
Latest cswip 3.1 book
Latest cswip 3.1 bookLatest cswip 3.1 book
Latest cswip 3.1 book
Ā 
Documents Governing Welding Inspection and Qualification
Documents Governing Welding Inspection and QualificationDocuments Governing Welding Inspection and Qualification
Documents Governing Welding Inspection and Qualification
Ā 
Welding Inspection Cswip
Welding Inspection CswipWelding Inspection Cswip
Welding Inspection Cswip
Ā 
cswip-3-1-new-book
cswip-3-1-new-bookcswip-3-1-new-book
cswip-3-1-new-book
Ā 
ASME Codes.pdf
ASME Codes.pdfASME Codes.pdf
ASME Codes.pdf
Ā 
Presentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ixPresentation on wpqr wps asme_ix
Presentation on wpqr wps asme_ix
Ā 
Asme b31,pressure piping code
Asme b31,pressure piping codeAsme b31,pressure piping code
Asme b31,pressure piping code
Ā 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
Ā 
86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt86177188-Wps-Pqr-Guide.ppt
86177188-Wps-Pqr-Guide.ppt
Ā 
Api 570 course material
Api 570 course materialApi 570 course material
Api 570 course material
Ā 
Welders qualification
Welders qualificationWelders qualification
Welders qualification
Ā 

Similar to WELDING PROCEDURES and WELDERS QUALIFICATION .ppt

WPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfWPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfmounirbonnois
Ā 
ASME training.pdf
ASME training.pdfASME training.pdf
ASME training.pdfBaber6
Ā 
Nwha tech weld_procedure_process_2014
Nwha tech weld_procedure_process_2014Nwha tech weld_procedure_process_2014
Nwha tech weld_procedure_process_2014Dinh Truong Van
Ā 
WELDING QUALIFICATION.PPT
WELDING QUALIFICATION.PPTWELDING QUALIFICATION.PPT
WELDING QUALIFICATION.PPTAbrahamAby3
Ā 
QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorAsad Ahsan
Ā 
0140.10 general welding fabrication and testing
0140.10   general welding fabrication and testing0140.10   general welding fabrication and testing
0140.10 general welding fabrication and testingRamamoorthy Madhan
Ā 
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUMEQA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUMEAnanda Ram Prasath
Ā 
Complete March 2015 CV-2
Complete March 2015 CV-2Complete March 2015 CV-2
Complete March 2015 CV-2Tim Jones
Ā 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Pratap Biswas
Ā 
100661266 cswip-3-1-2009
100661266 cswip-3-1-2009100661266 cswip-3-1-2009
100661266 cswip-3-1-2009Jithu John
Ā 
ASME Section IX Presentation.pptx
ASME Section IX Presentation.pptxASME Section IX Presentation.pptx
ASME Section IX Presentation.pptxMuhammad Shabbir
Ā 
Methodology Of Fabrication_R4_19.08.16.pptx
Methodology Of Fabrication_R4_19.08.16.pptxMethodology Of Fabrication_R4_19.08.16.pptx
Methodology Of Fabrication_R4_19.08.16.pptxharmanpnrgroup
Ā 
Structural Welding.pptx
Structural Welding.pptxStructural Welding.pptx
Structural Welding.pptxMASUKUMARA1
Ā 
Welding Procces
Welding ProccesWelding Procces
Welding ProccesAlen Pepa
Ā 
Welding
WeldingWelding
WeldingAlen Pepa
Ā 
QA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyQA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyAjith Puthoor
Ā 

Similar to WELDING PROCEDURES and WELDERS QUALIFICATION .ppt (20)

WPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdfWPS -PQR - Welder Qualifications .pdf
WPS -PQR - Welder Qualifications .pdf
Ā 
Module 5
Module 5Module 5
Module 5
Ā 
Asme section ix new
Asme section ix newAsme section ix new
Asme section ix new
Ā 
ASME training.pdf
ASME training.pdfASME training.pdf
ASME training.pdf
Ā 
Nwha tech weld_procedure_process_2014
Nwha tech weld_procedure_process_2014Nwha tech weld_procedure_process_2014
Nwha tech weld_procedure_process_2014
Ā 
WELDING QUALIFICATION.PPT
WELDING QUALIFICATION.PPTWELDING QUALIFICATION.PPT
WELDING QUALIFICATION.PPT
Ā 
QA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding InspectorQA/QC Mechanical and Welding Inspector
QA/QC Mechanical and Welding Inspector
Ā 
0140.10 general welding fabrication and testing
0140.10   general welding fabrication and testing0140.10   general welding fabrication and testing
0140.10 general welding fabrication and testing
Ā 
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUMEQA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
QA,QC INSPECTOR ANANDA RAM PRASATH.V RESUME
Ā 
Complete March 2015 CV-2
Complete March 2015 CV-2Complete March 2015 CV-2
Complete March 2015 CV-2
Ā 
Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------Quality assurance-for-ms-pipe itp-------------------------
Quality assurance-for-ms-pipe itp-------------------------
Ā 
Resume Khurshid
Resume KhurshidResume Khurshid
Resume Khurshid
Ā 
100661266 cswip-3-1-2009
100661266 cswip-3-1-2009100661266 cswip-3-1-2009
100661266 cswip-3-1-2009
Ā 
ASME Section IX Presentation.pptx
ASME Section IX Presentation.pptxASME Section IX Presentation.pptx
ASME Section IX Presentation.pptx
Ā 
Methodology Of Fabrication_R4_19.08.16.pptx
Methodology Of Fabrication_R4_19.08.16.pptxMethodology Of Fabrication_R4_19.08.16.pptx
Methodology Of Fabrication_R4_19.08.16.pptx
Ā 
Structural Welding.pptx
Structural Welding.pptxStructural Welding.pptx
Structural Welding.pptx
Ā 
Welding Procces
Welding ProccesWelding Procces
Welding Procces
Ā 
Welding
WeldingWelding
Welding
Ā 
Resume
ResumeResume
Resume
Ā 
QA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyQA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - Copy
Ā 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
Ā 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
Ā 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
Ā 
šŸ”9953056974šŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
šŸ”9953056974šŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...šŸ”9953056974šŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
šŸ”9953056974šŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
Ā 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
Ā 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
Ā 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
Ā 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
Ā 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
Ā 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
Ā 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
Ā 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
Ā 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
Ā 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
Ā 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
Ā 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
Ā 
Gurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort service
Gurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort serviceGurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort service
Gurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort servicejennyeacort
Ā 
Model Call Girl in Narela Delhi reach out to us at šŸ”8264348440šŸ”
Model Call Girl in Narela Delhi reach out to us at šŸ”8264348440šŸ”Model Call Girl in Narela Delhi reach out to us at šŸ”8264348440šŸ”
Model Call Girl in Narela Delhi reach out to us at šŸ”8264348440šŸ”soniya singh
Ā 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
Ā 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
Ā 
young call girls in Rajiv ChowkšŸ” 9953056974 šŸ” Delhi escort Service
young call girls in Rajiv ChowkšŸ” 9953056974 šŸ” Delhi escort Serviceyoung call girls in Rajiv ChowkšŸ” 9953056974 šŸ” Delhi escort Service
young call girls in Rajiv ChowkšŸ” 9953056974 šŸ” Delhi escort Service
Ā 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
Ā 
šŸ”9953056974šŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
šŸ”9953056974šŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...šŸ”9953056974šŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
šŸ”9953056974šŸ”!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
Ā 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
Ā 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Ā 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
Ā 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
Ā 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Ā 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
Ā 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
Ā 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
Ā 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
Ā 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
Ā 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Ā 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
Ā 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
Ā 
Gurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort service
Gurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort serviceGurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort service
Gurgaon āœ”ļø9711147426āœØCall In girls Gurgaon Sector 51 escort service
Ā 
Model Call Girl in Narela Delhi reach out to us at šŸ”8264348440šŸ”
Model Call Girl in Narela Delhi reach out to us at šŸ”8264348440šŸ”Model Call Girl in Narela Delhi reach out to us at šŸ”8264348440šŸ”
Model Call Girl in Narela Delhi reach out to us at šŸ”8264348440šŸ”
Ā 

WELDING PROCEDURES and WELDERS QUALIFICATION .ppt

  • 1. WELDING PROCEDURES and WELDERS QUALIFICATION 1 SOLID HDS2-9048
  • 2. ASME Sec IX code deals withā€¦ ā€¢ Part QW for welding ā€¢ Part QB for brazing -: ā€¢ Each part is divided into further 4 articles ā€“ 1. General requirements ā€“ 2. Procedure Qualification ā€“ 3. Performance Qualification ā€“ 4. Data 3
  • 3. WHY PROCEDURE QUALIFICATION IS REQUIRED ā€¢ The purpose of welding procedure specification (WPS) and Procedure Qualification Record (PQR) is to determine that the welding operation proposed for fabrication are capable of producing welds with required properties for intended application. (Assuming that the welder performing the welding procedure qualification test is a skilled workman). ā€¢ Procedure Qualification test is to establish the properties of the weldment and not the skill of the welders. . 4
  • 4. WELDING PROCEDURE SPECIFICA TION (WPS) QW-482 ā€¢ A WPS is a written document to provide direction for making production welds which will meet code requirements. ā€¢ i. ESSENTIAL VARIABLE: These are variables which have a marked and significant effect on the weld properties if changed ā€¢ ii. NON-ESSENTIAL VARIABLE: these will not, have any significant effect on weld properties if changed. These variables are listed for each welding process in QW-252 through QW-265 in ASME Sec. IX. 5
  • 5. WELDING PROCEDURE SPECIFICA TION (WPS) QW-482 ā€¢ iii. SUPPLEMENTARY ESSENTIAL VARIABLE. ā€¢ A WPS should be made available for reference and review by the inspector. It should also be made available with welding supervisors, welders actually involved in production of the weld. 6
  • 6. CONTENTS OF WPS : ā€¢ A completed WPS shall describe all essential and non- essential variables for each welding process used in WPS. ā€¢ The WPS shall also mention the supporting procedure qualification records. ā€¢ FORMAT OF WPS : ā€¢ A WPS may be written in any format suitable to the manufacturer. It should ensure that all essential and supplementary essential variables are listed in the WPS. 7
  • 7. PREPARATION OF A WPS Step by step procedure of preparing a WPS ā€¢ Review of job requirements ā€¢ Selection of a suitable welding process ā€¢ Fill in the suggested format of PQR ā€¢ Ensure that all the welding variables are covered ā€¢ Make a preliminary WPS based on the above PQR ā€¢ Weld a coupon as per the above WPS ā€¢ Carry out the examinations ā€¢ Make final WPS & PQR if the results are satisfactory 8
  • 8. PROCEDURE QUALIFICA TION RECORD (PQR) (FORMAT QW- 483) ā€¢ The record of welding data used during welding of Test- coupon and of Test results is Procedure Qualification Record. ā€¢ A PQR should contain. . ā€¢ -Actual values/range of all essential and supplementary essential(whenever required) variables observed during the welding of test coupon. ā€¢ -Actual values/range of non-essential variable may be recorded at manufacture's option. 9
  • 9. PROCEDURE QUALIFICA TION RECORD (PQR) (FORMAT QW- 483) ā€¢ Types of test conducted. ā€¢ Number of test conducted. Results of tests. ā€¢ A PQR should be certified by the Manufacturer. ā€¢ Changes to PQR are not permitted. However, correction can be made for example, if P No. or F No. or any other information is wrong then the same can be corrected. ā€¢ Additional information can be incorporated at a later date provided it can be substantiated as having been part of original qualification condition by some lab :-Record or similar document. 10
  • 10. FORMAT FOR PQR: ā€¢ Form QW 483 of section IX can be used as a guide to prepare PQR. ā€¢ PQR used for supporting WPS should be available for review by the inspector. PQR need not be available to welding operator or welder. 11
  • 11. TYPE OF TEST REQUIRED : ā€¢ It should be kept in mind while deciding the test requirements that the weld metal should also have the essential properties of the base metal. ā€¢ A new test coupon shall be welded. Qualification on grooves weld also qualifies for fillet welds. Procedure Qualification in any position qualify for all position, provided welding, process and welding rods electrodes etc are suitable for use in a specific position. ā€¢ Where notch-toughness is a requirement of construction code the PROCEDURE QUALIFICATION should be carried out in 3G or 6G only. 12
  • 12. ACCEPTANCE CRITERIA - PROCEDURE TENSION TEST -QW 153: In order to pass the tension test, the specimen shall have a tensile strength that is not less than : ā€¢ the minimum specified T.S. of base metal ā€¢ the minimum specified T.S. of the weaker of the two, if the metals of different T.S are welded ā€¢ the minimum specified T.S of weld metal when the applicable section provides for the use of weld metal having lower room temp strength than base metal(Applicable for Eutectic alloys) ā€¢ If the specimen breaks in the base metal outside of the weld or weld interface, the test shall be accepted as meeting the requirements,provided the strength is not more than 5 % below the minimum specified T.S of the base metal 13
  • 13. ACCEPTANCE CRITERIA - PROCEDURE AND PERFORMANCE BEND TEST -QW 163: ā€¢ The guided bend test shall have no open discontinuities in the weld or HAZ exceeding 1/8 in or 3.2 mm, measured in any direction on the convex surface of the specimen after bending. ā€¢ Open discontinuities occurring on the corners of the specimen during testing shall not be considered unless there is a definite evidence that they result from lack of fusion, slag inclusion or any other discontinuities. 14
  • 14. ACCEPTANCE CRITERIA - PROCEDURE MACRO EXAMINATION QW-183 ā€¢ Visual examination of the cross sections of the weld metal and HAZ shall show complete fusion and freedom form cracks and there shall not be more than 1/8 in difference in the legs of the fillet weld. 15
  • 15. ACCEPTANCE CRITERIA - PERFORMANCE - FRACTURE TEST- QW-182 ā€¢ The stem of 4 in. fracture test specimen centre shall be loaded laterally in such a way that the root of the weld is in tension.The load shall be steadily increased until the specimen fractures or bends flat upon itself.The stem shall not peel off from the base surface, which happens when the fusion is only skin deep If the specimen fractures, the fractured surface shall show no evidence of cracks or incomplete root fusion, and the sum of the lengths of the inclusions and porosity visible on the fractured surface shall not exceed 3/8 in. 16
  • 16. ACCEPTANCE CRITERIA - PERFORMANCE - MACROEXAMINATION QW-184 The smoothened and etched surface of the specimen should give a clear definition of the weld metal and HAZ. In order to pass the test: ā€¢ Visual examination of the cross section of the weld metal and HAZ shall show complete fusion and freedom from cracks, except that linear indications at the root not exceeding 1/32 in. shall be acceptable ā€¢ The weld shall not have a concavity or convexity greater than 1/16 in. ā€¢ There shall not be more than 1/8 in. difference in the lengths of the legs of the fillet. 17
  • 17. ACCEPTANCE CRITERIA - PERFORMANCE -RADIOGRAPHY-QW- 191.2 Welders and welding operators performance tests by radiography in test assemblies conducted as per stipulations of Article 2 of ASME Section V, shall be judged unacceptable when the radiograph exhibits any of the linear or rounded indications as given in this article. GENERAL NOTE: For Tensile tests, failure in HAZ is considered as ā€˜base metal failureā€™ whereas for bend tests, the failure in HAZ is considered as a ā€˜weld metal failureā€™. 18
  • 18. WELDING PERFORMANCE QUALIFICA TION (FORMAT QW 484) ā€¢ Welding performance qualification test are intended to determine (the ability of the welder to deposit sound welds using qualified welding procedure specification. ā€¢ RECORD OF TESTS : ā€¢ The record of welder's performance qualification (WPQ), shall contain besides personal details of the welders, essential variable, type of tests, and test results and range qualified and reference of WPS. ā€¢ A welder may be qualified as under. ā€¢ i) A welder may weld a test coupon using previously qualified WPS. 19
  • 19. WELDING PERFORMANCE QUALIFICA TION (FORMAT QW 484) Contd... ā€¢ However, pre-heating or post-heating required by WPS may be omitted while preparing performance test coupon. ā€¢ Specimens required for mechanical test shall be removed from test coupon and will be tested. All the results should meet the requirements as mentioned earlier. ā€¢ ii) A test coupon, minimum length of which should be 6" in case of plate and entire circumference of pipe (min 6ā€) shall be radiographed. 20
  • 20. WELDING PERFORMANCE QUALIFICA TION (FORMAT QW 484) Contd... ā€¢ iii) Alternatively, at the manufacturer's option a welder may be qualified on the job by Radiography examination of his first 6" of production weld (for SAW 3 feet). ā€¢ A welding supervisor/engineer may terminate the performance test at any stage if it becomes apparent that the welder/welding operator does not have the requisite skill. ā€¢ If a welding operator /welder fails in performance test immediate re-test can be taken. 21
  • 21. WELDING PERFORMANCE QUALIFICATION (FORMAT QW 484) Contd... ā€¢ If the mechanical test have failed then the welder will make two consecutive sample and all mechanical tests from both samples shall meet test requirements. ā€¢ If the qualification test have failed radiography examination then 2 additional 6" long plate coupon or 2 pipe coupons total circumstance of weld of which will 12" long shall be made and all shall meet the requirements of radiography. ā€¢ In case of radiography of first 6" failure of production weld then at the manufactures option further 12" of weld shall be radiographed and shall meet the radiography requirement. 22
  • 22. WELDING PERFORMANCE QUALIFICA TION (FORMAT QW 484) Contd... ā€¢ If on radiography re-test a welder meets the requirement then the area on which the welder failed to meet the requirement shall be repaired by him or other qualified welder. ā€¢ In case the welder fails in re-test or the manufacturer does not wish to offer for re-test then the entire weld made by this welder shall be radiographed and all defective areas shall be repaired by other qualified welder. 23
  • 23. RENEWAL OF QUALIFICATION: ā€¢ The performance qualification of welder/welding operator shall expire when he has not welded with a process for a period of 3 months or more. However when he has welded with another process, the period may be extended to six months. ā€¢ Renewal of qualification can be made for any process by welding a single coupon of either plate or pipe, of any material and by testing of that coupon. ā€¢ When there is a specific reason to doubt the ability of the welder to make welds that meet specification, requirements, his qualification which support the welding which he is doing shall be revoked. 24
  • 24. RENEWAL OF QUALIFICATION: Contd... ā€¢ In such case the welder or welding operator will have to weld a test coupon for re-qualification which will be tested as required by the code before he is put on the job. ā€¢ Performance qualification-position and diameter limitations are mentioned in QW- 461-9 and QW-454(see Annexures). Performance Qualification, tests can be carried out by using a combination of welding process on single test coupon limits of thickness for which he will be qualified will depend upon the amount of weldment thickness deposited by each process. 25
  • 25. RENEWAL OF QUALIFICATION: ā€¢ Two or more welders can be qualified on a single test coupon using same or different welding processes limits of qualification for each welder will be related to weld metal deposited by him with his specific welding process. ā€¢ The requirements for welding Procedure Specification (WPS), Procedure Qualification Record (PQR) and welders performance Qualification (WPQ) are given in ASME Sec. IX Article I, II and III respectively. 26
  • 26. 27
  • 27. 28
  • 28. 29
  • 29. 30
  • 30. 31
  • 31. 32
  • 32. 33
  • 33. 34
  • 34. 35
  • 35. 36
  • 36. 37
  • 37. 38
  • 38. 39
  • 39. 40