CHAPTER 3
LEVELING
Definitions
• An elevation of a point : The vertical distance between the point and the
reference level surface ( datum )
,the most commonly used datum is the mean sea level (MSL ) .
• Leveling : The process by which the elevation of a point above or bellow
the MSL or the elevation difference between points is determined, There are
several ways to do that:
A- Chain surveying: by measuring the slope distance and angle of inclination
B- Barometric leveling: by measuring the atmospheric pressure using
barometer or an altimeter.
C- Trigonometric Leveling: by measuring the horizontal or slope distance
between points and the vertical angle ( an elevation or zenith ).
D- Differential Leveling: by using an instrument called a level .
• Bench Mark ( BM) : well marked points whose elevation has been accurately
measured.
• Level line: a line perpendicular to the direction of gravity at all points.
Definitions
Basic Principle of A level
A level consists essentially of :
a- telescope for sighting.
b- a leveling device to maintain the line of sight a horizontal as Bubble Tube,
circular bubble, and some levels use a bubble consists of two separate halves
which can be seen through an eyepiece near the telescope.
To use the level instrument in making leveling there is a need for :
a- Tripod: A three-legged stand used to support a level or other surveying
equipments.
b- level rods ( staff ): used to measure the vertical distance between the points
and is usually 3 – 5 m long ( telescopic staff, folding staff, one piece staff ).
There three kinds of levels :
- The dumpy level: the line of sight ( collimation ) is fixed at right angles to the
vertical axis of rotation of the instrument, ( the spirit level attached to the
telescope) should also be perpendicular to the vertical axis and parallel to the
line of collimation.
- The tilting level: the vertical axis is made approximately vertical using circular
bubble, and the telescope is leveled horizontal using the telescope spirit level.
- The Automatic level: use a system of self-leveling compensators within the
optical system of the telescope to bring the line of sight to the horizontal plane.
Measuring Elevation Difference using a level
B
0.932.56
Line of collimation
A
C
B
A
2.97
C
0.64 Line of collimation
The difference in elevation between A & B
=the vertical distance AC = RA -RB
=2.56-0.93=1.63m.
”positive value means Rise”
Second reading smaller than first reading represents a rise
The difference in elevation between A & B
=the vertical distance BC = RA -RB
=0.64-2.97= -2.33m.
”Negative value means Fall”
Second reading greater than first reading represents a fall
B
0.932.56
Line of collimation
A
C
B
A
2.97
C
0.64 Line of collimation
Calculation of Unknown Points
A- The height of Instrument (collimation ) method:
Height of instrument (HI) = Elevation of A + staff reading at A
Elevation of B ( RL ) = HI – staff reading at B
HI = 520.43 + 2.56 = 522.99 m AMSL
RLB = 522.99 – 0.93 = 522.06 AMSL
HI = 520.43 + 0.64 = 521.07 m AMSL
RLB = 521.07 – 2.97 = 518.10 m AMSL
B- The Rise and Fall method:
Elevation Difference = first reading at A – second reading at B
Elevation of B ( RL ) = elevation of A + Rise or Fall
ELev. Diff. = 2.56 – 0.93 = 1.63 m. (Rise)
RLB = 520.43 + 1.63 = 522.06 m. AMSL
ELev. Diff. = 0.64 – 2.97 = -2.33 m. (Fall)
RLB = 520.43 + (-2.33) = 518.10 m. AMSL
∆HAB = HB – HA = RA - RB
Procedure in Differential Level
Definitions:
1- Backsight ( BS ): The first reading taken at every instrument station .
2- Foresight ( FS ): The last reading taken at every instrument station .
3- Intermediate sight ( IS ): Any reading taken at an instrument station between BS & FS
4- Turning point ( TP ): A point at which both BS & FS are taken before moving the staff
General Procedure:
The main purpose is to provide RL for a large number of points, such as the center line
of highway, or an area to produce a contour plan, this will be illustrated through the
following example of production longitudinal section (profile ) of a road.
Booking the work
Calculations
A- The Height of Instrument ( HI ) method:
Checks:
1- #of BS reading = # of FS reading = 2
2- ∑BS - ∑FS= RL last point – RL first point(3.450 – 2.231 = 99.979 – 98.760=1.219(
3- ( #of readings = 9 ( = (# of points( + (# of TP( = 8 + 1
4-Sum of all RL excluding the first reduced level = sum of the HI for each setup
multiplied by the number of IS and FS readings taken from that setup – sum of IS
-sum of FS
689.741=(99.423×4+100.625×3=699.567(–(∑IS=7.595)–(∑FS =2.231) =689.741
B- The rise and Fall method:
Checks:
1- #of BS = # of FS = 2
2-( #of readings = 9 ( = ( # of points = 8 ( + ( # of TP = 1(
3- (∑BS - ∑ FS( = (3.450 – 2.231 ( = 1.219
= (∑R - ∑ F( = ( 3.079 – 1.860( = 1.219
= (RL last - RL1st ( = ( 99.979 – 98.760 ( = 1.219
General Notes
1- The accuracy of RL depend on both calculations & correct measurements( staff readings(
To ensure accurate elevations of the level points, the field work should start at BM and
close at another known BM, or should go back and close at the starting point .
2- If the purpose of leveling is to find out the elevation difference between two points, no
intermediate sights are necessary, only BS & FS readings are made.
3- The BS & FS distances should be approximately equal to avoid errors.
4- IF possible staff readings should be made to the nearest mm at TP, and to the nearest cm
at other points.
5- TP points should be chosen on firm ground. On soft ground, a special triangular base is
used.
6- IF the point whose elevation is to be calculated lie above the level of the sight line like
a bridge or a ceiling or top of wall or column, then the staff reading is recorded in negative.
7- If the BM point is the last point, then use the equation ( ∑BS - ∑FS= RL last–RL1st ) to
calculate the RL of first point But if the BM lie in the middle of level chain, then calculate
the RL of last point ,and after that use the previous equation to calculate the RL of first
point and complete the calculations in the normal way.
Example:
Using the data in the following figure, calculate the RL of points: A, B, C, D, using
both of R & F and HI methods
1- #of BS = # of FS = 2
2- (∑BS - ∑FS(=(-0.67-0.85(=-1.52 & (∑R - ∑F(=(3.38-4.90( = -1.52
& (RL last – RL1st (= (498.48 – 500.00( = -1.52
3-RL excluding first RL = 501.13 + 503.38 + 498.48 = 1502.99
= (500.6×1+499.86×2=1500.32( – (∑FS=0.85( - (∑IS=-3.52(
=1502.99
Uses of Leveling
1- Longitudinal Sections: (center line of a railway, road, canal, sewer or water main(
Levels are taken at:
1- every 20m, 50m or 100m depending on the topography (for earthworks computations,
A spacing of 20m is common.
2- points at which gradient changes, and at streets intersections.
Notes:
• Staff readings to 0.01 m accuracy are generally adequate
• Common scale for roads works are 1/1000 for horizontal ( Distances (
& 1/100 for vertical ( levels or elevations (.
• Points are connected by straight lines on the profile.
2-Cross-Sections:
• Some Engineering works require that cross sections be taken at right angles to
the center line of a proposed or existing project such as a road.
• The width of these of sections are taken 15 m either side of the center for
a normal road.
• A scale of 1/50 or 1/100 is used for both horizontal and vertical axes.
3-contouring:
Definitions:
A contour: is an imaginary line connecting points on the ground that have the
same elevation.
Contour Interval ( CI ): The vertical distance or elevation difference between two
successive contours.
Contour interval = 20m
Characteristics of Contours
1- Closely contours represent a steep slope, but spaced far contours
represent a flat slope.
2- Contours of different values do not cross each other except in a cave, nor
do they merge except in a vertically standing surface such as a wall.
3- A single contour can not split into two contours of the same value, and
must be a closed circuit not necessary in limits of the contour plan.
4- Irregular contours represent a rough and uneven terrain.
5- contours are perpendicular to the direction of the steepest slope.
6- A hill or depression are represented by closed lines.
Factors affecting choice of contour intervals:
1- Contour plan scale: The larger scale is the smaller contour interval.
2- The importance and purpose of a contour plan : for more details, a small
contour interval is used.
3- Accuracy, time and cost : For higher accuracy, a smaller interval is used.
4- The topography of the ground : For steep ground a large contour interval
is used, but for flat ground a small contour interval is used.
5- The area covered by the plan: For larger areas, a large contour interval is
used.
Methods of Contouring
1- Griding : This method is suitable for flat terrain of small sites ,rectangles or squares of
10 to 20m side are set out on the ground
10-20m
10-20m
A
B
C
D
E
1 2 3 4 5
The reduced levels of corners are plotted as a grid on a plan with suitable scale,
Then the required contour lines are plotted by a process called linear interpolation.
X / 12 = ( 1 / 3(
X= (1 / 3(×12 = 4m
2-Radiating Lines:
Rays are set out on the ground from a central point, and levels are taken along
these rays at measured distance from the center, and linear interpolation is
used to give the contour lines.
3-Cross-Section Method : In this method, a cross-section are made on a line
or a traverse inside the area, levels are taken at points where the topography
changes, and linear interpolation is used to give the contour lines.
4-Setting Out Levels:
Sight rail A, RL= 30.02 + 3.75 =33.77m
Distance AB = 60 m
Fall = 60 ×( 1 / 100 ) =0.60 m
Invert Level at B = 30.02 – 0.60=29.42 m
Sight rail at B = 29.42 + 3.75 = 33.17 m
If a level is setup nearby has a height
Of collimation of 34.85 m, then the staff
Reading at A = 34.85 – 33.77 = 1.08 m
&Reading at B= 34.85 – 33.17 = 1.68 m
One of the basic applications of leveling is setting out sight rails which enable
The excavation operators to cut out earth to an even gradient, and enable
the pipe-layer to lay the pipes to this gradient using a boning rod looking
The capital letter T with a sight bar across it, the convenient height above
Invert would be 3.75 m.
Classes and Accuracy of leveling:
The allowable closure error in differential leveling is normally given in the form:
ε = ± x √ K mm where: K Is the total leveled distance in kilometers.
x = from 10 to 30 for ordinary leveling
x = from 2 to 5 for precise leveling
Errors in Differential Leveling:
1-Systematic errors:
A- Inclination of line of sight due to the earth’s curvature&
atmospheric refraction:
BC = line of sight refraction from horizontal
BD = error due to earth’s curvature
CD = Actual error in the staff reading
=BD-BC
In triangle ABO: (BD + DO)² =AB² + AO²
BD² + 2R.BD + R² = L² + R²
BD ≈ L² / 2R ≈ 0.0786 L² ( R = 6365 km.)
BD in meter & L in km.
Refraction = BC ≈ BD/7 ≈0.0786L²/7
CD = 0.0786L² - 0.0786L²/7 = 0.0673L²
Where CD is in meter & L is in km
When L=1km CD ≈ 0.07m ≈7cm
L ≈ 100m ≈0.10km CD ≈.001m ≈1mm
B-Maladjustment of the level collimation Errors:
Due to maladjustment of the level, the line of sight will be actually inclined from the
horizontal, this error can be completely eliminated by balancing the BS & FS distances
ε 1 = L1.tanα & ε 2 = L2.tanα
∆H = m – n =(a- ε1) – (b- ε2(
= (a – b ) – ( ε1 – ε2(
=(a – b ) – tanα (L1 – L2)
If L1 = L2 ( BS distance = FS)
∆H = ( a – b)
2-Random errors: the sources of random error are:
-The staff not held plumb.
-The bubble of the level not perfectly centered.
-The incorrect reading of the staff.
-The instability of turning points.
-Wind
3-Blunders or Mistakes:
-Not setting the staff on the same point for a FS and subsequent BS readings.
-Recording or Booking of data, like reading 2.58m as 2.85 m or booking a FS in
the BS column.
-Misreading the staff especially when the marks on the staff are obscured by
a tree or fence.
Example
TO check a level for the existence of collimation error, the level was set up mid-way
between A and B and the following two staff readings were taken:1.92m at A and
1.40m at B. The level was then moved to another position and the readings as
in the following figure. Is there a collimation error ? If the answer is yes, then
calculate the angle of inclination of the line of sight from the horizontal, as well
as correct readings that should have been taken at A & B in the second setup if
there was no collimation error?
For setup 1:
∆H1 = (correct)=1.92–1.40=0.52m
∆H2 = 1.75 - 1.20 = 0.55 m
∆H1 ≠ ∆H2
there is a collimation error
0.52=(1.75-1.20)–tanα(58–23)
α = 0º 2’ 57”
Correct reading at A (m) = 1.75 – 58 tanα = 1.70 m
Correct reading at B (m) = 1.20 – 23 tanα = 1.18 m
Check:
∆H = 1.70 – 1.18 = 0.52 m = ∆H1
Reciprocal leveling:
1-Setup the level at point C (first setup a), about 2 to 3 m. from A and take
the readings a1 at A and b1 at B ( ∆H1 = a1 – b1)
2-Move the level to point D where ( AC = BD ) .Take the readings:
a2 at A and b2 at B ( ∆H2 = a2 – b2)
3- ∆H =( ∆H1 + ∆H2 ) / 2 =( ( a1 – b1 ) + ( a2 – b2 ) ) / 2
ex: IF RLA = 917.34 m & a1 = 1.44m (BS) & b1 = 1.90m (FS) & a2 = 1.80m (BS)
&b2 = 2.34m (FS), what is the elevation of point B?
∆H AB =((1.44 – 1.90) + (1.80 – 2.34)) / 2 = -0.50 m
The elevation of B (HB) = HA + ∆H AB = 917.34 + (-0.50) = 916.84 m.
Closure error
Closure correction for ∆hi = (- ni / ∑ ni ( × ( ε(
Corrected ∆hi = measured ∆hi + closure correction for ∆hi
ε (closure error) = h’ ( calculated elevation ) – h ( known elevation)
ni refers to the number of level setups
&∆hi refers to the elevation difference between consecutive stations.

More Related Content

What's hot

Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
Lord1911
 
Contour & Contouring Surveying
Contour & Contouring SurveyingContour & Contouring Surveying
Contour & Contouring Surveying
Bahzad5
 

What's hot (20)

LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURING
 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
 
Contouring
ContouringContouring
Contouring
 
Introduction to surveying, ranging and chaining
Introduction to surveying, ranging and chainingIntroduction to surveying, ranging and chaining
Introduction to surveying, ranging and chaining
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptx
 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation survey
 
Traversing
TraversingTraversing
Traversing
 
Module 1 tacheometry
Module 1 tacheometryModule 1 tacheometry
Module 1 tacheometry
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
 
LAB MANUAL contouring by indirect method . dce: fet: iiui
LAB MANUAL contouring by indirect method . dce: fet: iiuiLAB MANUAL contouring by indirect method . dce: fet: iiui
LAB MANUAL contouring by indirect method . dce: fet: iiui
 
Total station Surveying
Total station SurveyingTotal station Surveying
Total station Surveying
 
Contour & Contouring Surveying
Contour & Contouring SurveyingContour & Contouring Surveying
Contour & Contouring Surveying
 
Setting out work
Setting out workSetting out work
Setting out work
 
Triangulation
Triangulation Triangulation
Triangulation
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
Reciprocal ranging or Indirect Ranging
Reciprocal ranging or Indirect RangingReciprocal ranging or Indirect Ranging
Reciprocal ranging or Indirect Ranging
 
Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurement
 
Project report2 of contour
Project report2 of contourProject report2 of contour
Project report2 of contour
 
1392741020 traverse survey
1392741020 traverse survey1392741020 traverse survey
1392741020 traverse survey
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 

Viewers also liked

Booking sheets, 2011 v1
Booking sheets, 2011 v1Booking sheets, 2011 v1
Booking sheets, 2011 v1
jbusse
 
Levelling final
Levelling finalLevelling final
Levelling final
seenyee
 
Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveying
Mohammed_82
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
XinYee Khoo
 
1st phase analysis
1st phase analysis1st phase analysis
1st phase analysis
Rohit Sahai
 

Viewers also liked (20)

Levelling
LevellingLevelling
Levelling
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Booking sheets, 2011 v1
Booking sheets, 2011 v1Booking sheets, 2011 v1
Booking sheets, 2011 v1
 
Levelling final
Levelling finalLevelling final
Levelling final
 
Surveying
Surveying Surveying
Surveying
 
Levelling
LevellingLevelling
Levelling
 
6 dumpy levels. example of use
6 dumpy levels. example of use6 dumpy levels. example of use
6 dumpy levels. example of use
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
 
Leveling surveying
Leveling surveyingLeveling surveying
Leveling surveying
 
Types of level
Types of levelTypes of level
Types of level
 
Levelling
LevellingLevelling
Levelling
 
Surveying and leveling-2
Surveying and leveling-2Surveying and leveling-2
Surveying and leveling-2
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Lecture 1 precise levelling
Lecture 1 precise levellingLecture 1 precise levelling
Lecture 1 precise levelling
 
Engineering surveying-ii
Engineering surveying-iiEngineering surveying-ii
Engineering surveying-ii
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
 
Interpersonal final
Interpersonal finalInterpersonal final
Interpersonal final
 
Android application for s park system
Android application for s park systemAndroid application for s park system
Android application for s park system
 
1st phase analysis
1st phase analysis1st phase analysis
1st phase analysis
 
DIFFERENT TYPE OF LEVELING I NSTRUMENTS
 DIFFERENT  TYPE  OF LEVELING I NSTRUMENTS DIFFERENT  TYPE  OF LEVELING I NSTRUMENTS
DIFFERENT TYPE OF LEVELING I NSTRUMENTS
 

Similar to levelling survey

chapter 3 up to booking method.pdf
chapter 3 up to booking method.pdfchapter 3 up to booking method.pdf
chapter 3 up to booking method.pdf
LeulDamtew
 
CET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfCET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdf
KumkumaIp
 
se_312_ch_3_-triangulation_survey.pptx
se_312_ch_3_-triangulation_survey.pptxse_312_ch_3_-triangulation_survey.pptx
se_312_ch_3_-triangulation_survey.pptx
ArisamTom
 
se_312_ch_3_-triangulation_survey.pptx
se_312_ch_3_-triangulation_survey.pptxse_312_ch_3_-triangulation_survey.pptx
se_312_ch_3_-triangulation_survey.pptx
ArisamTom
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
Bahzad5
 
S2 5 traverses
S2 5 traversesS2 5 traverses
S2 5 traverses
Est
 

Similar to levelling survey (20)

chapter 3 up to booking method.pdf
chapter 3 up to booking method.pdfchapter 3 up to booking method.pdf
chapter 3 up to booking method.pdf
 
Surveying
SurveyingSurveying
Surveying
 
Indirect contouring 31 35 (IIUI)
Indirect contouring 31 35 (IIUI)Indirect contouring 31 35 (IIUI)
Indirect contouring 31 35 (IIUI)
 
LEVELING.pdf
LEVELING.pdfLEVELING.pdf
LEVELING.pdf
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
CET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfCET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdf
 
Leveling
Leveling Leveling
Leveling
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
 
se_312_ch_3_-triangulation_survey.pptx
se_312_ch_3_-triangulation_survey.pptxse_312_ch_3_-triangulation_survey.pptx
se_312_ch_3_-triangulation_survey.pptx
 
se_312_ch_3_-triangulation_survey.pptx
se_312_ch_3_-triangulation_survey.pptxse_312_ch_3_-triangulation_survey.pptx
se_312_ch_3_-triangulation_survey.pptx
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
 
travesing.pdf
travesing.pdftravesing.pdf
travesing.pdf
 
ch5.pdf
ch5.pdfch5.pdf
ch5.pdf
 
Mohammed kareem
Mohammed kareemMohammed kareem
Mohammed kareem
 
TRAVERSE in land surveying and technique
TRAVERSE in land surveying and techniqueTRAVERSE in land surveying and technique
TRAVERSE in land surveying and technique
 
Laboratory manual surveying_ii
Laboratory manual surveying_iiLaboratory manual surveying_ii
Laboratory manual surveying_ii
 
1 st report
1 st report1 st report
1 st report
 
S2 5 traverses
S2 5 traversesS2 5 traverses
S2 5 traverses
 
Contour lines by sk
Contour lines by skContour lines by sk
Contour lines by sk
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 

Recently uploaded

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 

levelling survey

  • 2. Definitions • An elevation of a point : The vertical distance between the point and the reference level surface ( datum ) ,the most commonly used datum is the mean sea level (MSL ) . • Leveling : The process by which the elevation of a point above or bellow the MSL or the elevation difference between points is determined, There are several ways to do that: A- Chain surveying: by measuring the slope distance and angle of inclination B- Barometric leveling: by measuring the atmospheric pressure using barometer or an altimeter. C- Trigonometric Leveling: by measuring the horizontal or slope distance between points and the vertical angle ( an elevation or zenith ). D- Differential Leveling: by using an instrument called a level . • Bench Mark ( BM) : well marked points whose elevation has been accurately measured. • Level line: a line perpendicular to the direction of gravity at all points. Definitions
  • 3. Basic Principle of A level A level consists essentially of : a- telescope for sighting. b- a leveling device to maintain the line of sight a horizontal as Bubble Tube, circular bubble, and some levels use a bubble consists of two separate halves which can be seen through an eyepiece near the telescope. To use the level instrument in making leveling there is a need for : a- Tripod: A three-legged stand used to support a level or other surveying equipments. b- level rods ( staff ): used to measure the vertical distance between the points and is usually 3 – 5 m long ( telescopic staff, folding staff, one piece staff ). There three kinds of levels : - The dumpy level: the line of sight ( collimation ) is fixed at right angles to the vertical axis of rotation of the instrument, ( the spirit level attached to the telescope) should also be perpendicular to the vertical axis and parallel to the line of collimation. - The tilting level: the vertical axis is made approximately vertical using circular bubble, and the telescope is leveled horizontal using the telescope spirit level. - The Automatic level: use a system of self-leveling compensators within the optical system of the telescope to bring the line of sight to the horizontal plane.
  • 4. Measuring Elevation Difference using a level B 0.932.56 Line of collimation A C B A 2.97 C 0.64 Line of collimation The difference in elevation between A & B =the vertical distance AC = RA -RB =2.56-0.93=1.63m. ”positive value means Rise” Second reading smaller than first reading represents a rise The difference in elevation between A & B =the vertical distance BC = RA -RB =0.64-2.97= -2.33m. ”Negative value means Fall” Second reading greater than first reading represents a fall
  • 5. B 0.932.56 Line of collimation A C B A 2.97 C 0.64 Line of collimation Calculation of Unknown Points A- The height of Instrument (collimation ) method: Height of instrument (HI) = Elevation of A + staff reading at A Elevation of B ( RL ) = HI – staff reading at B HI = 520.43 + 2.56 = 522.99 m AMSL RLB = 522.99 – 0.93 = 522.06 AMSL HI = 520.43 + 0.64 = 521.07 m AMSL RLB = 521.07 – 2.97 = 518.10 m AMSL B- The Rise and Fall method: Elevation Difference = first reading at A – second reading at B Elevation of B ( RL ) = elevation of A + Rise or Fall ELev. Diff. = 2.56 – 0.93 = 1.63 m. (Rise) RLB = 520.43 + 1.63 = 522.06 m. AMSL ELev. Diff. = 0.64 – 2.97 = -2.33 m. (Fall) RLB = 520.43 + (-2.33) = 518.10 m. AMSL ∆HAB = HB – HA = RA - RB
  • 6. Procedure in Differential Level Definitions: 1- Backsight ( BS ): The first reading taken at every instrument station . 2- Foresight ( FS ): The last reading taken at every instrument station . 3- Intermediate sight ( IS ): Any reading taken at an instrument station between BS & FS 4- Turning point ( TP ): A point at which both BS & FS are taken before moving the staff General Procedure: The main purpose is to provide RL for a large number of points, such as the center line of highway, or an area to produce a contour plan, this will be illustrated through the following example of production longitudinal section (profile ) of a road.
  • 8. Calculations A- The Height of Instrument ( HI ) method: Checks: 1- #of BS reading = # of FS reading = 2 2- ∑BS - ∑FS= RL last point – RL first point(3.450 – 2.231 = 99.979 – 98.760=1.219( 3- ( #of readings = 9 ( = (# of points( + (# of TP( = 8 + 1 4-Sum of all RL excluding the first reduced level = sum of the HI for each setup multiplied by the number of IS and FS readings taken from that setup – sum of IS -sum of FS 689.741=(99.423×4+100.625×3=699.567(–(∑IS=7.595)–(∑FS =2.231) =689.741
  • 9. B- The rise and Fall method: Checks: 1- #of BS = # of FS = 2 2-( #of readings = 9 ( = ( # of points = 8 ( + ( # of TP = 1( 3- (∑BS - ∑ FS( = (3.450 – 2.231 ( = 1.219 = (∑R - ∑ F( = ( 3.079 – 1.860( = 1.219 = (RL last - RL1st ( = ( 99.979 – 98.760 ( = 1.219
  • 10. General Notes 1- The accuracy of RL depend on both calculations & correct measurements( staff readings( To ensure accurate elevations of the level points, the field work should start at BM and close at another known BM, or should go back and close at the starting point . 2- If the purpose of leveling is to find out the elevation difference between two points, no intermediate sights are necessary, only BS & FS readings are made. 3- The BS & FS distances should be approximately equal to avoid errors. 4- IF possible staff readings should be made to the nearest mm at TP, and to the nearest cm at other points. 5- TP points should be chosen on firm ground. On soft ground, a special triangular base is used. 6- IF the point whose elevation is to be calculated lie above the level of the sight line like a bridge or a ceiling or top of wall or column, then the staff reading is recorded in negative. 7- If the BM point is the last point, then use the equation ( ∑BS - ∑FS= RL last–RL1st ) to calculate the RL of first point But if the BM lie in the middle of level chain, then calculate the RL of last point ,and after that use the previous equation to calculate the RL of first point and complete the calculations in the normal way.
  • 11. Example: Using the data in the following figure, calculate the RL of points: A, B, C, D, using both of R & F and HI methods 1- #of BS = # of FS = 2 2- (∑BS - ∑FS(=(-0.67-0.85(=-1.52 & (∑R - ∑F(=(3.38-4.90( = -1.52 & (RL last – RL1st (= (498.48 – 500.00( = -1.52 3-RL excluding first RL = 501.13 + 503.38 + 498.48 = 1502.99 = (500.6×1+499.86×2=1500.32( – (∑FS=0.85( - (∑IS=-3.52( =1502.99
  • 12. Uses of Leveling 1- Longitudinal Sections: (center line of a railway, road, canal, sewer or water main( Levels are taken at: 1- every 20m, 50m or 100m depending on the topography (for earthworks computations, A spacing of 20m is common. 2- points at which gradient changes, and at streets intersections. Notes: • Staff readings to 0.01 m accuracy are generally adequate • Common scale for roads works are 1/1000 for horizontal ( Distances ( & 1/100 for vertical ( levels or elevations (. • Points are connected by straight lines on the profile.
  • 13. 2-Cross-Sections: • Some Engineering works require that cross sections be taken at right angles to the center line of a proposed or existing project such as a road. • The width of these of sections are taken 15 m either side of the center for a normal road. • A scale of 1/50 or 1/100 is used for both horizontal and vertical axes.
  • 14. 3-contouring: Definitions: A contour: is an imaginary line connecting points on the ground that have the same elevation. Contour Interval ( CI ): The vertical distance or elevation difference between two successive contours. Contour interval = 20m
  • 15. Characteristics of Contours 1- Closely contours represent a steep slope, but spaced far contours represent a flat slope. 2- Contours of different values do not cross each other except in a cave, nor do they merge except in a vertically standing surface such as a wall. 3- A single contour can not split into two contours of the same value, and must be a closed circuit not necessary in limits of the contour plan. 4- Irregular contours represent a rough and uneven terrain. 5- contours are perpendicular to the direction of the steepest slope. 6- A hill or depression are represented by closed lines. Factors affecting choice of contour intervals: 1- Contour plan scale: The larger scale is the smaller contour interval. 2- The importance and purpose of a contour plan : for more details, a small contour interval is used. 3- Accuracy, time and cost : For higher accuracy, a smaller interval is used. 4- The topography of the ground : For steep ground a large contour interval is used, but for flat ground a small contour interval is used. 5- The area covered by the plan: For larger areas, a large contour interval is used.
  • 16. Methods of Contouring 1- Griding : This method is suitable for flat terrain of small sites ,rectangles or squares of 10 to 20m side are set out on the ground 10-20m 10-20m A B C D E 1 2 3 4 5 The reduced levels of corners are plotted as a grid on a plan with suitable scale, Then the required contour lines are plotted by a process called linear interpolation. X / 12 = ( 1 / 3( X= (1 / 3(×12 = 4m
  • 17. 2-Radiating Lines: Rays are set out on the ground from a central point, and levels are taken along these rays at measured distance from the center, and linear interpolation is used to give the contour lines. 3-Cross-Section Method : In this method, a cross-section are made on a line or a traverse inside the area, levels are taken at points where the topography changes, and linear interpolation is used to give the contour lines.
  • 18. 4-Setting Out Levels: Sight rail A, RL= 30.02 + 3.75 =33.77m Distance AB = 60 m Fall = 60 ×( 1 / 100 ) =0.60 m Invert Level at B = 30.02 – 0.60=29.42 m Sight rail at B = 29.42 + 3.75 = 33.17 m If a level is setup nearby has a height Of collimation of 34.85 m, then the staff Reading at A = 34.85 – 33.77 = 1.08 m &Reading at B= 34.85 – 33.17 = 1.68 m One of the basic applications of leveling is setting out sight rails which enable The excavation operators to cut out earth to an even gradient, and enable the pipe-layer to lay the pipes to this gradient using a boning rod looking The capital letter T with a sight bar across it, the convenient height above Invert would be 3.75 m.
  • 19. Classes and Accuracy of leveling: The allowable closure error in differential leveling is normally given in the form: ε = ± x √ K mm where: K Is the total leveled distance in kilometers. x = from 10 to 30 for ordinary leveling x = from 2 to 5 for precise leveling Errors in Differential Leveling: 1-Systematic errors: A- Inclination of line of sight due to the earth’s curvature& atmospheric refraction: BC = line of sight refraction from horizontal BD = error due to earth’s curvature CD = Actual error in the staff reading =BD-BC In triangle ABO: (BD + DO)² =AB² + AO² BD² + 2R.BD + R² = L² + R² BD ≈ L² / 2R ≈ 0.0786 L² ( R = 6365 km.) BD in meter & L in km. Refraction = BC ≈ BD/7 ≈0.0786L²/7 CD = 0.0786L² - 0.0786L²/7 = 0.0673L² Where CD is in meter & L is in km When L=1km CD ≈ 0.07m ≈7cm L ≈ 100m ≈0.10km CD ≈.001m ≈1mm
  • 20. B-Maladjustment of the level collimation Errors: Due to maladjustment of the level, the line of sight will be actually inclined from the horizontal, this error can be completely eliminated by balancing the BS & FS distances ε 1 = L1.tanα & ε 2 = L2.tanα ∆H = m – n =(a- ε1) – (b- ε2( = (a – b ) – ( ε1 – ε2( =(a – b ) – tanα (L1 – L2) If L1 = L2 ( BS distance = FS) ∆H = ( a – b) 2-Random errors: the sources of random error are: -The staff not held plumb. -The bubble of the level not perfectly centered. -The incorrect reading of the staff. -The instability of turning points. -Wind 3-Blunders or Mistakes: -Not setting the staff on the same point for a FS and subsequent BS readings. -Recording or Booking of data, like reading 2.58m as 2.85 m or booking a FS in the BS column. -Misreading the staff especially when the marks on the staff are obscured by a tree or fence.
  • 21. Example TO check a level for the existence of collimation error, the level was set up mid-way between A and B and the following two staff readings were taken:1.92m at A and 1.40m at B. The level was then moved to another position and the readings as in the following figure. Is there a collimation error ? If the answer is yes, then calculate the angle of inclination of the line of sight from the horizontal, as well as correct readings that should have been taken at A & B in the second setup if there was no collimation error? For setup 1: ∆H1 = (correct)=1.92–1.40=0.52m ∆H2 = 1.75 - 1.20 = 0.55 m ∆H1 ≠ ∆H2 there is a collimation error 0.52=(1.75-1.20)–tanα(58–23) α = 0º 2’ 57” Correct reading at A (m) = 1.75 – 58 tanα = 1.70 m Correct reading at B (m) = 1.20 – 23 tanα = 1.18 m Check: ∆H = 1.70 – 1.18 = 0.52 m = ∆H1
  • 22. Reciprocal leveling: 1-Setup the level at point C (first setup a), about 2 to 3 m. from A and take the readings a1 at A and b1 at B ( ∆H1 = a1 – b1) 2-Move the level to point D where ( AC = BD ) .Take the readings: a2 at A and b2 at B ( ∆H2 = a2 – b2) 3- ∆H =( ∆H1 + ∆H2 ) / 2 =( ( a1 – b1 ) + ( a2 – b2 ) ) / 2 ex: IF RLA = 917.34 m & a1 = 1.44m (BS) & b1 = 1.90m (FS) & a2 = 1.80m (BS) &b2 = 2.34m (FS), what is the elevation of point B? ∆H AB =((1.44 – 1.90) + (1.80 – 2.34)) / 2 = -0.50 m The elevation of B (HB) = HA + ∆H AB = 917.34 + (-0.50) = 916.84 m.
  • 23. Closure error Closure correction for ∆hi = (- ni / ∑ ni ( × ( ε( Corrected ∆hi = measured ∆hi + closure correction for ∆hi ε (closure error) = h’ ( calculated elevation ) – h ( known elevation) ni refers to the number of level setups &∆hi refers to the elevation difference between consecutive stations.