Instruction: Encircle the best answer. This exam is good for 2 hours only.
1. What is A-4 and A-5 means in the Classification of Soils?
a. stone fragments b. silty soils c. fine sand d. none of the above
2. A dark brown to black cementitious material produced by the destructive distillation of bituminous coal?
a. Asphalt cement b. Coal tar c. Portland cement d. Emulsified asphalt
3. Cracks caused by a vertical and Horizontal movement in the pavement beneath the overlay which brought
on by expansion and contraction with temperature or moisture content?
a. Alligator crack b. Tranverse cracks c.Reflection cracks d. Rutting and Shoving
4. No transverse joint shall be constructed withing 1.5m of an expansion joint, contraction joint and plane of weakness?
a. false b. true c. maybe d. none of the above
5. Final Rolling in Bituminous mixes shall be performed with a ________roller?
a. 2-wheel type steel tandem b. Pneumatic c. Vibratory d. 3-wheel or tandem type steel wheel
6. How many times per layer should a concrete specimen molded in a 6"x6"x20" beam molded be rodded?
a. 63 blows b.60 blows c. 61 blows d. 62 blows
7. What kind of test that requires calibrated sand in filling the hole in order to determine the volume of hole?
a. Sieve analysis b. Attenberg's limit c. FDT d. Moisture Density Relation Test
8. What kind of Asphalt that has a penetration grade of 60/70?
a. hot asphalt b. bituminous mixes c. asphalt cement d. allof the above
9.Bituminous Concrete Surface Course mixes contain aggregates by weight equivalent to what?
a. 5%-8% b. 4%-18% c. 92%-95% d. both a & c
10. What is the other name of Transverse contraction joint?
a. longitudinal joints b. transverse contruction joints c. weakened plane joint d. none of the above
11. Half portion of the dowel shall be coated with or painted with?
a. lead or tar b. bituminous material c. approved lubricant d. all of the above e. both a &b only
12. when concrete is mixed in a central mixing plant, how many seconds is the mixing time?
a. less than 50s or more than 90s b. less than 50 s nor more than 90s
c. not less than 50s nor more than 90s d. none of the above choices
13. Who will approve the Job-mix formula?
a. Constractor's Materials Engineer b. DPWH Project Engineer
c. DPWH Material's Engineer d. Both b&c
14. A joint constructed when there is an interruption of more than 30 mins in the concreting operation?
a. longitudinal joints b. tranverse construction joint c. transverse contraction joint d. all of the above
15. A 350 m
3
of bituminous mixtures has been laid in a day's full operation, how many asphalt core specimen must be taken?
a. 5 cores b. 4 cores c. 2 cores d. 3 cores
16. In no.15 what test must be conducted on each specimen?
a. Grading and extraction b. Marshall stabilty c. core test d. penetration test e. all of the above f. a&b
17. How long does a vibrator be inserted in a concrete mix?
a. not to exceed 50 s at a 50cm space interval b.not to exceed 50 s at a 60cm space interval
c. not to exceed 50 s at a 15cm space interval d.not to exceed 15 s at a 60cm space interval
18. Subgrade having a CBR value of less than 2% is considered as ______?
a. Normal b. stable c. Weak d. None of the above
19. What apparatus or equipment is use for testing mass percent of wear?
a. California Bearing Ratio Machine b. Universal testing Machine c. Los Angeles Abrasion machine d. none
20. The test on asphalt used to test to determine overheating during manufacture?
a. Immersion Compression test b. Extraction test c. Spot test d. None of the above
21. The liquid limit is expressed as the moisture content corresponding to how many no. of blows?
a. 56 blows b. 35 blows c. 65 blows d. none of the above
22. If sample splitter is not available for use in reducing samples for test, what is the alternative way of
reducing sample for testing the size of coarse aggregates?
MATERIALS ENGINEER'S EXAMINATION No.1
a. applying quartering method and get two adjacent sides as sample
b. just directly get the sample from the sample container
c. applying quartering method and get two opposite sides as sample
d. all of the above method can be applied
23. What seive is use to separate the fine and coarse aggregates in concreting works?
a. No.16/1.118mm b. No.10/2.0mm c. No.8/ 2.36mm d. No. 4/4.75mm
24. Asphalt which has been liquefied by blending with petroleum solvents?
a. Asphalt cement b. Emulsified asphalt c. Cut-back asphalt d. Portland cement
25. Cement has been in storage for a long time and there is already doubt as to its quality should?
a. be rejected b. still be use c. be tested prior to use d. be re-tested while in use
26. If asphalt mix having a weight 0f 3000 g and an aggregate weighing 2,845g, compute % of asphalt content by weight of mix.
a. 94.55% b. 5.17% c. 94.83% d.5.45%
27. Applying the tolerances for asphalt content in No.26, what is the acceptable range of aspahlt content?
a. 5.05%-5.85% b.4.77%-5.57% c.5%-5.57% d. none of the above
28.What Compaction rammer shall be used if the specification given for Moisture Density Relation in AASHTO T 180 or the modified?
a. 2.5kg rammer with 305 mm drop b 4.54kg rammer with 305 mm drop
c. 2.5kg rammer with 457 mm drop d.4.54kg rammer with 457 mm drop
29. What does it mean if there is bleeding in a newly paved asphalt road?
a. too hot asphalt b. excessive asphalt cement c. excessive mineral filler d. all of the above
30. What apparatus is used to determine the temperature of delivered bituminous mix?
a. Penetrometer b. Viscometer c. Armored thermometer d. none of the choces
31. Immersion-Compression test is performed to determine the _______ of the bituminous mixes?
a. density b. air voids c. stability d. thickness
32. What is the slump of workable concrete if not vibrated?
a. 10-40mm b. 35-70mm c. 40-75mm d. none of the above
33. What seive is use to separate the fine and coarse aggregates in asphalting works?
a. No.16/1.118mm b. No.10/2.0mm c. No.8/ 2.36mm d. No. 4/4.75mm
34. If Sieve analysis and Plasticity test(Atterberg's limit)are used for soil classification, what test that its test
result be used in the Field Density Test?
a. Moisture Density Relation test b. Compaction test c. Proctor test d. all of the above
35. This test is use to determine the Index Retained Strength of the mixtures.
a. grading test b. Abrasion test c. California Bearing ratio test d. Atterberg's limit test
36. What is the required temperature for oven drying the soil sample?
a. 95-115 °c b.97-117 °c c. 105-115°c none of the above
37. how many hours do an aggregates tested for specific gravity and absorption be soaked in water?
a. 15-24 hours b. 10-19 hours c. 15-19 hours 0nly 4 hours @ 50 °c
38. The compacted bituminous pavement shall have a thickness tolerance of what?
a. ±5mm b. -5mm c. +5mm d. none of the above
39. adding one gallon of water to a cubic yard of cement will__________?
a. increase slump about one inch b. decrease compressive strength about 200-300 psi
c. waste as much as one half bag of cement d. all of the above
40. An emulsifying agent of emulsified asphalt?
a. kerosene b. gasoline c. water d. diesel
41. What apparatus is used to determine the temperature of delivered bituminous mix?
a. Penetrometer b. Viscometer c. armrored thermometer d. none of the above
42. What doe A-3 means in the soil Classifiation?
a. stone fragments b. silty soil c.fine sand d. clayey soil
43. It is an adjustment in Concrete Mix Design on the approximate sand content per cubic of concrete for less
workable concrete as pavement?
a. +3% b. -3% c.±3% d. all of the above
44. Moisture content of soil can be done by a?
a. Oven-dried weight b. Air-dried weigth c. soil dired weight d. None of the above
45. Slip-form of concrete slump?
a. 3"-4" b. not more than 3" c. almost zero d. none of the above
47. Which is not a duty or responsibility of a Materials Engineer?
a. Testing of Construction Materials b. scheduling of delivery materials c.making materials report d.none
48. The result of Immersion-Compression test conducted on an asphalt mix sample are as follows:
Dry stability= 2,000kPa, Wet satbility= 1000 kPa
What is the IRS?Does it pass for the requirement of item 310(Bituminous Concrete Surface Course)?
a. 40%,No b. 50%,NO c. 85%,Yes d. 80%,Yes
49. What is the penetration grade of asphalt that is used in sealing the joint of PPCP?
a. 60/70 b. 85/100 c.120/180 d. 90,max
50.In a certain project,the volume of an aggreagte base course is 17,5000m
3.
How many CBR is required?
a. 5 CBR b.6 CBR c. 7 CBR 8. 4 CBR
51. What is SPT for soil stands for?
a. Soil Penetration test b. Standard Penetration test c. Static penetration test d. Soil plasticity test
52. Wgat does a 60/70 means in asphalt construction?
a. a penetration grade b. density garde c. yield point d. stability test
53. The exposed surface of normanl cement concrete should be kept continously moist for a minimum of?
a. 3 days b. 14 days c. 5 days d. 7 days
54. What is the purpose of curing?
a.to promote and maximize concrete stregnth b. to promote cement hydration
c. to promote shrinkage d. all of the above
55. A Geosynthetic is used for?
a. Filtration in drainage b. Soil erosion c. Reinforcment d. Pipes
56. What is the frequency of sampling and testing for compaction of subbase material?
a. 1/1500 cu. M b. 1/2500 cu.m c. 1/500 cu.m d. 1/750cu.m
57. What is the color of tack coat if it is in a tacky condition?
a. brown b. grey c. black d. any of the above
58. How many samples should be taken for an asphalt mix for one full day operation?
a. 1 core sample but not to exceed 3 core samples b. 1 set of three samples but not more that 6 samples
c. 2 core samples but not to exceed 4 cores samples d.1 set core sample but not to exceed 3 cores
59. Given: LL=37.50, PL=26.80. What is the Plasticity Index?
a. 12.50 b. 11.70 c.10.70 d. 9.85
60. If asphalt contents increases what will happen to the air voids?
a. decreses b. increases c. remain constant d. none of the above
61. It is consist of the excavtion and utilization of an approved material required for the construction of
embankment and shall be obtained from approved sources?
a. Common excavation b. Muck excavaition c. Borrow excavation d. Rock excavation
62. What is the P.I. of the soil having a moisture content of 2.5% and a Liquid Limit of 29.2, & a PL=11.4?
a. 26.70 b. 8.90 c. 17.80 d. 19.00
63. What is the soaked CBR Value for Subbase Course Materials?
a. 15% b. 25% c.30% d.50%
64. What is the %wear of the subbase & base course material using Los Angeles Abarsion Machine Test?
a. 40,max b. 40,min. c.50,max d. 50,min
65. As the work of structural concrete progresses, at least one set of sample consisting of_________ three
concrete cylinder test specimens per pouring day and each set to represent not more that 75 m
3
of conc.
a. 100x300mm b. 150x300mm c. 150X330mm d. 200x350mm
66.What is the tolerance permitted for surface irregularity measured by 3-m stright edge for base course matl?
a. ±10mm b.+10mm c.±5mm d.+5
67.The strength of concrete shall be deemed acceptable if the average of three consecutive strength test result
is equal to or exceed the specified strength and no individual test results falls below the specified strength
by more than_____________?
a. 12% b. 15% c. 25% d. 20%
68. The contractor shall submit in writing a ________ for each mixture to the engineer for testig and approve to
at least how many weeks prior to production?
a. Job-mix formula/3 b. design mix/3 c. sample card/3 d. quality assurance report/3
69. How many quality test of cement is required to be submitted by the contractor on 4300 bags of cement?
a. Q-1 b. Q-2 c.Q-3 d. Q-4
70. Allowable temperature tolerance of Bituminous mix is____?
a. ±5°F b.±5°c c. a. ±10°F d.±10°c
71. The Bituminous Mixture shall have a Index Retained Strength to a minimum of what?
a. 70% b. 75% c.80% d.85%
72. The porportion of Bituminous material is on the basis of total dry aggregates shall be?
a. 3-5% b. 4-9% c.5-8% d.4-7%
73. Dial & Armored-stem thermometer should be inserted sufficiently in a deep of___into the mixture.
a. @ least 2" b. @ least 3" c. @ least 4" @ least 6"
74. Blue smoke rising from the a truck load of mix is often an indication of______?
a. underheating b. sluggish mix c. overheating d. Rich mix
75. A temperature measuring device used to monitor aggregates temperature as the mat'l leaves the dryer.
a. Pyrometer b. Pycnometer c. Hydrometer d. barometer
76. Measures asphalt content and provide aggregate for gradation analysis.
a. Sieve analysis b.Sluggish device c. Extraction test d. Penetration test
77.Method of sampling used in obtaining undisturbed soil samples(silts and clays and other cohesive clays
free from obstructionand containing little or no granular materials)
a. Split spoon sampling b. Push barrel or thin walled(shelby) tube sampling
b. Rock core boring sampling d. Rotary drilling sampling
78. It is a test that utilizes a drop hammer to drive a split-barrel samples with the number of blows required
to drive the samples 12 inches being designated by the Blow Count "n"?
a. Cone Penetrometer tes b. Standard Penetration test c. Driving Coring test d. Permeablity test
79. It determines the time rate of flow water through the soil?
a. permeability test b. Uncomfined Compression test c. Direct shear test d. tri-axial test
80. It is a series of tests for determining shear strength of cohesive or non cohesive soils. A sample usually
cylindrical, encased in an impervious flexible membrane is placed in a pressure chamber and sheared by
changing the stress on one axis (Commpressed axially to failure)
a. unconfined compression test b. Direct shear test c. Tri-axial test d. Hydrometer test
81. It is a bituminous mixture containing a high percentage of coarse aggregate and has a tendency to
segregate during handling and also may be difficult to compact.
a. Harsh mixture b. Tender mixture c. Rich(wet) mixture d. Any of the above
82. It is the lowest temperature at which the asphalt cement will catch fire and burn?
a. Flashpoint temperature b. Firepoint temperature c.Burning temperature d. None of the above
83. What is the minimum test required for abrasion test of coarse aggregate material of item 311?
a. 1/1500 cu. m b. 1/2500 cu.m c. 1/500 cu.m d. 1/750cu.m
84. If there is necessity to add water to the concrete mix in order to increse its workability(provided concrete
does not exceed the specified slump),how many minutes after the initial time of mixing does adding of
water be permitted?
a. 40 mins, max b. 45 mins,max c. 50 mins, max d.90 mins, max
85. Two test are done in one lot sample. The test differs from each other, third test taken. What test is this?
a. Final test b. trial test c. referee test d. any of the above
86. How many core samples shall be taken from a 2.4 km concrete pavement?
a. 8 cores b. 9 cores c. 10 cores d. 12 cores
87. It measures the velocity of elastic waves trnsmitted in soil and rocks. This method yields information with
regard to the compressional velocity, although sometimes the shear wave can be determined. Also it can
be used to indicate approximate depth to hard strata or the underlying hard layer.
a. Geophysical method b. Seismic refraction metheod c. electrical Resistivity d. Remote Sensing
88. What is the temperatuer to be maintained when curing concrete sampleafter its intial curing?
a. 16-18°c b. 22-25°c c.23-27°c d. 24-28°c
89. Concrete in the area represented by the cores will be consider adequate if the average strength of the
cores is equal to at least_____.
a. 80% of, and if no single core is less than 70% of, the specified strength,f'c
a. 80% of, and if no single core is less than 75% of, the specified strength,f'c
a. 85% of, and if no single core is less than 70% of, the specified strength,f'c
a. 85% of, and if no single core is less than 75% of, the specified strength,f'c
90. Quality control of the project is responsibility of_____.
a. DPWH Project engineer b. DPWH Materials engineer c. Contractor d. all of the above
91. Which of the following is not included in the Quality Control documentation?
a. The nature and the number of observations made b. The number and type of deficiency found
c. The quantities approved and rejected d. Manpower and equipment utilization
92. All superstructures and heavily reinforced structures belong to what class of concrete?
a. Class A b. Class B c. Class C d. Class D
93. Concrete samples maybe tested at an earlier stage in order to?
a. Determine the trend of its strength development b. Determine the earlier strength of concrete
c. Determine the highest strength of concrete d. Determine the lowest strength of concrete
94. How many samples shall be submitted for quality test if 800 drums of Bituminous Tack coat are to
be used in the project?
a. 5 Samples b. 6 samples c.7 samples d. 4 samples
95. the thickness of Concrete core using a caliper is based on how many measurements?
a. 9 measurements b. 6 measurements c. 4 measurements d. 5 measurements
96. The surface of newly placed concrete when it is sufficiently set shall be cured for the period of?
a. 4 days b. 7 days c. 72 hours d. 24 hours
97. Surface of the newly laid bituminous mix will be checked by the used of a ___ at the site.
a. 300 cm-straigth edge b. 3-m straigth edge c. spot test d. both a & b
98. When the strength test results of concrete beam or cylinder samples are not accceptable,_________
shall be takenfrom each member or area of concrete in-place considered deficient.
a. at least 3 representative concrete cylinder b.at least 3 representative concrete beam
c.at least 3 representative cores d. none of the above
99. If no asphalt core was taken at the end of each day's operationand the project has already been
a. 100 linear kilometer per lane or fraction thereof of the completed pavement
b. 200 linear kilometer per lane or fraction thereof of the completed pavement
a. 100 linear meter per lane or fraction thereof of the completed pavement
a. 200 linear meter per lane or fraction thereof of the completed pavement
100. In water-reducing admixtures that are used to produced flowing concrete especially in placing
in very heavily reinforced section, inaccessible location or where very rapid placing is required.
a. air-entraining admixtures b. accelarators c. retarders admixtures d. superplasticizers
1.75 3 5.25
1.5 3 4.5
1.75 3 5.25
2.25 3 6.75
2.25 3 6.75
1.5 6 9
2.75 6 16.5
1.75 6 10.5
2 6 12
2.25 3 6.75
2 4 8
2.5 4 10
2.75 4 11
1.75 4 7
1.75 4 7
3 3 9
2 2.25 4.5
2.5 3 7.5
2 3 6
2 3 6
1.75 3 5.25
1.75 3 5.25
2.5 4 10
3 4 12
1.5 2 3
1.75 2 3.5
1.75 2 3.5
2 2 4
2.5 1.5 3.75
2.5 1.5 3.75
1.75 1.5 2.625
1.5 1.5 2.25
1.75 4 7
1.5 3 4.5
3 3 9
1.5 3 4.5
1.75 3 5.25
2.5 3 7.5
3 3 9
2.25 3 6.75
1.5 4 6
3 3 9
3 3 9
2.5 3 7.5
1.75 3 5.25
2.5 3 7.5
1.25 3 3.75
2 2 4
1.5 2 3
2 3 6
1.5 4 6
2.5 4 10
2 3 6
1.75 3 5.25
2.5 4 10
2 3 6
2.75 3 8.25
2.5 4 10
2 3 6
1.75 4 7
1.75 3 5.25
1.25 3 3.75
1.5 3 4.5
1.5 3 4.5
1.5 3 4.5
2.75 3 8.25
2.25 3 6.75
214.25 444.625 2.075263

More Related Content

Similar to ME 1.pdf

1. Which section of a contract contains guidelines that ensure f.docx
1.   Which section of a contract contains guidelines that ensure f.docx1.   Which section of a contract contains guidelines that ensure f.docx
1. Which section of a contract contains guidelines that ensure f.docx
SONU61709
 
EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...
EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...
EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...
Ijripublishers Ijri
 

Similar to ME 1.pdf (20)

Mmup questionnaire 3
Mmup questionnaire 3Mmup questionnaire 3
Mmup questionnaire 3
 
CEMENT CONCRETE MIX DESIGN.ppt
CEMENT CONCRETE  MIX DESIGN.pptCEMENT CONCRETE  MIX DESIGN.ppt
CEMENT CONCRETE MIX DESIGN.ppt
 
Mmup questionnaire 5
Mmup questionnaire 5Mmup questionnaire 5
Mmup questionnaire 5
 
IV BITUMINOUS BOUND PAV MAT.pptx
IV BITUMINOUS BOUND PAV MAT.pptxIV BITUMINOUS BOUND PAV MAT.pptx
IV BITUMINOUS BOUND PAV MAT.pptx
 
CONCRETE MIX DESIGN
CONCRETE MIX DESIGNCONCRETE MIX DESIGN
CONCRETE MIX DESIGN
 
Concrete design mix (ss)
Concrete design mix (ss)Concrete design mix (ss)
Concrete design mix (ss)
 
Lect 18-conventional asphalt mix design
Lect 18-conventional asphalt mix designLect 18-conventional asphalt mix design
Lect 18-conventional asphalt mix design
 
1. Which section of a contract contains guidelines that ensure f.docx
1.   Which section of a contract contains guidelines that ensure f.docx1.   Which section of a contract contains guidelines that ensure f.docx
1. Which section of a contract contains guidelines that ensure f.docx
 
Concrete Mix Design Report
Concrete Mix Design ReportConcrete Mix Design Report
Concrete Mix Design Report
 
Laboratory Investigation of Conventional Asphalt Mix Using Shell Thiopave for...
Laboratory Investigation of Conventional Asphalt Mix Using Shell Thiopave for...Laboratory Investigation of Conventional Asphalt Mix Using Shell Thiopave for...
Laboratory Investigation of Conventional Asphalt Mix Using Shell Thiopave for...
 
Job 3
Job 3Job 3
Job 3
 
Terms
TermsTerms
Terms
 
Marshall mix design Method.pptx
Marshall mix design Method.pptxMarshall mix design Method.pptx
Marshall mix design Method.pptx
 
Mmup questionnaire 6
Mmup questionnaire 6Mmup questionnaire 6
Mmup questionnaire 6
 
Interview questions
Interview questionsInterview questions
Interview questions
 
Dense Bituminous macadam
Dense Bituminous macadamDense Bituminous macadam
Dense Bituminous macadam
 
EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...
EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...
EXPERIMENTAL BEHAVIOUR OF SELF COMPACTING CONCRETE USING GGBS WITH PARTIAL RE...
 
RoadstaB august 2013
RoadstaB august 2013RoadstaB august 2013
RoadstaB august 2013
 
Api 510-closed-1[1]
Api 510-closed-1[1]Api 510-closed-1[1]
Api 510-closed-1[1]
 
crri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxcrri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptx
 

Recently uploaded

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Recently uploaded (20)

Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 

ME 1.pdf

  • 1. Instruction: Encircle the best answer. This exam is good for 2 hours only. 1. What is A-4 and A-5 means in the Classification of Soils? a. stone fragments b. silty soils c. fine sand d. none of the above 2. A dark brown to black cementitious material produced by the destructive distillation of bituminous coal? a. Asphalt cement b. Coal tar c. Portland cement d. Emulsified asphalt 3. Cracks caused by a vertical and Horizontal movement in the pavement beneath the overlay which brought on by expansion and contraction with temperature or moisture content? a. Alligator crack b. Tranverse cracks c.Reflection cracks d. Rutting and Shoving 4. No transverse joint shall be constructed withing 1.5m of an expansion joint, contraction joint and plane of weakness? a. false b. true c. maybe d. none of the above 5. Final Rolling in Bituminous mixes shall be performed with a ________roller? a. 2-wheel type steel tandem b. Pneumatic c. Vibratory d. 3-wheel or tandem type steel wheel 6. How many times per layer should a concrete specimen molded in a 6"x6"x20" beam molded be rodded? a. 63 blows b.60 blows c. 61 blows d. 62 blows 7. What kind of test that requires calibrated sand in filling the hole in order to determine the volume of hole? a. Sieve analysis b. Attenberg's limit c. FDT d. Moisture Density Relation Test 8. What kind of Asphalt that has a penetration grade of 60/70? a. hot asphalt b. bituminous mixes c. asphalt cement d. allof the above 9.Bituminous Concrete Surface Course mixes contain aggregates by weight equivalent to what? a. 5%-8% b. 4%-18% c. 92%-95% d. both a & c 10. What is the other name of Transverse contraction joint? a. longitudinal joints b. transverse contruction joints c. weakened plane joint d. none of the above 11. Half portion of the dowel shall be coated with or painted with? a. lead or tar b. bituminous material c. approved lubricant d. all of the above e. both a &b only 12. when concrete is mixed in a central mixing plant, how many seconds is the mixing time? a. less than 50s or more than 90s b. less than 50 s nor more than 90s c. not less than 50s nor more than 90s d. none of the above choices 13. Who will approve the Job-mix formula? a. Constractor's Materials Engineer b. DPWH Project Engineer c. DPWH Material's Engineer d. Both b&c 14. A joint constructed when there is an interruption of more than 30 mins in the concreting operation? a. longitudinal joints b. tranverse construction joint c. transverse contraction joint d. all of the above 15. A 350 m 3 of bituminous mixtures has been laid in a day's full operation, how many asphalt core specimen must be taken? a. 5 cores b. 4 cores c. 2 cores d. 3 cores 16. In no.15 what test must be conducted on each specimen? a. Grading and extraction b. Marshall stabilty c. core test d. penetration test e. all of the above f. a&b 17. How long does a vibrator be inserted in a concrete mix? a. not to exceed 50 s at a 50cm space interval b.not to exceed 50 s at a 60cm space interval c. not to exceed 50 s at a 15cm space interval d.not to exceed 15 s at a 60cm space interval 18. Subgrade having a CBR value of less than 2% is considered as ______? a. Normal b. stable c. Weak d. None of the above 19. What apparatus or equipment is use for testing mass percent of wear? a. California Bearing Ratio Machine b. Universal testing Machine c. Los Angeles Abrasion machine d. none 20. The test on asphalt used to test to determine overheating during manufacture? a. Immersion Compression test b. Extraction test c. Spot test d. None of the above 21. The liquid limit is expressed as the moisture content corresponding to how many no. of blows? a. 56 blows b. 35 blows c. 65 blows d. none of the above 22. If sample splitter is not available for use in reducing samples for test, what is the alternative way of reducing sample for testing the size of coarse aggregates? MATERIALS ENGINEER'S EXAMINATION No.1
  • 2. a. applying quartering method and get two adjacent sides as sample b. just directly get the sample from the sample container c. applying quartering method and get two opposite sides as sample d. all of the above method can be applied 23. What seive is use to separate the fine and coarse aggregates in concreting works? a. No.16/1.118mm b. No.10/2.0mm c. No.8/ 2.36mm d. No. 4/4.75mm 24. Asphalt which has been liquefied by blending with petroleum solvents? a. Asphalt cement b. Emulsified asphalt c. Cut-back asphalt d. Portland cement 25. Cement has been in storage for a long time and there is already doubt as to its quality should? a. be rejected b. still be use c. be tested prior to use d. be re-tested while in use 26. If asphalt mix having a weight 0f 3000 g and an aggregate weighing 2,845g, compute % of asphalt content by weight of mix. a. 94.55% b. 5.17% c. 94.83% d.5.45% 27. Applying the tolerances for asphalt content in No.26, what is the acceptable range of aspahlt content? a. 5.05%-5.85% b.4.77%-5.57% c.5%-5.57% d. none of the above 28.What Compaction rammer shall be used if the specification given for Moisture Density Relation in AASHTO T 180 or the modified? a. 2.5kg rammer with 305 mm drop b 4.54kg rammer with 305 mm drop c. 2.5kg rammer with 457 mm drop d.4.54kg rammer with 457 mm drop 29. What does it mean if there is bleeding in a newly paved asphalt road? a. too hot asphalt b. excessive asphalt cement c. excessive mineral filler d. all of the above 30. What apparatus is used to determine the temperature of delivered bituminous mix? a. Penetrometer b. Viscometer c. Armored thermometer d. none of the choces 31. Immersion-Compression test is performed to determine the _______ of the bituminous mixes? a. density b. air voids c. stability d. thickness 32. What is the slump of workable concrete if not vibrated? a. 10-40mm b. 35-70mm c. 40-75mm d. none of the above 33. What seive is use to separate the fine and coarse aggregates in asphalting works? a. No.16/1.118mm b. No.10/2.0mm c. No.8/ 2.36mm d. No. 4/4.75mm 34. If Sieve analysis and Plasticity test(Atterberg's limit)are used for soil classification, what test that its test result be used in the Field Density Test? a. Moisture Density Relation test b. Compaction test c. Proctor test d. all of the above 35. This test is use to determine the Index Retained Strength of the mixtures. a. grading test b. Abrasion test c. California Bearing ratio test d. Atterberg's limit test 36. What is the required temperature for oven drying the soil sample? a. 95-115 °c b.97-117 °c c. 105-115°c none of the above 37. how many hours do an aggregates tested for specific gravity and absorption be soaked in water? a. 15-24 hours b. 10-19 hours c. 15-19 hours 0nly 4 hours @ 50 °c 38. The compacted bituminous pavement shall have a thickness tolerance of what? a. ±5mm b. -5mm c. +5mm d. none of the above 39. adding one gallon of water to a cubic yard of cement will__________? a. increase slump about one inch b. decrease compressive strength about 200-300 psi c. waste as much as one half bag of cement d. all of the above 40. An emulsifying agent of emulsified asphalt? a. kerosene b. gasoline c. water d. diesel 41. What apparatus is used to determine the temperature of delivered bituminous mix? a. Penetrometer b. Viscometer c. armrored thermometer d. none of the above 42. What doe A-3 means in the soil Classifiation? a. stone fragments b. silty soil c.fine sand d. clayey soil 43. It is an adjustment in Concrete Mix Design on the approximate sand content per cubic of concrete for less workable concrete as pavement? a. +3% b. -3% c.±3% d. all of the above 44. Moisture content of soil can be done by a?
  • 3. a. Oven-dried weight b. Air-dried weigth c. soil dired weight d. None of the above 45. Slip-form of concrete slump? a. 3"-4" b. not more than 3" c. almost zero d. none of the above 47. Which is not a duty or responsibility of a Materials Engineer? a. Testing of Construction Materials b. scheduling of delivery materials c.making materials report d.none 48. The result of Immersion-Compression test conducted on an asphalt mix sample are as follows: Dry stability= 2,000kPa, Wet satbility= 1000 kPa What is the IRS?Does it pass for the requirement of item 310(Bituminous Concrete Surface Course)? a. 40%,No b. 50%,NO c. 85%,Yes d. 80%,Yes 49. What is the penetration grade of asphalt that is used in sealing the joint of PPCP? a. 60/70 b. 85/100 c.120/180 d. 90,max 50.In a certain project,the volume of an aggreagte base course is 17,5000m 3. How many CBR is required? a. 5 CBR b.6 CBR c. 7 CBR 8. 4 CBR 51. What is SPT for soil stands for? a. Soil Penetration test b. Standard Penetration test c. Static penetration test d. Soil plasticity test 52. Wgat does a 60/70 means in asphalt construction? a. a penetration grade b. density garde c. yield point d. stability test 53. The exposed surface of normanl cement concrete should be kept continously moist for a minimum of? a. 3 days b. 14 days c. 5 days d. 7 days 54. What is the purpose of curing? a.to promote and maximize concrete stregnth b. to promote cement hydration c. to promote shrinkage d. all of the above 55. A Geosynthetic is used for? a. Filtration in drainage b. Soil erosion c. Reinforcment d. Pipes 56. What is the frequency of sampling and testing for compaction of subbase material? a. 1/1500 cu. M b. 1/2500 cu.m c. 1/500 cu.m d. 1/750cu.m 57. What is the color of tack coat if it is in a tacky condition? a. brown b. grey c. black d. any of the above 58. How many samples should be taken for an asphalt mix for one full day operation? a. 1 core sample but not to exceed 3 core samples b. 1 set of three samples but not more that 6 samples c. 2 core samples but not to exceed 4 cores samples d.1 set core sample but not to exceed 3 cores 59. Given: LL=37.50, PL=26.80. What is the Plasticity Index? a. 12.50 b. 11.70 c.10.70 d. 9.85 60. If asphalt contents increases what will happen to the air voids? a. decreses b. increases c. remain constant d. none of the above 61. It is consist of the excavtion and utilization of an approved material required for the construction of embankment and shall be obtained from approved sources? a. Common excavation b. Muck excavaition c. Borrow excavation d. Rock excavation 62. What is the P.I. of the soil having a moisture content of 2.5% and a Liquid Limit of 29.2, & a PL=11.4? a. 26.70 b. 8.90 c. 17.80 d. 19.00 63. What is the soaked CBR Value for Subbase Course Materials? a. 15% b. 25% c.30% d.50% 64. What is the %wear of the subbase & base course material using Los Angeles Abarsion Machine Test? a. 40,max b. 40,min. c.50,max d. 50,min 65. As the work of structural concrete progresses, at least one set of sample consisting of_________ three concrete cylinder test specimens per pouring day and each set to represent not more that 75 m 3 of conc. a. 100x300mm b. 150x300mm c. 150X330mm d. 200x350mm 66.What is the tolerance permitted for surface irregularity measured by 3-m stright edge for base course matl? a. ±10mm b.+10mm c.±5mm d.+5
  • 4. 67.The strength of concrete shall be deemed acceptable if the average of three consecutive strength test result is equal to or exceed the specified strength and no individual test results falls below the specified strength by more than_____________? a. 12% b. 15% c. 25% d. 20% 68. The contractor shall submit in writing a ________ for each mixture to the engineer for testig and approve to at least how many weeks prior to production? a. Job-mix formula/3 b. design mix/3 c. sample card/3 d. quality assurance report/3 69. How many quality test of cement is required to be submitted by the contractor on 4300 bags of cement? a. Q-1 b. Q-2 c.Q-3 d. Q-4 70. Allowable temperature tolerance of Bituminous mix is____? a. ±5°F b.±5°c c. a. ±10°F d.±10°c 71. The Bituminous Mixture shall have a Index Retained Strength to a minimum of what? a. 70% b. 75% c.80% d.85% 72. The porportion of Bituminous material is on the basis of total dry aggregates shall be? a. 3-5% b. 4-9% c.5-8% d.4-7% 73. Dial & Armored-stem thermometer should be inserted sufficiently in a deep of___into the mixture. a. @ least 2" b. @ least 3" c. @ least 4" @ least 6" 74. Blue smoke rising from the a truck load of mix is often an indication of______? a. underheating b. sluggish mix c. overheating d. Rich mix 75. A temperature measuring device used to monitor aggregates temperature as the mat'l leaves the dryer. a. Pyrometer b. Pycnometer c. Hydrometer d. barometer 76. Measures asphalt content and provide aggregate for gradation analysis. a. Sieve analysis b.Sluggish device c. Extraction test d. Penetration test 77.Method of sampling used in obtaining undisturbed soil samples(silts and clays and other cohesive clays free from obstructionand containing little or no granular materials) a. Split spoon sampling b. Push barrel or thin walled(shelby) tube sampling b. Rock core boring sampling d. Rotary drilling sampling 78. It is a test that utilizes a drop hammer to drive a split-barrel samples with the number of blows required to drive the samples 12 inches being designated by the Blow Count "n"? a. Cone Penetrometer tes b. Standard Penetration test c. Driving Coring test d. Permeablity test 79. It determines the time rate of flow water through the soil? a. permeability test b. Uncomfined Compression test c. Direct shear test d. tri-axial test 80. It is a series of tests for determining shear strength of cohesive or non cohesive soils. A sample usually cylindrical, encased in an impervious flexible membrane is placed in a pressure chamber and sheared by changing the stress on one axis (Commpressed axially to failure) a. unconfined compression test b. Direct shear test c. Tri-axial test d. Hydrometer test 81. It is a bituminous mixture containing a high percentage of coarse aggregate and has a tendency to segregate during handling and also may be difficult to compact. a. Harsh mixture b. Tender mixture c. Rich(wet) mixture d. Any of the above 82. It is the lowest temperature at which the asphalt cement will catch fire and burn? a. Flashpoint temperature b. Firepoint temperature c.Burning temperature d. None of the above 83. What is the minimum test required for abrasion test of coarse aggregate material of item 311? a. 1/1500 cu. m b. 1/2500 cu.m c. 1/500 cu.m d. 1/750cu.m 84. If there is necessity to add water to the concrete mix in order to increse its workability(provided concrete does not exceed the specified slump),how many minutes after the initial time of mixing does adding of water be permitted? a. 40 mins, max b. 45 mins,max c. 50 mins, max d.90 mins, max 85. Two test are done in one lot sample. The test differs from each other, third test taken. What test is this? a. Final test b. trial test c. referee test d. any of the above 86. How many core samples shall be taken from a 2.4 km concrete pavement? a. 8 cores b. 9 cores c. 10 cores d. 12 cores
  • 5. 87. It measures the velocity of elastic waves trnsmitted in soil and rocks. This method yields information with regard to the compressional velocity, although sometimes the shear wave can be determined. Also it can be used to indicate approximate depth to hard strata or the underlying hard layer. a. Geophysical method b. Seismic refraction metheod c. electrical Resistivity d. Remote Sensing 88. What is the temperatuer to be maintained when curing concrete sampleafter its intial curing? a. 16-18°c b. 22-25°c c.23-27°c d. 24-28°c 89. Concrete in the area represented by the cores will be consider adequate if the average strength of the cores is equal to at least_____. a. 80% of, and if no single core is less than 70% of, the specified strength,f'c a. 80% of, and if no single core is less than 75% of, the specified strength,f'c a. 85% of, and if no single core is less than 70% of, the specified strength,f'c a. 85% of, and if no single core is less than 75% of, the specified strength,f'c 90. Quality control of the project is responsibility of_____. a. DPWH Project engineer b. DPWH Materials engineer c. Contractor d. all of the above 91. Which of the following is not included in the Quality Control documentation? a. The nature and the number of observations made b. The number and type of deficiency found c. The quantities approved and rejected d. Manpower and equipment utilization 92. All superstructures and heavily reinforced structures belong to what class of concrete? a. Class A b. Class B c. Class C d. Class D 93. Concrete samples maybe tested at an earlier stage in order to? a. Determine the trend of its strength development b. Determine the earlier strength of concrete c. Determine the highest strength of concrete d. Determine the lowest strength of concrete 94. How many samples shall be submitted for quality test if 800 drums of Bituminous Tack coat are to be used in the project? a. 5 Samples b. 6 samples c.7 samples d. 4 samples 95. the thickness of Concrete core using a caliper is based on how many measurements? a. 9 measurements b. 6 measurements c. 4 measurements d. 5 measurements 96. The surface of newly placed concrete when it is sufficiently set shall be cured for the period of? a. 4 days b. 7 days c. 72 hours d. 24 hours 97. Surface of the newly laid bituminous mix will be checked by the used of a ___ at the site. a. 300 cm-straigth edge b. 3-m straigth edge c. spot test d. both a & b 98. When the strength test results of concrete beam or cylinder samples are not accceptable,_________ shall be takenfrom each member or area of concrete in-place considered deficient. a. at least 3 representative concrete cylinder b.at least 3 representative concrete beam c.at least 3 representative cores d. none of the above 99. If no asphalt core was taken at the end of each day's operationand the project has already been a. 100 linear kilometer per lane or fraction thereof of the completed pavement b. 200 linear kilometer per lane or fraction thereof of the completed pavement a. 100 linear meter per lane or fraction thereof of the completed pavement a. 200 linear meter per lane or fraction thereof of the completed pavement 100. In water-reducing admixtures that are used to produced flowing concrete especially in placing in very heavily reinforced section, inaccessible location or where very rapid placing is required. a. air-entraining admixtures b. accelarators c. retarders admixtures d. superplasticizers
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43. 1.75 3 5.25 1.5 3 4.5 1.75 3 5.25 2.25 3 6.75 2.25 3 6.75 1.5 6 9 2.75 6 16.5 1.75 6 10.5 2 6 12 2.25 3 6.75 2 4 8 2.5 4 10 2.75 4 11 1.75 4 7 1.75 4 7 3 3 9 2 2.25 4.5 2.5 3 7.5 2 3 6 2 3 6 1.75 3 5.25 1.75 3 5.25 2.5 4 10 3 4 12 1.5 2 3 1.75 2 3.5 1.75 2 3.5 2 2 4 2.5 1.5 3.75 2.5 1.5 3.75 1.75 1.5 2.625 1.5 1.5 2.25 1.75 4 7 1.5 3 4.5 3 3 9 1.5 3 4.5 1.75 3 5.25 2.5 3 7.5 3 3 9 2.25 3 6.75
  • 44. 1.5 4 6 3 3 9 3 3 9 2.5 3 7.5 1.75 3 5.25 2.5 3 7.5 1.25 3 3.75 2 2 4 1.5 2 3 2 3 6 1.5 4 6 2.5 4 10 2 3 6 1.75 3 5.25 2.5 4 10 2 3 6 2.75 3 8.25 2.5 4 10 2 3 6 1.75 4 7 1.75 3 5.25 1.25 3 3.75 1.5 3 4.5 1.5 3 4.5 1.5 3 4.5 2.75 3 8.25 2.25 3 6.75 214.25 444.625 2.075263