2. AFTER
BEFORE
BAKU 2015 SKK Arena A&A Architects
AZERBAÏDJAN
SOLTIS FT 381
Lightweight renovation for an iconic design
Transparent façade from inside
3. BAKU 2015 SKK Arena A&A Architects
AZERBAÏDJAN
SOLTIS FT 381
Flexible and adaptable to any shapes & constraints
Lighting scenario for outstanding effects
4. BAKU 2015 Olympic Village – PUJOL Architects
AZERBAÏDJAN
PRECONTRAINT TX 30 CROSSLINK
• Long term aesthetics for roof
SOLTIS FT 381
Flexible & transparent façade solution
Large color range to maximize dynamic look
5. BAKU 2015 Olympic Village – PUJOL Architects
AZERBAÏDJAN
SOLTIS FT 381
Colourful design to create landmarks and meeting points
Versatile pattern associations
6. BAKU 2015 National Gymnastic arena – BRADWAY
MALYAN Architects
AZERBAÏDJAN
PRECONTRAINT 1002 S2 Ruban Facade
Original external sun protection
Design Identity feature
7. BAKU 2015 Crystall Hall – GMP Architects
AZERBAÏDJAN
PRECONTRAINT 1002 S2
• Translucent tensile roof
SOLTIS FT 381
• Lightweight for outstanding shapes & panel sizes
8. EURO 2016 LYON Stadium - POPULOUS
FRANCE
PRECONTRAINT TX 30 for roof
• PRECONTRAINT dimensionnal stability and predictability
Crosslink Technology for longevity & long term aesthetics
9. WWC 2014 Arena Pantanal - GCP
BRAZIL - Cuiabá
SOLTIS 381
Micro climatic façade to contribute to natural ventilation
Tropical climate resistant material – Long term service
10. WWC 2014 Arena Las Dunas - POPULOUS & CDCA
BRAZIL - Natal
PRECONTRAINT 1002 FLUOTOP T2
Lightweight & large free span inner ceiling
Continuous surface for smooth design
11. WWC 2014 Corinthians stadium - CDCA
BRAZIL – Sao Paulo
PRECONTRAINT 1002
Lightweight and large free span inner ceiling
Large surface to optimize light projection
12. LONDON 2012 – SITE OVERVIEW
UNITED KINGDOM
PRECONTRAINT materials compliant with
GREEN & LEGACY OLYMPIC POLICY
13. LONDON 2012 Aquatic center – ZAHA HADID
UNITED KINGDOM
PRECONTRAINT 1002 S2 & SOLTIS FT 381
Versatile design : lightweight roofs and windbreak walls on temporary wings
23 T composite materials recycled in 2013 by TEXYLOOP according to
LEGACY policy
14. LONDON 2012 Olympic stadium - Populous
UNITED KINGDOM
PRECONTRAINT 1202 S2
Lightweight and dismantable roof
30 T composite materials recycled by TEXYLOOP in 2014
15. Hazza Bin Zayed Stadium - Pattern Design
UAE – Al Ain
PRECONTRAINT 1002 S2
High UV exposure & sand wind resistant
Long term service life
16. EURO 2012 JSK Architekten
Warsaw Stadium retractable roof
PRECONTRAINT 1202 & 1302 S2
15 mn conversion time from open stadium to closed arena
Boost revenue generation with multiple events
17. Konya stadium
TURKEY – Selçuklu
FLEXLIGHT FX 701
Leading edge transparency for turf growth
Primary structure continuity to optimize design
18. Westlake girls high school
NEW ZEALAND – Auckland
PRECONTRAINT 1202 S2
Natural light input to optimize comfort
Translucent material association for a dynamic effect
19. Covered walk way - Hospital Cartagene
SPAIN – Carthagène
SOLTIS FT 381
UV and sand wind resistance
Transparency to open up space while providing solar protection
20. Swimming pool ceillings – Les vagues aquatic center
FRANCE – Meyzieu – TNA Architects
BATYLINE AW
Acoustic comfort : Micro perforated lightweight material for acoustic
absorption
Corrosion free - zero maintenance
21. Swimming pool ceiling
FRANCE – Mantes la Jolie
BATYLINE XP 55 tensile ceiling
Lightweight & large free span for flexible shapes
Visibility & access to the metal structure