Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Coursework - Shooting Schedule Day 1
1. Shooting Schedule
Day 1
Date and Time Monday 9th April 2018
11am – 6pm
Section of
Location
I am going to London to film parts of My music video. On this
specific day I will go to Covent Garden to get some scenery shots
and specifically try to get a shot of the flower benches. I think that
shot like that would fit in with the theme of my music video.
However, I would like to get a variety of shots while I am there just
so I have lots of footage to possibly add into the music video if I
am not happy with one shot I can replace it.
People
Involved
The music video includes myself and two other people.
Equipment
needed
An IPhone Camera
Problems and
Solutions
The weather could be an issue. If it is bad weather then we may
not be able to get the outdoor shots that we want which would be
a drawback. The solution to this problem would be to check the
weather before we come out to give us the best chance of getting
as much footage with the good weather as possible.
Another problem would be if one of the cast not turning up. A
solution for this problem is making sure I ask reliable people to be
in my music video.