Copyright © 2016 Lindsey Manufacturing Co. Lindsey, TLM, and SMARTLINE are trade-
marks or registered trademarks of Lindsey Manufacturing.
www.lindsey-usa.com
Publica on Number 11T-002 FERC1000 • March 2016
APPLICATIONS of Dynamic Line Ra ng
Increasing Compe veness of
FERC 1000 Proposals
Inclusion of a Dynamic Line Ra ng (DLR) solu on as part of a
FERC 1000 transmission project posi vely impacts
compe veness on new line construc on costs, and
increases the likelihood of qualifying for incen ve rate
treatment. DLR may be of addi onal benefit to incumbent
u li es.
L L C C
Developing a compe ve proposal for a FERC 1000 project
is a complex undertaking. Key aspects are the material and
construc on cost of the line. DLR, when integral to the line’s
design, can offer significant reduc ons in line costs.
 Numerous studies, including those by the DOE, show
that lines equipped with DLR can regularly carry 10 -
25% more power than their designed sta c ra ng1
.
 When DLR is integral to the line’s design, this addi onal
capacity can be included. For example, a 1000MW line
could be designed at a lower ra ng, for example,
900MW, knowing the addi onal capacity would be
available through DLR.
 Savings would follow from a variety of sources including
the use of a less expensive, smaller conductor. The
lighter conductor loads may allow the use of lighter,
less expensive line hardware and towers. Lighter towers
and conductor loads may extend to less expensive
founda ons which may reduce construc on cost and
installa on me.
I U A
Installing DLR proac vely on exis ng lines will provide an
incumbent u lity a history of opera onal DLR data and the
addi onal capacity iden fied by the DLR deployment. When
included in a FERC 1000 proposal this data offers strong
ra onale suppor ng the use of the addi onal DLR capacity
as a base of the line design. While this logic can be used for
any company submi ng a proposal, the incumbent u lity
operator may have an advantage of valida ng the addi onal
DLR capacity on their own system under the same clima c
condi ons that the proposed line may be constructed.
Q I R
DLR is specifically iden fied in a recent FERC Policy
Statement as an advanced technology that would qualify a
project for incen ve rate treatment2
. DLR is noted in this
Policy Statement as a technology that creates “addi onal
incremental capacity without significant construc on.” This
approach may be used for rate treatment filings for both the
installa on of DLR on exis ng lines and for FERC 1000
projects.
W D L R ?
Dynamic Line Ra ng, or DLR, is a transmission line’s actual
real- me or forecast power carrying capacity based on real-
me line behavior and weather condi ons. A line’s DLR is
typically 10 - 25% higher than its sta c ra ng.
This addi onal capacity provides opportuni es in economic
dispatch, trading, opera ons, and conges on mi ga on.
Applica on of DLR is also a powerful tool for improving N-1
con ngency planning, cost effec vely addressing lines with
slow load growth, and can also defer or eliminate the need
for line upgrades or reconductoring.
Implemen ng DLR is straigh orward. Installa on of sensors
to monitor real- me line behavior is required and so ware
which analyzes the collected data to compute the dynamic
ra ngs.
SMARTLINE® is Lindsey’s next genera on DLR. Compared to
other DLR packages, the SMARTLINE DLR and line ra ng
forecas ng system is simple to install, easy to integrate into
engineering or EMS systems, and provides con nuous line
clearance monitoring.
1
“Dynamic Line Ra ng Systems for Transmission Lines: Topical
Report,” Smart Grid Demonstra on Program, US DOE, April 25,
2014, page vi
2
“Promo ng Transmission Investment Through Pricing Reform”,
FERC Policy Statement 141 FERC ¶ 61,129, November 15, 2012,
p15, footnote 28.
SMARTLINE is the next genera on dynamic line ra ng (DLR) system providing transmission line operators and RTOs reliable,
real- me and forecast, transmission line capacity ra ngs.
Unlike conven onal dynamic line ra ng (DLR) methods, SMARTLINE ra ngs are developed by ac vely learning how the conductor
behaves with regard to conductor temperature, weather, current, and the conductor’s exact clearance-to-ground.
SMARTLINE Dynamic Line Ra ng System
LINDSEY TLM® Conductor Monitor
The Lindsey TLM®Conductor Monitor provides a complete picture
of conductor behavior to SMARTLINE. Data collected includes
actual conductor clearance-to-ground through built-in LiDAR,
conductor temperature, line current, vibra on, lt and roll. The
TLM monitor is an easily installed, self-powered conductor
monitoring solu on for system voltages up to 765kV.
THREE UNIQUE RATINGS FOR OPERATIONS,
TRADING, PLANNING, AND COMPLIANCE
SMARTLINE RBR; Reliability Based Ra ng
The Reliability Based Ra ng (RBR) is a sta s cally stabilized
DLR ra ng and acts as a reduced risk line ra ng alterna ve.
SMARTLINE RBR is designed for operators to ensure the
transmission line is opera ng over me within both clearance
and thermal parameters. Unique to SMARTLINE.
SMARTLINE RBF; Reliability Based Forecast
SMARTLINE’s Reliability Based Forecast (RBF) ra ngs are
SMARTLINE RBR line capacity ra ngs adjusted for forecasted
future weather condi ons. Available for any meframe for
which weather forecasts are available, SMARTLINE RBF
ra ngs are tailored to address energy dispatch and trading
needs.
SMARTLINE DLR; Dynamic Line Ra ng
SMARTLINE DLR provides a line’s maximum instantaneous
current carrying capacity while ensuring clearance
requirements are not violated, and elimina ng risk of
conductor thermal damage. SMARTLINE DLR is the heart of
SMARTLINE RBR and RBF ra ngs. Clearance enhanced DLR is
unique to SMARTLINE.
MEANINGFUL AND RELIABLE DATA
 Uses con nuous direct LiDAR measurement of conductor
clearance-to-ground.
 U lizes only directly measured conductor data, unlike other
DLR systems which interpolate values from look-up tables,
relying on data such as vibra on to infer cri cal span sag.
 Ensures dependable data feed even in remote loca ons via
simple and reliable satellite or mesh radio communica ons.
SIMPLE INSTALLATION
 Fast, live line installa on. No line outage or dead-end structure
modifica ons required.
 Suitable for installa on on lines up to 765kV.
 Suitable for single and bundled conductors.
SIMPLE INTERPRETATION
Tradi onal DLR systems produce a graph of a transmission line’s instantaneous power ra ng. By nature, this changes constantly,
appears quite erra c, and is difficult to interpret for real- me opera on. SMARTLINE eliminates the variability and provides power
line capacity readings that are easy to interpret and act upon in the control room, on the trading floor, or an engineer’s desk.

More Related Content

What's hot

Modified Congestion Re-Routing Scheme using Centralized Road Side Unit
Modified Congestion Re-Routing Scheme using Centralized Road Side UnitModified Congestion Re-Routing Scheme using Centralized Road Side Unit
Modified Congestion Re-Routing Scheme using Centralized Road Side UnitIRJET Journal
 
Circuit switch vs packet switch
Circuit switch vs packet switchCircuit switch vs packet switch
Circuit switch vs packet switchGauravBiswas9
 
Dotnet power allocation for statistical qo s provisioning in opportunistic m...
Dotnet  power allocation for statistical qo s provisioning in opportunistic m...Dotnet  power allocation for statistical qo s provisioning in opportunistic m...
Dotnet power allocation for statistical qo s provisioning in opportunistic m...Ecway Technologies
 
Cooperation versus multiplexing multicast scheduling algorithms for ofdma rel...
Cooperation versus multiplexing multicast scheduling algorithms for ofdma rel...Cooperation versus multiplexing multicast scheduling algorithms for ofdma rel...
Cooperation versus multiplexing multicast scheduling algorithms for ofdma rel...Shakas Technologies
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)inventionjournals
 
Upgrading Cellular Mobile Networks
Upgrading Cellular Mobile NetworksUpgrading Cellular Mobile Networks
Upgrading Cellular Mobile NetworksStanislav Milanovic
 
Distribution Automation based on IEC61850
Distribution Automation based on IEC61850Distribution Automation based on IEC61850
Distribution Automation based on IEC61850Nirmal Thaliyil
 
Predictive Data Dissemination in Vanet
Predictive Data Dissemination in VanetPredictive Data Dissemination in Vanet
Predictive Data Dissemination in VanetDhruvMarothi
 
Sat Magazine Article -Hybrid Networks and Customer Expectations Published
Sat Magazine Article -Hybrid Networks and Customer Expectations PublishedSat Magazine Article -Hybrid Networks and Customer Expectations Published
Sat Magazine Article -Hybrid Networks and Customer Expectations PublishedPhillip Howard
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Computaris Diameter Router
Computaris Diameter RouterComputaris Diameter Router
Computaris Diameter RouterComputaris
 

What's hot (14)

Modified Congestion Re-Routing Scheme using Centralized Road Side Unit
Modified Congestion Re-Routing Scheme using Centralized Road Side UnitModified Congestion Re-Routing Scheme using Centralized Road Side Unit
Modified Congestion Re-Routing Scheme using Centralized Road Side Unit
 
Circuit switch vs packet switch
Circuit switch vs packet switchCircuit switch vs packet switch
Circuit switch vs packet switch
 
netsci15_UP1
netsci15_UP1netsci15_UP1
netsci15_UP1
 
Dotnet power allocation for statistical qo s provisioning in opportunistic m...
Dotnet  power allocation for statistical qo s provisioning in opportunistic m...Dotnet  power allocation for statistical qo s provisioning in opportunistic m...
Dotnet power allocation for statistical qo s provisioning in opportunistic m...
 
Cooperation versus multiplexing multicast scheduling algorithms for ofdma rel...
Cooperation versus multiplexing multicast scheduling algorithms for ofdma rel...Cooperation versus multiplexing multicast scheduling algorithms for ofdma rel...
Cooperation versus multiplexing multicast scheduling algorithms for ofdma rel...
 
International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)International Journal of Engineering and Science Invention (IJESI)
International Journal of Engineering and Science Invention (IJESI)
 
Upgrading Cellular Mobile Networks
Upgrading Cellular Mobile NetworksUpgrading Cellular Mobile Networks
Upgrading Cellular Mobile Networks
 
THINK GCCIA
THINK GCCIA THINK GCCIA
THINK GCCIA
 
Distribution Automation based on IEC61850
Distribution Automation based on IEC61850Distribution Automation based on IEC61850
Distribution Automation based on IEC61850
 
Predictive Data Dissemination in Vanet
Predictive Data Dissemination in VanetPredictive Data Dissemination in Vanet
Predictive Data Dissemination in Vanet
 
Sat Magazine Article -Hybrid Networks and Customer Expectations Published
Sat Magazine Article -Hybrid Networks and Customer Expectations PublishedSat Magazine Article -Hybrid Networks and Customer Expectations Published
Sat Magazine Article -Hybrid Networks and Customer Expectations Published
 
Lpwan IoT for fleet management
Lpwan IoT for fleet managementLpwan IoT for fleet management
Lpwan IoT for fleet management
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
Computaris Diameter Router
Computaris Diameter RouterComputaris Diameter Router
Computaris Diameter Router
 

Similar to Ferc1000 march

Lidar Technology_ Unlocking Greater Accuracy and Precision in Utility Operati...
Lidar Technology_ Unlocking Greater Accuracy and Precision in Utility Operati...Lidar Technology_ Unlocking Greater Accuracy and Precision in Utility Operati...
Lidar Technology_ Unlocking Greater Accuracy and Precision in Utility Operati...Anil
 
A Case Study on Ip Based Cdma Ran by Controlling Router
A Case Study on Ip Based Cdma Ran by Controlling RouterA Case Study on Ip Based Cdma Ran by Controlling Router
A Case Study on Ip Based Cdma Ran by Controlling RouterIJERA Editor
 
IRJET- Design and Analysis of Passive Multi-Static Radar System
IRJET-  	  Design and Analysis of Passive Multi-Static Radar SystemIRJET-  	  Design and Analysis of Passive Multi-Static Radar System
IRJET- Design and Analysis of Passive Multi-Static Radar SystemIRJET Journal
 
Civilizing the Network Lifespan of Manets Through Cooperative Mac Protocol Me...
Civilizing the Network Lifespan of Manets Through Cooperative Mac Protocol Me...Civilizing the Network Lifespan of Manets Through Cooperative Mac Protocol Me...
Civilizing the Network Lifespan of Manets Through Cooperative Mac Protocol Me...IRJET Journal
 
Smart Grids:Enterprise GIS For Distribution Loss Reduction in Electric Utilit...
Smart Grids:Enterprise GIS For Distribution Loss Reduction in Electric Utilit...Smart Grids:Enterprise GIS For Distribution Loss Reduction in Electric Utilit...
Smart Grids:Enterprise GIS For Distribution Loss Reduction in Electric Utilit...HIMADRI BANERJI
 
The Advanced Distribution Management System (ADMS)
The Advanced Distribution Management System (ADMS)The Advanced Distribution Management System (ADMS)
The Advanced Distribution Management System (ADMS)Schneider Electric
 
Smart energy summit 2019
Smart energy summit 2019Smart energy summit 2019
Smart energy summit 2019Moustafa Shahin
 
Impact of dynamic demand response in the load frequency control
Impact of dynamic demand response in the load frequency controlImpact of dynamic demand response in the load frequency control
Impact of dynamic demand response in the load frequency controlIRJET Journal
 
R-APDRP (Restructured Accelerated Power Development And Reforms Programme)
R-APDRP (Restructured Accelerated Power Development And Reforms Programme)R-APDRP (Restructured Accelerated Power Development And Reforms Programme)
R-APDRP (Restructured Accelerated Power Development And Reforms Programme)AMIT YADAV
 
White paper on Why Power Line Communication is the best fit for AMI In india
White paper on Why Power Line Communication is the best fit for AMI In indiaWhite paper on Why Power Line Communication is the best fit for AMI In india
White paper on Why Power Line Communication is the best fit for AMI In indiaSameer Patil
 
White Paper: Dynamic TDD for LTE-a (eIMTA) and 5G
White Paper: Dynamic TDD for LTE-a (eIMTA) and 5GWhite Paper: Dynamic TDD for LTE-a (eIMTA) and 5G
White Paper: Dynamic TDD for LTE-a (eIMTA) and 5GEiko Seidel
 
Proptotype radio network
Proptotype radio networkProptotype radio network
Proptotype radio networkfdr1975
 
Comparison of routing protocols with performance parameters for different num...
Comparison of routing protocols with performance parameters for different num...Comparison of routing protocols with performance parameters for different num...
Comparison of routing protocols with performance parameters for different num...ijctet
 
ENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSN
ENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSNENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSN
ENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSNIAEME Publication
 
ENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSN
ENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSNENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSN
ENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSNIAEME Publication
 
Maravedis-Rethink:White Paper Sensification SCWS
Maravedis-Rethink:White Paper Sensification SCWSMaravedis-Rethink:White Paper Sensification SCWS
Maravedis-Rethink:White Paper Sensification SCWSWi-Fi 360
 
06 - IDNOG04 - Dion Leung (Coriant) - Emerging Trends & Real Deployments for ...
06 - IDNOG04 - Dion Leung (Coriant) - Emerging Trends & Real Deployments for ...06 - IDNOG04 - Dion Leung (Coriant) - Emerging Trends & Real Deployments for ...
06 - IDNOG04 - Dion Leung (Coriant) - Emerging Trends & Real Deployments for ...Indonesia Network Operators Group
 
QoS-aware scheduling in LTE-A networks with SDN control
QoS-aware scheduling in LTE-A networks with SDN controlQoS-aware scheduling in LTE-A networks with SDN control
QoS-aware scheduling in LTE-A networks with SDN controlUniversity of Piraeus
 
CLOUD RAN- Benefits of Centralization and Virtualization
CLOUD RAN- Benefits of Centralization and VirtualizationCLOUD RAN- Benefits of Centralization and Virtualization
CLOUD RAN- Benefits of Centralization and VirtualizationAricent
 

Similar to Ferc1000 march (20)

Lidar Technology_ Unlocking Greater Accuracy and Precision in Utility Operati...
Lidar Technology_ Unlocking Greater Accuracy and Precision in Utility Operati...Lidar Technology_ Unlocking Greater Accuracy and Precision in Utility Operati...
Lidar Technology_ Unlocking Greater Accuracy and Precision in Utility Operati...
 
A Case Study on Ip Based Cdma Ran by Controlling Router
A Case Study on Ip Based Cdma Ran by Controlling RouterA Case Study on Ip Based Cdma Ran by Controlling Router
A Case Study on Ip Based Cdma Ran by Controlling Router
 
IRJET- Design and Analysis of Passive Multi-Static Radar System
IRJET-  	  Design and Analysis of Passive Multi-Static Radar SystemIRJET-  	  Design and Analysis of Passive Multi-Static Radar System
IRJET- Design and Analysis of Passive Multi-Static Radar System
 
Civilizing the Network Lifespan of Manets Through Cooperative Mac Protocol Me...
Civilizing the Network Lifespan of Manets Through Cooperative Mac Protocol Me...Civilizing the Network Lifespan of Manets Through Cooperative Mac Protocol Me...
Civilizing the Network Lifespan of Manets Through Cooperative Mac Protocol Me...
 
Smart Grids:Enterprise GIS For Distribution Loss Reduction in Electric Utilit...
Smart Grids:Enterprise GIS For Distribution Loss Reduction in Electric Utilit...Smart Grids:Enterprise GIS For Distribution Loss Reduction in Electric Utilit...
Smart Grids:Enterprise GIS For Distribution Loss Reduction in Electric Utilit...
 
The Advanced Distribution Management System (ADMS)
The Advanced Distribution Management System (ADMS)The Advanced Distribution Management System (ADMS)
The Advanced Distribution Management System (ADMS)
 
Smart energy summit 2019
Smart energy summit 2019Smart energy summit 2019
Smart energy summit 2019
 
Impact of dynamic demand response in the load frequency control
Impact of dynamic demand response in the load frequency controlImpact of dynamic demand response in the load frequency control
Impact of dynamic demand response in the load frequency control
 
R-APDRP (Restructured Accelerated Power Development And Reforms Programme)
R-APDRP (Restructured Accelerated Power Development And Reforms Programme)R-APDRP (Restructured Accelerated Power Development And Reforms Programme)
R-APDRP (Restructured Accelerated Power Development And Reforms Programme)
 
White paper on Why Power Line Communication is the best fit for AMI In india
White paper on Why Power Line Communication is the best fit for AMI In indiaWhite paper on Why Power Line Communication is the best fit for AMI In india
White paper on Why Power Line Communication is the best fit for AMI In india
 
White Paper: Dynamic TDD for LTE-a (eIMTA) and 5G
White Paper: Dynamic TDD for LTE-a (eIMTA) and 5GWhite Paper: Dynamic TDD for LTE-a (eIMTA) and 5G
White Paper: Dynamic TDD for LTE-a (eIMTA) and 5G
 
Proptotype radio network
Proptotype radio networkProptotype radio network
Proptotype radio network
 
Comparison of routing protocols with performance parameters for different num...
Comparison of routing protocols with performance parameters for different num...Comparison of routing protocols with performance parameters for different num...
Comparison of routing protocols with performance parameters for different num...
 
ENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSN
ENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSNENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSN
ENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSN
 
ENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSN
ENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSNENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSN
ENERGY EFFICIENT DIRECTION BASED ROUTING PROTOCOL FOR WSN
 
Maravedis-Rethink:White Paper Sensification SCWS
Maravedis-Rethink:White Paper Sensification SCWSMaravedis-Rethink:White Paper Sensification SCWS
Maravedis-Rethink:White Paper Sensification SCWS
 
06 - IDNOG04 - Dion Leung (Coriant) - Emerging Trends & Real Deployments for ...
06 - IDNOG04 - Dion Leung (Coriant) - Emerging Trends & Real Deployments for ...06 - IDNOG04 - Dion Leung (Coriant) - Emerging Trends & Real Deployments for ...
06 - IDNOG04 - Dion Leung (Coriant) - Emerging Trends & Real Deployments for ...
 
Software Defined Networking – Virtualization of Traffic Engineering
Software Defined Networking – Virtualization of Traffic EngineeringSoftware Defined Networking – Virtualization of Traffic Engineering
Software Defined Networking – Virtualization of Traffic Engineering
 
QoS-aware scheduling in LTE-A networks with SDN control
QoS-aware scheduling in LTE-A networks with SDN controlQoS-aware scheduling in LTE-A networks with SDN control
QoS-aware scheduling in LTE-A networks with SDN control
 
CLOUD RAN- Benefits of Centralization and Virtualization
CLOUD RAN- Benefits of Centralization and VirtualizationCLOUD RAN- Benefits of Centralization and Virtualization
CLOUD RAN- Benefits of Centralization and Virtualization
 

More from Lindsey-USA Transmission and Manufacturing Co.

More from Lindsey-USA Transmission and Manufacturing Co. (16)

Distribution Rollers Multi Conductor
Distribution Rollers Multi ConductorDistribution Rollers Multi Conductor
Distribution Rollers Multi Conductor
 
Distribution Specialty Stringing Rollers
Distribution Specialty Stringing Rollers Distribution Specialty Stringing Rollers
Distribution Specialty Stringing Rollers
 
Distributed horizontal Dumping Roller
Distributed horizontal Dumping RollerDistributed horizontal Dumping Roller
Distributed horizontal Dumping Roller
 
Lindsey ERS Questionnaire
Lindsey ERS QuestionnaireLindsey ERS Questionnaire
Lindsey ERS Questionnaire
 
Ers ladwp
Ers ladwpErs ladwp
Ers ladwp
 
Ers public-power
Ers public-powerErs public-power
Ers public-power
 
Pole Line Hardware Fail Safe Bases
Pole Line Hardware Fail Safe BasesPole Line Hardware Fail Safe Bases
Pole Line Hardware Fail Safe Bases
 
Pole Line Hardware Dead End Adapter
Pole Line Hardware Dead End AdapterPole Line Hardware Dead End Adapter
Pole Line Hardware Dead End Adapter
 
Pole Line Hardware
Pole Line HardwarePole Line Hardware
Pole Line Hardware
 
Tie top-vertical-clamps-10-2015
Tie top-vertical-clamps-10-2015Tie top-vertical-clamps-10-2015
Tie top-vertical-clamps-10-2015
 
Dynamic line rating as a means to enhance transmission grid resilience
Dynamic line rating as a means to enhance transmission grid resilienceDynamic line rating as a means to enhance transmission grid resilience
Dynamic line rating as a means to enhance transmission grid resilience
 
Canductors clamps
Canductors clampsCanductors clamps
Canductors clamps
 
Determining Crossing Conductor Clearance Using Line-Mounted LiDAR
 Determining Crossing Conductor Clearance Using Line-Mounted LiDAR  Determining Crossing Conductor Clearance Using Line-Mounted LiDAR
Determining Crossing Conductor Clearance Using Line-Mounted LiDAR
 
07 t 005-ers-public-power
07 t 005-ers-public-power07 t 005-ers-public-power
07 t 005-ers-public-power
 
07 t 002-control-risk
07 t 002-control-risk07 t 002-control-risk
07 t 002-control-risk
 
Dynamic line rating as a means to enhance transmission grid resilience
Dynamic line rating as a means to enhance transmission grid resilienceDynamic line rating as a means to enhance transmission grid resilience
Dynamic line rating as a means to enhance transmission grid resilience
 

Recently uploaded

08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 

Recently uploaded (20)

08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 

Ferc1000 march

  • 1. Copyright © 2016 Lindsey Manufacturing Co. Lindsey, TLM, and SMARTLINE are trade- marks or registered trademarks of Lindsey Manufacturing. www.lindsey-usa.com Publica on Number 11T-002 FERC1000 • March 2016 APPLICATIONS of Dynamic Line Ra ng Increasing Compe veness of FERC 1000 Proposals Inclusion of a Dynamic Line Ra ng (DLR) solu on as part of a FERC 1000 transmission project posi vely impacts compe veness on new line construc on costs, and increases the likelihood of qualifying for incen ve rate treatment. DLR may be of addi onal benefit to incumbent u li es. L L C C Developing a compe ve proposal for a FERC 1000 project is a complex undertaking. Key aspects are the material and construc on cost of the line. DLR, when integral to the line’s design, can offer significant reduc ons in line costs.  Numerous studies, including those by the DOE, show that lines equipped with DLR can regularly carry 10 - 25% more power than their designed sta c ra ng1 .  When DLR is integral to the line’s design, this addi onal capacity can be included. For example, a 1000MW line could be designed at a lower ra ng, for example, 900MW, knowing the addi onal capacity would be available through DLR.  Savings would follow from a variety of sources including the use of a less expensive, smaller conductor. The lighter conductor loads may allow the use of lighter, less expensive line hardware and towers. Lighter towers and conductor loads may extend to less expensive founda ons which may reduce construc on cost and installa on me. I U A Installing DLR proac vely on exis ng lines will provide an incumbent u lity a history of opera onal DLR data and the addi onal capacity iden fied by the DLR deployment. When included in a FERC 1000 proposal this data offers strong ra onale suppor ng the use of the addi onal DLR capacity as a base of the line design. While this logic can be used for any company submi ng a proposal, the incumbent u lity operator may have an advantage of valida ng the addi onal DLR capacity on their own system under the same clima c condi ons that the proposed line may be constructed. Q I R DLR is specifically iden fied in a recent FERC Policy Statement as an advanced technology that would qualify a project for incen ve rate treatment2 . DLR is noted in this Policy Statement as a technology that creates “addi onal incremental capacity without significant construc on.” This approach may be used for rate treatment filings for both the installa on of DLR on exis ng lines and for FERC 1000 projects. W D L R ? Dynamic Line Ra ng, or DLR, is a transmission line’s actual real- me or forecast power carrying capacity based on real- me line behavior and weather condi ons. A line’s DLR is typically 10 - 25% higher than its sta c ra ng. This addi onal capacity provides opportuni es in economic dispatch, trading, opera ons, and conges on mi ga on. Applica on of DLR is also a powerful tool for improving N-1 con ngency planning, cost effec vely addressing lines with slow load growth, and can also defer or eliminate the need for line upgrades or reconductoring. Implemen ng DLR is straigh orward. Installa on of sensors to monitor real- me line behavior is required and so ware which analyzes the collected data to compute the dynamic ra ngs. SMARTLINE® is Lindsey’s next genera on DLR. Compared to other DLR packages, the SMARTLINE DLR and line ra ng forecas ng system is simple to install, easy to integrate into engineering or EMS systems, and provides con nuous line clearance monitoring. 1 “Dynamic Line Ra ng Systems for Transmission Lines: Topical Report,” Smart Grid Demonstra on Program, US DOE, April 25, 2014, page vi 2 “Promo ng Transmission Investment Through Pricing Reform”, FERC Policy Statement 141 FERC ¶ 61,129, November 15, 2012, p15, footnote 28.
  • 2. SMARTLINE is the next genera on dynamic line ra ng (DLR) system providing transmission line operators and RTOs reliable, real- me and forecast, transmission line capacity ra ngs. Unlike conven onal dynamic line ra ng (DLR) methods, SMARTLINE ra ngs are developed by ac vely learning how the conductor behaves with regard to conductor temperature, weather, current, and the conductor’s exact clearance-to-ground. SMARTLINE Dynamic Line Ra ng System LINDSEY TLM® Conductor Monitor The Lindsey TLM®Conductor Monitor provides a complete picture of conductor behavior to SMARTLINE. Data collected includes actual conductor clearance-to-ground through built-in LiDAR, conductor temperature, line current, vibra on, lt and roll. The TLM monitor is an easily installed, self-powered conductor monitoring solu on for system voltages up to 765kV. THREE UNIQUE RATINGS FOR OPERATIONS, TRADING, PLANNING, AND COMPLIANCE SMARTLINE RBR; Reliability Based Ra ng The Reliability Based Ra ng (RBR) is a sta s cally stabilized DLR ra ng and acts as a reduced risk line ra ng alterna ve. SMARTLINE RBR is designed for operators to ensure the transmission line is opera ng over me within both clearance and thermal parameters. Unique to SMARTLINE. SMARTLINE RBF; Reliability Based Forecast SMARTLINE’s Reliability Based Forecast (RBF) ra ngs are SMARTLINE RBR line capacity ra ngs adjusted for forecasted future weather condi ons. Available for any meframe for which weather forecasts are available, SMARTLINE RBF ra ngs are tailored to address energy dispatch and trading needs. SMARTLINE DLR; Dynamic Line Ra ng SMARTLINE DLR provides a line’s maximum instantaneous current carrying capacity while ensuring clearance requirements are not violated, and elimina ng risk of conductor thermal damage. SMARTLINE DLR is the heart of SMARTLINE RBR and RBF ra ngs. Clearance enhanced DLR is unique to SMARTLINE. MEANINGFUL AND RELIABLE DATA  Uses con nuous direct LiDAR measurement of conductor clearance-to-ground.  U lizes only directly measured conductor data, unlike other DLR systems which interpolate values from look-up tables, relying on data such as vibra on to infer cri cal span sag.  Ensures dependable data feed even in remote loca ons via simple and reliable satellite or mesh radio communica ons. SIMPLE INSTALLATION  Fast, live line installa on. No line outage or dead-end structure modifica ons required.  Suitable for installa on on lines up to 765kV.  Suitable for single and bundled conductors. SIMPLE INTERPRETATION Tradi onal DLR systems produce a graph of a transmission line’s instantaneous power ra ng. By nature, this changes constantly, appears quite erra c, and is difficult to interpret for real- me opera on. SMARTLINE eliminates the variability and provides power line capacity readings that are easy to interpret and act upon in the control room, on the trading floor, or an engineer’s desk.